Sustainable Management of Available Resources and Technology (SMART) Cleanup

Similar documents
Implementation of the Best in Class Project Management and Contract Management Initiative at the U.S. Department of Energy s Office of Environmental

Improvements to Hazardous Materials Audit Program Prove Effective

Issues for Future Systems Costing

Developing an Army Water Security Strategy

Fort Belvoir Compliance-Focused EMS. E2S2 Symposium Session June 16, 2010

Trends in Acquisition Workforce. Mr. Jeffrey P. Parsons Executive Director Army Contracting Command

Decision Framework for Incorporation of Sustainability into Army Environmental Remediation Projects

Joint JAA/EUROCONTROL Task- Force on UAVs

Army Quality Assurance & Administration of Strategically Sourced Services

ITEA LVC Special Session on W&A

Performance-Based Acquisitions (PBA) E2S2 Conference April 2011

RFID and Hazardous Waste Implementation Highlights

Kelly Black Neptune & Company, Inc.

Defense Business Board

Panel 5 - Open Architecture, Open Business Models and Collaboration for Acquisition

Navy s Approach to Green and Sustainable Remediation

MEDCOM SUSTAINABILITY

Water Sustainability & Conservation in an Exhaust Cooling Discharge System Case Study

309th Commodities Group

Service Incentive Towards an SOA Friendly Acquisition Process

Robustness of Communication Networks in Complex Environments - A simulations using agent-based modelling

DoD Solid Waste Diversion

Improving Energy Efficiency at the Watervliet Arsenal

DoD Sustainability Strategy The Latest. Mr. Dave Asiello DUSD(I&E)/CMRM

SE Tools Overview & Advanced Systems Engineering Lab (ASEL)

NDCEE. Ecosystem Banking Best Practices. Elizabeth Keysar, NDCEE/CTC. National Defense Center for Energy and Environment

PL and Payment of CWA Stormwater Fees

Flexible Photovoltaics: An Update

Geothermal Energy Demonstration at Fort Indiantown Gap

DoD Environmental Information Technology Management (EITM) Program

US Naval Open Systems Architecture Strategy

Tactical Equipment Maintenance Facilities (TEMF) Update To The Industry Workshop

Earned Value Management on Firm Fixed Price Contracts: The DoD Perspective

NDCEE National Defense Center for Energy and Environment

Alex G. Manganaris Director, Workforce Plans and Resources

Department of Defense Green Procurement Program and Biobased Products

Agenda. Current Acquisition Environment-Strategic Sourcing. Types of Contract Vehicles. Specific Contract Vehicles for Navy-wide Use DOD EMALL

Systems Engineering Processes Applied To Ground Vehicle Integration at US Army Tank Automotive Research, Development, and Engineering Center (TARDEC)

Natural Infrastructure Management

Biased Cramer-Rao lower bound calculations for inequality-constrained estimators (Preprint)

Diminishing Returns and Policy Options in a Rentier State: Economic Reform and Regime Legitimacy in Saudi Arabia

USACE Environmental Support to the Army and the Nation

Success with the DoD Mentor Protégé Program

Ultraviolet (UV) Curable Coatings DoD Executive for Bullet Agent Tip Identification

Based on historical data, a large percentage of U.S. military systems struggle to

Life Cycle Metrics and OSD Oversight: Discipline With Flexibility

Bio-Response Operational Testing & Evaluation (BOTE) Project

The Port of Hueneme Confined Aquatic Disposal Project: A Unique Partnership for Contaminated Sediment Management

Implementing Open Architecture. Dr. Tom Huynh Naval Postgraduate School

Characterizing Munitions Constituents from Artillery and Small Arms Ranges

1 ISM Document and Training Roadmap. Challenges/ Opportunities. Principles. Systematic Planning. Statistical Design. Field.

AF Future Logistics Concepts

NDCEE. Landscape Modeling Technologies for Sustainable Forests. National Defense Center for Energy and Environment. Ms. Donna S.

Forward Operating Bases Solid Waste Characterization

Anti-Corrosion Nanotechnology Solutions for Logistics (ACNS-L)

Lessons Learned: Implementing BMPs for Munitions Constituent Migration at Operational Ranges

NDCEE. Cadmium and Hexavalent Chromium Free Electrical Connectors: A Synergistic Approach. National Defense Center for Energy and Environment

NEC2 Effectiveness and Agility: Analysis Methodology, Metrics, and Experimental Results*

DoD Sustainable Buildings. Col Bart Barnhart ODUSD(I&E) May 12, 2011

Environmental Restoration Program Optimization and Sustainable Remediation

Ranked Set Sampling: a combination of statistics & expert judgment

11. KEYNOTE 2 : Rebuilding the Tower of Babel Better Communication with Standards

Sustainability Action Planning and Initiatives at Twentynine Palms Marine Corps Air Ground Combat Center (MCAGCC) May 2011

USACE Infrastructure Investments with Integration of Climate Change, Sea-Level Rise, and Other Scenarios

A Family of SCAMPI SM Appraisal Methods

From Environmental Science to BMP The Canadian Experience

Energy Security: A Global Challenge

CORROSION CONTROL Anniston Army Depot

A Quality Control Procedure Specialized for Incremental Sampling

This Brief is Unclassified

Contractor Past Performance Information: An Analysis of Assessment Narratives and Objective Ratings. Rene G. Rendon Uday Apte Michael Dixon

Achieving EO Goals Through the AF EMS

Applying Software Architecture Principles in a DoD Acquisition

SEDD Our Vision. Anand Mudambi. Joseph Solsky USACE USEPA 3/31/2011 1

Right Person, Right Qualifications, Right Place, Right Time Human Resources (R4 HR) Technology Demonstration Project

Satisfying DoD Contract Reporting With Agile Artifacts

Report No. D August 1, Internal Controls Over U.S. Army Corps of Engineers, Civil Works, Disbursement Processes

An Open Strategy for the Acquisition of Models and Simulations. Rudolph P. Darken Director, MOVES Institute

CMMI Level 2 for Practitioners: A Focused Course for Your Level 2 Efforts

Characterizing PCB contamination in Painted Concrete and Substrates: The Painted History at Army Industrial Sites

Reporting Limit (RL) Presenter

Bri~n IR. Moyer Headquarters, IDepartmemt of the Army OACSIMJ, Installation Services Dirrec~orate. Army EnvironrnelilJta ~ IDivisiom

Photovoltaic (PV) Systems Comparison at Fort Hood

Cataloging Green Items

NAVY REGION SOUTHWEST SUSTAINABLE SOLID WASTE PROGRAM. Construction and Demolition Debris Management. Leslie L. McLaughlin

Warstopper Material Supply Chain Risk Assessments

At the Defense Acquisition University, we spend a lot of time with incoming program. Calling on Mission Assistance. John Higbee Jesse Stewart

Strategic Sustainability Assessment

USMC Environmental and Corrosion Control Issues. Andrew Sheetz USMC CPAC Engineering Manager

Quality Control Review of Air Force Audit Agency s Special Access Program Audits (Report No. D )

Developing a More Complete Set of DMSMS Solutions

Army Net Zero Installation Initiative and Cost Benefit Analysis Activity

Climate Change Adaptation: U.S. Navy Actions in the Face of Uncertainty

NOGAPS/NAVGEM Platform Support

Supply Chain Modeling: Downstream Risk Assessment Methodology (DRAM)

Vehicle Thermal Management Simulation at TARDEC

Range Sustainment: Assessing Marine Corps Operational Small Arms Ranges (SARs)

Tailoring Earned Value Management

Oversight Review January 27, Quality Control Review of Army Audit Agency's Special Access Program Audits. Report No.

Future Capabilities of GenCade Ashley Frey

Transcription:

Sustainable Management of Available Resources and Technology (SMART) Cleanup Mr. Samuel Pierre (703) 601-1550 Headquarters, Department of the Army OACSIM, Installations Service Directorate Environmental Division June 2010

Report Documentation Page Form Approved OMB. 0704-0188 Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. 1. REPORT DATE JUN 2010 2. REPORT TYPE 3. DATES COVERED 00-00-2010 to 00-00-2010 4. TITLE AND SUBTITLE Sustainable Management of Available Resources and Technology (SMART) Cleanup 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Army Ofc of the Assistant Chief of Staff for Installation Management,Installations Service Directorate,600 Army Pentagon,Washington,DC,20310-0600 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR S ACRONYM(S) 12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited 11. SPONSOR/MONITOR S REPORT NUMBER(S) 13. SUPPLEMENTARY NOTES Presented at the NDIA Environment, Energy Security & Sustainability (E2S2) Symposium & Exhibition held 14-17 June 2010 in Denver, CO. 14. ABSTRACT 15. SUBJECT TERMS 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT a. REPORT unclassified b. ABSTRACT unclassified c. THIS PAGE unclassified Same as Report (SAR) 18. NUMBER OF PAGES 24 19a. NAME OF RESPONSIBLE PERSON Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18

Agenda SMART Cleanup Introduction Contributing Factors Regulatory Drivers Benefits and Applicability of SMART Cleanup Upcoming Activities

SMART Cleanup SMART Cleanup is an initiative to place a higher priority on evaluating long-term future land use considerations during the remediation process. Includes consideration of an installation s Master Plan when formulating a site remedial strategy. Allows for the efficient use of available funding. Increases the flexibility of future Army land use and decreases overall long-term redevelopment costs.

Why SMART Cleanup? Master planning operations are under continued pressure to utilize an installation s real property resources as efficiently as possible. Contributing Factors: BRAC Support of up-tempo activities Neighboring community encroachment

Additional Planning Pressures Environmentally contaminated areas located on an installation further limit development opportunity. Lower cost and shorter remedial timeframe have historically led to remediation to commercial/industrial standards. Implementation of Land Use Controls (LUCs) has left residual contamination in place.

Regulatory Drivers AR 210-20 - Real Property Master Planning for Army Installations Garrison commander s responsibility to create a blueprint and vision that allows an installation to respond to future Army missions and community aspirations, while providing and maintaining the capability to train, protect, sustain, and support today s force. Establish installations as valued neighbors and trusted partners with surrounding communities. Installations must be recognized as providing examples of excellent environmental stewardship. The garrison commander s instrument for installation real property management, is recorded in the installation s real property master plan (RPMP). RPMP covers a 20-year planning horizon, is adjusted semiannually, and reviewed and updated at least every 5 years.

Regulatory Drivers (cont) AR 200-1 - Environmental Protection and Enhancement Addresses environmental responsibilities for all Army organizations and implements Federal, State, and local laws and DoD policies for preserving, protecting, conserving, and restoring the quality of the environment. Imparts authority to the DASA (ESOH) to provide overall policy, advocacy, program direction, and oversight across installations, logistics, acquisition, and operations. Governs the majority of activities that are completed by installation-level environmental personnel on a daily basis. Stipulates that it is a garrison commander s responsibility to ensure that an installation s master plan incorporates environmental considerations.

Issues with Regulatory Implementation AR 210-20 and AR 200-1 indicate that both planning and environmental tasks ultimately lie at installation level. Neither regulation stipulates exactly how personnel operating within the planning and environmental departments are to coordinate their activities. Regulations do not specifically stipulate who determines what a reasonable reuse is for a given site.

SMART Cleanup Applications and Results SMART Cleanup will: Develop a decision framework for coordinating long-term installation master planning efforts with environmental cleanup decisions. Highlight opportunities to encourage early discussions. Emphasize opportunities where investments of additional funding would yield long-term benefits Facilitate mutually beneficial communication and decision-making between environmental and planning personnel. Outline continuous opportunities to revise decisions based on changing installation needs. Better coordination between environmental and master planning communities could result in more efficient cleanup decisions, saving both time and money.

SMART Cleanup Applicability Applied to both new and existing sites on enduring installations. Sites presently undergoing remediation or longterm monitoring can be evaluated for additional remedial activities that would: Reduce the overall duration of environmental remediation at a site; Yield a cost savings; and/or Increase in value to the Army through increased property reuse.

Determination of Site Applicability Multiple criteria will be considered when evaluating a site for additional cleanup activities. The following decision matrix (draft) was designed to streamline the process and graphically depict key concepts. The matrix is not final; the SMART Cleanup concept remains under development.

SMART Cleanup Decision Matrix 1. Does site have contamination requiring ongoing cleanup? 2. Will the cleanup strategy leave contamination onsite above unrestricted reuse? 3. Is cleanup beyond planned restricted reuse technically feasible? 4. Is the site located on an enduring installation? 5. Has coordination with the Planning Department regarding options for future site reuse begun? 6. Will additional cleanup reduce future Army environmental liability? Environmental Department to initiate coordination 7. Has site previously undergone cleanup activities? 8. Is site undergoing LTM or IC maintenance activities that require annual funding? 9. Will mission needs lead to future or current issues regarding spatial limitations at the installation (e.g. T/E species, external encroachment, anticipated gaining, needed housing/ construction/ daycare)? 10. Will the additional cleanup result in a significant monetary ROI? Determine parameters for ROI. Site is not eligible for 11. Will additional cleanup assist the Army in meeting other priorities? Site may be eligible for Initiate documentation of need and forward to AEC. Complete Cleanup. 12. Does the additional SMART cleanup require additional funding? Elevate site to ACSIM for further evaluation.

1. Does site have contamination requiring ongoing cleanup? 7. Has site previously undergone cleanup activities? 2. Will the cleanup strategy leave contamination onsite above unrestricted reuse? 8. Is site undergoing LTM or IC maintenance activities that require annual funding? Site is not eligible for 3. Is cleanup beyond planned restricted reuse technically feasible? 4. Is the site located on an enduring installation? 11. Will additional cleanup assist the Army in meeting other priorities? Complete Cleanup. Environmental Department to initiate coordination 5. Has coordination with the Planning Department regarding options for future site reuse begun? 9. Will mission needs lead to future or current issues regarding spatial limitations at the installation (e.g. T/E species, external encroachment, anticipated gaining, needed housing/ construction/ daycare)? Site may be eligible for 12. Does the additional SMART cleanup require additional funding? 6. Will additional cleanup reduce future Army environmental liability? 10. Will the additional cleanup result in a significant monetary ROI? Determine parameters for ROI. Initiate documentation of need and forward to AEC. Elevate site to ACSIM for further evaluation. Initial Site Evaluation 1. Does site have contamination requiring ongoing cleanup? 2. Will the cleanup strategy leave contamination onsite above unrestricted reuse? 3. Is cleanup beyond planned restricted reuse technically feasible?

1. Does site have contamination requiring ongoing cleanup? 7. Has site previously undergone cleanup activities? 2. Will the cleanup strategy leave contamination onsite above unrestricted reuse? 8. Is site undergoing LTM or IC maintenance activities that require annual funding? Site is not eligible for 3. Is cleanup beyond planned restricted reuse technically feasible? 4. Is the site located on an enduring installation? 11. Will additional cleanup assist the Army in meeting other priorities? Complete Cleanup. Environmental Department to initiate coordination 5. Has coordination with the Planning Department regarding options for future site reuse begun? 9. Will mission needs lead to future or current issues regarding spatial limitations at the installation (e.g. T/E species, external encroachment, anticipated gaining, needed housing/ construction/ daycare)? Site may be eligible for 12. Does the additional SMART cleanup require additional funding? 6. Will additional cleanup reduce future Army environmental liability? 10. Will the additional cleanup result in a significant monetary ROI? Determine parameters for ROI. Initiate documentation of need and forward to AEC. Elevate site to ACSIM for further evaluation. Installation Criteria 4. Is the site located on an enduring installation? 5. Has coordination with the Planning Department regarding options for future site reuse begun? Environmental Department to initiate coordination

1. Does site have contamination requiring ongoing cleanup? 7. Has site previously undergone cleanup activities? 2. Will the cleanup strategy leave contamination onsite above unrestricted reuse? 8. Is site undergoing LTM or IC maintenance activities that require annual funding? Site is not eligible for 3. Is cleanup beyond planned restricted reuse technically feasible? 4. Is the site located on an enduring installation? 11. Will additional cleanup assist the Army in meeting other priorities? Complete Cleanup. Environmental Department to initiate coordination 5. Has coordination with the Planning Department regarding options for future site reuse begun? 9. Will mission needs lead to future or current issues regarding spatial limitations at the installation (e.g. T/E species, external encroachment, anticipated gaining, needed housing/ construction/ daycare)? Site may be eligible for 12. Does the additional SMART cleanup require additional funding? 6. Will additional cleanup reduce future Army environmental liability? 10. Will the additional cleanup result in a significant monetary ROI? Determine parameters for ROI. Initiate documentation of need and forward to AEC. Elevate site to ACSIM for further evaluation. Liability and Monetary ROI Evaluation 6. Will additional cleanup reduce future Army environmental liability? 10. Will the additional cleanup result in a significant monetary ROI? Determine parameters for ROI.

Evaluation of Spatial Needs or Other Army Priorities 1. Does site have contamination requiring ongoing cleanup? 7. Has site previously undergone cleanup activities? 2. Will the cleanup strategy leave contamination onsite above unrestricted reuse? 8. Is site undergoing LTM or IC maintenance activities that require annual funding? Site is not eligible for 3. Is cleanup beyond planned restricted reuse technically feasible? 4. Is the site located on an enduring installation? 11. Will additional cleanup assist the Army in meeting other priorities? Complete Cleanup. Environmental Department to initiate coordination 5. Has coordination with the Planning Department regarding options for future site reuse begun? 9. Will mission needs lead to future or current issues regarding spatial limitations at the installation (e.g. T/E species, external encroachment, anticipated gaining, needed housing/ construction/ daycare)? Site may be eligible for 12. Does the additional SMART cleanup require additional funding? 6. Will additional cleanup reduce future Army environmental liability? 10. Will the additional cleanup result in a significant monetary ROI? Determine parameters for ROI. Initiate documentation of need and forward to AEC. Elevate site to ACSIM for further evaluation. 9. Will mission needs lead to future or current issues regarding spatial limitations at the installation (e.g. T/E species, external encroachment, anticipated gaining, needed housing/ construction/ daycare)? 11. Will additional cleanup assist the Army in meeting other priorities? Site may be eligible for

1. Does site have contamination requiring ongoing cleanup? 7. Has site previously undergone cleanup activities? 2. Will the cleanup strategy leave contamination onsite above unrestricted reuse? 8. Is site undergoing LTM or IC maintenance activities that require annual funding? Site is not eligible for 3. Is cleanup beyond planned restricted reuse technically feasible? 4. Is the site located on an enduring installation? 11. Will additional cleanup assist the Army in meeting other priorities? Complete Cleanup. Environmental Department to initiate coordination 5. Has coordination with the Planning Department regarding options for future site reuse begun? 9. Will mission needs lead to future or current issues regarding spatial limitations at the installation (e.g. T/E species, external encroachment, anticipated gaining, needed housing/ construction/ daycare)? Site may be eligible for 12. Does the additional SMART cleanup require additional funding? 6. Will additional cleanup reduce future Army environmental liability? 10. Will the additional cleanup result in a significant monetary ROI? Determine parameters for ROI. Initiate documentation of need and forward to AEC. Elevate site to ACSIM for further evaluation. Activities After Eligibility Initiate documentation of need and forward to AEC. Complete Cleanup. 12. Does the additional SMART cleanup require additional funding? Elevate site to ACSIM for further evaluation.

Evaluation of Sites Without Required Cleanup 1. Does site have contamination requiring ongoing cleanup? 7. Has site previously undergone cleanup activities? 2. Will the cleanup strategy leave contamination onsite above unrestricted reuse? 8. Is site undergoing LTM or IC maintenance activities that require annual funding? Site is not eligible for 3. Is cleanup beyond planned restricted reuse technically feasible? 4. Is the site located on an enduring installation? 11. Will additional cleanup assist the Army in meeting other priorities? Complete Cleanup. Environmental Department to initiate coordination 5. Has coordination with the Planning Department regarding options for future site reuse begun? 9. Will mission needs lead to future or current issues regarding spatial limitations at the installation (e.g. T/E species, external encroachment, anticipated gaining, needed housing/ construction/ daycare)? Site may be eligible for 12. Does the additional SMART cleanup require additional funding? 6. Will additional cleanup reduce future Army environmental liability? 10. Will the additional cleanup result in a significant monetary ROI? Determine parameters for ROI. Initiate documentation of need and forward to AEC. Elevate site to ACSIM for further evaluation. 7. Has site previously undergone cleanup activities? 8. Is site undergoing LTM or IC maintenance activities that require annual funding? Site is not eligible for

SMART Cleanup Criteria The SMART Cleanup decision matrix is designed to be used on enduring installations only. SMART Cleanup is an evaluation of the best practicable future use of a site, and is not always tied to additional cost-to-complete funding. Only sites demonstrating a clear return on investment may be eligible for additional funding. t all sites will benefit from additional environmental remediation or additional funding.

Outcomes of SMART Cleanup SMART Cleanup places increased emphasis on the long-term evaluation of anticipated reuse of contaminated sites early in the remedial process. SMART Cleanup evaluation may provide justification for additional remedial funding. Contaminated sites with a potential future mission need may warrant allocation of additional resources. Additional investment may prove to provide longterm cost and time savings to the Army.

Upcoming Activities The decision framework will be pilot tested first on a site level, then on an installation level. Results of the pilot tests will lead to new guidance development as needed.

Regulatory Involvement SMART Cleanup goals are not intended to be part of regulatory negotiation SMART Cleanup goals are not intended to be enforceable by regulators

Summary of SMART Cleanup SMART Cleanup is an initiative to place a higher priority on evaluating long-term future land use considerations and future Army liability during the remediation process. Benefits include: Increased communication between stakeholders; Reduction of the duration of environmental remediation at a site; Cost savings (decreased Army environmental liability); and/or Increase in value to the Army through increased property reuse.

QUESTIONS??? Mr. Samuel Pierre Headquarters, Department of the Army OACSIM, Installations Service Directorate, Environmental Division (703) 601-1550 samuel.pierre@us.army.mil