How Construction Contracts Cause Litigation. By: Robert C. Epstein, Esq. 1

Similar documents
Project Owners, especially in the public sector, are. Design-Build and Public-Private Partnerships: Risk Allocation of Subsurface Conditions

The table below sets out the main features of the Yellow and Silver Books and highlight their key differences 1.

Sounds good. What could possibly go wrong? 5/6/2014. Potential Benefits of Design Build. Potential Downsides of Design Build

Choosing Delivery Method

RISK REDUCTION IN DESIGN-BUILD

Richard J. Long, P.E.

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

CONSTRUCTION MANAGEMENT AGREEMENT

Mid-America Intergovernmental Audit Forum. Selecting an External Auditor. Guide for Making a Sound Decision

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

SEMPRA ENERGY. Corporate Governance Guidelines. As adopted by the Board of Directors of Sempra Energy and amended through December 15, 2017

Top 10 Eminent Domain Business Relocation Mistakes

Common Myths and Best Practices. By Gr e g o r y A. Ga r r e t t

Consulting Newsletter

Business Succession Planning Model

Document B101 TM. Standard Form of Agreement Between Owner and Architect

Guidance for Rating Each Performance Category on Contractor Performance Evaluation

Fiduciary Duty of Board of Directors to Oversee Financial Affairs

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

NZS 3916:2013. Conditions of contract for building and civil engineering Design and construct NZS 3916:2013. New Zealand Standard

Purchasing professionals have an ethical responsibility to many groups:

Document B Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition

Construction Family of Documents

Professional Practice 544

Conception Design Construction Operation.

PROBUILD GUIDE SUBCONTRACTOR QUALITY MANAGEMENT. Section Two Project Specific Quality Management Plans. Version No 1.

Project Agreements, Risk Management and Litigation Risk Sean Ralph, General Counsel, Sasol Canada Phil Scheibel, Partner, Rose LLP

Single or multi-sourcing model?

CIPS Exam Report for Learner Community:

Practice Bulletin No

EJCDC Contract Documents for America s Infrastructure Buy online at

AutoGyro Platinum Extra Guarantee

SOSi SUPPLIER CODE OF CONDUCT

Multiple-Prime Top 10 Concerns Especially when

Key information for the year abroad

GENERAL TERMS AND CONDITIONS

Readiness Assessment

A DESIGN-BUILDER'S LOOK AT THE NEW AIA DESIGN-BUILD FAMILY OF DOCUMENTS

AUTODESK, INC. CORPORATE GOVERNANCE GUIDELINES. Adopted December 15, Most Recently Amended December 15, 2016

Coordination of Consultants

IMMUNOGEN, INC. CORPORATE GOVERNANCE GUIDELINES OF THE BOARD OF DIRECTORS

1.1 Purchase orders shall only be legally binding if issued on our order forms and legally signed.

TREE SERVICE STANDARD OF CARE

ECONOMICS COURSE. Preconstruction Operations

Unit: CPC 421 Manage contracts to achieve outcomes (Commissioning, Procurement and Contracting)

BMW Financial Services India

Tips For Managing The In-House And Outside Counsel Relationship. By David F. Johnson

AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES

AIA C-Series Agreements

Forsyth County General Services Department Construction Management Division 201 North Chestnut Street Winston-Salem, NC 27101

Detecting Fraud Through Vendor Audits

Working with roof consultants can be beneficial, but there are

Licensee Design Authority Capability

Philip R. Moncrief, P.E.

Continuing Education Credits

INTERNATIONAL STANDARD ON AUDITING 260 COMMUNICATION WITH THOSE CHARGED WITH GOVERNANCE CONTENTS

BOARD OF DIRECTORS MANDATE

Managing a complaint at work A step-by-step guide

PLEASE NOTE, THESE TERMS APPLY TO RETAIL (CONSUMER) SALES ONLY. IF YOU ARE A BUSINESS CUSTOMER, SEPARATE TERMS WILL APPLY.

BIG LOTS, INC. CODE OF BUSINESS CONDUCT AND ETHICS

STABILITY AND SECURITY IN EMPLOYMENT AND DECENT WORK

SECTION QUALITY REQUIREMENTS

CCMoore Website Consumer Terms and Conditions

BOC HONG KONG (HOLDINGS) LIMITED. Mandate of the Remuneration Committee

TERMS OF REFERENCE OF THE AUDIT COMMITTEE OF THE BOARD OF DIRECTORS

Chapter 9 Department of Supply and Services - Purchasing

Local Governing Bodies Responsibilities. Code of Conduct

We Maintain Accurate Financial Books and Records. We Strive to Comply with All Laws and Regulations. We Maintain the Confidences Entrusted to Us

APB ETHICAL STANDARD 4 (REVISED) FEES, REMUNERATION AND EVALUATION POLICIES, LITIGATION, GIFTS AND HOSPITALITY

Corporate Code of Business Conduct and Ethics

Eastern Michigan University

APPENDIX D Forms for Analytical Delivery Decision Approach (Tier 1)

Fiscal Oversight Fundamentals

Master Document Master Document. Version 4.28, dated December 2017 B-1 Planning Considerations

FIATA MODEL RULES FOR FREIGHT FORWARDING SERVICES

Project Manual For. Lincoln, Alabama. March 11, Owner: McDowell & Associates 128 Heath Road Carrollton, Ga Phone:

AMETEK, Inc. Code of Ethics and Business Conduct

AVOIDING CONLICTS OF INTEREST

Rules for accreditation of providers of proficiency testing/interlaboratory

INTERNSHIP STARTER HANDBOOK For Community Providers

ASSOCIATED BANC-CORP CODE OF BUSINESS CONDUCT AND ETHICS

APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES

Basic Checklist for Drafting Distribution Agreements

Pros & Cons of Outsourcing Employees

MARIANNE E. ROCHE ATTORNEY AT LAW

CODE OF CONDUCT DESCRIPTION PRINCIPLES POLICIES AND DEFINITIONS

CHAPTER 5 INFORMATION TECHNOLOGY SERVICES CONTROLS

International Construction Contracting: Use and Application of the FIDIC Form Contracts and Trends in International Construction Contracting

WSH (Design for Safety) Regulations - An Overview -

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES

Change Order Causation; Who is the Guilty Party?

Construction Contracting Methods. By: Nick Thornsbury Falcon Engineering

HSE information sheet. Policy on working hours offshore. Offshore Information Sheet No. 8/2008

Kootenai County Bar Association CLE Lunch Presentation Employment and Labor Law Updates and Trends November 5, :30-1:00 p.m.

Present Contract Courses on:

TOMPKINS COUNTY CIVIL SERVICE EXAMINATION Inclusion Through Diversity OPEN TO THE PUBLIC

Six Steps to Reduce DSO.

ISSUE CERTIFICATE OF PRACTICAL COMPLETION AND INITIATE HANDOVER TO UNIVERSITY

MAIN THEME FRIDAY 6 JUNE 2008 DISTRIBUTION AND INTERNET. The Impact of Internet on Agency, Distributorship and Franchising Agreements

Recruitment and Selection: Procedure and Guidance

Transcription:

How Construction Contracts Cause Litigation By: Robert C. Epstein, Esq. 1 We live in a litigious society, and construction contributes its fair share of disputes. Conflicts, disputes and claims seem to be an inevitable part of construction projects. But conflicts on construction projects and the resulting delays, disruptions and expense can be minimized. History teaches that, while the parties and projects may change, the types of disputes generated by construction projects do not. Knowing the areas where conflict is likely to arise, and carefully planning to address them, can reduce the risk of conflicts and increase the chances of a successful project. Some of the areas that generate conflicts are as follows: One-Sided Contracts Owner-drafted contracts frequently reflect the mentality that conflict can be avoided by protecting the owner from all possible claims. Such contracts contain exculpatory language, waivers and limitations intended to bar virtually all claims by the contractor. The idea is to protect the owner from all foreseeable and unforeseeable risks by shifting responsibility for those risks to someone else. One-sided contracts, however, may generate as many claims as they prevent. Construction claims principally are caused by: (a) unforeseen or changed project conditions; (b) changes in the work; (c) late provision of drawings, access, permits, equipment or materials; (d) inadequate drawings or specifications; and (e) interference in the work. When commencing construction, contractors justifiably expect that all necessary permits are in place, they will have access to the work, they will receive timely engineering and owner-supplied 1 Epstein is a shareholder at Greenberg Traurig in Florham Park, New Jersey. He co-chairs the firm s national construction law practice. Page 1

information, shop drawings will be promptly reviewed and unexpected conditions or changes will be fairly compensated. Where these expectations are not met, contractors often lose money on a project, prompting claims no matter what the contract provides. In a worst case scenario, severe losses may force a contractor out of business, resulting in a failure to complete the work and the attendant project delays, disruptions and increased costs. Construction disputes are better avoided through a fair allocation of project risks. The guiding principles are that risks should be allocated (a) first, to the party who has direct control over the portion of the construction that creates the risk, (b) second, where no party has direct control, to the party who is best able to protect against an unexpected loss, and (c) where no party has any control, to the owner, who is the party that initiated the construction project and is the ultimate beneficiary of the results. The Project Delivery System The delivery system selected for a project, and the contract structure reflecting that system, can greatly affect the risk of conflicts regarding such fundamental issues as scope, time, money and risk allocation. The traditional single-prime contract for a fixed price between the owner and contractor is the most commonly used and best understood project delivery format. This type of contract, with a clear chain of command, removes all ambiguity regarding which party is responsible for management of the construction work and which is responsible for the design. Driven by market forces, recent decades have seen the use of innovative project delivery systems and contract forms reflecting those systems. Design-build, construction management and fast-track delivery systems often provide economic benefits to the owner. An owner may need an office building by April, a shopping center by June, or a school by September, necessitating Page 2

an alternative delivery approach to meet the owner s needs. Innovative project delivery systems, however, often blur the traditional roles and responsibilities of parties on a construction project. Use of non-traditional project delivery systems increases the risk of misunderstandings, particularly where the scope of work and compensation are changing continuously during the project. For these reasons, the contingencies involved in non-traditional construction approaches are greater than in the traditional single prime contract approach. The Design An incomplete, inaccurate or poorly coordinated design inevitably will produce a project with conflicts, unanticipated costs and delays. Conversely, nothing diminishes the risk of conflict, and provides more protection for the owner, more than an accurate and complete design. To avoid project conflicts and disputes, owners should take measures to assure that the project plans are as complete and error-free as possible, such as by having the plans peer reviewed by independent designers and evaluated for constructability by a qualified contractor. Site Conditions Views differ on whether, and to what extent, a contract should provide additional compensation for differing site conditions. Some form contracts (such as the federal and American Institute of Architects standard general conditions) include a differing site conditions clause which entitles the contractor to additional compensation for unexpected subsurface conditions meeting certain criteria. Some owners (public and private) model their contracts on these forms. Other owners utilize contracts that are silent on the issue, or expressly prohibit recovery for differing site conditions while placing all of the risk of the unknown on the contractor. Page 3

The assurance of equitable compensation for differing site conditions encourages prudent contractors to submit lower bids that do not include contingencies for unknown conditions. Just as importantly, a differing site conditions clause helps protect prudent contractors against being underbid by competitors who are either too careless or too reckless to include such a contingency. Because hidden conditions can make the difference between a profitable contract and a financial disaster, contractors often insist on an equitable adjustment clause before submitting a bid on a job with significant risk of differing site conditions. No matter which approach is taken, the wise owner will perform a thorough subsurface investigation so that as much as possible is known about the site. That information should be shared with the contractor. Reliable structural engineering and design, and realistic pricing by the contractor, cannot be generated in the absence of such knowledge. A thorough exploratory program by a competent engineering firm will diminish misunderstandings and disputes resulting from extra work and foundation failures when unforeseen site conditions are discovered. Oversight of Construction The prudent owner will keep a close eye on the progress of construction to head off problems or conflicts which may be brewing in the field. The owner generally has no contractual obligation to inspect or monitor construction; rather, the contractor has the obligation to provide its work in accordance with the plans and specifications, and free from defect. Nevertheless, the careful owner will monitor construction through on-site representatives who act as the owner s eyes and ears. That representative may be from the architect s office or it may be a permanent employee of an owner who is experienced in construction. Unfortunately, some owners, even on large projects, attempt to avoid overhead costs by cutting corners here. Even if an owner ultimately proves that the contractor made a bad pour or Page 4

connected the steel improperly, it is infinitely better that the defect be discovered early rather than well into the construction stage, where litigation is usually the result. By regularly reviewing construction activities using a variety of methods, an owner improves the chances of uncovering conflicts, reducing unexpected change orders, detecting potential design errors, revealing poor construction practices and avoiding project delays. Contractor Submittals The shop drawing process seeks to avoid failures and misunderstandings by allowing the contractor to demonstrate the detailed application of the architect s or engineer s design. The process of shop drawing submittal and review is intended to be a dialogue between the designer and builders concerning the details of construction. It is here that the owner, contractor and designers have the best opportunity to avoid non-conforming or defective work. To avoid problems, the owner should make sure that the contractor and designers each carry out their unique responsibilities for shop drawing review. The purpose shop drawing review by the contractor is to coordinate the trades and verify that the project can be built. The designers review the shop drawings to ensure that the proposed construction scheme meets the design intent for the completed structure. Failure by either to properly perform these duties increases the risk of project conflicts, defects and problems. Conclusion The areas discussed above, if given proper attention, present opportunities to reduce conflict on construction projects. Knowing where conflicts are likely to arise, and carefully planning to address those areas, can reduce the risk of conflict and therefore increase the chance of a successful project for all concerned. Page 5