G2-0 List of Active Ministry of Transportation of Ontario Drawings (MTOD s)

Similar documents
G2-0 List of Active Ministry of Transportation of Ontario Drawings (MTOD s)

G2-0 LIST OF ACTIVE MTODs

G2-0 LIST OF ACTIVE MTODs

G2-0 LIST OF ACTIVE MTODs

Abbreviations, Building Descriptions Topography Plan Features, Monument Features

H3-29 DIVISION 900 FENCING AND GUIDE RAILS

Abbreviations, Building Descriptions Topography Plan Features, Monument Features

Abbreviations, Building Descriptions Topography Plan Features, Monument Features

CONTRACT DESIGN ESTIMATING and DOCUMENTATION (CDED) MANUAL REVISION PACKAGE #189

Maine Turnpike Authority

H3-2 LIST OF ACTIVE ONTARIO PROVINCIAL STANDARD DRAWINGS Division 900 Fencing and Guide Rails

LIST OF STANDARD DRAWINGS H2-9 - SERIES 9: Fencing, Guide Rails

SUPPLEMENTAL DRAWINGS

B STEEL BEAM GUIDE RAIL - OPSS 721

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

B STEEL BEAM GUIDE RAIL - OPSS.PROV 721

B STEEL BEAM GUIDE RAIL - OPSS 552

B STEEL BEAM GUIDE RAIL - OPSS 721

CONSTRUCTION SPECIFICATION FOR ENERGY ATTENUATORS

B STEEL BEAM GUIDE RAIL - OPSS 721

LIST OF ACTIVE STRUCTURAL STANDARD DRAWINGS (SSDs)

TABLE OF DRAWINGS. Pierce County Public Works & Utilities

TABLE OF DRAWINGS. Pierce County Public Works & Utilities

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

LIST OF STANDARD DRAWINGS H2-2 - SERIES 2: Grading

Maine Turnpike Authority

Include the appropriate special provisions as required.

Include the appropriate special provisions as required.

CONSTRUCTION SPECIFICATION FOR STEEL BEAM GUIDE RAIL AND CABLE GUIDE RAIL

I2-0 LIST OF ACTIVE SSDs

Baseline Document Change Announcement

Maine Turnpike Authority

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

B723 ENERGY ATTENUATORS - OPSS 723

B723 ENERGY ATTENUATORS - OPSS 723

LIST OF ACTIVE STANDARD SPECIAL PROVISIONS

GUIDERAILS INTRODUCTION DESIGN PURPOSE CHAPTER 12

General Symbols, Ducts and Cables

2001 Insertable Sheet List For Use With The 2001 Imperial Road and Bridge Standards February 2008

FEBRUARY 13, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $9,000,000.00) Bids. Kokosing Construction Company, Inc. $8,623,609.96

Contract Design, Estimating and Documentation (CDED) Manual REVISION PACKAGE #204

General Symbols, Ducts and Cables

Amendments to the January 2016 Design Criteria Manual & Supplementary Master Municipal Construction Documents

CONSTRUCTION SPECIFICATION FOR REMOVAL

CONSTRUCTION SPECIFICATION FOR GUIDE RAIL END TREATMENT - EXTRUDER TERMINAL SYSTEM

B510-5 REMOVAL-PAVEMENT WORK OPSS 510. CDED B Removal CDED B Reclaim Asphalt Pavement

2008 Interim Standard Sheet List For Use with the 2008 Imperial Road and Bridge Standards July, 2015

CONSTRUCTION SPECIFICATION FOR TAU II SYSTEM

Maine Turnpike Authority

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS

CONSTRUCTION SPECIFICATION FOR STEEL BEAM GUIDE RAIL AND CABLE GUIDE RAIL

General Symbols, Ducts and Cables

B510-5 REMOVAL-PAVEMENT WORK OPSS 510. CDED B Removal CDED B Reclaim Asphalt Pavement

2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form

MERCED COUNTY CAMPUS PARKWAY SEGMENT 2

City of St. Catharines Standard Drawings SEPTEMBER Revised September 6, 2018 TES-ENG (SH)

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

LIST OF ACTIVE STANDARD SPECIAL PROVISIONS

FOR HISTORICAL REFERENCE ONLY

Bids JANUARY 10, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $29,000,000.00) Miller Bros. Const., Inc. $27,699,031.59

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges.

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

Engineering Design Center. Standard Drawings. 1st Edition -January 2016

2008 Interim Standard Sheet List For Use With The 2008 Imperial Road and Bridge Standards October, 2014

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work

Figure Inlet protection (Source: Minnesota DOT)

New Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES

ENGINEERING DESIGN & IMPROVEMENT STANDARDS

CITY OF ROCKLIN STANDARD DRAWINGS

City of St. Catharines Standard Drawings JULY Revised July 21, 2017 TES-ENG (SH)

CONSTRUCTION SPECIFICATION FOR GUIDE RAIL END TREATMENT - STEEL BEAM ENERGY ATTENUATING TERMINAL SYSTEMS

B760 - NOISE BARRIER SYSTEMS OPSS 760

IIS03_04 RS-3 REVISED NOTE 7 REMOVED STATEMENT IN ASPHALT CONCRETE PAVEMENT THAT IS BEEN IN PLACE MORE THAN ONE YEAR.

City of Redding Construction Standards Index

DECEMBER 5, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $5,000,000) Bids

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

General Info Number: PROJECT NO Description: REPAIRS AND RESURFACING INTERCHANGE 209 MILEPOST TRUMBULL COUNTY, OHIO

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BUY AMERICA

CHECK THE LOWER RIGHT CORNER OF EACH DETAIL FOR THE LATEST REVISION.

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

BRIDGE STANDARD PLANS AND SPECIAL DETAILS ADAM LANCASTER, P.E. FEB. 27, 2018

New Jersey Department of Transportation DATE : 05/17/12 PAGE : TABULATION OF BIDS

MDS TL5 Minimum Deflection Systems

Barriers and highway accessory supports

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2017-Tender Capital Works

NOTICE. Registration Form and Notice of Needed Revisions

Appendix I. Cost Estimate Tables

ROADSIDE SAFETY BARRIER ELEMENTS Module 3

Roadway Surfaces and Traffic Control Elements

Section 9 Guidelines for the Selection and Design of Crash Cushions

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5

MAY 11, 2017 T-MC-107A & T-MC-107B1

CONSTRUCTION SPECIFICATION FOR REMOVAL

CONSTRUCTION SPECIFICATION FOR GUIDE RAIL END TREATMENT - ECCENTRIC LOADER TERMINAL SYSTEM

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

2016 STRUCTURE INSPECTION APPRAISAL REPORT. Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN

MDS TL4 Minimum Deflection Systems

Transcription:

G2-0 List of Active Ministry of Transportation of Ontario Drawings ( s) DIVISION 100 - ABBREVIATIONS 101.070 Legend - Pavement Markings 01/04/1994 04/01/1994 TOS/TO For use with Pavement Marking items. DIVISION 200 GRADING 202.033 Roadway Widening, Single Sided Energy Attenuating Terminals - Grading 217.030 Minimum Vertical Clearances for Aerial Cable Systems 219.101 Light Duty Straw Bale Barrier Ditch Inlet Protection During Construction 01/11/2009 22/07/2010 0 DSS/DCSO 30/11/2007 30/11/2007 0 EES/TO 01/08/2002 16/10/2002 0 ENV/PEPO DIVISION 300 ENTRANCES No Division 300 Drawings DIVISION 400 FRAMES AND GRATES No Division 400 Drawings DIVISION 500 PAVING 503.020 Shoulder Rumble Strips 27/01/2000 02/02/2000 1 DSS/DCSO For use as identified and directed. 503.021 Shoulder Rumble Strips at Speed Change Lanes 503.022 Shoulder Rumble Strips at Intersections and Entrances 01/09/1999 01/09/1999 DSS/DCSO For use as identified and directed. 01/09/1999 01/09/1999 DSS/DCSO For use as identified and directed. 503.050 Centreline Rumble Strips 01/04/2010 17/06/2010 0 DSS/DCSO 505.010 Carpool Parking Facilities, Barrier Free Parking Spaces 508.010 Routing and Sealing Cracks in Asphalt Pavement 01/04/2007 07/06/2007 0 DSS/DCSO 11/02/2008 14/02/2008 0 BITM/ MERO September 2011 Page 1 of 6 G2-0 List of Active s

G2-0 List of Active Ministry of Transportation of Ontario Drawings ( s) DIVISION 600 CURBS & GUTTERS 600.120 Concrete Parking Curb with Wide Gutter 01/04/1993 01/04/1993 1 DSS/DCSO A 600 mm high curb for use in Truck Inspection Stations. DIVISION 700 CATCH BASINS & MAINTENANCE HOLES No Division 700 Drawings DIVISION 800 CULVERTS & DRAINS 803.021 Bedding and Backfill for Precast Concrete Box Culverts 25/05/1994 25/05/1994 P&F/MERO Always with Precast Concrete Box Culvert items. DIVISION 900 FENCING, GUIDERAILS 911.150 Guide Rail System, Concrete Barrier Type J Connection, 4m Length Installation - 911.151 Guide Rail System, Concrete Barrier Type J Connection, 6m Length Installation - 911.160 Guide Rail System, Concrete Barrier Type M 911.161 Guide Rail System, Concrete Barrier Type M 911.162 Guide Rail System, Concrete Barrier Type M Restraint System Pinned to Asphalt Pavement 911.163 Guide Rail System, Concrete Barrier Type M Restraint System Strapped to Concrete 911.164 Guide Rail System, Concrete Barrier Type M Restraint System Strapped to Concrete with Asphalt Surface 911.167 Guide Rail System, Concrete Barrier Type M Restraint System Bolted Through Concrete 01/07/2009 27/08/2009 2 DSS/DCSO 01/07/2009 27/08/2009 2 DSS/DCSO 01/07/2009 27/08/2009 2 DSS/DCSO 01/12/2008 27/08/2009 2 DSS/DCSO September 2011 Page 2 of 6 G2-0 List of Active s

G2-0 List of Active Ministry of Transportation of Ontario Drawings ( s) 911.168 Guide Rail System, Concrete Barrier Type M Restraint System Bolted Through Concrete with Asphalt Surface 911.170 Guide Rail System, Concrete Barrier Type M Restraint System Transition to Pinned TCB 911.171 Guide Rail System, Concrete Barrier Type M Restraint System Transition to Strapped TCB 911.172 Guide Rail System, Concrete Barrier Type M Restraint System Transition to Bolted TCB 911.173 Guide Rail System, Concrete Barrier Type M Restraint System Transition to Permanent Concrete Barrier 911.174 Guide Rail System, Concrete Barrier Type M Connection, Component - Thrie Beam Transition 911.180 Guide Rail System, Concrete Barrier Type T Connection, 4m Length Installation - 911.181 Guide Rail System, Concrete Barrier Type T Connection, 6m Length Installation - 911.340 Guide Rail System, Concrete Barrier Drainage Gap Connection, Installation - 912.131 Steel Beam Guide Rail and End-Treatments, Rock Cut Installation 917.100 100 X 100 Fabricated Steel Sign Base Concrete Barrier Installation Details 917.101 150 X 150 Fabricated Steel Sign Base Concrete Barrier Installation Detail 01/03/2010 11/03/2010 1 DSS/DCSO 01/03/2010 11/03/2010 1 DSS/DCSO 01/01/2010 11/03/2010 1 DSS/DCSO 01/01/2007 15/03/2007 1 DSS/DCSO 01/03/1997 01/03/1997 DSS/DCSO Included in walls at a 90 01/03/1997 01/03/1997 DSS/DCSO Included in walls at a 90 September 2011 Page 3 of 6 G2-0 List of Active s

G2-0 List of Active Ministry of Transportation of Ontario Drawings ( s) 917.102 100 X 100 Fabricated Steel Sign Base - 45 Degree Angle Mount Concrete Barrier Installation Details 917.103 150 X 150 Fabricated Steel Sign Base - 45 Degree Angled Mount Concrete Barrier Installation Detail 922.330 Energy Attenuator, End Treatment Crash- Cushion Attenuating Terminal System Assembly 923.003 Energy Attenuator, Crash Cushion REACT 350, Component - Reinforced Concrete Pad 923.004 Energy Attenuator, Crash Cushion Quadguard and TAU-II Wide Systems Component - Reinforced Concrete Pad 923.005 Energy Attenuator, Crash Cushion Quadguard and TAU-II Extra Wide Systems Component - Reinforced Concrete Pad 923.184 Energy Attenuator, Crash Cushion Quadguard Wide System Installation - 923.186 Energy Attenuator, Crash Cushion Quadguard Wide System Installation - Permanent Unidirectional 923.188 Energy Attenuator, Crash Cushion Quadguard Extra Wide System Installation - 923.190 Energy Attenuator, Crash Cushion Quadguard Extra Wide System Installation - Permanant Unidirectional 923.384 Energy Attenuator, Crash Cushion TAU-II Wide System Installation - Unidirectional 923.386 Energy Attenuator, Crash Cushion TAU-II Wide System Installation - Permanent Unidirectional 923.388 Energy Attenuator, Crash Cushion TAU-II Extra Wide System - TL-2 Installation - 25/03/1997 25/03/1997 DSS/DCSO 25/03/1997 25/03/1997 DSS/DCSO 30/11/2008 12/03/2009 0 DSS/DCSO 01/02/2007 15/03/2007 0 DSS/DCSO 30/11/2010 16/12/2010 0 DSS/DCSO 30/11/2010 16/12/2010 0 DSS/DCSO Included in walls at a 45 Included in walls at a 45 September 2011 Page 4 of 6 G2-0 List of Active s

G2-0 List of Active Ministry of Transportation of Ontario Drawings ( s) 923.390 Energy Attenuator, Crash Cushion TAU-II Extra Wide System - TL-3 Installation - 923.392 Energy Attenuator, Crash Cushion TAU-II Extra Wide System - TL-2 Installation - Permanent Unidirectional 923.394 Energy Attenuator, Crash Cushion TAU-II Extra Wide System - TL-3 Installation - Permanent Unidirectional 923.610 Energy Attenuator, Crash Cushion REACT 350 TL-2, Installation - Permanent 923.611 Energy Attenuator, Crash Cushion, REACT 350 TL-3, Installation - Permanent 924.131 Energy Attenuator, Crash Cushion Absorb 350 System Installation - Concrete Barrier 924.135 Energy Attenuator, Crash Cushion ACZ-350 System, Installation - Concrete Barrier 925.000 Thrie Beam Guide Rail - Median Barrier General Layout 01/02/2007 15/03/2007 0 DSS/DCSO 01/02/2007 15/03/2007 0 DSS/DCSO 01/11/2009 22/07/2010 1 DSS/DCSO 01/11/2009 22/07/2010 0 DSS/DCSO 21/06/1993 21/06/1993 DSS/DCSO 925.010 Thrie Beam Guide Rail - Rail Details 02/06/1993 02/06/1993 DSS/DCSO 925.020 Thrie Beam Median Guide Rail - Post, Offset Block and Back-Up Plate 925.030 Thrie Beam Median Guide Rail - Terminal Connector 925.040 Thrie Beam Guide Rail - Transition Rail SBGR To Thrie Beam 925.100 Thrie Beam Guide Rail - Median Barrier Details 925.310 Thrie Beam Median Guide Rail - Transition To Concrete Median Barrier 925.800 Thrie Beam Guide Rail - Timber Deck - Transition To Structure SBGR to Thrie Beam 980.101 Small Sign Support System Non-Breakaway U-Flange Post Installation - Single Post Assembly 985.101 Small Sign Support System Breakaway Wooden Post 89 mm x 140 mm Installation - Single Post Assembly 985.102 Small Sign Support System Breakaway Wooden Post 140 mm x 140 mm Istallation - Single Post Assembly 04/06/1993 04/06/1993 DSS/DCSO 08/06/1993 08/06/1993 DSS/DCSO 14/10/1993 14/10/1993 DSS/DCSO 02/06/1993 02/06/1993 DSS/DCSO 08/06/1993 08/06/1993 DSS/DCSO 29/09/1993 29/09/1993 DSS/DCSO September 2011 Page 5 of 6 G2-0 List of Active s

G2-0 List of Active Ministry of Transportation of Ontario Drawings ( s) 985.201 Small Sign Support System Breakaway Wooden Post 89 mm x 140 mm Installation - Double Post Assembly 985.202 Small Sign Support System Breakaway Wooden Post 140 mm x 140 mm Istallation - Double Post Assembly 986.101 Small Sign Support System Franklin Industries Company Breakaway U-Flange Post Installation - Single Post Assembly 986.201 Small Sign Support System Franklin Industries Company Breakaway U-Flange Post Installation - Double Post Assembly 986.301 Small Sign Support System Franklin Industries Company Breakaway U-Flange Post Installation - Triple Post Assembly 987.101 Small Sign Support System Nucor Steel Marion Inc. Breakaway Rib-Bak U-Flange Post Installation - Single Post Assembly 987.105 Small Sign Support System Nucor Steel Marion Inc. Breakaway U-Flange Post Components 987.201 Small Sign Support System Nucor Steel Marion Inc. Breakaway Rib-Bak U-Flange Post Installation - Double Post Assembly 987.301 Small Sign Support System Nucor Steel Marion Inc. Breakaway Rib-Bak U-Flange Post Installation - Triple Post Assembly 988.101 Small Sign Support System Allied Tube & Conduit Breakaway Square Post Installation - Single Post Assembly 988.201 Small Sign Support System Allied Tube & Conduit Breakaway Square Post Installation - Double Post Assembly 989.101 Small Sign Support System Northwest Pipe Company Breakaway Square Post Installation - Single Post Assembly 989.201 Small Sign Support System Northwest Pipe Company Breakaway Square Post Installation - Double Post Assembly September 2011 Page 6 of 6 G2-0 List of Active s