Aufait Associates Ltd

Similar documents
Quality Commitment. Quality Management System Manual

POLICY MANUAL FOR ISO 9001:2008. Document: PM-9001:2008 Date: April 7, Uncontrolled Copy

Proprietary Document Disclosure Restricted To Employees and Authorized Holders

Derlin Construction Limited QUALITY POLICY MANUAL ISO 9001:2008

<Full Name> Quality Manual. Conforms to ISO 9001:2015. Revision Date Record of Changes Approved By

APS Cleaning Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland.

Machined Integrations, LLC

CHAPTER 8 INTEGRATION OF QMS AND LMS

HACCPEUROPA PUBLICATIONS ISO 22000:2005 FOOD SAFETY QUALITY MANUAL. ISO 22000:2005 Quality Manual

1 Management Responsibility 1 Management Responsibility 1.1 General 1.1 General

Awareness to ISO 9001:2000

Document Number: QM001 Page 1 of 19. Rev Date: 10/16/2009 Rev Num: 1. Quality Manual. Quality Manual. Controlled Copy

NATO STANDARD AQAP-2110 NATO QUALITY ASSURANCE REQUIREMENTS FOR DESIGN, DEVELOPMENT AND PRODUCTION

ISO 9001:2008 Quality Management System QMS Manual

General Accreditation Guidance. ISO/IEC 17025:2017 Gap analysis. April 2018

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES 4.0 DEFINITIONS. No.: P /21/2012 PAGE 1 OF 8 INTERNAL QUALITY AUDITS

Quality Manual. Print Name Title Date Prepared by L Naughton QA Consultant 9 th April 09. Reviewed by Bernard Lennon Fire and Safety Officer

Stanley Industries, Inc. ISO 9001:2008 Quality Policy Manual

Quality System Manual - Section 00

25 D.L. Martin Drive Mercersburg, PA (717)

P. 1. Identify the Differences between ISO9001:2000 與 ISO9001:2008 ISO9001:2008 ISO9001:2000 版本的異同. 5 January 2009 ISO 9000 SERIES

METUCHEN CAPACITORS INCORPORATED. Quality Manual P.O. BOX HIGHWAY 35, SUITE 2 HOLMDEL NJ USA

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

AS 9100 Rev C Quality Systems Manual AS-050C-QM

Quality System Manual - Section 00

CUSTOMER RELATIONSHIPS FURTHER EXCELLENCE GENERIC STANDARDS TRAINING SERVICES THE ROUTE TO ISO 9001:2015 AVOIDING THE PITFALLS

Comparison Matrix ISO 9001:2015 vs ISO 9001:2008

Quality Management System Manual

Mapping ISO/IEC 27001:2005 -> ISO/IEC 27001:2013

QUALITY MANUAL. Number: M-001 Revision: C Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED

CMI Guidance Document

NATO STANDARD AQAP-2110 NATO QUALITY ASSURANCE REQUIREMENTS FOR DESIGN, DEVELOPMENT AND PRODUCTION

UNIT 10 CLAUSE-WISE INTERPRETATION OF ISO 22000: 2005

NATO STANDARD AQAP-2310 NATO QUALITY ASSURANCE REQUIREMENTS FOR AVIATION, SPACE AND DEFENCE SUPPLIERS

PTM PLANT ISO 9001 Quality Manual Certification No

ISO 9001:2015 QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES

DECISION TO ACCREDIT

QUALITY MANAGEMENT SYSTEM QUALITY MANUAL ISO 9001:2008

QUALITY MANUAL ECO# REVISION DATE MGR QA A 2/25/2008 R.Clement J.Haislip B 6/17/2008 T.Finneran J.Haislip

Luminus Devices, Inc Quality Management Systems Manual ISO 9001:2008

OPERATIONS MANUAL ISO 9001 Quality Management System

UNCONTROLLED DOCUMENT

Quality Management System. Manual MASTER COPY

Quality Manual ISO Cedarburg, Wisconsin Revision: L

QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES

14620 Henry Road Houston, Texas PH: FX: WEB: QUALITY MANUAL

Quality and Environmental Business Process Manual

CORPORATE QUALITY MANUAL

ISO 9001: 2000 (December 13, 2000) QUALITY MANAGEMENT SYSTEM DOCUMENTATION OVERVIEW MATRIX

ISO 9001:2015. Quality Management System. Manual

ISO 9001:2015. Quality Manual Template.

Quality Manual. This manual complies with the requirements of the ISO 9001:2015 International Standard.

ENVIRONMENTAL MANUAL. Page 1 of 26 Uncontrolled when printed NCH Env Manual Vers 11.0 date 01/02/18

ISO 9001 PMA and 14 CFR 21 QUALITY POLICIES HANDBOOK

Quality Manual DRAFT. Quality Management Plan Version A1 Date: <22/01/11> Page 1 of 17

UPGRADE ASSESSMENT CHECKLIST

Reliance Aerospace Solutions

The following is an example systems manual from a low volume (TE, but not an automotive supplier) company.

Quality Assurance Manual, Revision F Page 1 of 20

Correlation Matrix & Change Summary

PRECISION SENSORS QUALITY ASSURANCE MANUAL THIS DOCUMENT IS CONTROLLED ONLY IF COPY IS STAMPED CONTROLLED IN RED INK

Continental Steel & Tube Co. Quality Manual

Security Operations. BS EN ISO 9001: 2008 Issue 1.2: 21/10/2016. Quality Manual. Managing Director. Controlled / Uncontrolled when printed

ISO 9001:2000 Revision G

QUALITY MANUAL. This document defines the requirements, processes, structure and documentation for the Teledyne DGO Quality Management System.

ISO AUDIT PREPARATION KIT 2016

HFI Fluid Power Products Quality Manual Revision # 5 dated 02/07/10. HFI FLUID POWER PRODUCTS A Division of Hydraulic Fittings, Inc.

INTERNATIONAL STANDARD

ISO 9001: 2015 Quality Management System Certification. Awareness Training

[Type text] QUALITY MANUAL. ISO 9001:2015 Quality Management System QMS1 ISSUE 1 12/09/16

Correspondence Between ISO 13485:2016 and 21 CFR Part 820 QMS Requirements

QUALITY SYSTEM MANUAL

QUALITY MANUAL 1.0 INTRODUCTION POLICY AND OBJECTIVES DEFINITIONS SCOPE QUALITY SYSTEM... 3

4. Quality Management System 4.1 GENERAL REQUIREMENTS

RULES FOR A QUALITY STANDARDS SYSTEM (QSS) IN MARITIME ACADEMIES/INSTITUTIONS

AEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing

AS9100 PMA and 14 CFR 21 QUALITY HANDBOOK

Quality Manual. Ingenuity at its best WEST INDUSTRIES LLC Silverton, Suite 924 San Diego, CA USA

Texas International Oilfield Tools, Ltd.

SQF 2000 Code. 6th Edition AUGUST A HACCP-Based Supplier Assurance Code for the Food Manufacturing and Distributing Industries

QUALITY MANUAL 1.0 INTRODUCTION POLICY AND OBJECTIVES DEFINITIONS SCOPE QUALITY SYSTEM... 3

Quality Manual In support of ISO 9001:2015 ANSI/NCSL Z , ISO/IEC17025 ISO10012

ISO /TS 29001:2010 SYSTEMKARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER

MCBO B Jun 13. Subj: IMPLEMENTATION AND MANAGEMENT OF INTERNATIONAL ORGANIZATION OF STANDARDS QUALITY MANAGEMENT SYSTEM

PROOF/ÉPREUVE A ISO INTERNATIONAL STANDARD. Environmental management systems Specification with guidance for use

POLYCRAFT INCORPORATED QUALITY MANUAL Quality Manual QM -10 Approval: D. Wheeler.

Supplier Quality Survey. 1. Type of Business: g) Commodities supplied? Supplier Changes/comments: 2. Headcount breakdown by group: Purchasing

Quality Management System Plan

ISO 22000:2005 SYSTEMKARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER FOOD SAFETY MANAGEMENT SYSTEM ISO 22000:2005

MPC SERVICES (UK) LIMITED

BS EN ISO 9001 QUALITY ASSURANCE MANUAL

Quality Systems Manual

INTERNATIONAL STANDARD

Quality Manual This copy printed on 30 August 2016

AS9120 Quality System Manual Street Address City, State, Zip

Humantech Environmental Management System Manual

Quality, Health Safety & Environment Code: 2013

Specification for Quality Programs for the Petroleum, Petrochemical and Natural Gas Industry

INTERNATIONAL STANDARD

NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual

Transcription:

Example Quality Management System 191 Aufait Associates Ltd Quality Management System Part 1 Quality Manual This Quality Manual (QM) has been issued on the authority of the Managing Director of Aufait Associates Ltd (AAL) for the use of all staff, subcontractors, clients and/or regulatory bodies to whom AAL may be required to provide such information to. Approved... Date: 1 November 2009 Ray Rekcirt, Managing Director, AAL Ó 2009 by AAL. All rights reserved. Copyright subsists in all AAL deliverables including magnetic, optical and/or any other soft copy of these deliverables. This document may not be reproduced, in full or in part, without written permission.

192 ISO 9001:2008 for Small Businesses DOCUMENT CONTROL SHEET Abstract AAL s Quality Management System (QMS) is divided into four parts. This QM is Part 1 and describes the policies adopted by AAL. It defines: The overall QMS adopted by AAL; The organisation that has been developed to implement that QMS; and The associated documentation [e.g. Quality Processes, Quality Procedures (QPs) and Work Instructions (WIs)] that have been designed to enable AAL to carry out the QMS. The Quality Processes designed to meet these policies are contained in Part 2 and the details of the QPs and WIs are in Parts 3 and 4. Attachments Attachment Annex A Annex B Annex C Annex D Description Aufait Associates Ltd s organisation and responsibilities ISO 9001:2008 cross-check List of Quality Procedures Abbreviations, Acronyms and References QMS Revision History No. Chapter Amendment details Date 01.00 All First published version in accordance with ISO 9001:1994 28.06.93 01.01 3 Inclusion of new chapter for customer satisfaction 05.04.94 01.02 4.2.3 Procedure for the control of documents changed 23.12.95 01.03 All Minor editorial revisions of all sections and annexes 30.07.96 02.00 All Second published version to conform to ISO 9001:2000 31.12.00 02.01 5 Management responsibility procedure updated to cover new (i.e. Fuels) Division 02.02 All Minor editorial changes following 3 years experience of ISO 9001:2000 01.01.02 01.01.05 03.00 All Major revision following publication of ISO 9001:2008 01.11.09

Example Quality Management System 193 CONTENTS Abstract... 192 Attachments... 192 QMS revision history... 192 List of Illustrations... 196 List of Tables... 196 Aufait Associates Ltd policy statement and mission statement... 197 1. Quality assurance at Aufait Associates Ltd... 198 1.1 Company profile... 199 1.2 Costs... 199 1.3 Aufait Associates Ltd organisational chart... 200 1.4 Quality policy and objectives... 200 1.4.1 Policy... 200 1.4.2 Objectives... 200 1.5 Implementation... 201 1.5.1 Overall responsibility... 201 1.5.2 Responsibility for quality system... 201 1.5.3 Responsibility for contract quality... 201 1.5.4 Responsibility for product quality... 201 1.5.5 Responsibility for subcontractor(s) quality... 201 1.6 Registrations and approvals held... 202 2. Aufait Associates Ltd s management system... 202 2.1 Requirements... 202 2.2 Organisational goals... 204 2.3 Purpose... 205 3. Quality policy... 205 3.1 Introduction... 205 3.2 Quality Management System requirements... 205 3.3 Company requirements... 205 3.4 Company quality policy... 207 3.5 Adherence to standards... 208 3.6 Purpose of a Quality Management System... 208 3.7 Quality in performance... 208 3.8 Organisational goals... 209 3.9 Structure for quality management... 209 3.9.1 QMS Document Control... 211 3.10 The Quality Manual... 212 3.11 Quality Processes... 212

194 ISO 9001:2008 for Small Businesses 3.12 Quality Procedures... 216 3.13 Work Instructions... 216 3.14 Records... 217 3.15 Project Quality Plans... 217 4. Quality Management System (ISO 9001:2008 4)... 217 Conformance with ISO 9001:2008... 218 Quality Manual administration... 218 Confidentiality... 218 4.1 General requirements (ISO 9001:2008 4.1)... 218 4.2 Documentation requirements (ISO 9001:2008 4.2)... 219 4.2.1 General (ISO 9001:2008 4.2.1)... 219 4.2.2 Quality Manual (ISO 9001:2008 4.2.2)... 220 4.2.3 Control of documents (ISO 9001:2008 4.2.3)... 220 4.2.4 Control of quality records (ISO 9001:2000 4.2.4)... 221 5. Management responsibility (ISO 9001:2008 5)... 222 5.1 Management commitment (ISO 9001:2008 5.1)... 222 5.2 Customer focus (ISO 9001:2008 5.2)... 222 5.3 Quality policy (ISO 9001:2008 5.3)... 223 5.4 Planning (ISO 9001:2008 5.4)... 223 5.4.1 Quality objectives (ISO 9001:2008 5.4.1)... 223 5.4.2 Quality Management System planning (ISO 9001:2008 5.4.2)... 224 5.5 Responsibility, authority and communication (ISO 9001:2008 5.5)... 225 5.5.1 Responsibility and authority (ISO 9001:2008 5.5.1)... 225 5.5.2 Management representative (ISO 9001:2008 5.5.2)... 225 5.5.3 Internal communication (ISO 9001:2008 5.5.3)... 226 5.6 Management review (ISO 9001:2008 5.6)... 227 5.6.1 General (ISO 9001:2008 5.6.1)... 227 5.6.2 Review input (ISO 9001:2008 5.6.2)... 228 5.6.3 Review output (ISO 9001:2008 5.6.3)... 228 6. Resource management (ISO 9001:2008 6)... 229 6.1 Provision of resources (ISO 9001:2008 6.1)... 229 6.2 Human resources (ISO 9001:2008 6.2)... 229 6.2.1 General (ISO 9001:2008 6.2.1)... 230 6.2.2 Competence, training and awareness (ISO 9001:2008 6.2.2)... 230 6.3 Infrastructure (ISO 9001:2008 6.3)... 231 6.4 Work environment (ISO 9001:2008 6.4)... 232

Example Quality Management System 195 7. Product realisation (ISO 9001:2008 7)... 232 7.1 Planning of realisation processes (ISO 9000:2000 7.1)... 233 7.2 Customer-related processes (ISO 9000:2000 7.2)... 234 7.2.1 Determination of requirements related to the product (ISO 9001:2008 7.2.1)... 234 7.2.2 Review of requirements related to the product (ISO 9000:2000 7.2.2)... 235 7.2.3 Customer communication (ISO 9000:2000 7.2.3)... 235 7.3 Design and development (ISO 9000:2000 7.3)... 236 7.3.1 Design and development planning (ISO 9001:2008 7.3.1)... 236 7.3.2 Design and development inputs (ISO 9001:2008 7.3.2)... 237 7.3.3 Design and development outputs (ISO 9001:2008 7.3.3)... 238 7.3.4 Design and development review (ISO 9001:2008 7.3.4)... 239 7.3.5 Design and development verification (ISO 9001:2008 7.3.5)... 240 7.3.6 Design and development validation (ISO 9001:2008 7.3.6)... 241 7.3.7 Control of design and development changes (ISO 9001:2008 7.3.7)... 242 7.4 Purchasing (ISO 9001:2008 7.4)... 242 7.4.1 Purchasing process (ISO 9001:2008 7.4.1)... 243 7.4.2 Purchasing information (ISO 9001:2008 7.4.2)... 244 7.4.3 Verification of purchased product (ISO 9001:2008 7.4.3)... 245 7.5 Production and service provision (ISO 9001:2008 7.5)... 246 7.5.1 Control of production and service provision (ISO 9001:2000 7.5.1)... 246 7.5.2 Validation of processes for production and service provision (ISO 9001:2008 7.5.2)... 247 7.5.3 Identification and traceability (ISO 9001:2008 7.5.3)... 248 7.5.4 Customer property (ISO 9001:2008 7.5.4)... 248 7.5.5 Preservation of product (ISO 9001:2008 7.5.5)... 249 7.6 Control of monitoring and measuring equipment (ISO 9001:2008 7.6)... 250 8. Measurement, analysis and improvement (ISO 9001:2008 8)... 251 8.1 General (ISO 9001:2008 8.1)... 251 8.2 Monitoring and measurement (ISO 9001:2008 8.2)... 252 8.2.1 Customer satisfaction (ISO 9001:2008 8.2.1)... 252 8.2.2 Internal audit (ISO 9001:2008 8.2.2)... 253

196 ISO 9001:2008 for Small Businesses 8.2.3 Monitoring and measurement of processes (ISO 9001:2008 8.2.3)... 254 8.2.4 Monitoring and measurement of product (ISO 9001:2008 8.2.4)... 255 8.3 Control of non-conforming product (ISO 9001:2008 8.3)... 256 8.4 Analysis of data (ISO 9001:2008 8.4)... 257 8.5 Improvement (ISO 9001:2008 8.5)... 257 8.5.1 Continual improvement (ISO 9001:2008 8.5.1)... 258 8.5.2 Corrective action (ISO 9001:2008 8.5.2)... 258 8.5.3 Preventive action (ISO 9001:2008 8.5.3)... 259 Annex A Aufait Associates Ltd s organisation and responsibilities... 260 Annex B ISO 9001:2008 cross-check... 262 Annex C List of Quality Procedures... 267 Annex D Abbreviations and Acronyms... 267 References... 268 LIST OF ILLUSTRATIONS Figure 6.1.1: Aufait Associates Ltd organisational chart... 200 Figure 6.1.2: Quality loop... 203 Figure 6.1.3: Some of the determinants and measurements of the quality of a service... 206 Figure 6.1.4: Some of the determinants and measurements of the quality of a product... 206 Figure 6.1.5: Quality Management System... 210 Figure 6.1.6: The eight principles of ISO 9001:2008 expressed diagrammatically... 211 Figure 6.1.7: AAL s Quality Manual... 213 Figure 6.1.8: AAL s Core Business Process... 214 Figure 6.1.9: Inter-relationship of documented processes with QPs and WIs... 215 Figure 6.1.10: Aufait Associates Ltd management structure... 215 LIST OF TABLES Table 6.1.1: QMS documentation... 212

Example Quality Management System 197 AUFAIT ASSOCIATES LTD POLICY STATEMENT Within Aufait Associates Ltd (AAL) we are committed to provide products and services which meet the customers specified contractual requirements. AAL recognises that in order to provide and maintain a consistently high quality in the work it undertakes, an effective Quality Management System (QMS) is necessary so as to ensure that proper communication, work control and accountable records are generated for all work undertaken. We are totally committed to setting and achieving quality standards that are capable of meeting (in all respects) the specified requirements and reasonable expectations of our customers. It is the policy, therefore, of AAL to control and conduct its business of producing and implementing integrated management services by means of a formalised system of modern quality management. This quality management shall be in accordance with the quality system requirements as specified in ISO 9001:2008. The Quality Manual (QM) (i.e. this document) defines AAL s QMS which has been established and adopted as the means for achieving these declared objectives and which is detailed in the sections below. All members of AAL staff are charged with promoting these aims and are required to familiarise themselves with the contents of this QM and to observe and implement the systems and procedures defined in the performance of their work. Everyone connected with AAL shall be supported according to their individual needs for personal development. The Quality Manager based at the AAL main office is my appointed management representative responsible for monitoring and ensuring the correct and effective implementation of AAL s QMS as a whole. Ray Rekcirt, Managing Director, Aufait Associates Ltd. Author s Hint This Policy Statement must be changed so that it accurately reflects your own business. Mission Statement To deliver effective, evidence-based management systems in accordance to the recommendations of ISO 9001:2008 and other industry equivalent standards.

198 ISO 9001:2008 for Small Businesses 1. QUALITY ASSURANCE AT AAL This QM has been issued on the authority of the Managing Director of AAL for the use of all staff, subcontractors, clients or regulatory bodies to whom AAL may be required to provide such information. This QM defines: The overall quality policy adopted by AAL; The organisation that has been developed to implement this quality policy; and The documentation (i.e. Quality Processes, QPs and WIs) that has been designed to enable AAL to carry out that policy. Other than the permissible exclusions shown in the relevant parts of the text, AAL s QM conforms to the requirements of ISO 9001:2008 (Ref 1). It takes into consideration the requirements of AAL s Memorandum and Articles of Association (Ref 3), together with all other applicable national, European and international standards and procedures [e.g. ACP8 and ACP9 (Refs 4 and 5) written for the aircraft industry. Author s Hint If you are not a Ltd Company, then you probably will not have Memorandum and Articles of Association and so you can leave it out or you could say. objectives set out in Section 1 of the QM or something similar. Author s Hint Insert the directives, standards and procedures that are relevant to your organisation in here. If there are any discrepancies between the AAL QM and these other directives/standards, the requirements of the AAL QM shall prevail. Changes in the organisation of AAL, or the environment in which it operates, may necessitate modifications, amendments, insertions and/or deletions to the overall quality management adopted by AAL and its associated documentation (e.g. Quality Processes, QPs and WIs). The contents of this QM may, therefore, be altered on an as required basis. All changes shall be subject to QP/1 Document Control. Changes shall be deemed operational following approval by the authorised person(s) and published as updated sections of the QM.

Example Quality Management System 199 Certain technical terms and usage in this QM, although only reflecting the masculine gender, are, in fact, the parlance of the field and should be interpreted to apply equally to both sexes. 1.1 Company Profile AAL is a Private Limited Company specialising in the production of integrated QMSs for small-and medium-sized enterprises (SMEs) as well as large multinational organisations (LMO). All deliverables are designed and supplied to the highest standards and conform to the relevant international and European standards. AAL s aim is to produce everything that you want in support of your company s QMS. AAL provides advice and guidance on all quality matters. We can produce either complete QMSs, QMs, Quality Processes, QPs, WIs or technical books to suit individual customer requirements. AAL also provides qualified advice on health and safety and environmental requirements (particularly those for the railway industry) and are experts in fuel conservation and railway signaling systems. AAL controls and conducts its business of producing and implementing integrated management systems by means of a formalised system of modern quality management, which is in accordance with the quality system requirements and recommendations specified in the ISO 9001:2008. At AAL, we believe that it is important to develop a good working relationship with our customers at every level, ensuring that they receive a quality product and service. Nothing is considered too small. Indeed, AAL has become renowned for assisting the smaller company (who rarely possesses a quality infrastructure) in establishing their own QMS in accordance with ISO 9001:2008 and working towards becoming an ISO 9001:2008 certified company. Author s Hint The Company Profile will need to be changed so that it accurately reflects your own business. 1.2 Costs Each deliverable s budget is carefully prepared taking into account the type of product and the market to which it is aimed. Emphasis is placed on producing a quality product at a realistic cost thereby giving the customer value for money.

200 ISO 9001:2008 for Small Businesses 1.3 Aufait Associates Ltd organisational chart Author s Hint This will probably need amending to reflect your own organisation s structure. 1.4 Quality Policy and Objectives 1.4.1 Policy AAL shall define and manage the processes necessary to ensure that all project deliverables conform to customer requirements. As a means of continually improving project performance, AAL shall establish a QMS covering the requirements of ISO 9001:2008. This QMS shall be implemented, maintained, continually improved and have the full support of Top Management (Fig. 6.1.1). Company Secretary MANAGING DIRECTOR Quality Manager Quality Management Systems Environmental Section Fuels Section Projects Section Standards Quality Manuals Policies & Procedures Standards Policy Conserve & Mgt Safety & Policy UIC and Railways Military Civilian FIGURE 6.1.1 Aufait Associates Ltd organisational chart AAL shall prepare procedures that describe the processes required to implement the QMS. These shall include: Core Business Process(CP) and Supporting Processes(SP); QPs that describe the methods adopted to manage the CP and SP; QPs required for ISO 9001:2008 compliance; and WIs that describe the operating methods, practice and control of the CP and SP. 1.4.2 Objectives The main objective of the AAL s QMS is to ensure that company activities, whether they are organisational (e.g. management and infrastructure) or

Example Quality Management System 201 technical (e.g. specification work, testing and simulation), comply with the QM and its associated Quality Plans. 1.5 Implementation Quality management at AAL is based on the QMS described in ISO 9001:2008. The purpose of the AAL s QMS is to define the policy, organisation and responsibilities for the management of quality within AAL. The most important aspects of AAL s QMS are to be found in the AAL QM (i.e. this document), which describes, in detail, how the main elements of ISO 9001:2008 are catered for. The QM is then supported by individual Quality Plans (for each section or major contract/document), which in turn are supported by Quality Processes, QPs and WIs. All AAL personnel shall have access to a copy of this QM (see Section 3.10 page 212) and as part of personnel induction training, the objectives of the manual shall be explained to them by the AAL Quality Manager. 1.5.1 Overall Responsibility The responsibility of ensuring that AAL has a quality policy and for ensuring that an organisation with the necessary resources is in place to implement the policy lies with the Managing Director. 1.5.2 Responsibility for Quality System The Managing Director has appointed the Quality Manager to have overall responsibility for implementing and maintaining the AAL quality system. As Quality Manager, he has the responsibility and the authority to ensure that adequate processes, procedures, plans and instructions are drawn up so as to provide a common approach to quality assurance throughout AAL and to ensure that the quality system is continuously monitored and improved by means of internal audits and management reviews. 1.5.3 Responsibility for Contract Quality The responsibility for the development of contract quality rests with AAL s Managing Director via the Company Managers. 1.5.4 Responsibility for Product Quality The responsibility for ensuring that the product conforms to the defined quality requirements in this manual lies with all AAL personnel. 1.5.5 Responsibility for Subcontractor(s) Quality Specialised areas of operation and technical expertise may be required to meet the needs of AAL. In many cases, these shall have to be provided externally

202 ISO 9001:2008 for Small Businesses via a subcontractor. These subcontractors will need to provide evidence that their QMS is in accordance with the requirements of the principles of ISO 9001:2008. 1.6 Registrations and Approvals Held AAL is a Registered Organisation certified by an Accredited Certification Body and verified as having quality documentation and effective practices in operation, which are in accordance with the requirements of the international Quality System ISO 9001:2008. Author s Hint You will need to include your own organisation s registrations and approvals in here. 2. AAL S MANAGEMENT SYSTEM 2.1 Requirements AAL s QMS is the organised structure of responsibilities, activities, resources and events that together provide procedures and implementation methods to ensure that AAL meets the quality requirements of customers and is capable of continual improvement. AAL has to develop, establish and implement a QMS in order to ensure that the overall objectives and policies stated in AAL s Memorandum of Articles and Association are met. Author s Hint If you are not an Ltd company, then you might not have any Memorandum and Articles of Association. To achieve these requirements, AAL involves all phases of a quality loop (see Fig. 6.1.2) that is derived from the requirements of ISO 9001:2008 and covers the initial identification of the requirement to the final satisfaction of the customer s needs and expectations. Within AAL, an effective QMS ensures that all activities are fully understood, controlled and documented and that everyone knows exactly what they are supposed to be doing and how they should be doing it.

Example Quality Management System 203 Devise the product or service Design and development 7.2.1, 7.3 Market, sell, propose, bid, negotiate Customer focus 5.2, 7.2 Provide contracted support after sale Servicing 7.1, 7.5.1 Buy (or subcontract) materials and services 7.4 Purchasing Manage inventory Production and service provision 7.5.1, 7.5.4, 7.5.5 Manage inventory Production and service provision 7.5.1, 7.5.4, 7.5.5 Contain and correct unacceptable product/service Control of nonconforming product 8.3 Manage inventory Process control 6.3, 6.4, 7.1, 7.5.1, 7.5.2, 8.2.3 Verify acceptability Inspection and testing 7.1, 7.4.3, 7.5.1, 7.5.3, 8.1, 8.2.4 FIGURE 6.1.2 Quality loop

204 ISO 9001:2008 for Small Businesses There are four main requirement sections making up the ISO 9001:2008 standard ranging from how to control a design process to how to audit an activity but the most important element is the first one, which demands that everyone shall be involved in quality in order for it to succeed and that it must be management led and that there must be a commitment to quality at the highest level. Within AAL, we have this commitment. It stems from AAL s decisions in this respect and manifests itself throughout AAL s management, at all levels. 2.2 Organisational Goals The primary goal of AAL shall, at all times, be the quality of the end product and service. To succeed, AAL must be able to offer products and services that: Meet the need, use and purpose as defined in AAL s Memorandum and Articles of Association; Satisfy the customer s requirements and expectations; and Comply with applicable international, European and national quality standards and specifications. In order to meet these objectives, AAL shall organise itself in such a way that the technical, administrative and human factors affecting the quality of AAL products and services are always under control. It is imperative that this control is orientated to the reduction, elimination and of paramount importance the prevention of quality deficiencies. The AAL s QMS, therefore, has to be developed and implemented for the purpose of accomplishing the objectives set out in AAL s Memorandum and Articles of Association. Author s Hint If you are not an Ltd company, then you might not have any Memorandum and Articles of Association, you could say.objectives set out in Section 1 of the QM or something similar. Above all (and to achieve maximum effectiveness), it is essential that the AAL s QMS is designed so that it is appropriate to the type of contract and services being offered by AAL. Demonstration of the continued success of the QMS shall be achieved via regular audits and reviews.

Example Quality Management System 205 2.3 Purpose The purpose of a QMS is to ensure that the end product (i.e. the deliverable) conforms to the customer s (i.e. user s) contractual requirements. AAL s QMS, therefore, involves all AAL s functions, wherever and however instigated (e.g. Director level, Section Manager level), that directly, or indirectly, affect AAL deliverables and contracts. In essence, AAL s QMS essentially consists of the documented rules, procedures and instructions prepared in accordance with ISO 9001:2008. These are stated in the QM as well as the associated CP, SPs, QPs and WIs. The AAL audit team (consisting of the Managing Director, Quality Manager and Company Secretary) plus Section Manager(s) may decide if additional documents are required for individual sections. In these cases, the requirement for an additional document shall be clearly stated and rules developed. 3. QUALITY POLICY 3.1 Introduction This section of the manual defines AAL s quality policy and outlines the main responsibilities for its implementation. 3.2 Quality Management System Requirements A QMS is the organised structure of responsibilities, activities, resources and events that together provide procedures and methods of implementation to ensure the capability of an organisation meets the quality requirement of the client. (ISO 10011:2002). Quality is an objective concept. It is something that the whole workforce can understand and measure and for which they accept responsibility. As an indicator, some of the determinants and measures of AAL s quality of a service are shown in Fig. 6.1.3, whilst those appertaining to the quality of a product are shown in Fig. 6.1.4. 3.3 Company Requirements As described in the company Policy Statement, within AAL we are totally committed to setting and achieving quality standards that will enable the company to provide its customers with a high-quality product and service. To meet this commitment, AAL shall develop and maintain a QMS that meets the requirements and the recommendations of ISO 9001:2008. Total Quality Management (TQM) shall be applied to every aspect of our activity and quality shall be the responsibility of everyone, in every activity, throughout AAL.

206 ISO 9001:2008 for Small Businesses Determinants Measures Company financial resources People The quality of a service Proficiency Requirements, specifications and/or directives Confirmed market need Facilities Instructions The totality of features and characteristics of a service that bear on its ability to satisfy a given need Timing FIGURE 6.1.3 Some of the determinants and measurements of the quality of a service Determinants Measures Human resources Design The quality of a product Conformity Function Appearance Other sensory effects Confirmed market need Requirements, specifications and directives Materials Variability Percentage defective Company financial resources Processes The totality of features and characteristics of a product that bear on its ability to satisfy a given need General reliability Stability Mean life Characteristic reliability Failure rate FIGURE 6.1.4 Mean time between failure Some of the determinants and measurements of the quality of a product

Example Quality Management System 207 To achieve these objectives, everyone s involvement and commitment is vital in adhering to the system adopted and in fully appreciating their quality responsibilities. Everyone connected with AAL shall be supported according to their individual needs for personal development, training and facilities. 3.4 Company Quality Policy Quality management within AAL is based on the quality system described in Section 4 of ISO 9001:2008. The purpose of the quality system is to define the policy, organisation and responsibilities for the management of quality within AAL. Quality management forms an integral part of our overall company management and the role of quality management within our company is an essential requirement. It provides confidence that application of company management (as described within this QM) is efficient, comprehensive and effective in ensuring that every stage of the product (or service) development is delivered: On time; To the agreed product specifications; and Within budget. The main objective of AAL s QMS is to ensure that all activities, whether they are managerial (e.g. organisation) or technical (e.g. specification work), comply with the QM and it is incumbent on all staff to have a day-to-day responsibility for ensuring conformance to the requirements and rules as stated in this QM. Author s Hint You will need to change the above sentence to reflect your own type of business. In cases of non-compliance (e.g. if part of the specified work is not carried out in accordance with the product and/or service requirements), a problemsolving process shall be executed by the first responsible manager. This process shall include the location of root causes, remedial action, review of AAL s QMS and, if necessary, its adjustment and modification. The Quality Manager plays an important part in this process. His role will be to suggest alternative solutions and help the First Line Manager to take the necessary remedial action. If no effective corrective action is taken, the Quality Manager has the duty to inform the Managing Director.

208 ISO 9001:2008 for Small Businesses Summarised, AAL s QMS shall ensure: Clear responsibilities for all activities and tasks; Confirmation that all activities are defined and controlled by a QP or WI; Staff are trained to the requirements listed in the QM and contract Quality Plans; Compliance with AAL s QPs detailed in the QM and Contract Quality Plans are audited; Remedial action is taken whenever appropriate; and The Quality Processes, QPs, WIs (contained in the QM) and contract Quality Plans themselves are regularly reviewed. 3.5 Adherence to Standards AAL s QM is based on the requirements of ISO 9001:2008 and takes into consideration the requirements of all other applicable national, European and international standards, procedures and directives. If there are any discrepancies between AAL s QM and these other directives/standards, the requirements of AAL s QM shall prevail. 3.6 Purpose of a Quality Management System The purpose of having a QMS is to ensure that the end product or service conforms to the customer s (i.e. user s) contractual requirements. AAL s QMS, therefore, involves all AAL functions, wherever and however instigated, that directly, or indirectly, affect deliverables and contracts. Demonstration of the continued success of our QMS shall be achieved via regular audits and reviews (for details see QP/6 Internal Quality Audits). 3.7 Quality in Performance The system adopted by AAL to achieve quality in performance with accountability is based on the following four main items or activities: 1. QM Manual the QM (as the primary control document) which defines the policy, processes, responsibilities, procedures, etc., that are to be used; 2. Quality Manager the appointment of a Quality Manager within a defined organisational structure, who is responsible for operating the system and ensuring that the QM and its associated documentation is fully and effectively implemented; 3. Documented processes and procedures the use of documented processes and procedures to define all activities which could lead to variability of execution with consequent loss of quality attainment, performance or safety if not rigorously controlled;

Example Quality Management System 209 4. QMS Reviews regular reviews of the QM (and its supporting documentation) together with auditing its effective implementation to ensure that the most suitable and effective methods and procedures are still prescribed and used. 3.8 Organisational Goals The primary goal of AAL shall be, at all times, to ensure that the quality of the product and/or service: Satisfies the customer s requirements and expectations; Meets the need, use and purpose as defined in the approved product and/or service specifications; Complies with the requirements of ISO 9001:2008; and Complies with applicable international, European and national quality standards, specifications and directives. In order to meet these objectives, AAL has to be organised in such a way that the technical, administrative and human factors affecting the quality of AAL products and services are always under control. It is imperative that this control is orientated to the reduction, elimination and very importantly the prevention of quality deficiencies. The AAL s QMS, therefore, has to be developed and implemented for the purpose of accomplishing the objectives set out above. To achieve maximum effectiveness, it is essential that this QMS is designed so that it is appropriate to the type of contract and services being offered by AAL. 3.9 Structure for Quality Management AAL s QMS defines the policy, organisation and responsibilities for the management of quality within AAL. It ensures that all activities comply with an agreed set of rules, regulations and guidelines and that the end product or service (i.e. the deliverable) conforms to the customer s (i.e. the user s) contractual requirements. A QMS can only be effective if it is fully documented, understood and followed by all. Within the ISO 9001:2008 Quality Model, there are four levels of documentation, and these are structured as shown in Fig. 6.1.5. The AAL s QMS relies on the eight quality management principles contained in ISO 9001:2008 to provide and enable a continual improvement of our business and our overall efficiency and to make us capable of responding to customer needs and expectations. These eight principles (Fig. 6.1.6) are:

210 ISO 9001:2008 for Small Businesses Quality manual Quality processes Quality procedures Work instructions FIGURE 6.1.5 Quality Management System 1. Customer focused organisation AAL depends on our customers and is committed to understanding, anticipating and responding to every customer requirement with product and service excellence. 2. Leadership leaders establish unity of purpose and directions create the environment in which people can become fully involved in achieving AAL s objectives. 3. Involvement of people AAL has created an environment, which makes every employee a team member and encourages participation in achieving our goals. 4. Process approach the desired result is achieved by relating resources and activities to managed processes. 5. System approach to management identifying, understanding and managing a system of inter-related processes for a given objective contributes to the effectiveness and efficiency of AAL. 6. Continual improvement continual improvement is a permanent objective of AAL. 7. Factual approach to decision-making effective decisions are based on the logical and intuitive analysis of data and information.

Example Quality Management System 211 Leadership 2 Continual improvement 6 3 Involvement of people Supply chain Supplier 8 Mutually beneficial supplier relationship Internal customers ORGANISATION Internal customers 1 Customer focused organisation Customer 5 7 4 System approach to management Factual approach to decision making Process approach FIGURE 6.1.6 The eight principles of ISO 9001:2008 expressed diagrammatically 8. Mutually beneficial supplier relationships mutually beneficial relationships between AAL and its suppliers enhance the ability of both organisations to create value. 3.9.1 QMS Document Control One copy of the QMS shall be held on the server (Table 6.1.1). For control purposes, the Quality Manager shall have sole access to this file and it is the Quality Manager s responsibility to modify, update, amend and approve these documents as required. In all cases, the procedures and instructions contained in this controlled copy shall be official company policy. Uncontrolled copies of the QM (including QPs and WIs) shall be available to all staff via a link on AAL s Intranet Home Page. Uncontrolled copies (watermarked Uncontrolled Copy across each page) may be provided to outside organisations, or individuals, for publicity or information purposes (these copies will not be automatically updated). Staff shall be informed by e-mail when a controlled copy has been amended; it will include a request for all uncontrolled copies to be destroyed. All staff will reply by e-mail to the Quality Manager stating that they have complied with the request.

212 ISO 9001:2008 for Small Businesses TABLE 6.1.1 QMS documentation Level 1 Quality Manual Level 2 Processes Level 3 Quality Procedures Level 4 Work Instructions The main policy document that establishes AAL s QMS and how it meets the requirements of ISO 9001:2008. The CP plus SPs that describe the activities required to implement the QMS and to meet the policy requirements made in the QM. A description of the method by which quality system activities are managed. A description of how a specific task is carried out (supplemented by drawings, blueprints, forms, checklists, records and flowcharts). 3.10 The Quality Manual The QM is a statement of the managerial policy and the objectives for each element of ISO 9001:2008. For AAL this is included in Section 4 and, having been established in response to the specified system requirements, it provides a statement of commitment to customers (or external approval and/or regulatory bodies) to which AAL may be required to provide such information (Figs. 6.1.7 6.1.10). AAL s QM describes a number of systematic controls and procedures for the staff in fulfilling their duties and responsibilities. It defines the lines of traceability, accountability and responsibility and whilst it exists primarily as an internal management control document, the QM also provides a definitive statement of the policy, objectives, operating systems, processes and procedures established by AAL. The system recognises the established elements of modern formalised quality management as expressed in national and international standards and as appropriate to the nature of the work undertaken. 3.11 Quality Processes AAL s QMS is founded on the requirements of ISO 9001:2008, with a common structure based on a CP (describing the end-to-end activities involved in AAL s project management and the production of contract deliverables) supplemented by a number of SPs which describe the infrastructure required to complete AAL s projects on time and within budget. To ensure achievement of process objectives, a process owner with full responsibility and authority for managing the process and achieving process objectives is nominated.

Example Quality Management System 213 Company Secretary MANAGING DIRECTOR Quality Manager Quality Management Systems Environmental Section Fuels Section Projects Section Standards Quality Manuals Policies & Procedures Standards Policy Consrve & Management Safety & Policy UIC and Railways Military Civilian Organisation Structure Quality Policy Quality Procedures QUALITY MANUAL Marketing, market research and corporate policy Work Instructions Create market opportunity Obtain contract Appoint project team QP/1 Document Control QP/2 Production of a Quality Document QP/3 Design Control QP/4 Quality Management System Review QP/5 Customer Feedback QP/6 Internal Audits QP/7 Change Control QP/8 Meetings and Reports QP/9 Training QP/10 Budget and Finance QP/11 Investments Investigate further market opportunities for the contract product Invoice and receive payment Package and despatch to client Produce contract deliverable Core Business Process FIGURE 6.1.7 AAL s Quality Manual

214 ISO 9001:2008 for Small Businesses Marketing, market research and corporate policy Create market opportunity Obtain contract Appoint project team QP/1 Document Control QP/2 Production of a Quality Document QP/3 Design Control QP/4 Quality Management System Review QP/5 Customer Feedback QP/6 Internal Audits QP/7 Change Control QP/8 Meetings and Reports QP/9 Training QP/10 Budget and Finance QP/11 Investments Investigate further market opportunities for the contract product Invoice and receive payment Package and despatch to client Produce contract deliverable FIGURE 6.1.8 AAL s Core Business Process From the initial identification of the task through to the final customer satisfaction, all steps in AAL s CP are supported by QPs that ensure that all activities are fully understood, controlled and documented and that everyone knows exactly what they are supposed to be doing and how they should be doing it.

Example Quality Management System 215 Project definition System Processes (SPs) System procedures (QPs and WIs) ISO 9001:2000 Requirement(s) that have been met START Process A ISO 9001:2000 section(s) 1.2.3 QP A WI 1 Process B ISO 9001:2000 section(s) a.b.c QP B Process C QP C WI 2 ISO 9001:2000 section(s) x.y.z Result FIGURE 6.1.9 Inter-relationship of documented processes with QPs and WIs Company Secretary MANAGING DIRECTOR Quality Manager Quality Management Systems Environmental Section Fuels Section Projects Section Standards Quality Manuals Policies & Procedures Standards Policy Conserve & Management Safety & Policy UIC and Railways Military Civilian FIGURE 6.1.10 AAL s management structure

216 ISO 9001:2008 for Small Businesses Current AAL processes are listed in Part 2 of the QM. Note: If a particular project requires additional quality controls for a specific product or service, then project-specific QPs shall be written by the Quality Manager (in conjunction with the department or section concerned) as part of a separate project Quality Plan. 3.12 Quality Procedures QPs form the bulk of AAL s QMS and describe how the policy objectives of the QM can be met in practice and how these processes are controlled. A list of the current AAL QPs is shown in Annex C to this QM. QPs shall cover all the applicable elements of ISO 9001 and shall detail procedures that concern AAL s actual method of operation. They shall be used for planning and controlling all activities that impact on quality. Each QP shall cover an easily identifiable and separate part of the quality system and shall be capable of being easily traced back to the policies dictated by senior management. QPs should not normally include technical requirements or specialist procedures required for the manufacture of a product. This type of detail will generally be included in a WI. The generation and control of QPs is defined in QP/2 Production of a Quality Document. In addition to a descriptive title and a file number, each procedure is dated and is subject to regular review (during an internal audit) for possible updating. These documented procedures are made available as uncontrolled copies via a link on AAL s Intranet Home Page and can be used as separate documents outside the QM in places of work. A number of forms are used in the application of certain procedures, which mainly relate to the communication of data or instructions for keeping records. Copies of these forms are included in the relevant procedures and WIs. Some procedures may contain data or information, the knowledge of which must remain restricted to AAL. These procedures shall not be included in the QM, beyond their title and reference number. If these procedures are required for contractual purposes, the Managing Director must authorise their release. Current AAL QPs are listed in Part 3 of the QMS. 3.13 Work Instructions WIs describe, in detail, how AAL implements its procedures, such as what is to be done, who should do it, when it should be done, what supplies, services and/or equipment are to be used and what criteria have to be satisfied. They describe how to perform specific operations and are produced for all of the

Example Quality Management System 217 relevant activities of AAL so as to ensure that the whole company can work to the same format. In order that AAL Management can be sure that everything is being carried out under the strictest of controlled conditions, it is crucial that all WIs referring to a product activity or service are clear, accurate and fully documented. In summary, a WI shall, as a minimum, define: The manner of production (and installation) where the absence of such controls would adversely affect quality; Measurable criteria for workmanship to ensure that the required level of quality is being adhered to; Monitoring and quality control requirements; and The approval processes by which compliance can be identified; and Who can carry out this procedure. The generation and control of WIs is defined in QP/2 Production of a Quality Document. In addition to a descriptive title and a file number, each instruction is dated and is subject to regular review (during an internal audit) for possible updating. These documented instructions are made available as uncontrolled copies and can be used as separate documents outside the QM in places of work (see QP-01 Document Control ). Current AAL WIs are listed in Part 4 of the QMS. Note: If a particular project demands further details, then project-specific WIs shall be created. These project-specific WIs shall appear in the Quality Plan applicable to that particular project. 3.14 Records Records provide objective evidence of and demonstrate conformance to specified requirements contained in the QMS. Normally, records are retained for 5 years except as required by local or national law. 3.15 Project Quality Plans For larger and more complex projects/contracts, project-specific Quality Plans may have to be produced. These are effectively a subset of the QM and describe additional procedures and controls that will have to be applied. The production of these Quality Plans shall be coordinated between the Quality Manager and Project/Contract Manager concerned. 4. QUALITY MANAGEMENT SYSTEM (ISO 9001:2008 4) Subsequent sections of this QM are modelled on ISO 9001:2008 and describe the arrangements or systems that have been established to meet the specified requirements of this standard. As far as possible, the sections

218 ISO 9001:2008 for Small Businesses (i.e. 4 8) have been structured in a similar manner to those in ISO 9001:2008 (i.e. each section and subsection directly correspond in terms of number and content with the ISO equivalent number). The correspondence between the QM and the requirements of ISO 9001:2008 is shown in Annex B. Conformance with ISO 9001:2008 Other than the permissible exclusions shown in the relevant parts of the text and in Annex B, AAL s QMS conforms to the requirements specified in ISO 9001:2008. Quality Manual administration The Quality Manager shall review the effectiveness and suitability of the QM at least twice a year. Where the system is found to be ineffective as a result of changed requirements, amendments shall be made to the QM. Confidentiality This QM is the intellectual property of AAL and may not be copied in whole or part or transmitted to any third party without the expressed written permission of the Quality Manager. Author s Hint Where the term documented procedure appears, this means that the procedure is established, documented, implemented and maintained. In accordance with ISO 9001:2008: A single document may address the requirements for one or more procedures; and A requirement for a documented procedure may be covered by more than one document. 4.1 General Requirements (ISO 9001:2008 4.1) AAL recognises the need of adequate documentation for clarity and transparency of the system. AAL shall define and manage the processes necessary to ensure that all contract deliverables conform to customer requirements. As a means of continually improving performance, AAL shall: Ensure the availability of resources and information necessary to support the operation and monitoring of these processes;

Example Quality Management System 219 Establish, document, implement and maintain a QMS and continually improve its effectiveness in accordance with the requirements and principles of ISO 9001:2008; and Prepare procedures that describe the processes required to implement the QMS. Author s Hint All organisations should ensure that any outsourced processes that affect product conformity are thoroughly analysed, controlled and subject to continual improvement. 4.2 Documentation Requirements (ISO 9001:2008 4.2) AAL shall establish and document the specified requirements for controlling the quality of a deliverable, in conformance with the appropriate regulatory requirements. 4.2.1 General (ISO 9001:2008 4.2.1) AAL s QMS documentation shall include: AQM; Documented statements regarding quality policy and quality objectives; Documented procedures that clearly describe the sequence of processes necessary to ensure conformance with ISO 9001:2008; and Documented instructions to ensure the effective planning, operation and control of processes and quality records. Author s Hint The amount of documentation required for a QMS can vary from one organisation to another depending on: The size of organisation and type of activities, The complexity of processes and their interactions; and The competence of personnel. The documentation can be in any form or type of medium.

220 ISO 9001:2008 for Small Businesses 4.2.2 Quality Manual (ISO 9001:2008 4.2.2) The Quality Manager shall establish and maintain a QM, which shall (inclusive of Annexes) be regularly reviewed and audited to ensure continuing acceptability, validity and effectiveness. The Quality Manager shall ensure that the QM includes: The scope of the QMS; Details of the documented procedures that need to be established as part of the QMS; The sequence and interaction between the processes of the QMS; and Details of (and justification for) any ISO 9001:2008 exclusions; The Quality Manager is responsible for overseeing the operation of the QMS for ensuring that the QM is fully and effectively implemented and for coordinating the writing (as well as the availability) of the necessary processes, procedures and instructions. QP/4 Quality Management System Review. 4.2.3 Control of Documents (ISO 9001:2008 4.2.3) All documents required by and used in support of AAL s QMS shall be controlled and maintained. Author s Hint It is a mandatory requirement of ISO 9001:2008 for all organisations to have a documented procedure for the control of documentation. AAL shall establish a documented procedure for the control of all documents no matter their origin or topic. This procedure shall ensure that: Documents are approved for adequacy prior to release; Documents are reviewed, updated as necessary and reapproved; Documents remain legible and readily identifiable and retrievable;

Example Quality Management System 221 Documents of external origin can be identified, controlled and recorded; Only relevant versions of documents are available at points of use; Obsolete documents are removed from all points of issue and use or otherwise controlled to prevent unintended use; Any obsolete documents retained for legal or knowledge-preservation purposes are suitably identified; and A master list identifying the current revision status of documents is established. Author s Hints Only external documents that the organisation believes are necessary for the planning and operation of the QMS need to be identified and their distribution controlled. Records are considered by ISO 9001:2008 as a special type of document that need to be controlled according to the requirements given in Section 4.2.4. The Quality Manager (in consultation with the Company Secretary) is responsible for the overall planning of Document Control procedures throughout AAL. QP/2 Production of a Quality Document. QP/7 Change Control. 4.2.4 Control of Quality Records (ISO 9001:2008 4.2.4) AAL shall maintain appropriate quality records that demonstrate conformance to the requirements and the effective operation of the QMS. AAL shall establish a documented procedure to define the controls required for the identification, storage, protection, retrieval, retention and disposition of records. Records shall remain legible, readily identifiable and retrievable. The Quality Manager (in consultation with the Company Secretary) is responsible for maintaining quality records demonstrating conformance to the requirements and the effective operation of the QMS.