SPECIAL CONDITIONS OF CONTRACT

Similar documents
Bill of Quantity (BOQ)

Tender No: DAFFPL/MOD/FF/ /06 15 th July, 2015

SCOPE OF WORK FOR ELECTRICAL WORK

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. "Beit Hanoun Emergency Water Supply Project"

GENERAL TERMS & CONDITIONS (GT&C) FOR ITEMS & SERVICES (EXCLUDING CIVIL WORKS)

Bill of Quantity (BOQ)

TCN Ref: PSER:SCT:FKK-M717:TCN-01 Date:

No. D-31014/01/15-Estate Cell/ November, 2015

Bill of Quantity (BOQ)

ERECTION AND DISMANTLING OF TRANSMISSION LINE TOWERS & TOWER LIKE STRUCTURES AT TOWER TESTING STATION OF CPRI, BANGALORE

Tender No: KKNPP/CMM/15673 Section C2 Other Conditions. Index

NSIC THE NATIONAL SMALL INDUSTRIES CORPORATION LTD

COUNCIL OF SCIENTIFIC & INUDSTIRAL RESEARCH NEW DELHI NIT

MSME-TECHNOLOGY DEVELOPMENT CENTRE (Central Footwear Training Institute, Chennai)

OFFICE OF THE ASSAM HIGHER SECONDARY EDUCATION COUNCIL BAMUNIMAIDAM, GUWAHATI-21. Notice Inviting Quotation for Annual Maintenance Contract of IT

No: PUR/IMP/JPL/UVIT/ISO/39 July 29, 2008

TOWN OF ROMULUS WATER DISTRICTS RULES AND REGULATIONS

NOTICE OF INVITATION TO TENDER

GRASS CUTTING CONTRACT/S TYTHERINGTON PARISH COUNCIL Clerk to Parish Council, Gill Brooks c/o 8 Solent Way, Thornbury,Bristol BS 35

General Conditions of Contract For CIVIL / STRUCTURE WORKS At

THE BRAITHWAITE BURN & JESSOP CONSTRUCTION COMPANY LIMITED NOTICE INVITING TENDER

Bangalore Airport. No: AAI/BG/LEGAL/DATA PROCESSING/2017 Date: NOTICE INVITING QUOTAION

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT

PUBLIC WORKS DEPARTMENT NOTICE INVINTING QUOTATION

Corporate Policy and Procedure

Bill of Quantity (BOQ)

Bill of Quantity (BOQ)

TCN - 01 Ref: PSER:SCT:MRW-B1052:TCN-01 Date: VOL.ID SCC Unloading from railway wagon 50% SHALL BE READ AS :

TCN Revised `No deviation certificate as per enclosed Annexure-2. Bidder shall submit no deviation certificate as per enclosed format only.

Appendix C Having used FIDIC 99 as the basis for identifying the modifications made within the analyzed contracts, it was necessary to understand the

LIMITED DURATION CONTRACT OF EMPLOYMENT. Made and entered into by and between

INDIAN INSTITUTE OF TECHNOLOGY INDORE

Ref : Global Tender Notice No : DBJ/21/ April 19, 2011.

SPECIFICATIONS & SPECIAL PROVISIONS FOR DESIGN AND CONSTRUCTION CITY OF MONTCLAIR - ENGINEERING DIVISION

TENDER DOCUMENT FOR REPLACEMENT OF THE EXISTING PASSENGER LIFT WITH 10 PERSONS CAPACITY AT HOLKAR STADIUM, INDORE.

ELECTRIC SUPPLY CIRCLE, BHAGALPUR

BID SPECIFICATION: ADDENDUM A

Bill of Quantity (BOQ)

Name of work Estimated cost Time allowed for completion of work 1. Construction of PVC coated Chain Link fencing at Megapode Resort. Sl. No.

No. NIQ03/2018/IND15589/ Dated:

NATIONAL INSTITUTE OF RURAL DEVELOPMENT & PANCHAYATI RAJ NORTH EASTERN REGIONAL CENTRE, Jawaharnagar, Khanapara, Guwahati

Rte. 66/29 Interchange Reconstruction Project: ,C505 Grade Separation of Two Crossings Norfolk Southern Railway Right of Way and Track

TERMS AND CONDITIONS OF CARRIAGE

GENERAL PORT OPERATING CONDITIONS IN FINLAND 2006

DEPARTMENT OF OCEAN ENGINEERING INDIAN INSTITUTE OF TECHNOLOGY MADRAS CHENNAI , INDIA. Ref: OED/13/017/MEWM Date: 09 July 2013

REHABILITATION OF DRIVEWAY AND GROUND FLOOR OF THE SECOND BUILDING AT MIDDLE STREET OFFICE

Subject: Inviting Tender / Quotation for Designing and Printing of University Annual Report (Hindi Version)

Section Safety Section Cleanup. None Required

Tender Document and Specifications for Council Property Assorted Painting and Decorating between Parks and Recreation and Contractor.

STANDARD SPECIFICATION FOR TANK PADS

SPECIAL REQUIREMENTS AT AN OPERATIONAL AIRPORT

QUOTATION FOR CONSTRUCTION OF SEPTIC TANK, SOAK PIT AND INSPECTION CHAMBER AT ROIDA

TECHNICAL SPECIFICATIONS OF LAYING OF UNDER GROUND POWER CABLE FOR TRANSMISSION LINE

NOTICE INVITING TENDER NO- 02 OF OF ASSISTANT ENGINEER (AGRI-MECH) BISHNUPUR(AGRI-MECH) SUB DIVISION, BISHNUPUR( BANKURA)

INVITATION TO TENDER FOR HEATING VENTILATION AIR CONDITIONING SYSTEM PHARMA FORMULATION FACILITY AT JAIPUR

Name of work: - Supply and Installation of Electrical fittings at CSIR Scientist Apartments, Maharani Bagh, New Delhi C O N T E N T S

CONSTRUCTION AND REHABILITATION OF FENCE AT GPL'S VERSAILLES COMPOUND

CENTRAL WAREHOUSING CORPORATION

Ref no.zo/csd/bps/ /452 Date: NOTICE INVITING QUOTATION

ALLAHABAD BANK Head Office, 2, N. S. Road, Kolkata NOTICE INVITING TENDER

TENDER SPECIFICATION

PART C2: PRICING DATA. C2.1 : Pricing Instructions. C2.2 : Bills of Quantities

4. GENERAL REQUIREMENTS

SBI INFRA MANAGEMENT SOLUTIONS PVT. LTD., (SBIIMS) (WHOLLY OWNED SUBSIDIARY OF SBI) INVITES TENDERS ON BEHALF OF SBI, HYDERABAD.

DIVISION 1 GENERAL REQUIREMENTS SECTION PROJECT SCHEDULE

Ref. No.: SRMU/NDP-I/VBMPS-II/ INVITATION FOR QUOTATION FOR SUPPLY OF GOODS UNDER SHOPPING PROCEDURES

III. TECHNICAL SPECIFICATIONS DIVISION 56 BORED PIPE

Specifications. For. from. 6x660 MW Sasan Ultra Mega Power Project (SUMPP) Sasan, Gram Siddhikhurd, Dist-Singrauli, Madhya Pradesh.

1.1 Purchase orders shall only be legally binding if issued on our order forms and legally signed.

COUNCIL OF SCIENTIFIC AND INDUSTRIAL RESEARCH NEW DELHI TENDER NOTICE (N I T)

GENERAL REQUIREMENTS

MADHYA PRADESH CRICKET ASSOCIATION TENDER DOCUMENT FOR CONSTRUCTION OF UG WATER TANK CAPACITY OF LTRS FOR CRICKET GROUND AT SAGAR

NOTICE INVITING TENDER/एन आई ट. Est. cost In Rs.

RFQ CISCO NETWORK ROUTER

Disable friendly Washrooms at hostel blocks (A & E)

Tender Document and Specification

4. GENERAL REQUIREMENTS

Volume 3 - Section I Method of Measurement for Road Works. Chapter TV - Series 100 Preliminaries

Indian Institute of Technology Madras. Chennai - 36

NOTICE INVITING TENDER (NIT)

SECTION DRILLED CONCRETE PIERS AND SHAFTS

MOTOR CARRIER ACT REGULATIONS

COUNCIL OF SCIENTIFIC & INUDSTIRAL RESEARCH. NEW DELHI. NOTICE INVITING TENDER

INDIAN INSTITUTE OF TECHNOLOGY INDORE

SCOPE OF WORK FOR STEEL SHEDS OF FIRE WATER PUMP HOUSE & PRODUCT PUMP HOUSE

NOTICE INVITING QUOTATIONS. File No. NITT/F.No. 020/PROJ/ /DAC Date:

General Terms and Conditions of Delivery

Domtar Standard Terms of Sale March 2017

INVITATION FOR QUOTATIONS FOR SUPPLY OF ITEM THIS INVITATION DULY SIGNED ON ALL PAGES SHOULD BE ATTACHED WITH THE QUOTE

TENDER [WEB]No CDJ-03/12-13

CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION BY JACKING AND BORING

Tender Document and Specifications for Council Property Assorted Painting and Decorating between the Council and Contractor.

PILING WORKS FOR PROPOSED NEW BUILDING OF IIT MADRAS RESEARCH PARK AT KANAGAM ROAD, TARAMANI, CHENNAI

Chapter 2 Parties to the Contract

~!~/ 1V1AN~&ER (C&C) Balrner Lawrle & Co Ltd. Logistic Services Division TENDER FOR HIRING OF FORKLIFT/CRANE. 32~33 Kushal Bazar,Nehru Place

Request for Proposal (RFP) June 2017

Government of West Bengal PASCHIMANCHAL UNNAYAN PARSHAD Ailakundi (Behind S.B.S.T.C. Garage), Kenduadihi, Bankura

PW # 2-18 TENDER FOR SUPPLY & APPLY CRUSHED GRANITE

VISAKHAPATNAM PORT TRUST MATERILAS MANAGEMENT DEPARTMENT TENDER FORM

TOWN OF ROTTERDAM BUILDING DEPARTMENT RESIDENTIAL ACCESSORY BUILDINGS AND STRUCTURE PERMIT APPLICATION Ext 395

Transcription:

Annexure 16 SPECIAL CONDITIONS OF CONTRACT 1.0 General The Special conditions of contract shall be read in conjunction with the General Conditions of Contract, Specifications, Pre-amble to Bill of Quantities, Drawings and / or other supplementary documents detailing the work. Provided that where any provision of the General Conditions of contract is repugnant to or at variance unless a different intention appears, the provisions of the Special Conditions of Contract shall be deemed to override the provision of the General Conditions of contract and shall to the extent of such repugnance or variation prevail. 2.0 Site and Local Conditions The Fertilizer Plant site is located in the latitude of 13d 10 0 N and longitude of 80d16 5 E and it is in the Manali Village of Ponneri Taluk of Thiruvalluvar District. The site is in the out skirts of Chennai Metropolitan Area. The site is served by the bitumen road which lies for full length of front boundary connecting Tiruvottriyur, Minjur and Ennore. The site is about 12 KM from Chennai horbour, adjoining Chennai Petroleum Corporation Limited, Manali Petro-product limited. Nearest Railway station is Tiruvottiyur 4 KM from southern boundary. The Buckingham canal runs at about 2km east of the site and the sea coast is about 4.5 KM from the site. The site is situated on a generally flat ground with the contours varying from 1.2 M to 1.8 M above mean sea level. As the site is close to the sea coast the sub soil water table is fairly high. The site is situated in Seismic Zone 1 as defined by IS : 1893. Horizontal Seismic Coefficient of 0.02 for Seismic Method and 0.10 as Seismic Zone factor for response spectrum method is to be considered. Climatic conditions as observed in the nearest meteorological observatory at Nungambakkam, 22 KM from MFL site are as follows: Mean of maximum daily temperature 32 C Mean of minimum daily temperature 24 C Mean relative humidity 71% Maximum daily precipitation Average yearly precipitation Maximum rainfall occurs in 55 cm 160 cm October to December

Maximum wind velocity 63 KM per hour November to January - Mainly from NW & NE in morning and from North & East afternoon February & March - Mainly from East and SE April & May - Mainly from South & SE June - From SW July & August - From NW September & October - From SE & SW 3.0 Construction Facilities 3.1 Rail and Road Transport The site is about 4 KM west of Tiruvottiyur Railway Station on the Chennai Vijayawada line and close to Tondiarpet Marshalling Yard. The site is connected to Chennai City by the Waltax Road and also by Chennai North Beach Road. Access to the site will be from Tiruvottiyur Highway thro the railway over bridge. Intending tenderers shall visit and are deemed to have visited the site and make themselves thoroughly acquainted with the nature and requirement of the construction facilities, access for materials and removal of rubbish, cost of carriage, freights and other charges and shall allow in their tenders for special difficulties if any, in, carrying out the work, although these may not be mentioned in this specification. 3.2 Construction Water The Raw water for works shall be supplied free of cost by the Company to the Contractor at the ground level tank located in the off-site area or the well within MFL plot. The Contractor shall make his own arrangement for drawing water from this source and further distribution at his own cost with the approval of the Company. The Contractor cannot claim compensation for any failure in water supply caused due to any reason whatsoever. The Contractor shall be responsible to store water in sufficient quantities to meet his requirements in well built water storage tanks. The Contractor is responsible to ensure that there is no wastage or misuse of water. He will also be responsible for maintaining the tap, pipe lines etc. in proper conditions. The requirement of water for construction shall be indicated by the contractor.

3.3 Construction Power Electric power for construction purposes will be made available at 400 volts, 3 phase, 50 cycles to the Contractor free of cost at one point at the site, selected by the company. This does not cover, however, the power requirement for fabrication of structures and connected structural steel work, for which the contractors shall have to make their own arrangement at their own cost. Further distribution, installation of the switchboard, maintenance etc. shall be arranged by the contractor at his own cost. The Contractor shall be responsible to get necessary approval for energizing such part of the electrical installation from the State Electrical Inspector. All connections made will be to the Contractor s account, and shall conform to Indian Electricity rules 1956 and Indian Electricity Act 1910 with latest amendments. All wiring from the switchboard will be removed by the Contractor on completion of the work. He shall reinstate and make good any work disturbed by the temporary power lines to the satisfaction of the Company. The Contractor is responsible to ensure that there is no wastage or misuse of power. The energy consumed shall be used only for the works for which it is intended. The Contractor cannot claim compensation for any interruption or failure in power supply caused due to any reason whatsoever. The Contractor shall indicate requirement of electric power for lighting and construction equipment. 3.4 Temporary Roads The Contractor shall construct and maintain at his own cost all temporary roads within the plant boundary for leading materials to various sites of construction or otherwise deemed necessary to carry on the work. The Contractor shall be required to permit the use of the roads constructed by him for the vehicles of any other parties who may be engaged on Fertilizer site. The Contractors shall also facilitate the construction of permanent roads, should the construction thereof start while he is engaged on this work. Non availability of access roads for the use of the Contractor shall in no case condone any delay in the execution of works or the cause for any claim for compensation against the Company. 4.0 Time Schedule of construction Time is the essence of the contract. The Contractor shall complete the whole of the work to the satisfaction of the Engineer within the period as stipulated in the main Tender Document.

5.0 Supply of Materials The Company will not supply any materials to the Contractor and the Contractor shall make his own arrangements to procure all materials as required to complete the works in all respects according to the Contract. The quoted rates shall be inclusive of cost of materials together with sales tax and other taxes if leviable from time to time, loading, unloading, handling, stacking, transport and storage charge and shall also cover Contractor s overhead and profit. The Contractor shall procure his steel requirement for the work only from main producers and secondary producers. 6.0 Authorized Agents If the headquarters of the Contractor is elsewhere than in Manali he shall have a duly authorized agent in Manali from the commencement of work until completion of the work as specified. Such agent shall be authorized to act on behalf of the Contractor, to accept services of notices under the Contract and to agree to extras, omissions and varied items of work and rates for same. Such agent shall not be changed and shall not leave Manali during the period of the Contract unless the consent of the Engineer shall have been previously obtained. If the Engineer shall require the Contractor to carry out any rectifications under the terms of Contract after the work is completed the contractor shall have the same or another duly authorized agent in Manali when such rectifications are being carried out. The Contractor shall send a duly authorized competent representative to meet the Engineer at his office at site whenever called upon in writing to do so by the Engineer and any instructions, directions or explanations given by the Engineer to such representative shall be held to have been given to the Contractor. 7.0 Construction Stores and Site Office Suitable areas will be allocated by the Company to the Contractor to build storages for storing the equipments, plants, materials etc. and also to build his site offices. He will be solely responsible for watching and guarding of his stores, offices etc. The Contractor shall build at his own cost a weather proof shed to store cement. The Contractor shall cover all his equipments and materials at site with requisite insurance against theft, larceny, dacoity, fire, tempest, flood, earthquakes etc. On completion of the works undertaken by the Contractor, he shall remove all temporary works erected by him and have the site cleaned as directed by the Engineer. MFL reserves the right to ask the Contractor any time during the pendency of the Contract to vacate the land by giving 7 days notice on security reasons or on national interest or otherwise.

8.0 Labour and Supervisory Camp No land will be provided by the company to the Contractor for constructing his labour and supervisory camps. Contractor shall make his own arrangements for the same outside the plant boundary. 9.0 Construction Equipment The Contractor shall make his own arrangements to procure all constructional plant and equipments for his work. He shall also state in Annexure the type and number of different equipments with their capacities in good working conditions, which he will use on the site to ensure completion of the work in the specified time. All materials, construction plants and equipments etc. once brought by the Contractor to the site are not to be removed from there without the written authority from the Engineer. Also, the Contractor shall have adequate stock of spare parts for the equipment on the site and work shall not be delayed on this account. Similarly all temporary works built by the Contractor for the main constructions undertaken by him, are not to be dismantled and removed without the written authority from the Engineer. 10.0 Bar Bending Schedule Unless otherwise directed by the Engineer, all bar bending schedules shall be prepared by the Contractor on the basis of drawings, general arrangements and sections supplied by the Engineer. Bar bending schedules are to be prepared in conformity with the best modern practice with due regard to speed and economy and in general shall conform to the relevant Indian Standard Codes. The cost of the preparation of bar bending schedules and furnishing three (3) copies of the same shall be included in the rate for reinforcement work and no extra will be paid on this account. Bending and binding of reinforcement shall be taken in hand until the relevant bar bending schedules have been approved by the Engineer. 11.0 Co-operation with other Contractors The Contractor shall execute his work in a phased manner as directed by the Engineer from time to time so as not to obstruct or retard the work being executed simultaneously by other agencies. 11.0 Safety The Contractor shall be responsible for provision of safety arrangement and protective clothing for all operatives on the site whether or not engaged in actual operation or supervision. The contractor shall also be responsible for safety arrangements of all equipment used for construction and shall employ trained workmen conversant with safety regulation. The

Contractor shall use only tested equipment and tools and shall periodically renew tests to the satisfaction of the Engineer. All test certificates shall be made available to the Engineer at the site of the work. If at any time, in the opinion of the Engineer, this provision is not complied with, the Contractor shall forthwith replace such equipment and tools. The Contractor shall display notices and arrange proper fencing at such places where hazardous work is being carried out. The Contractor shall provide at his own expense on the works to the satisfaction of the Engineer at such places, proper and sufficient fire fighting, first-aid appliances etc. which shall at all times be available for use. 12.0 Coverage of Contract The Contract for the work is a complete one for labour, material and workmanship with Contractor s overheads and profit including all temporary works and the provision and use of all construction equipment, tools, tackles etc. The contractor shall make his own arrangements for all the materials and equipment required for the due performance of the Contract. Except where it is expressly provided that the cost will be borne by the Company the various obligations of Contractor under the Contract shall be at the cost of the Contractor. 14.0 Royalty Royalties for the construction materials i.e. sand, stone aggregates, boulders, moorum etc. as prescribed from time to time to by the State Government shall be paid by the Contractors. All mining regulations have to be strictly adhered to by the contractors. 15.0 Guarantees All guarantees such as for water proofing, acid resisting materials for the entire work as obtained from the manufacturers shall be transferred to the Company by the contractor after the completion on of the work. 16.0 Rules & Regulations Contractor shall provide all amenities to his staff and labour at site as per MFL Rules and Regulations. Contractor shall strictly follow the Rules & Regulations of Madras Fertilizers Limited. Contractor throughout the pendency of the contract, shall observe all the provisions, relevant rules, regulations and acts of Government of India, Government of Tamil Nadu and also local authorities as in force from time to time.

The contractor is fully responsible for the safety of his staff and workmen and must equip them with safety appliances and tools. All the workmen and staff shall be covered under Group Accident Insurance Scheme at his cost for the duration of the contract, without which the contractor will not be permitted to commence the work. The contractor shall also observe all rules and regulations framed by MFL, for work in the area, which houses other acid storage tanks. The contractor shall only use tested equipment, tools and tackles to the satisfaction of MFL Engineer 17.0 Site Facilities & Construction of Stores & Site Office MFL shall make available electric power and water at one point near to the site. The successful tenderer shall extend the same to the work site at their cost. Water and power for site work will be supplied to the contractor at free of cost. Any other facility like compressed air, blower etc. shall be arranged by the Bidder. MFL will not provide any scaffolding, tools & tackles for carrying out the work. 18.0 Removal of Rejected Material / Equipment Goods rejected by the company shall be removed by the contractor within 15 days from the date of intimation. MFL shall in no way be responsible for any loss, deterioration or damage to the rejected goods under any circumstances whatsoever. ****