G2-0 LIST OF ACTIVE MTODs

Similar documents
G2-0 LIST OF ACTIVE MTODs

G2-0 LIST OF ACTIVE MTODs

G2-0 List of Active Ministry of Transportation of Ontario Drawings (MTOD s)

G2-0 List of Active Ministry of Transportation of Ontario Drawings (MTOD s)

CONTRACT DESIGN ESTIMATING and DOCUMENTATION (CDED) MANUAL REVISION PACKAGE #189

H3-2 LIST OF ACTIVE ONTARIO PROVINCIAL STANDARD DRAWINGS Division 900 Fencing and Guide Rails

LIST OF ACTIVE STRUCTURAL STANDARD DRAWINGS (SSDs)

I2-0 LIST OF ACTIVE SSDs

H3-29 DIVISION 900 FENCING AND GUIDE RAILS

Abbreviations, Building Descriptions Topography Plan Features, Monument Features

B STEEL BEAM GUIDE RAIL - OPSS 552

B STEEL BEAM GUIDE RAIL - OPSS 721

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

Abbreviations, Building Descriptions Topography Plan Features, Monument Features

B STEEL BEAM GUIDE RAIL - OPSS 721

Abbreviations, Building Descriptions Topography Plan Features, Monument Features

B STEEL BEAM GUIDE RAIL - OPSS.PROV 721

B STEEL BEAM GUIDE RAIL - OPSS 721

LIST OF STANDARD DRAWINGS H2-9 - SERIES 9: Fencing, Guide Rails

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Maine Turnpike Authority

SUPPLEMENTAL DRAWINGS

LIST OF ACTIVE OPSSs

TABLE OF DRAWINGS. Pierce County Public Works & Utilities

Contract Design, Estimating and Documentation (CDED) Manual. CDED REVISION No. 206

TABLE OF DRAWINGS. Pierce County Public Works & Utilities

LIST OF STANDARD DRAWINGS H2-2 - SERIES 2: Grading

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

LIST OF ACTIVE STANDARD SPECIAL PROVISIONS

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS

Maine Turnpike Authority

B510-5 REMOVAL-PAVEMENT WORK OPSS 510. CDED B Removal CDED B Reclaim Asphalt Pavement

Maine Turnpike Authority

LIST OF ACTIVE STANDARD SPECIAL PROVISIONS

B510-5 REMOVAL-PAVEMENT WORK OPSS 510. CDED B Removal CDED B Reclaim Asphalt Pavement

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

B723 ENERGY ATTENUATORS - OPSS 723

CORPORATION OF THE TOWN OF WHITBY

2008 Interim Standard Sheet List For Use with the 2008 Imperial Road and Bridge Standards July, 2015

CONSTRUCTION SPECIFICATION FOR STEEL BEAM GUIDE RAIL AND CABLE GUIDE RAIL

BRIDGE STANDARD PLANS AND SPECIAL DETAILS ADAM LANCASTER, P.E. FEB. 27, 2018

2001 Insertable Sheet List For Use With The 2001 Imperial Road and Bridge Standards February 2008

B760 - NOISE BARRIER SYSTEMS OPSS 760

Contract Design, Estimating and Documentation (CDED) Manual REVISION PACKAGE #204

CONSTRUCTION SPECIFICATION FOR REMOVAL

Baseline Document Change Announcement

Amendments to the January 2016 Design Criteria Manual & Supplementary Master Municipal Construction Documents

Figure Inlet protection (Source: Minnesota DOT)

Contract Design, Estimating and Documentation (CDED) Manual. CDED REVISION No. 214

Engineering & Construction Services Division Standard Drawings for Road Works. T No. Revision T No. Revision Remarks All T- drawings

GUIDERAILS INTRODUCTION DESIGN PURPOSE CHAPTER 12

Provincial Highways Management. Ministry of Transportation PRODUCTION RATES. Contract Management Office Estimating Section

ENGINEERING DESIGN & IMPROVEMENT STANDARDS

B723 ENERGY ATTENUATORS - OPSS 723

Maine Turnpike Authority

2008 Interim Standard Sheet List For Use With The 2008 Imperial Road and Bridge Standards October, 2014

MERCED COUNTY CAMPUS PARKWAY SEGMENT 2

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BUY AMERICA

Include the appropriate special provisions as required.

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

Include the appropriate special provisions as required.

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges.

2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form

NOTICE. Registration Form and Notice of Needed Revisions

FOR HISTORICAL REFERENCE ONLY

FEBRUARY 13, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $9,000,000.00) Bids. Kokosing Construction Company, Inc. $8,623,609.96

General Symbols, Ducts and Cables

CHECK THE LOWER RIGHT CORNER OF EACH DETAIL FOR THE LATEST REVISION.

CONSTRUCTION SPECIFICATION FOR STEEL BEAM GUIDE RAIL AND CABLE GUIDE RAIL

ROADSIDE SAFETY BARRIER ELEMENTS Module 3

Roadway Surfaces and Traffic Control Elements

Bids JANUARY 10, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $29,000,000.00) Miller Bros. Const., Inc. $27,699,031.59

Ironton Russell Bridge Project

Residential Street Rebuild Program (RSRP) Test Project Updates Rogerson Drive & Ralston Avenue. Council Presentation January 23, 2018

City of St. Catharines Standard Drawings SEPTEMBER Revised September 6, 2018 TES-ENG (SH)


Ironton Russell Bridge Project

General Symbols, Ducts and Cables

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016

New Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS

City of Redding Construction Standards Index

Appendix I. Cost Estimate Tables

CONSTRUCTION SPECIFICATION FOR ENERGY ATTENUATORS

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5

DECEMBER 5, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $5,000,000) Bids

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED?????

HOLDER CONSTRUCTION COMPANY Superintendents Weekly Activity Report #77 Douthit Hills Student Community, Clemson University Project Joe Jett

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION Edition

CONSTRUCTION SPECIFICATION FOR REMOVAL

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work

CITY OF ROCKLIN STANDARD DRAWINGS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

2016 STRUCTURE INSPECTION APPRAISAL REPORT. Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

CONSTRUCTION SPECIFICATION FOR REMOVAL

CONSTRUCTION SPECIFICATION FOR REMOVAL

VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDA NEW AND REVISED IIM

Transcription:

G2-0 LIST OF ACTIVE MTODs DIVISION 100 - ABBREVIATIONS 101.070 Legend - Pavement Markings Apr 1, 1994 Jan 4, 1994 TOS/TO For use with Pavement Marking items. DIVISION 200- GRADING 219.101 Light Duty Straw Bale Barrier Ditch Inlet Protection During Construction Aug 1, 2002 Oct 16, 2002 0 ENV/PEPO DIVISION 300 - ENTRANCES No Division 300 Drawings DIVISION 400 - FRAMES AND GRATES No Division 400 Drawings DIVISION 500 - PAVING 503.020 Shoulder Rumble Strips Jan 27, 2000 Feb 2, 2000 1 DSS/DCSO For use as identified and directed. 503.021 Shoulder Rumble Strips at Speed Change Lanes 503.022 Shoulder Rumble Strips at Intersections and Entrances Sep 1, 1999 Sep 1, 1999 DSS/DCSO For use as identified and directed. Sep 1, 1999 Sep 1, 1999 DSS/DCSO For use as identified and directed. 503.050 Centreline Rumble Strips Apr 1, 2010 Jun 17, 2010 0 DSS/DCSO 505.010 Carpool Parking Facilities, Barrier Free Parking Spaces 508.010 Routing and Sealing Cracks in Asphalt Pavement Apr 1, 2007 Jun 7, 2007 0 DSS/DCSO Feb 11, 2008 Feb 14, 2008 0 BITM/ MERO March 2013 Page 1 of 7 G2-0 List of Active MTODs

DIVISION 600 CURBS & GUTTERS 600.120 Concrete Parking Curb with Wide Gutter Apr 1, 1993 Apr 1, 1993 1 DSS/DCSO A 600 mm high curb for use in Truck Inspection Stations. DIVISION 700 - CATCH BASINS & MAINTENANCE HOLES No Division 700 Drawings DIVISION 800 - CULVERTS & DRAINS 803.021 Bedding and Backfill for Precast Concrete Box Culverts May 25, 1994 May 25, 1994 P&F/MERO Always with Precast Concrete Box Culvert items. DIVISION 900 - FENCING, GUIDERAILS 911.140 Guide Rail System, Concrete Barrier Precast I-Lock Connection Installation - Temporary and Permanent 911.143 Guide Rail System, Concrete Barrier Precast I-Lock Connection, Type TW Installation - Permanent 911.150 Guide Rail System, Concrete Barrier Type J Connection, 4m Length 911.151 Guide Rail System, Concrete Barrier Type J Connection, 6m Length 911.160 Guide Rail System, Concrete Barrier Temporary 911.161 Guide Rail System, Concrete Barrier Temporary 911.162 Guide Rail System, Concrete Barrier Pinned to Asphalt Pavement 911.163 Guide Rail System, Concrete Barrier Strapped to Concrete Feb 1, 2013 Mar 7, 2013 0 DSS/DCSO Feb 1, 2013 Mar 7, 2013 0 DSS/DCSO Jul 1, 2009 Aug 27, 2009 2 DSS/DCSO Jul 1, 2009 Aug 27, 2009 2 DSS/DCSO Dec 1, 2011 Jan 19, 2012 3 DSS/DCSO Dec 1, 2011 Jan 19, 2012 3 DSS/DCSO March 2013 Page 2 of 7 G2-0 List of Active MTODs

911.164 Guide Rail System, Concrete Barrier Strapped to Concrete with Asphalt Surface 911.167 Guide Rail System, Concrete Barrier Bolted Through Concrete 911.168 Guide Rail System, Concrete Barrier Bolted Through Concrete with Asphalt Surface 911.170 Guide Rail System, Concrete Barrier Transition to Pinned TCB 911.171 Guide Rail System, Concrete Barrier Transition to Strapped TCB 911.172 Guide Rail System, Concrete Barrier Transition to Bolted TCB 911.173 Guide Rail System, Concrete Barrier Transition to Permanent Concrete Barrier 911.174 Guide Rail System, Concrete Barrier Type M Connection, Component - Thrie Beam Transition 911.180 Guide Rail System, Concrete Barrier Type T Connection, 4m Length 911.181 Guide Rail System, Concrete Barrier Type T Connection, 6m Length 911.340 Guide Rail System, Concrete Barrier Temporary Drainage Gap Connection, 912.131 Steel Beam Guide Rail and End- Treatments, Rock Cut Installation Mar 1, 2010 Mar 11, 2010 1 DSS/DCSO Mar 1, 2010 Mar 11, 2010 1 DSS/DCSO Jun 1, 2012 Jul 5, 2012 2 DSS/DCSO Jan 1, 2007 Mar 15, 2007 1 DSS/DCSO March 2013 Page 3 of 7 G2-0 List of Active MTODs

912.135 Guide Rail System, Steel Beam Steel Post With Steel Offset Block Adjustment - Single Rail 912.145 Guide Rail System, Steel Beam Wooden Post Adjustment - Single Rail 913.135 Guide Rail System, Cable Adjustment - Shoulder 917.100 100 X 100 Fabricated Steel Sign Base Concrete Barrier Installation Details 917.101 150 X 150 Fabricated Steel Sign Base Concrete Barrier Installation Detail 917.102 100 X 100 Fabricated Steel Sign Base - 45 Degree Angle Mount Concrete Barrier Installation Details 917.103 150 X 150 Fabricated Steel Sign Base - 45 Degree Angled Mount Concrete Barrier Installation Detail 922.330 Energy Attenuator, End Treatment Crash-Cushion Attenuating Terminal System 923.003 Energy Attenuator, Crash Cushion REACT 350, Component - Reinforced Concrete Pad 923.610 Energy Attenuator, Crash Cushion REACT 350 TL-2, Installation - Permanent 923.611 Energy Attenuator, Crash Cushion, REACT 350 TL-3, Installation - Permanent Nov 1, 2011 Nov 17, 2011 0 DSS/DCSO Nov 1, 2011 Nov 17, 2011 0 DSS/DCSO Nov 1, 2011 Nov 17, 2011 0 DSS/DCSO Mar 1, 1997 Mar 1, 1997 DSS/DCSO Included in contracts barrier walls at a 90 Mar 1, 1997 Mar 1, 1997 DSS/DCSO Included in contracts barrier walls at a 90 Mar 25, 1997 Mar 25, 1997 DSS/DCSO Included in contracts barrier walls at a 45 Mar 25, 1997 Mar 25, 1997 DSS/DCSO Included in contracts barrier walls at a 45 Nov 30, 2008 Mar 12, 2009 0 DSS/DCSO Feb 1, 2013 Mar 7, 2013 1 DSS/DCSO Feb 1, 2007 Mar 15, 2007 0 DSS/DCSO Feb 1, 2007 Mar 15, 2007 0 DSS/DCSO March 2013 Page 4 of 7 G2-0 List of Active MTODs

925.000 Thrie Beam Guide Rail - Median Barrier General Layout Jun 21, 1993 Jun 21, 1993 DSS/DCSO 925.010 Thrie Beam Guide Rail - Rail Details Jun 2, 1993 Jun 2, 1993 DSS/DCSO 925.020 Thrie Beam Median Guide Rail - Post, Offset Block and Back-Up Plate 925.030 Thrie Beam Median Guide Rail - Terminal Connector 925.040 Thrie Beam Guide Rail - Transition Rail SBGR To Thrie Beam 925.100 Thrie Beam Guide Rail - Median Barrier Details 925.310 Thrie Beam Median Guide Rail - Transition To Concrete Median Barrier 925.800 Thrie Beam Guide Rail - Timber Deck - Transition To Structure SBGR to Thrie Beam 971.101 Fence, Highway In Earth, Shale, Loose Rock, Or Friable Rock Installation 971.102 Fence, Highway In Solid Rock Installation Jun 4, 1993 Jun 4, 1993 DSS/DCSO Jun 8, 1993 Jun 8, 1993 DSS/DCSO Oct 14, 1993 Oct 14, 1993 DSS/DCSO Jun 2, 1993 Jun 2, 1993 DSS/DCSO Jun 8, 1993 Jun 8, 1993 DSS/DCSO Sep 29, 1993 Sep 29, 1993 DSS/DCSO Mar 1, 2013 Mar 7, 2013 1 DSS/DCSO Mar 1, 2013 Mar 7, 2013 1 DSS/DCSO 971.103 Fence, Highway Installation Details Jun 1, 2012 July 5, 2012 DSS/DCSO 980.101 Small Sign Support System Non- Breakaway U-Flange Post Installation - Single Post 985.101 Small Sign Support System Breakaway Wooden Post 89 mm x 140 mm Installation - Single Post 985.102 Small Sign Support System Breakaway Wooden Post 140 mm x 140 mm Istallation - Single Post 985.201 Small Sign Support System Breakaway Wooden Post 89 mm x 140 mm Installation - Double Post 985.202 Small Sign Support System Breakaway Wooden Post 140 mm x 140 mm Istallation - Double Post March 2013 Page 5 of 7 G2-0 List of Active MTODs

986.101 Small Sign Support System Franklin Flange Post Installation - Single Post 986.105 Small Sign Support System Franklin Flange Post Components 986.201 Small Sign Support System Franklin Flange Post Installation - Double Post 986.301 Small Sign Support System Franklin Flange Post Installation - Triple Post 987.101 Small Sign Support System Nucor Steel Marion Inc. Breakaway Rib-Bak U-Flange Post Installation - Single Post 987.105 Small Sign Support System Nucor Steel Marion Inc. Breakaway U- Flange Post Components 987.201 Small Sign Support System Nucor Steel Marion Inc. Breakaway Rib-Bak U-Flange Post Installation - Double Post 987.301 Small Sign Support System Nucor Steel Marion Inc. Breakaway Rib-Bak U-Flange Post Installation - Triple Post 988.101 Small Sign Support System Allied Tube & Conduit Breakaway Square Post Installation - Single Post 988.201 Small Sign Support System Allied Tube & Conduit Breakaway Square Post Installation - Double Post 989.101 Small Sign Support System Northwest Pipe Company Breakaway Square Post Installation - Single Post Jan 1, 2012 Jan 19, 2012 0 DSS/DCSO March 2013 Page 6 of 7 G2-0 List of Active MTODs

989.201 Small Sign Support System Northwest Pipe Company Breakaway Square Post Installation - Double Post DIVISION 2000 See Electrical and Electrical ATMS CDED Manuals March 2013 Page 7 of 7 G2-0 List of Active MTODs