SCOPE OF WORK Contract of Work involving (A) Preparation /testing of Bag samples &sundry jobs (B) Supply of Samples to Labs

Similar documents
SCOPE OF WORK. Contract of OPERATION OF NFL BIOFERTILIZERPLANTVIJAIPUR Scope of work shall include but not limited to the followings: -

The data for the period, April 2016 September 2016, is enclosed at Annexure III (1 nos. of pages)

Energy Saving Efforts in Indian Ammonia Urea Plants

CO 2. Recovery AND PRODUCTION

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT GENERAL ADMINISTRATION ADMINISTRATIVE CODE

OF WORK TO BE DONE BY CONTRACTOR

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

ENERGY CONSERVATION MEASURES AT NATIONAL FERTILIZERS LIMITED, VIJAIPUR

SYNTHETIC NATURAL GAS PLANT. Philadelphia, PA

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018)

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

INSTALLATION OF NEW FURNACE CALCINER 2

18 th National Award for Excellence in Energy Management

ENERGY CONSERVATION EFFORTS AT NATIONAL FERTILIZERS LIMITED, VIJAIPUR

Item Hydrogen Gas Plant

EFFECTIVE WAY TO BOOST YOUR UREA PLANT CAPACITY - REVAMPING OF FERTIL UNIT

WSA-DC NEXT GENERATION TOPSØE WSA TECHNOLOGY FOR STRONGER SO 2 GASES AND VERY HIGH CONVERSION. Helge Rosenberg Haldor Topsoe

FORM-V (See Rule - 14) Part-A

Gas Dehydration Field Manual

CANADIAN NATURAL RESOURCES LIMITED (the Corporation ) Charter of the Nominating, Governance and Risk Committee of the Board of Directors

Report No. 32 HYDROGEN. December A private report by the PROCESS ECONOMICS PROGRAM STANFORD RESEARCH INSTITUTE PARK, CALIFORNIA

SOP-C-130 Determination of Total Solids and Percent Solids

Report No. 7 CAPROLACTAM PART II. November A private report by the PROCESS ECONOMICS PROGRAM STANFORD RESEARCH INSTITUTE MENLO PARK, CALIFORNIA

Process Economics Program

Cement Manufacturing Company Ltd. Page 1

Charter for Water Recycling & Pollution Prevention in Pulp & Paper Industries. (Specific to Ganga River Basin States)

Control System Objective

4.0 HYDROGEN GENERATION UNIT (PREP) 4.1 INTRODUCTION

JOB DESCRIPTION ORGANISATION STRUCTURE GSM. Position Title Warehouse Co-Ordinator Department Soft Services

AMINO ACIDS PROCESS ECONOMICS PROGRAM. Report No by WING S. FONG. Contributions by Victor E. Althouse. November A private report by the

Efficient Technologies for Down Stream Gasification Process and Integration with IGCC Power Production

Contents. Preface to the Third Edition Preface to the Fourth Edition. Part I Air Pollution Essentials

HYDROGEN UNIT CHAPTER-7 NORMAL OPERATION

Borregaard Case Study. Sarpsborg I & II

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

THE NATIONAL PENSIONS FUND

Environmental, Health and Safety Policy for Contractors

INDONESIA. (Summary of contents based on unofficial translation)

Annual maintenance of Afforestation works in van-vihar area. (B) Same item No. 7, but in disintegrated rock(copra) CUM 60.

2.0 HYDROGEN GENERATION UNIT 2.1 INTRODUCTION

Integrated processes for converting coal to chemicals and fuels. Maninder Jit Singh Haldor Topsøe

MORSES CLUB PLC ( MCL or the Company ) REMUNERATION and CORPORATE SOCIAL RESPONSIBILITY COMMITTEE ( RemCo or the Committee ) TERMS OF REFERENCE

Global Water Instrumentation, Inc.

ECONOMICS STANDARD XII (ISC) Chapter 8: Cost and Revenue Analysis

Comparison of synthesis gas generation concepts for capacity enlargement of ammonia plants

Boiler cleaning. 2.4 The above job can be split in two or more contractors at the sole descretion of NFL.

31. POLLUTION CONTROL COMMITTEE

LCL LOGISTIX (INDIA) PRIVATE LIMITED LOGIX PARK (CFS), PIPAVAV. Tariff W.E.F 01 April EXPORT 1.1 COMPOSITE STUFFING CHARGES FOR 20' 40'/45'

Case No. 601: Reducing NOx Emissions from Nitric Acid Manufacturing Plants with NOx Abatement or NSCR

ELIGIBILITY CRITERIA

Fluor s Econamine FG Plus SM Technology

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

Technical Guidance Note (Monitoring) Medium Combustion Plant Directive and Generator Controls: monitoring point source emissions

PHTHALIC ANHYDRIDE PROCESS ECONOMICS PROGRAM I. Supplement. June A private report by the STANFORD RESEARCH INSTITUTE I MENLO PARK, CALIFORNIA

Wastewater Recycling Plants with Zero Effluent Discharge. Water Recycling Plants

Online Gas Analyzer / Monitor

Corporate Governance Guidelines

ECONOMICS CHAPTER 8: COST AND REVENUE ANALYSIS Class: XII(ISC) Q1) Define the following:

R & R IDENTIFICATION CO.

Mangalam Cement Ltd.(Unit I)

Resources Discussions Annual Plan Summary Statement. Name of the State Power Utility (SPU) / ED

SOP-C-107 Determination of Non Filterable Residue

DAVID BRENNAN SUSTAINABLE PROCESS ENGINEERING CONCEPTS, STRATEGIES, EVALUATION, AND IMPLEMENTATION. Pan Stanford. Publishing

Successful Sulfur Control & Hydrogen Purification at Saras World-Scale IGCC Plant

[Karaiya* et al., 5(7): July, 2016] ISSN: IC Value: 3.00 Impact Factor: 4.116

Citations from CRF as required in WV DEP's 45CSR24

SOP-C-109 Determination of Filterable Residue

POLICY FOR SELECTING VENDORS OF NON-CONSTRUCTION PURCHASING CONTRACTS, PROFESSIONAL SERVICES AND DELEGATION OF IMPLEMENTATION AUTHORITY

Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013

TECHNICAL SCOPE OF WORK

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

Chilled Ammonia Process Update. Richard Rhudy, EPRI Sean Black, ALSTOM CO 2 Capture Network May 24, 2007 Lyon, France

Energy Production Systems Engineering

2. 0 Test Records - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards.

Boiler Efficiency Testing. To understand the operation of a fire tube boiler To determine the operating efficiency of the boiler

Asbestos Management Plan. Program originated: 02/2000 Last updated: 6/2015. Wendel Reece University Safety Manager

SECTION 15 - GENERAL INDUSTRIAL (MG) ZONE

Contract Labour (Regulation & Abolition) Act, 1970 &Tamil Nadu Contract Labour Rules, 1975 (PRINCIPAL EMPLOYER)

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

Activity Aspects Impacts/ Nuisances Construction phase - Site preparation. - Generation of excavated soil, debris and construction wastes

Hydrogen is a particularly

Worldwide Pollution Control Association

PROCESS ECONOMICS PROGRAM

Environmental Clearance Compliance Half Yearly Report

Industrial Gas Analyzers in Applications Information

Autothermal Reforming for efficient and versatile syngas production. Esben Sorensen, Haldor Topsoe Inc. GSTC 2017 Syngas Technologies Conference

GUJARAT ELECTRICITY REGULATORY COMMISSION (GERC) LICENSEE S POWER TO RECOVER EXPENDITURE INCURRED IN PROVIDING SUPPLY AND OTHER MISCELLANEOUS CHARGES

PROCESS ECONOMICS PROGRAM. Report No by NICK KORENS ROBERT W. VAN SCOY. January private report by the PARK, CALIFORNIA

Dated: 22 nd June, To The Director, Mjs Vulcan Waste Management Pvt. Ltd., 1046, Sector-31, Gurgaon, Haryana

General requirements.

Environmental Clearance Compliance Half Yearly Report

Analysis. 04 Detail Report purchase order invoice data. Report Manual

Global Water Instrumentation, Inc.

Energy Saving and Pollution Control in Urea Plant Though Prilling Tower and Other Equipments

BOILERS FOR PALM OIL MILLS RECENT TRENDS SELECTION & FEATURES

NORTH EASTERN ELECTRICITY SUPPLY COMPANY OF ORISSA Ltd. Corporate Office: Januganj, Balasore

Transcription:

SCOPE OF WORK Contract of Work involving (A) Preparation /testing of Bag samples &sundry jobs (B) Supply of Samples to Labs 1.0 SCHEDULE-A( 2917 OPERATIONS PER YEAR) Part I(1978 OPERATIONS PER YEAR) Name of Work:-Provided services for Central lab Maintenance/Sampling & Sundry jobs 1.1 Maintaining of various Laboratories i.e. Central Lab, DM Lab, Ammonia & Urea Lab Unit I & II & Lab Store. 1.2 To bring various items from Main Store to Central Lab/Plant Labs. 1.3 Carrying manually the bottles of reagent, standard solutions and equipment s from Central Lab to all plant Laboratories and bring them back. 1.4 Installing and manning of High Volume Sampler (HVS) for continuous 8 Hrs. to monitor ambient air at four/five stations on alternate days or as per requirement and Installation of Pollution Control Equipment for Dust emission at Prilling Towers Urea Line-I & Line- II once in a week. 1.5 Installing and manning of High Volume Sampler (HVS) for continuous 24 Hrs. to monitor ambient air at four /five stations simultaneously once in a month or as per requirement. The frequency of sampling may increase or decrease, depending upon the statutory requirement of the state pollution control board & plant requirement. 1.6 Various points samples collection from Pre Treatment plant of Raw water, Filter water, clarifier water from I, II, III,& IV, drinking water, DM filter water, PTP filter water to Central lab. 1.7 Raw materials/chemicals/neem oil/caustic/acid samples from Main store, PDIL store, Cement Godown, Bagging Plant, DM Plant to Central Lab. 1.8 Urea product of Line-I from ET-3 Belt, Urea product of Line-II from ET-23 Belt(Twice in a day) & urea composite samples, Urea Rake sample from Bagging plant (twice in a day) to Central Lab.

1.9 Samples collection from Sewerage Treatment plant to Central lab. 2.0 Purging samples from Line-I &Line- II, GTG I, II, III & package boiler as per requirement. 2.1 Flue gas stack s monitoring from GTG I, II& III, HRU I, II& III, Primary reformer Ammonia Plant Line- I &, Line - II HRU Line II under statuary compliances of MP state pollution control board. 2.2 Ammonia product from Line-I, II, Storage I & II. 2.3 Gas sample of PV-108, PV133, PV165 from Line-I & II as per requirement. 2.4 Gas sample from NG, HDS, ZnO A & B of Line-I & II. 2.5 Carrying of LPG Cylinder from NFL Co-operative to Central Lab & DM Lab. 2.6 Carrying of Gas cylinders of H2, N2, Ar, N2O etc. from Main Store to Central Lab & Line-II Lab. 2.7 Cleaning Glass wares. 2.8 To supply reagent, glass wares from Central lab to Plant Laboratory & Day Log sheet from plant lab to Central lab. 2.9 Condensates sample from DM Plant to Central Lab 3.0 Oil samples from Ammonia Plant Line-I& II, Urea Plant Line-I& II, CPP, Township & Transformer of different area & Diesel sample from plants as required by plant people. 3.1 Cleaning of tubes & Petridis s for microbiological TBC & SRB etc.analysis. 3.2 Dak from different offices, photocopy etc. 3.2.1 Sundry job of Central lab, DM Lab, Line-I Lab & Chemical Stores etc. 3.2.2 All plant shut down Jobs & start up jobs, in exigency labours may be also call in shift duty.

3.2.3 Quantum of sampling job can be increased or decreased depending upon the plant requirement. 3.2.4 Any other jobs related to Labs can assigned by Sr. Manager (Lab) I/c 4.0 Part -II ( 939 OPERATIONS PER YEAR) Name of Work:-Provided services for intermittent jobs of un-skilled nature, for Urea Empty HDPE Bag samples preparation and testing as detailed below (450± 10% Bag Lots per year, subject to actual number of bag lots analyzed in our Lab). 4.1 The work involves Urea Empty HDPE Bag samples preparation and testing of bags for all destructive and non-destructive shall be as per IS 9755:2003 as revised upto date for the type I sacks & test of breaking strength width wise, lengthwise by IS 1969:1985 as revised upto date (Revelled strip test method) & test of bottom seam breaking strength by IS 9030:1979 as revised upto date & as per NIT guidelines given by corporate office. Out of the total no of selected bags (20 or 13) three test specimens each from width wise, length wise & bottom seam form each selected bag will be tested for strength parameter. (450± 10% lots per year). Branding test as per NIT guidelines. 4.2 In case of Lot-II, only the specific parameters will be tested as per NIT as required when Lot No. I do not meet the specifications (45± 10% lots per year). 4.3 The entire job will be conducted under the supervision and guidance of the relevant bag testing committee. Collection & shifting of cut out pieces of bags to the main store and cleaning of the work place. The chemicals required for branding test or any other test will be supplied by NFL free of cost.

SCHEDULE- B (1945 operations per year) Part I(1165 operations per year) Name of work: Provided Services for Supply of Samples to Labs in Rotating Shift. The rotating shift operation involves the work of carrying/transporting routine & special samples to Line-I & Line-II Labs as per the analysis schedule:- (i) Process gas samples from Prim.ref, Sec.ref, HT, MT, LT, Absorber I st, II nd,iii rd bed, Absorber out let, Methanator outlet, Syn. Conv. Inlet, New Synthesis Converter inlet & outlet of Ammonia Plant Line-I (ii) (iii) Purge Gas Recovery Plant (PGR) Gas samples from Fuel Gas outlet, Tail Gas outlet, Product Hydrogen Gas outlet, Purge Gas outlet of Ammonia plant Line-I. Carbon Di Oxide Recovery Plant (CDR) Gas Samples from CO2 product, Quencher In let,co2 Absorber outlet of Ammonia Plant Line- I (iv) Process gas samples from Prim-reformer, Sec. Reformer, HT,LT I st & II nd bed, Absorber I st, II nd III rd bed, Absorber out let, Methanator outlet, Syn. Convertor Inlet, New Synthesis Converter inlet & outlet, Purge Gas outlet of Ammonia Line-II. (v) GV Rich & Lean, semi lean etc. of Line-I & Line-II Ammonia plant (vi) BFW, Blow downs & Steams samples from RG, Syn, New Syn boilers of Ammonia plant line II. (vii) Passivated CO2 Gas samples from 11 Sec.,21 Sec.,31 Sec.& 41Sec. of Urea Plant Line-I & Line-II ) (viii) Instrument Air Dryer unit Dew point analysis of Ammonia Plant Line-II.

(ix) Drain samples of Ammonia & Urea Plant Line-II (twice or as required). (x) Product urea sample for Biuret analysis from ET23 belt of Line-II Urea plant. (xi) Blow Downs Samples etc. from CPP (night Shift).. (xii) Maintenance of Line II Lab and glassware Cleaning.. (xiii) Sundry Jobs of Line II Lab. (xiv) The quantum of sampling jobs can be increased or decreased depending upon the plant requirement. (xv) Any other jobs related to Labs, assigned by Sr. Manager (Lab) I/c. Part- II (780 operations per year) Name of work: Provided Services for Supply of Samples to Labs in General Shift. General shift operation involves the work of carrying routine & special samples of Line-I & Line-II as per the general shift analysis schedule:- i) Natural gas sample 1 st & 2 nd half to Central Lab ii) BFW, Blow downs & Steams samples from RG, Syn, New Syn boilers of Ammonia plant line I. iii) Carbon Di Oxide Recovery Plant(CDR) Samples from Rich, lean, Semi lean, I st wash,ii nd wash & Reclaimer sample points of Ammonia Plant Line-I. iv) Hydrolyzer samples from P14, P18, V6, P33 and V9 etc. of Urea plant Line-I. v) Product urea sample for Biuret analysis at 11 Hrs. & 15 Hrs. from ET3 belt of Urea plant Line-I. vi) Drains samples from Ammonia & Urea Battery limit of Line I (twice or as per required).

vii) viii) Urea process Samples from R1,E1,E2,E3,V3,V8 etc. including condensates & ammonia pumps A,B&C plunger samples of Urea Plant Line-I. Urea process Samples from R1,E1,E2,E3,V3,V8 etc. including ammonia pumps A,B&C plunger samples of Urea Plant Line-II. ix) Dew point analysis Samples from Instrument Nitrogen gas & Instrument Air Dryer unit I st, II nd III rd in shift or as per requirement of Ammonia plant Line-I. x) Blow Downs & Steams Samples etc. from CPP (A &B Shift) xi) Samples of DM plant streams 1, 2, 3 & 4 including condensate Units. xii) xiii) Purging samples from GTG1, GTG2, GTG3, HRU1, HRU2, HRU3, PB & DM streams of CPP & DM Plant Maintenance of Line-I & DM Lab and glassware cleaning. xiv) The quantum of sampling jobs can be increased or decreased depending upon the plants requirement. xv) Sundry job of, Line-I Lab & DM lab etc. xvi) Plant shut down & Start up jobs, in exigency labours may be also call in shift duty. xvii) Quantum of sampling jobs can be increased or decreased depending upon the plant requirement. xviii) Any other jobs related to Labs, assigned by Sr. Manager (Lab) I/c

1.0 Remark 1.1 At any stage, if it is felt that any of the workers/technical staff is not capable, contractor will have to change with a competent man. Further, in case the conduct of any of the workers/employee engaged is found undesirable the contractor to replace the person with a suitable substitute. It would be the responsibility of the contractor to get the job done to the entire satisfaction of Lab-in-charge. 1.2 The contractor shall maintain absolute secrecy with regard to all matters pertaining to NFL 1.3 The contractor has to give at least one month notice, if any labour is to be Retrenched. 1.4 Contractor shall full fill all General, Special, and Technical Terms, Conditions and Obligation of contractors mention in Annexure`A in NIT applicable under this contract. 1.5 Contractor must full fill all compliances of forms number 302 A, B,C applicable under Contract Labour (Regulation & Abolition) Act. 1.6 Overtime as per Factories Act, 1948 is to be paid by contractor to his labours 1.7 Labour insurance compliances as per rules 1.8 Penalties as per GTC