C. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified testing agency, for each product.

Similar documents
GOWANDA, NEW YORK SEPTEMBER 18, 2008 ARCH PROJECT NO

A. Source Limitations: Obtain each type of building insulation through one source.

RAMAPO COLLEGE OF NEW JERSEY PHASE II HOUSING REHABILITATION #05-221C 2012

Recommended Design Considerations. and. Guide Specifications For. Commercial Building Insulation

Copyright 2014 AIA MasterSpec Premium 06/14 PRODUCT MASTERSPEC LICENSED BY ARCOM TO ATLAS EPS.

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION DUCT INSULATION

EcoTouch Insulation with PureFiber Technology

REPORT HOLDER: THE DOW CHEMICAL COMPANY 1501 LARKIN CENTER DRIVE MIDLAND, MICHIGAN EVALUATION SUBJECT:

SECTION REFLECTIVE-FACED, MASONRY CAVITY WALL INSULATION

SECTION PRE-ENGINEERED BUILDING INSULATION

SECTION ACOUSTICAL PANEL CEILINGS

COOK COUNTY ILLINOIS CONTRACT FOR WORK DOCUMENT NO Countywide Warehouse and Records Storage Center Hawthorne Project TKB No.

Chevy Chase Club June 30, 2008 Bowie Gridley Architects SECTION GYPSUM BOARD SHAFT WALL ASSEMBLIES

Short Form Guide Specification. STYROFOAM CAVITYMATE Ultra Air Barrier Wall System

1. Division 23 Section "Hangers and Supports for HVAC Piping and Equipment" for pipe insulation shields and protection saddles.

SECTION GYPSUM BOARD

PRESTON HEALTH SERVICES ARCHITECT'S NO. 2700

ICC-ES Evaluation Report Reissued May 1, 2010 This report is subject to re-examination in two years.

A. This Section includes acoustical panel ceilings installed with exposed suspension systems.

INSULATION OWENS CORNING INSULATION PRODUCTS IN THIS SECTION:

Gold Bond BRAND Gypsum Sheathing

FIBER GLASS INSULATION. Thermal. Acoustical. Fire Resistant. Moisture Control. Recycled Content. Formaldehyde-free. Air Control FIBER GLASS INSULATION

1. Interior gypsum wallboard. 2. Exterior gypsum board panels for ceilings and soffits. 3. Tile backing panels.

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

SECTION HVAC INSULATION

ONE SCHOOL STREET SEPTEMBER 18, 2008 GOWANDA, NEW YORK ARCH PROJECT NO

EXCEL Medical Waste - Equipment Installation Section SECTION GYPSUM BOARD

Residential Building Inspections

SECTION BUILDING INSULATION. Display hidden notes to specifier. (Don't know how? Click Here)

Design & Construction Standards, Revised January

SECTION SHEET MEMBRANE WATERPROOFING AND CRACK ISOLATION

Thermasheath -3. Insulation for the Building Envelope ROOF WALL SPECIALTY

Thermasheath-XP. Insulation for Exposed Use

CONTRACT NUMBER: W912DQ-08-C % CORRECTED DESIGN 28 JULY 2008

Johns Manville MinWool Water & Fire Block Mineral Wool Insulation

Union County Vocational - Technical Schools Scotch Plains, New Jersey

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

SECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION 07530CP EPDM MEMBRANE ROOFING

A. This Section includes ceilings consisting of acoustical panels and exposed suspension systems.

SECTION ACOUSTICAL PANEL CEILINGS. A. Section includes acoustical panels and exposed suspension systems for ceilings.

OptiLiner Banded Liner System, Thermal, Metal Building

Fire Barrier Duct Wrap 615+

Trusted ICC ES DIVISION: ATLANTA, CGF PRO, ENERGYS. Look. Conformity! Evaluation. ICC-ES Evaluation

TSX Insulation for Exposed Use ROOF WALL SPECIALTY

Alply CLASSIC WALL Architectural Insulated Panel Wall System

Metal Roof Panels

Insulation Board. Knauf Data Sheet PE-DS

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: COMPOSITE WALL PANELS REPORT HOLDER: ARCONIC ARCHITECTURAL PRODUCTS, LLC

Reflective Insulation Specification & Application Guide for Post Frame and Metal Building Construction

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: MINERAL FIBER FIREPROOFING REPORT HOLDER: UNIFRAX I LLC

SECTION SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM

Knauf Data Sheet PE-DS-2e Insulation Board. with ECOSE Technology

SPECIFICATION GUIDELINE

SECTION SHEET MEMBRANE SOUND REDUCTION, CRACK ISOLATION / JOINT BRIDGING, AND WATERPROOFING

This Design guideline contained herein includes the requirements for mechanical insulation at The University of Texas at Austin

University of Delaware

ROCKWOOL Board Insulation Section Master Guide Specification (ROCKBOARD 80) Page 1 January 2017

A. Dimension Lumber: Lumber of 2 inches nominal or greater but less than 5 inches nominal in least dimension.

PROJECT LOCATION SECTION COPPER METAL PLATE WALL PANELS

REPORT HOLDER: JOHNS MANVILLE TH STREET DENVER, COLORADO EVALUATION SUBJECT:

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: DEMILEC (USA) INC.

Magnum Board Section Digicon Information Inc. Page 1

EDGEWATER, FLORIDA JUNE 14, 2010

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: WATER RESISTIVE BARRIERS/WEATHER BARRIERS SECTION: AIR BARRIERS

Thermal/Acoustical Insulation. Data Sheet BI-BT-DS 08-17

REPORT HOLDER: OMEGA PRODUCTS INTERNATIONAL, INC CALIFORNIA AVENUE CORONA, CALIFORNIA EVALUATION SUBJECT:

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: CERTAINTEED CORPORATION

Retain "Preinstallation Conference" Paragraph below if Work of this Section is extensive or complex enough to justify a conference.

E. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage.

B. American Society for Testing and Materials: 1. ASTM F708 - Standard Practice for Design and Installation of Rigid Pipe Hangers.

GypLyner. GypLyner. Metal framed wall lining system. All our systems are covered by SpecSure when using genuine Gyproc and Isover products.

NFPA 285 Compliant Wall Systems and Assemblies

INSTALLATION MANUAL. ZIP System R12 Sheathing. Contents. 07 ZIP System R12 Sheathing Window Installation 08 ZIP System R12 Sheathing Siding Guidelines

SECTION MANUFACTURED ROOF EXPANSION JOINTS

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION SECTION: WATER-RESISTIVE BARRIERS/WEATHER BARRIERS

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping

ESR-1655 Reissued April 2014 This report is subject to renewal April 1, 2016.

ROXUL Blanket (and Batt) Insulation Section Master Guide Specification (AFB) Page 1 April 2015

Air and Vapor Barrier 3015

Acceptable Floor Substrates: Concrete, cured mortar bed, plywood, and backer board.

ESR-2072 Reissued September 1, 2013 This report is subject to renewal September 1, 2015.

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: DEMILEC (USA) LLC

ACOUSTICAL INSULATION (LAGGING) FOR PIPING AND EQUIPMENT

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for LIQUEFIED NATURAL GAS (LNG) CRYOGENIC REFRIGERATION CHILLED WATER

3M Fire Barrier Duct Wrap 615+ Product Data Sheet and Installation Guide (Condensed Version)

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: WATER RESISTIVE BARRIERS/WEATHER BARRIERS SECTION: AIR BARRIERS

Eclipse Energy Guard. Product Information & Installation Manual General Installation Requirements

Tel: Fax:

SECTION RESILIENT SHEET FLOORING

I-STUD Shaftwall System

NATIONAL GYPSUM COMPANY Wood Frame Walls And Ceilings Single- And Double-Layer Construction

Mechanical Insulation for Refrigeration Systems

Redi-Klad 1000 Pipe Insulation

WHY I SHOULD SPECIFY AND USE FAS TRACK 1000?

Repair Maintenance Hangar Phase II August 2010

Page 1 of 5

Transcription:

SECTION 07210 - BUILDING INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section Includes: 1. Foam-plastic board insulation. 2. Glass-fiber blanket insulation. 3. Mineral-wool blanket insulation. 4. Radiant barriers. 5. Vapor retarders. B. Related Sections: 1. Division 4 Section "Unit Masonry Assemblies" for insulation installed in cavity walls and masonry cells. 2. Division 7 Section for insulated drainage panels installed with waterproofing. 3. Division 7 Section(s) for insulation specified as part of roofing construction. 4. Division 7 Section "Fire-Resistive Joint Systems" for insulation installed as part of a perimeter fire-resistive joint system. 5. Division 9 Section(s) Gypsum Board Shaft-Wall Assemblies for installation in metal-framed assemblies of insulation specified by referencing this Section. 1.3 SUBMITTALS A. Product Data: For each type of product indicated. B. LEED Submittals: 1. Product Data for Credit MR 4.1and Credit MR 4.2: For products having recycled content, documentation indicating percentages by weight of postconsumer and preconsumer recycled content. Include statement indicating costs for each product having recycled content. C. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified testing agency, for each product. D. Research/Evaluation Reports: For foam-plastic insulation, from ICC-ES. 1.4 QUALITY ASSURANCE A. Surface-Burning Characteristics: As determined by testing identical products according to ASTM E 84 by a qualified testing agency. Identify products with appropriate markings of applicable testing agency. BUILDING INSULATION 07210-1

1.5 DELIVERY, STORAGE, AND HANDLING A. Protect insulation materials from physical damage and from deterioration due to moisture, soiling, and other sources. Store inside and in a dry location. Comply with manufacturer's written instructions for handling, storing, and protecting during installation. B. Protect foam-plastic board insulation as follows: 1. Do not expose to sunlight except to necessary extent for period of installation and concealment. 2. Protect against ignition at all times. Do not deliver foam-plastic board materials to Project site before installation time. 3. Quickly complete installation and concealment of foam-plastic board insulation in each area of construction. PART 2 - PRODUCTS 2.1 FOAM-PLASTIC BOARD INSULATION A. Extruded-Polystyrene Board Insulation: ASTM C 578, of type and minimum compressive strength indicated below, with maximum flame-spread and smoke-developed indexes of 75 and 450, respectively, per ASTM E 84. 1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. DiversiFoam Products. b. Dow Chemical Company (The). c. Owens Corning. d. Pactiv Building Products. B. Foil-Faced, Polyisocyanurate Board Insulation: ASTM C 1289, Type I, Class 1, with maximum flamespread and smoke-developed indexes of 75 and 450, respectively, per ASTM E 84. 1. Manufacturers: Subject to compliance with requirements, a. Atlas Roofing Corporation. b. Dow Chemical Company (The). c. Rmax, Inc. C. Adhesive for Bonding Insulation: Product with demonstrated capability to bond insulation securely to substrates without damaging insulation and substrates. 2.2 GLASS-FIBER BLANKET INSULATION A. Manufacturers: Subject to compliance with requirements, provide products the following: 1. CertainTeed Corporation. 2. Guardian Building Products, Inc. 3. Johns Manville. 4. Knauf Insulation. 5. Owens Corning. BUILDING INSULATION 07210-2

B. Unfaced, Glass-Fiber Blanket Insulation: ASTM C 665, Type I; with maximum flame-spread and smoke-developed indexes of 25 and 50, respectively, per ASTM E 84; passing ASTM E 136 for combustion characteristics. C. Polypropylene-Scrim-Kraft-Faced, Glass-Fiber Blanket Insulation: ASTM C 665, Type II (non-reflective faced), Class A (faced surface with a flame-spread index of 25 or less); Category 1 (membrane is a vapor barrier). D. Sustainability Requirements: Provide glass-fiber blanket insulation as follows: 1. Free of Formaldehyde: Insulation manufactured with 100 percent acrylic binders and no formaldehyde. 2. Low Emitting: Insulation tested according to ASTM D 5116 and shown to emit less than 0.05- ppm formaldehyde. 2.3 MINERAL-WOOL BLANKET INSULATION A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1. Fibrex Insulations Inc. 2. Owens Corning. 3. Roxul Inc. 4. Thermafiber. B. Unfaced, Mineral-Wool Blanket Insulation: ASTM C 665, Type I (blankets without membrane facing); consisting of fibers; with maximum flame-spread and smoke-developed indexes of 25 and 50, respectively, per ASTM E 84; passing ASTM E 136 for combustion characteristics. C. Reinforced-Foil-Faced, Mineral-Wool Blanket Insulation: ASTM C 665, Type III (reflective faced), Class A (faced surface with a flame-spread index of 25 or less per ASTM E 84); Category 1 (membrane is a vapor barrier), faced with foil scrim, foil-scrim kraft, or foil-scrim polyethylene. 2.4 LOOSE-FILL INSULATION A. Cellulosic-Fiber Loose-Fill Insulation: ASTM C 739, chemically treated for flame-resistance, processing, and handling characteristics. B. Glass-Fiber Loose-Fill Insulation: ASTM C 764, Type II for poured application; with maximum flamespread and smoke-developed indexes of 5, per ASTM E 84. 2.5 VAPOR RETARDERS A. Fire-Retardant, Reinforced-Polyethylene Vapor Retarders: Two outer layers of polyethylene film laminated to an inner reinforcing layer consisting of either nonwoven grid of nylon cord or polyester scrim and weighing not less than 22 lb/1000 sq. ft. (10 kg/100 sq. m), with maximum permeance rating of 0.1317 perm (7.56 ng/pa x s x sq. m) and with flame-spread and smoke-developed indexes of not more than 5 and 60, respectively, per ASTM E 84. a. Raven Industries Inc.; DURA-SKRIM 2FR. b. Reef Industries, Inc.; Griffolyn T-55 FR. BUILDING INSULATION 07210-3

B. Foil-Polyester-Film Vapor Retarders: Two layers of 0.5-mil- (0.013-mm-) thick polyester film laminated to an inner layer of 1-mil- (0.025-mm-) thick aluminum foil, with maximum water-vapor transmission rate in flat condition of 0.0 g/h x sq. m and with maximum flame-spread and smoke-developed indexes of 5, per ASTM E 84. a. Alumiseal Corporation; Zero Perm Vapor Barrier. C. Vapor-Retarder Tape: Pressure-sensitive tape of type recommended by vapor-retarder manufacturer for sealing joints and penetrations in vapor retarder. D. Vapor-Retarder Fasteners: Pancake-head, self-tapping steel drill screws; with fender washers. E. Single-Component Nonsag Urethane Sealant: ASTM C 920, Type I, Grade NS, Class 25, Use NT related to exposure, and Use O related to vapor-barrier-related substrates. F. Adhesive for Vapor Retarders: Product recommended by vapor-retarder manufacturer and has demonstrated capability to bond vapor retarders securely to substrates indicated. 2.6 INSULATION FASTENERS A. Adhesively Attached, Spindle-Type Anchors: Plate welded to projecting spindle; capable of holding insulation of specified thickness securely in position indicated with self-locking washer in place. a. AGM Industries, Inc.; Series T TACTOO Insul-Hangers. b. Gemco; Spindle Type. 2. Plate: Perforated, galvanized carbon-steel sheet, 0.030 inch (0.762 mm) thick by 2 inches (50 mm) square. 3. Spindle: Copper-coated, low-carbon steel; fully annealed; 0.105 inch (2.67 mm) in diameter; length to suit depth of insulation indicated. B. Insulation-Retaining Washers: Self-locking washers formed from 0.016-inch- (0.41-mm-) thick galvanized-steel sheet, with beveled edge for increased stiffness, sized as required to hold insulation securely in place, but not less than 1-1/2 inches (38 mm) square or in diameter. a. AGM Industries, Inc.; RC150, SC150. b. Gemco; Dome-Cap, R-150, S-150. 2. Protect ends with capped self-locking washers incorporating a spring steel insert to ensure permanent retention of cap. C. Insulation Standoff: Spacer fabricated from galvanized mild-steel sheet for fitting over spindle of insulation anchor to maintain air space of 1 inch (25 mm) between face of insulation and substrate to which anchor is attached. a. Gemco; Clutch Clip. BUILDING INSULATION 07210-4

D. Anchor Adhesive: Product with demonstrated capability to bond insulation anchors securely to substrates indicated without damaging insulation, fasteners, and substrates. a. AGM Industries, Inc.; TACTOO Adhesive. b. Gemco; Tuff Bond Hanger Adhesive. PART 3 - EXECUTION 3.1 PREPARATION A. Clean substrates of substances that are harmful to insulation or vapor retarders, including removing projections capable of puncturing vapor retarders, or that interfere with insulation attachment. 3.2 INSTALLATION, GENERAL A. Comply with insulation manufacturer's written instructions applicable to products and applications indicated. B. Install insulation that is undamaged, dry, and unsoiled and that has not been left exposed to ice, rain, or snow at any time. C. Extend insulation to envelop entire area to be insulated. Cut and fit tightly around obstructions and fill voids with insulation. Remove projections that interfere with placement. D. Provide sizes to fit applications indicated and selected from manufacturer's standard thicknesses, widths, and lengths. Apply single layer of insulation units to produce thickness indicated unless multiple layers are otherwise shown or required to make up total thickness. 3.3 INSTALLATION OF BELOW-GRADE INSULATION A. On vertical footing and foundation wall surfaces, set insulation units using manufacturer's recommended adhesive according to manufacturer's written instructions. 1. If not otherwise indicated, extend insulation a minimum of 48 inches below exterior grade line. B. On horizontal surfaces under slabs, loosely lay insulation units according to manufacturer's written instructions. Stagger end joints and tightly abut insulation units. 1. If not otherwise indicated, extend insulation a minimum of 24 inches (610 mm) in from exterior walls. 3.4 INSTALLATION OF CAVITY-WALL INSULATION A. Foam-Plastic Board Insulation: Install pads of adhesive spaced approximately 24 inches (610 mm) o.c. both ways on inside face, and as recommended by manufacturer. Fit courses of insulation between wall ties and other obstructions, with edges butted tightly in both directions. Press units firmly against inside substrates. BUILDING INSULATION 07210-5

1. Supplement adhesive attachment of insulation by securing boards with two-piece wall ties designed for this purpose and specified in Division 4 Section "Unit Masonry Assemblies." 3.5 INSTALLATION OF INSULATION FOR FRAMED CONSTRUCTION A. Apply insulation units to substrates by method indicated, complying with manufacturer's written instructions. If no specific method is indicated, bond units to substrate with adhesive or use mechanical anchorage to provide permanent placement and support of units. B. Foam-Plastic Board Insulation: Seal joints between units by applying adhesive, mastic, or sealant to edges of each unit to form a tight seal as units are shoved into place. Fill voids in completed installation with adhesive, mastic, or sealant as recommended by insulation manufacturer. C. Glass-Fiber Blanket Insulation: Install in cavities formed by framing members according to the following requirements: 1. Use insulation widths and lengths that fill the cavities formed by framing members. If more than one length is required to fill the cavities, provide lengths that will produce a snug fit between ends. 2. Place insulation in cavities formed by framing members to produce a friction fit between edges of insulation and adjoining framing members. 3. Maintain 3-inch (76-mm) clearance of insulation around recessed lighting fixtures not rated for or protected from contact with insulation. 4. For metal-framed wall cavities where cavity heights exceed 96 inches (2438 mm), support unfaced blankets mechanically and support faced blankets by taping flanges of insulation to flanges of metal studs. 5. Vapor-Retarder-Faced Blankets: Tape joints and ruptures in vapor-retarder facings, and seal each continuous area of insulation to ensure airtight installation. a. Exterior Walls: Set units with facing placed toward interior of construction. b. Interior Walls: Set units with facing placed toward areas of high humidity. c. Retain first paragraph below for loose-fill glass-fiber or cellulosic insulation. D. Miscellaneous Voids: Install insulation in miscellaneous voids and cavity spaces where required to prevent gaps in insulation using the following materials: 1. Loose-Fill Insulation: Compact to approximately 40 percent of normal maximum volume equaling a density of approximately 2.5 lb/cu. ft. (40 kg/cu. m). 3.6 INSTALLATION OF INSULATION IN CEILINGS FOR SOUND ATTENUATION A. Where glass-fiber blankets are indicated for sound attenuation above ceilings, install blanket insulation over entire ceiling area in thicknesses indicated. Extend insulation 48 inches (1219 mm) up either side of partitions. 3.7 INSTALLATION OF INSULATION FOR CONCRETE SUBSTRATES A. Install board insulation on concrete substrates by adhesively attached, spindle-type insulation anchors as follows: BUILDING INSULATION 07210-6

1. Fasten insulation anchors to concrete substrates with insulation anchor adhesive according to anchor manufacturer's written instructions. Space anchors according to insulation manufacturer's written instructions for insulation type, thickness, and application indicated. 2. Apply insulation standoffs to each spindle to create cavity width indicated between concrete substrate and insulation. 3. After adhesive has dried, install board insulation by pressing insulation into position over spindles and securing it tightly in place with insulation-retaining washers, taking care not to compress insulation below indicated thickness. 4. Where insulation will not be covered by other building materials, apply capped washers to tips of spindles. 3.8 INSTALLATION OF CURTAIN-WALL INSULATION A. Install board insulation in curtain-wall construction where indicated on Drawings according to curtainwall manufacturer's written instructions. 1. Hold insulation in place by securing metal clips and straps or integral pockets within window frames, spaced at intervals recommended in writing by insulation manufacturer to hold insulation securely in place without touching spandrel glass. Maintain cavity width of dimension indicated between insulation and glass. 2. Install insulation where it contacts perimeter fire-containment system to prevent insulation from bowing under pressure from perimeter fire-containment system. 3.9 INSTALLATION OF VAPOR RETARDERS A. Place vapor retarders on side of construction indicated on Drawings. Extend vapor retarders to extremities of areas to protect from vapor transmission. Secure vapor retarders in place with adhesives or other anchorage system as indicated. Extend vapor retarders to cover miscellaneous voids in insulated substrates, including those filled with loose-fiber insulation. B. Seal vertical joints in vapor retarders over framing by lapping no fewer than two studs. 1. Fasten vapor retarders to wood framing at top, end, and bottom edges; at perimeter of wall openings; and at lap joints. Space fasteners 16 inches (406 mm) o.c. 2. Before installing vapor retarders, apply urethane sealant to flanges of metal framing including runner tracks, metal studs, and framing around door and window openings. Seal overlapping joints in vapor retarders with vapor-retarder tape according to vapor-retarder manufacturer's written instructions. Seal butt joints with vapor-retarder tape. Locate all joints over framing members or other solid substrates. 3. Firmly attach vapor retarders to metal framing and solid substrates with vapor-retarder fasteners as recommended by vapor-retarder manufacturer. C. Seal joints caused by pipes, conduits, electrical boxes, and similar items penetrating vapor retarders with vapor-retarder tape to create an airtight seal between penetrating objects and vapor retarders. D. Repair tears or punctures in vapor retarders immediately before concealment by other work. Cover with vapor-retarder tape or another layer of vapor retarders. 3.10 PROTECTION BUILDING INSULATION 07210-7

A. Protect installed insulation and vapor retarders from damage due to harmful weather exposures, physical abuse, and other causes. Provide temporary coverings or enclosures where insulation is subject to abuse and cannot be concealed and protected by permanent construction immediately after installation. END OF SECTION 07210 BUILDING INSULATION 07210-8