Panel System. Industrial Wood Construction Puu Atsushi Takano

Similar documents
DRY CONSTRUCTION SYSTEMS

Plan /Submission Requirements

9/24/2015. Aalto! / ENG + ARC. Asuinrakennusten rakenneratkaisut. Requirements : Sound insulation requirements : Thermal insulation requirements :

Energy Panel Structures, Inc

Framing Methods Structural Components

SECTION WOOD FRAMING. A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents.

assembly an open space between the roof and ceiling of a building attic balloon frame a joist constructed of steel with bars in the verticle web space

CHAPTER 6 TYPES OF CONSTRUCTION

COPYRIGHTED MATERIAL. Contents. 1 Making Buildings 3. 3 Wood Foundations and. Preface to the Sixth Edition xi. Sitework 31

Introduction to Canadian Residential Construction CANADIAN HOUSING IS ADAPTABLE, FLEXIBLE AND ACCOMMODATES DIVERSE CLIMATES.

Part 1: Vocabulary Select the best answer and write the corresponding letter in the space provided.

Modular Wood Framing Goes Vertical

PRESENTATION PLAN A MODEL COMPARISON FLOOR CONSTRUCTION

Learning Objectives. Copyright Materials. Timber over non-combustible Podium Structures. High Performance and Low Cost.

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: STRUCTURAL PANELS REPORT HOLDER: ENERCEPT, INC.

Insulation and Technologies

TYPICAL BEARING WALL FRAMING

WOOD I-JOIST AWARENESS GUIDE

High Performance Walls:

High Performance Walls:

Carpentry. The following describes the scope and sequence of instruction for Carpentry.

SECTION WOOD FRAMING. A. Includes But Not Limited To: 1. Furnish and install wood framing and blocking as described in Contract Documents.

DIVISION 06 WOOD, PLASTICS, AND COMPOSITES

Plywood, Composite Wood Products, High-Pressure Laminates

9.36. Energy Efficiency

BBA 001 Documents included under the scope of BBA s ISO UKAS accreditation

TECHNICAL SPECIFICATION FOR MATERIAL

Building Envelope

Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING

WP6 Case studies. Pic. 1 Apartment houses in Chýně

Structural Composite Lumber (SCL)

Building Division Informational Handout

Attachment A. USG Minimum Design and Construction Requirements for Wood Framed Structures

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: STRUCTURAL PANELS REPORT HOLDER: EVALUATION SUBJECT: STRUCTURAL PANELS

TYPICAL BEARING WALL FRAMING Joints in plates must be offset by 24 min.

Chapter 14 - Air Sealing

Construction Technology Revision Guide

SINTEF Building and Infrastructure confirms that. Hunton wall

Building Science. Intro Dr John Straube, P.Eng. Principal, RDH Building Science Assoc. Professor, University of Waterloo Waterloo, Canada

Waikoloa Homesites. Kohala Coast, HI. Outline Specifications. Prepared By: 16 December 15

U.S. EDITION RESIDENTIAL CONSTRUCTION DETAILS SAMPLE. A visual guide to construction detailing. Emma Walshaw

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings

R-Matte Plus-3: Insulation for the Building Envelope

LUXURY LOG CABINS. Built under caravan regulations act 1960, 1968 Amendment 2006 BS VAT Zero rated 701/20

Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage

Mid-Rise Engineering Considerations for Engineered Wood Products

Garage/Accessory Structures

PRODUCT: Structural Insulated Panels (SIP) DIVISION: Wood and Plastics (06) SECTION: Structural Panels ( )

PRODUCT: Structural Insulated Panels (SIPs) DIVISION: Wood, Plastics, and Composites (06) SECTION: Structural Panels ( )

K O N E C TA C AV I T Y W A L L LO G S Y S T E M

Walls. 34 Technical Guide STEICO construction

ESCONDIDO FIRE DEPT TRAINING MANUAL Section Truck Module Page 1 of 7 Ventilation Lightweight Construction Revised

Lather (Interior Systems Mechanic) Level 3

High Performance Walls:

Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey sqft.spf] Page 1 of 5

THE FLORIDA BUILDING CODE

Lather/Interior Systems Mechanic (ISM) Level 3

Airport Vicinity Acoustic Insulation

Two complete sets of plans that are legible and drawn to conventional scale are required to be submitted with the Building Permit Application Form.

Job Cost Summary 11/27/08

SECTION ROUGH CARPENTRY. B. AWPA (American Wood Preservers Association) Book of Standards. C. WCLIB (West Coast Lumber Inspection Bureau)

SIP Homes: Built for a Lifetime of Comfort and Value

Building elements. Guideline for SINTEF Technical Approval

The Inspection Process. Waxhaw N.C.

Timber products used to build U.S. single-family houses in 1988

COMP ONENT CATA LO GUE FOR INDUSTRIAL BUILDINGS

Thermal Characteristics of Exterior Building Wall (Above Heritage Building

LCT ONE: CASE STUDY OF AN EIGHT STORY WOOD OFFICE BUILDING

Carpenter Level 3 Rev. September 2017

ADVANCED WALL FRAMING

The better way to build TM. Installation Manual NAILBASE PANELS

The Homeowner s Building Application Checklist for Constructing a Residential Addition

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Insulated Cold-Formed Steel Wall Panels: A case study of a contractor-manufacturer

A Homeowner s Guide to Renovation and Addition Permits

Construction Catalogue Timber construction goes into a lot of detail. Just like this catalogue.

HOUSE ADDITIONS A guide to the plans required when applying for a Building Permit

Building Systems and Design Elements included in SliDeRulE

Interior FRT Wood. References of Previous Model Building Codes

BUILDING WITH ROOF ELEMENTS UNDER ONE ROOF IDEA & ADVANTAGES

SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE:

LISTING INFORMATION OF International Beams - IB Series Joists SPEC ID: 27316

Seattle Public Schools Building Excellence IV Projects Under Construction

2003 International Residential Building Code

The CornerStone Cottage Series

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

FIGURE R502.2 FLOOR CONSTRUCTION

NATIONAL GYPSUM COMPANY 2-Hour Area Separation Wall System

ThermaSteel Corporation ASSEMBLY MANUAL

ISO Types 1-6: Construction Code Descriptions

Building Guide. olorado Chapter of the International Conference of Building Officials. Lancaster County Building Department

Title: Building Construction for the Fire Service. Time: 3 hours. Teaching Materials: White board Building Construction for the Fire Service (PDF)

NAAHB Workgroup Index General Ledger Account

Attaching Cladding with Long Screws. Presented by: Michael Aoki-Kramer LEED AP

Pulaski County, Virginia Typical Carport Enclosure Details Based on the 2012 International Residential Code

LVL Product Guide 2.0E LVL 1.5E LVL

Installation Guidelines

Guidance on U Values from Domestic Heating Design Guide

Transcription:

Panel System Industrial Wood Construction Puu 28.5010 Atsushi Takano 13.01.2016

Structure Components Design Construction Examples Contents

Structure

Plate structure

Prefabricated wooden panels

e.g. 60cm e.g. 4m Post & Beam Panel Difference between P&B and Panel system

Structural principle Source: Building Construction Illustrated

Frame types Balloon frame Platform frame Source: Der Neue Holzbau

Balloon Frame types Platform Floor Wall Floor Wall Floor Wall Floor

Comparison of balloon and platform Balloon Production efficiency < Construction efficiency < Cost efficiency < Structural rationality > Easiness of multi-story < Easiness of fire protection < Platform

Components

Typical exterior wall panel composition

Typical roof panel composition

Typical exterior floor panel composition

Typical intermediate floor panel composition Images: Metsä Wood

Components FRAMING INSULATION OTHER COMPONENTS SAWN TIMBER Cellulose Fibre insulation GLUE I-Joist Mineral wool insulation NAILS AND SCREWS LVL - Laminated Veneer Lumber Form insulation (EPS, XPS, SPF, etc.) CONCRETE / PLASTER SCREED Opening BOARDING SHEETING Finishing PLYWOOD Vapour barrier sheet (plastic, paper, felt) Wood Fibreboard (LDF, MDF, HDF) Water proof sheet (Bituminous, metal, etc.) Particleboard OSB - Oriented Strand Board GYPSUM BOARD

Design

Division Joints between the panels What seems to be the most important?

Panel size design (Module design) Small panel system Wall-size panel system Panel size e.g. 0.3-1.8m x 3m Panel size e.g. 12m x 3m Depend on weight, transport, factory infra and handling limits

Requirements for joints Stability? Air tightness?? Heat bridge?? Fire protection?? Sound protection??

Standardized wooden panel system: Runko PES

Standardized wooden panel system: Runko PES Module grid Structural thickness Floor height Geometry of joints Seaming Fixings BIM support

US 001 US 001 Principles of Runko PES Structure types of roof can be varied Edge profile standardised Structure types of walls can be varied Edge profile standardised VP 001 Structure types of floors can be varied Structure types of walls can be varied Edge profile standardised Structure types of floors can be varied Tero Lahtela / FWR

Design for disassembly (DfD) BrusselsretrofitXL

Construction

CONSTRUCTION PROCESS: PREFABRICATED PANEL SYSTEM SITE SPECIFIC CONSTRUCTION SYSTEM SPECIFIC PROJECT SPECIFIC SITE WORK FOUNDATION FRAMING SHEATHING FINISHING INSTALLATIONS LANDSCAPING HAND OVER CLEARING EXCAVATION DRILLING, EXPLODING PILES (IF NEEDED) LANDFILL BUILDING SITE INFRA (TEMP) MOLD PREPARATION CAST WORK FLOOR ELEMENTS WALL ELEMENTS INTERMEDIATE FLOOR ELEMENTS ROOF TRUSSES ROOF COVER INTERIOR WALL STUDS SEAMING FLOORING TILING PLASTERING PAINTING EXT. CLADDING INT. CLADDING INT. DOORS INT. FIXTURES INT. CABINETS EXT. FIXTURES APPLIANCES CLEAR SITE GARDEN WORK INSPECTIONS MEP WORKS PLUMBING, HVAC, ELECTRICITY WALL ELEMENTS CUPBOARDS FLOOR ELEMENTS MACHINES ROOF TRUSS CATERPILLAR BOBCAT HIAB CRANE SCREW DRIVERS SCREW DRIVERS BOBCAT CHAINSAW SCREW DRIVERS SCREW DRIVERS ROTARY SAW NAIL GUNS NAIL GUNS DRILLS NAIL GUNS ROTARY SAW ROTARY SAW ROTARY SAW

Prefabrication process 1. Assembly of panel frame 2. Installation of vapour barrier sheet and interior cladding

Prefabrication process 3. Turning the panel 4. Installation of insulation

Prefabrication process 5. Installation of building service systems 6. Installation of window

Prefabrication process 7. Installation of wind barrier layer etc. 8. Installation of exterior cladding

Prefabrication process 9. Panels are ready 10. Transport

Example Life Cycle Tower system by Architekten Hermann Kaufmann ZT GmbH

33 Architekten Hermann Kaufmann ZT GmbH

Wood double column Hybrid slab: timber-concrete bond Architekten Hermann Kaufmann ZT GmbH

Architekten Hermann Kaufmann ZT GmbH

Architekten Hermann Kaufmann ZT GmbH

Architekten Hermann Kaufmann ZT GmbH

Architekten Hermann Kaufmann ZT GmbH

LCT in figures Height: up to 100m(3-30 storys) Grid options: 1,25m 1,35m 1,5m Floor span: <9,45m Architekten Hermann Kaufmann ZT GmbH

Realization: LCT One in Dornbirn, Austria, 2012 Architekten Hermann Kaufmann ZT GmbH

Realization: LCT IZM Architekten Hermann Kaufmann ZT GmbH

Common prefabrication system so far Reasonable balance between standardization and flexibility Freedom for design Easy transport of components Features of wall panel system

Thank you Questions? Next lectures: CLT and Volume unit 18.01.2016

First task for group work: Development of Courtyard living in accordance with the construction systems allocated to the groups - Arrangement of dimensions - Sketches of building elements First tutoring session will be on next Wednesday (20 th )