Form Fit & Function Engineering, LLC 350 Seminole Drive Spartanburg, SC Supplementary Quality Assurance Clauses

Similar documents
CTM. SUBJECT: Quality Clauses (Q Clauses) WI The purpose of this work instruction is to control the content of the CTM Quality clauses.

Orbital ATK Alliant Techsystems Defense Electronic Systems Special Mission Aircraft Fort Worth

L-3 PHOTONICS QUALITY CODES Reference

SUPPLIER QUALITY CODES

STRAN Technologies Quality Notes

BYRON PRODUCTS QUALITY TERMS AND CONDITIONS

Supplier Quality Codes

Quality Flow-Down Requirements to Suppliers

PROCUREMENT QUALITY PROVISIONS Revision G January 9, 2017

FORM Rexnord Industries, LLC Aerospace Division. Subject: Supplier Quality Assurance Requirements

SUPPLIER QUALITY REQUIREMENTS

FIDELITY TECHNOLOGIES CORPORATION QUALITY CLAUSES

Quality Flow-Down Requirements to Suppliers

STRAN Technologies Quality Notes

Supplier Quality Requirements (SQR)

SUPPLIER QUALITY ASSURANCE REQUIREMENTS

SQRs SUPPLIER QUALITY REQUIREMENTS

SQRs SUPPLIER QUALITY REQUIREMENTS

SQR Supplier Quality Requirements TRANSLINE TECHNOLOGY, INC. (TTI) SQRs SUPPLIER QUALITY REQUIREMENTS

Supplier Quality Requirements Q Clauses

Supplier Quality Requirements

Controlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70

SUPPLIER QUALITY PROCUREMENT REQUIREMENTS

AC Incorporated Quality Clauses

THE FOLLOWING GENERAL REQUIREMENTS APPLY ON ALL ORDERS

VOLTAGE MULTIPLIERS, INC. QUALITY SUPPLEMENT TO PURCHASE ORDERS

A1 The supplier shall operate and maintain an approved Quality System that is subject to approval by Curtiss Wright Defense Solutions Dayton.

STANDARD QUALITY ASSURANCE PROVISIONS FOR PURCHASED MATERIALS

QUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised.

The Following Clauses are applicable only as noted on the Purchase Order, either by Quality Clause Code or Itemized Quality Clauses:

Trident Precision Manufacturing

IKHANA Aircraft Services, Fabrication Division PO Quality Clauses

Purchase Order and Quality Clauses

Purchase Order Quality Clause SCC40 Revision G, Effective 1/20/2015

Supplier Quality Clauses

002 Supplier Quality System Compliance with Rocker Quality System for Suppliers is required for this Purchase Order.

Title: PROCUREMENT QUALITY REQUIREMENTS CWCDS Dayton, OH

PURCHASE ORDER REQUIREMENTS (Quality Assurance Provisions)

Procedure Documentation

Supplier Quality Requirements Master List

TT Electronics Integrated Manufacturing Services Supplement to Purchase Order Quality Clauses TT Electronics Purchase Order

APPENDIX A QUALITY ASSURANCE REQUIREMENTS FOR SUPPLIERS

Tech Ord Supplier Quality Survey. Supplier Survey Evaluation

General Requirements for all External Providers

GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS

AEROJET PURCHASE ORDER QUALITY CLAUSES (FULL TEXT) CONTENTS

Supplier Quality Requirements (ASQR)

PURCHASE ORDER QUALITY SYSTEM REQUIREMENTS

Clause "A" Subcontractor Controls, General Requirements (Applicable when Clause "A" is invoked in the Purchase Order "Remarks")

PI Purchase Order QC Codes

Altech Machining, Inc. Terms and Conditions

Supplier Quality Clauses

SUPPLIER QUALITY MANUAL

SUPPLIER QUALITY SYSTEM SURVEY

ASM AEROSPACE SPECIFICATION METALS, INC NW 34 th Place #B28 Terrace Pompano Beach, Florida Tel: Fax:

The Supplier shall have a quality management system that conforms to any one of the following, as applicable:

QUALITY CLAUSES. Real Time Logic, Inc Academy Ridge View, Colorado Springs, CO Phone: (719) Fax: (719)

GKN Aerospace Advanced Composite Structure

Terms and Conditions Form OL-668 Rev l

1.0 Purpose. 2.0 General notes 3.0 QUALITY SYSTEM REQUIREMENTS. Approved by: G. Stugart Prepared by: Schelert

Special Purchase Order Clauses

Quality Management System

Purchase Order Quality Clause SCC20 Revision E, Effective 1/20/2015

Quality Procurement Requirements

PO QUALITY CLAUSES PRODUCT MUST COMPLY WITH DFARS PREFERENCE FOR DOMETIC SPECIALTY METALS. MELTED IN USA OR QUALIFYING COUNTRY.

Document Rev: 18 State: RELEASED see Smarteam for approval authorities TASK REQUIREMENTS. Supplier Quality Requirements

UNIVERSAL QUALITY NOTE

SELLER QUALITY REQUIREMENTS QCS-001 PROCESSING SOURCES

Supplier Quality Requirements

Supplier Quality Assurance Requirements Manual

Requirements for Suppliers

PROCUREMENT QUALITY CLAUSES

Purchase Order Quality Terms and Conditions

EP-QC Supplier s General Requirements. Revision AK

Orbel Corporation Quality Assurance Provisions (QAP) for Suppliers

Supplier Quality Clauses

TURBO MACH A DIVISION OF VT SAA

Procurement Quality Assurance Requirements

Quality Assurance Procurement Clauses and Flow Down Requirements

PROCUREMENT QUALITY REQUIREMENTS

NAV 06 MATERIAL CONTROL

Procedure QAP-10 Date Issue Page ALTA Quality Requirements for Suppliers 25 Sept

EP-QC Supplier s General Requirements. Revision AH

Quality Clauses. NOTE: All specifications and revisions, unless otherwise specified, are the current version in effect at the time the PO is issued.

Printed versions may not be the latest. Suppliers shall utilize the latest version which can be found on our website at

General Requirements (Pages 1-3 are applicable to all Purchase Orders)

Supplier Quality Procurement Requirements (SQPR) DATED: 01/31/2018

Purchase Order Quality Clauses These quality clauses are in addition to the Standard Ameriflex Inc.Terms & Conditions

BC Systems, Inc. Quality Assurance Department. Q.A. Provisions. (Clauses are incorporated in and part of the Contract or Purchase Order.

Orbel Corporation Quality Assurance Provisions (QAP) for Suppliers

Purchase Order Quality Requirement Clauses

TASK REQUIREMENTS. Supplier Quality Requirements

Quality Clauses. The Seller shall notify the Buyer when a change in Ownership and/or Quality management has

Purchasing/Quality Clauses

STANDARD QUALITY ASSURANCE CLAUSES AND NOTES OIC - QC-5 REV T

In addition to specific quality clauses listed in the body of the Purchase Order, the following General Clauses apply

SUPPLIER QUALITY SYSTEM SURVEY

Quality Assurance Manual

Transcription:

Supplementary Quality Assurance Clauses The Supplementary Quality Assurance Clauses specified on the face of the attached Purchase Order are listed below. Your compliance with these requirements is necessary to avoid your product being rejected for nonconformance. F3 Engineering Suppliers are required to maintain F3 records for period of 7 years. GROUP A 1. Quality Inspection System The Supplier shall have established and maintains a Quality Management System which conforms to the requirements of ISO 9001:2015. The Supplier shall provide Form Fit and Function Engineering with a copy of its certificate from its registrar. 2. Source Inspection If the Form Fit and Function Purchase Order contains a government contract number, then Form Fit and Function and/or the government, reserve the right to inspect any or all of the work included in this order at the Supplier s facility. 3. Quality Investigation Investigations in conjunction with Form Fit and Function Engineering at the supplier s facilities. 4. Control of Changes Supplier agrees not to make any change in materials or design details which would affect the part or any component part thereof with regard to (a) part number identification, and (b) physical or functional interchangeability, without prior approval of Form Fit and Function Engineering, and without revising the part numbers and the originals of all drawings or data affected by the change. 5. Non-Conforming Material Material Review Authority is not delegated. Parts which do not conform to all applicable specifications must be adequately controlled. Such non-conforming supplies can be shipped only through Form Fit and Function Engineering Material Review, accompanied by formal waiver. Upon request, Form Fit and Function Engineering will supply the appropriate instructions and form. The waiver must be approved and returned to you before shipment is authorized. 6. Certificate of Compliance Certification stating materials, processes (including applicable Inspection processes) and finished items were controlled and tested in accordance with requirements and this contract and applicable specifications and that such records are on file (or that the material used was supplied by Buyer) shall be included with the packing sheet for each shipment. When required by the contract, original test reports from the mill must be provided, and transcription of that data is prohibited

7. Special Process Certification Special Processes; i.e. Welding, Plating, Soldering, X-Ray etc., whether performed at the supplier s facility or by Supplier s subcontractor shall be approved and certified by Form Fit and Function Engineering Quality Assurance. 8. Special Process Sources The Supplier is required to maintain adequate control on those special processes sources utilized in the performance of this work. 9 Inspection and Acceptance Data Inspection and Acceptance Data must accompany each shipment. 10. Receiving Inspections Received product must conform to a 1% AQL Mil-Std-105 E. 11. Corrective Action Supplier shall, on request, on forms designated by Form Fit and Function Engineering, provide statements of Corrective Action on failure of supplier s hardware. Corrective Action statements, at Form Fit and Function Engineering s option, may require approval signature by Supplier and Government Quality Representative. All rejected articles resubmitted by Supplier to Form Fit and Function Engineering shall bear adequate identification, including reference to Supplier s rejection document. 12. First Piece Inspection Supplier first-piece inspection is required on one (1) piece of each lot for each item on this order. Vendor is to submit a complete inspection report together with the part it represents. 13. Create and Maintain Records GROUP B 1. Requirement for the Control of Mercury (MIL STD 767 Rev E) The material supplied under this purchase order shall contain no metallic mercury and shall be

free from mercury contamination. This statement shall be certified to in your certificate of conformance. These requirements shall be included in any subcontract or purchase order here under and the contract shall insure subcontractor compliance with these requirements. 2. Control of Changes Supplier agrees not to make any change in materials or design details which would affect the part or any component part thereof with regard to (a) part number identification, and (b) physical or functional interchangeability, without prior approval of Form Fit and Function Engineering, and without revising the part numbers and the originals of all drawings or data affected by the change. 3. Non-Conforming Material Material Review Authority is not delegated. Parts which do not conform with all applicable specifications must be adequately controlled. Such non-conforming supplies can be shipped only through Form Fit and Function Engineering Material Review, accompanied by formal waiver. Upon request, Form Fit and Function Engineering will supply the appropriate instructions and Form. The waiver must be approved and returned to you before shipment is authorized. 4. Certificate of Compliance Certification stating materials, processes (including applicable Inspection processes) and finished items were controlled and tested in accordance with requirements and this contract and applicable specifications and that such records are on file (or that the material used was supplied by Buyer) shall be included with the packing sheet for each shipment. When required by the contract, original test reports from the mill must be provided, and transcription of that data is prohibited. 5. Source Inspection If the Form Fit and Function Purchase Order contains a government contract number, then Form Fit and Function and/or the government, reserve the right to inspect any or all of the work included in this order at the Supplier s facility. 6. Quality Investigation Investigations in conjunction with Form Fit and Function Engineering at the supplier s facilities. 7. Corrective Action Supplier shall, on request, on forms designated by Form Fit and Function Engineering, provide statements of Corrective Action on failure of supplier s hardware. Corrective Action statements, at Form Fit and Function Engineering s option, may require approval signature by Supplier and Government Quality Representative. All rejected articles resubmitted by Supplier to Form Fit and Function Engineering shall bear adequate identification, including reference to Supplier s Rejection Document.

8. Create and Maintain Records GROUP C 1. Control of Changes Supplier agrees not to make any change in materials or design details which would affect the part or any component part thereof with regard to (a) part number identification, and (b) physical or functional interchangeability, without prior approval of Form Fit and Function Engineering, and without revising the part numbers and the originals of all drawings or data affected by the Change. 2. Certificate of Compliance Certification stating materials, processes (including applicable Inspection processes) and finished items were controlled and tested in accordance with requirements and this contract and applicable specifications and that such records are on file (or that the material used was supplied by buyer) shall be included with the packing sheet for each shipment. When required by the contract, original test reports from the mill must be provided, and transcription of that data is prohibited. 3. Special Process Certification Special Processes; i.e. Paint, Plating, Anodize, Chemical Conversion etc., whether performed at the Supplier s facility or by Supplier s subcontractor shall be approved and certified by Form Fit and Function Engineering Quality Assurance. 4. Special Process Sources The Supplier is required to maintain adequate control on those special processes sources utilized in The performance of this work. 5. Source Inspection If the Form Fit and Function Purchase Order contains a government contract number, then Form Fit and Function and/or the government, reserve the right to inspect any or all of the work included in this order at the Supplier s facility.

6. Quality Investigation Investigations in conjunction with Form Fit and Function Engineering at the supplier s facilities. 7. Corrective Action Supplier shall, on request, on forms designated by Form Fit and Function Engineering, provide statements of Corrective Action on failure of supplier s hardware. Corrective Action statements, at Form Fit and Function Engineering s option, may require approval signature by Supplier and Government Quality Representative. All rejected articles resubmitted by Supplier to Form Fit and Function Engineering shall bear adequate identification, including reference to Supplier s rejection document. 8. Requirement for the Control of Mercury (MIL STD 767 Rev E) The material supplied under this purchase order shall contain no metallic mercury and shall be free from mercury contamination. This statement shall be certified to in your certificate of conformance. These requirements shall be included in any subcontract or purchase order hereunder and the contract shall insure subcontractor compliance with these requirements. 9. Create and Maintain Records GROUP D 1. Calibration System Vendor must maintain a calibration system in accordance with MIL-STD-45662A, ANSI/NCSL Z540-1-1994, ISO/IEC-1705, and/or ISO-10012-1, 2. When performing calibration of inspection gages or test equipment Vendor must provide certificate with traceability to NIST standards and statement that equipment has been calibrated in accordance with ANSI/NCSL Z540-1-1994 or MIL-STD-45662A. 2. Certification of Calibration Certificates must be supplied which attest to the accuracy of the items procured on this Purchase Order. This certification must contain all the test parameters necessary to demonstrate conformance to the manufactures specifications and shall be traceable to NIST. 3. Source Inspection

If the Form Fit and Function Purchase Order contains a government contract number, then Form Fit and Function and/or the government, reserve the right to inspect any or all of the work included in this order at the Supplier s facility. 4. Quality Investigation Investigations in conjunction with Form Fit and Function Engineering at the supplier s facilities. 5. Create and Maintain Records GROUP E 1. Control of Changes Supplier agrees not to make any changes to hardware part number identification, or substitute parts, without prior approval of Form Fit and Function Engineering. 2. Certificate of Compliance Certification stating part identification number finish of items in accordance with requirements are applicable. Certification of Conformance shall be included with packing sheet for each shipment. When require by the contract original test reports must be provided, and transcription of this data is prohibited. 3. Quality Investigation Investigations in conjunction with Form Fit and Function Engineering at the supplier s facilities. 4. Create and Maintain Records

GROUP F 1. Control of Changes Supplier agrees not to make any changes to electronic components, board configuration, or Substitute parts without prior approval of Form Fit and Function Engineering. Supplier shall inspect electronic components for counterfeit, prior to shipping to Form Fit and Function Engineering. Supplier agrees to have records of counterfeit inspection available. 2. Certificate of Compliance Certification stating part identification number finish of items in accordance with requirements are applicable. Test report when applicable must be included with the shipment. Certification of Conformance shall be included with packing sheet for each shipment. When require by the contract original test reports must be provided, and transcription of this data is prohibited. 3. Quality Investigation Investigations in conjunction with Form Fit and Function Engineering at the supplier s facility. 4. Source Inspection If the Form Fit and Function Purchase Order contains a government contract number, then Form Fit and Function and/or the government, reserve the right to inspect any or all of the work included in this order at Supplier s facility. 5. Create and Maintain Records