Shallow Utilities Joint Provisioning Guidelines for Residential Areas in the City of Calgary

Similar documents
If a new residence s electrical service is not located within 200 feet of existing

ENMAX POWER CORPORATION. Requirements for Distribution Wires Access

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

[Type text] Heber Light & Power. Developers & Excavators. Electrical Service Requirements Manual

20 North Main Alpine, UT (Phone) (Fax) SITE PLAN

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.

Gas meter clearances and service installation requirements

Gainesville Technical Center 5399 Wellington Branch Drive Gainesville VA Phone (703)

Gainesville Technical Center 5399 Wellington Branch Drive Gainesville VA Phone (703)

Thank you for your interest in natural gas. We appreciate the opportunity to serve you.

Application for Commercial Plan Review and Building Permit. Address:

Residential Engineering P.O. Box 430 Memphis, TN (Deliveries at 5791 Summer Trees Memphis, TN 38134) (901) / (901) Fax

Underground Residential Distribution (Specifications for Installation) PES March 2008 Spec 11

Section 2: Underground

Underground Conduit Systems

General Rules and Regulations

Beaumont Lot Grading Guidelines

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

Electric Service Handbook

Developer s Guide To Turnkey Subdivisions The Saskatchewan Turnkey Program

ATTACHED/DETACHED GARAGE BUILDING PERMIT APPLICATION

Chapter 3: Permit Procedures and Requirements

Index. Composition and Order of Plan Set. Utility Plan... 5

Equipment Guide shorten restoration times underground

SWIMMING POOL PERMIT AND INSPECTION REQUIREMENTS

Specifications for Electrical Underground Residential Distribution Systems

Merrimac Municipal Light Department. Commercial Developments Policy

Two complete sets of plans that are legible and drawn to conventional scale are required to be submitted with the Building Permit Application Form.

Electric Service Handbook

INSPECTION AND ACCEPTANCE FOR MAINTENANCE

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT NON-NETWORK SYSTEMS SECTION

SECTION PROTECTION AND RESTORATION OF EXISTING FACILITIES

1420 Miner Street Des Plaines, IL P: desplaines.org COMMERCIAL STRUCTURES (INCLUDING ALTERATIONS AND ADDITIONS)

MEMPHIS LIGHT, GAS, AND WATER DIVISION Application for Utility Services for Residential Ranchette Developments (Lots of four acres or more)

TEMPORARY FACILITIES

INSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST

VOLUME 15 Section 6: Gas Metering Guidelines

EXPRESS PERMIT INFORMATION

T a b l e o f C o n t e n t s

Huntsville Utilities Underground Residential Service Requirements

Water Services Guidelines

Tucson Electric Power Company Rules and Regulations

Post Office Box 500 Carson, WA Phone (509) Fax (509) Toll Free (800)

SPECIAL SPECIFICATION 6664 Level (3) Communications System

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK

COTTONWOOD IMPROVEMENT DISTRICT SALT LAKE COUNTY SERVICE AREA #3 SOLITUDE IMPROVEMENT DISTRICT TOWN OF ALTA WATERSHED SERVICE LINE SPECIFICATIONS

SPECIAL SPECIFICATION 6658 Time Warner Communications System

The installation of natural gas facilities involves two phases: 1. Underground Facilities (Main, Service, & Riser) 2. Meter Set

SPECIAL SPECIFICATION 6666 Charter Communications System

Construction Requirements for Installation of Utilities in the Public Right-of-way of McPherson County, Kansas October 2011

8 WATER DISTRIBUTION FACILITIES

Applying for a Kinder Morgan Cochin Canada / UTOPIA Canada Proximity & Crossing Permit. Design and Construction Guidelines

SECTION 13 WATER SYSTEMS

Please check with your local inspection authority for any additional requirements before installation.

DEVELOPMENT PERMIT APPLICATION COMMERCIAL

CITY OF LETHBRIDGE INFRASTRUCTURE SERVICES DEPT. CONSULTING ENGINEER S LAND DEVELOPMENT FIELD SERVICES GUIDELINES

SECTION VI POTABLE WATER, RECYCLED WATER, AND SANITARY SEWER SYSTEM FACILITY CONSTRUCTION

Electric Engineering Division RESIDENTIAL CONDUIT RULES AND REGULATION. S:\COO_ACM_US_Electric_Telecommunications\COO_ET_Engineering\Conduit Policies

PHILADELPHIA GAS WORKS SPECIFICATION BOOK For Common Trenching For Natural Gas Mains and Services

ENBRIDGE GAS DISTRIBUTION METER BOX. Builder Installation Requirements February 2018

SPRINKLER SYSTEM Job Ready Checklist

SECTION 400 SANITARY SEWER SYSTEM

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

Please Complete and Return the Required Forms:

City of St. Catharines Standard Drawings JULY Revised July 21, 2017 TES-ENG (SH)

MEMPHIS LIGHT, GAS AND WATER DIVISION Application for Utility Services for Apartment Complexes

RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS

New Construction Handbook

SECTION FACILITY SANITARY SEWERS

SALEM CITY POWER ELECTRICAL REQUIREMENTS & STANDARDS MANUAL

Application Requirements for obtaining a Building Permit

3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES

I. STREET CONSTRUCTION AND RECONSTRUCTION

REQUEST FOR ELECTRIC SERVICE Residential

C. Foundation stabilization for pipe and utility structures.

CHAPTER 5 WATER SYSTEM DESIGN STANDARDS

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

Amendments to the January 2016 Design Criteria Manual & Supplementary Master Municipal Construction Documents

SPECIFICATIONS FOR STRUCTURAL EXCAVATION

SECTION MAINTENANCE OF EXISTING CONDITIONS

PENNSYLVANIA STANDARDS FOR RESIDENTIAL SITE DEVELOPMENT: APRIL 2007 CHAPTER 8: OTHER UTILITIES

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

UNDERGROUND SERVICES - GENERAL SERVICE AND MULTI-UNIT RESIDENTIAL

Review of Changes to the 2012 IPC. Chapter 3 Standard Plumbing Code General Regulations. Next Page

PART V - STORM DRAIN DESIGN CRITERIA

PART V - STORM DRAIN DESIGN CRITERIA

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

ZONING CLEARANCE PERMIT APPLICATION

MEMPHIS LIGHT, GAS AND WATER DIVISION Application for Utility Services for Apartment Complexes in the Network Area

$ Plan Review Fee when Permit Application is submitted SHED BUILDING PERMIT APPLICATION. Application Date / /

City of Westerville Guide to Commercial Inspections

DISTRICT OF HOPE SUPPLEMENTARY SPECIFICATIONS

ATTACHMENT 4. New Eastside Regional Park Phase 1. BIM (Building Information Modeling) 3D Design & Modeling Program Requirements

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

CHAPTER 2. Restricted Residential ½ Street** Design Speed 25 MPH 25 MPH 25 MPH 25 MPH 40 MPH 50 MPH 55 MPH

Klickitat County. On-Site Sewage System. Construction Manual

East Manawa Porous Paving Project Council Bluffs, Iowa. Project Location. Phase 1 Project Location 9/2/2011

Transcription:

Shallow Utilities Joint Provisioning Guidelines for Residential Areas in the City of Calgary Prepared by the Calgary Shallow Utilities Consortium March, 2016 Page 1 of 11

AN INFORMATION GUIDE This guide documents the Joint Provisioning Guidelines for Standard Shallow Utility Servicing in Residential Areas in the City of Calgary. ENMAX Power Corporation, ATCO Gas, Shaw Communications and TELUS Communications operate in a Consortium relationship to install their shallow utility infrastructure in a common trench. This relationship is referred to as the Calgary Shallow Utilities Consortium. The common trench process is used to provide shallow utility services to single family and semi-detached dwellings in almost all new subdivisions. This shallow utilities infrastructure is referred to as Underground Residential Distribution (URD) infrastructure. This guide provides guidelines for developers and home builders regarding the provisioning of the shallow utilities infrastructure. It provides information regarding: Who is responsible for what The process Typical 2.4 m main trench configuration (most common URD configuration) Service trench configuration Utility wall configurations Minimum clearances of the gas meter and pressure regulator from windows, vents, air intakes and other building openings CONTACT For more information, contact: Bruce Littke Executive Director Calgary Shallow Utilities Consortium 403-514-2070 blittke@enmax.com March, 2016 Page 2 of 11

PROJECT MANAGEMENT The four shallow utilities have entered into an agreement with ENMAX Power Services Corporation (EPSC) to provide project management services to the Shallow Utilities Consortium. EPSC is designated as the joint trench project manager responsible for carrying out the URD joint trench construction work on behalf of the shallow utilities. EPSC currently contracts the survey, construction and civil inspection activities to subcontractors. JOINT PROVISIONING BENEFITS For the Utilities: Improved safety Reduced installation cost Reduction in facility damages during initial construction and installation More accurate facility locates For Developers and Home Builders: Faster service Greater flexibility Single point of contact to arrange for shallow utility construction and servicing For the City of Calgary: Reduced space requirements for shallow utilities infrastructure Single point of contact for shallow utilities issues March, 2016 Page 3 of 11

DEVELOPER INFORMATION To start the URD provisioning process, the Developer or Developer s Consultant provides a design request for shallow utilities service to each of the shallow utilities, as well as to EPSC. The following information is to be included in the design request: Tentative legal plans A digital copy of the project base plan in AutoCAD (.DWG) format, Version 2004 or 2007 Sanitary sewer, storm sewer and water plans Sidewalk cover sheet (surface improvements) Overland drainage plan Shallow utilities plan Driveway plan Grade plan, including water service valve locations Indication of the size of the electrical services (100A or 200A) and Indication of extra electrical coil length where required (if more than 25m) Proposed in-service date for energization and/or proposed shallow utility construction start date A SharePoint site has been established to manage all URD projects in the City of Calgary. The site contains a swim lane process, and is used by all Developers, Consultants and Shallow Utilities. Once the initial design request has been provided to the shallow utilities and EPSC, all future plans and project information are shared via the site, and are no longer shared via email. After receiving the initial design request, EPSC will set up a project and associated access permissions on the SharePoint site. EPSC and the shallow utilities will have access to all projects, while Developers and Consultants will have access to their unique projects. Once a project has been established, there are 9 KPI milestones, with responsibilities assigned to shallow utilities, developers and EPSC. Timelines have been established for each milestone, with the intent that a project will be ready for construction within 32 weeks from project initiation, provided each party completes each milestone on or before the due date. The SharePoint site is located at https://projects.4partyurd.org/. Developers and Consultants can obtain a SharePoint user ID by contacting EPSC at 403-514-1526. March, 2016 Page 4 of 11

PROJECT & SITE READY DATE The project is ready for construction of the shallow utility infrastructure when the following criteria are met: Developer s Consultant has approved all shallow utility final designs, and the plans have been received by the joint trench City Utility Line Assignment has provided their approval Deep services are completed Site is within 150mm of final grade, and the shallow utility line assignments are clear of obstructions Developer s Consultant requests start (option of shallow utility construction before or after surface improvements) Developer has met all required shallow utility financial obligations Any significant Developer-initiated revisions to the approved final shallow utility designs will be chargeable to the Developer, and will result in the project going back to the swim lane process. This will result in project delays. In the event that frozen ground conditions are encountered, the Developer is required to provide the equivalent of frostfree conditions for the installation of the shallow utility infrastructure, or pay a frost surcharge. CONSTRUCTION OBJECTIVES It is expected that the construction of the shallow utility (mains) infrastructure will be completed within a six-week window after the project site ready date. Timing is dependent upon a number of factors, such as the size of the project, number of concurrent projects and weather conditions, among others. Shallow utility construction occurs most expediently when housing starts do not take place until after shallow utility construction. Housing starts can result in a reduction in construction productivity and the potential for increased safety risks. To minimize the productivity and safety impact on shallow utility construction, the Developer and Home Builders are to attend mandatory joint coordination meetings that will be scheduled and led by EPSC, when housing starts are expected to occur prior to the completion of shallow utilities construction. (See UDI Information Bulletin 100) In addition, the Developer is responsible for any incremental costs caused by building starts, obstructions in the utility rights-of-way, etc. March, 2016 Page 5 of 11

URD SERVICE TRENCH STANDARDS & RESPONSIBILITES Service Trench Standards Minimum depth of 1 metre below grade level from the service stub out to the foundation excavation, then angled down to the foundation footing level. This reduces the risk of service line breaks due to ground settlement. The EPC electric cables are to be placed in rigid conduit with a minimum diameter of 2 inches. The Shaw/TELUS communications/data cables are to be placed in rigid conduit with a minimum diameter of ¾ inches. The gas line will be placed in a ¾ inch sleeve (26.7 mm o.d.). All conduits and sleeve are to rest on the foundation footings at the point where the vertical risers extend to the meter or service connection locations Conduits are to be sealed at the easement end, and vented at the house A minimum 30 cm separation is maintained between the gas line and the cables from the stub out location at the edge of the easement up to the base of the foundation; the conduits may be bundled together along the foundation for added strength and protection Service trench is to be backfilled with clean fill to grade level. The backfilled trench must be kept free of debris. Service Trench Responsibilities Builder s contractor excavates the service trench from the house to the service stub-out at the easement Builder s electrical contractor installs the electric and TELUS conduits, and installs the electric cable in the electric conduit TELUS installs the TELUS cables inside the TELUS duct Shaw s contractor installs the Shaw conduit and cables ATCO Gas contractor installs the sleeved gas line facility Builder s contractor backfills the service trench Service Connection Responsibilities ENMAX crew installs the electrical meter and energizes the service ATCO Gas contractor installs the gas meter TELUS crew installs the TELUS service connection SHAW crew installs the Shaw service connection March, 2016 Page 6 of 11

URD Main Trench Joint Provisioning Process Design Scheduling Construction Administration Developer submits subdivision plans to shallow utilities confirms project site ready date conducts pre-construction meeting receives Construction Contractor invoice Shallow utility planners send designs / quotes to Developer schedules construction work Construction Contractor completes trench construction allocates costs to the utilities No Developer approves designs / quotes To Construction Process Construction Contractor completes utility facility placement pays Construction Contractor Yes Utilities issue work packages to the conducts post-construction meeting issues invoices to the Utilities and Developer To Administration Process March, 2016 Page 7 of 11

March, 2016 Page 8 of 11

March, 2016 Page 9 of 11

March, 2016 Page 10 of 11

T S P Meters & Service Connections G Gas Line Foundation Excavation Service Stubs Bundled Conduits Resting on the Foundation Footings Electric, Communications/Data Cables Front Lot Service Trench Configuration (Down to Footings) March, 2016 Page 11 of 11