Ancillary Service for Transmission Systems By Tap Stagger Operation in Distribution Networks

Similar documents
DS3: Voltage Control Workstream

INITIAL ASSESSMENT OF REACTIVE POWER EXCHANGES AT UK GRID SUPPLY POINTS

Market Framework for Distributed Energy Resourcesbased

Mitigation of Voltage Fluctuations in Power System Using STATCOM

VOLTS-VAR OPTIMISATION (VVO)

8 th Annual Electric Power Industry Conference

Chronological Simulation of the Interaction between Intermittent Generation and Distribution Network. G.N. Taranto C.C.O. Hincapié

A New Connection Concept to Connect an Offshore Wind Park to an Onshore Grid

SEVILLA, APRIL Distributed Generation and Microgeneration and its Impacts. João A. Peças Lopes. Power Systems Unit INESC Porto

Joint DSO TSO reactive power management for an HV system considering MV systems support

Optimal Voltage Control in Distribution Network.

Optimal Voltage Control in Distribution Network.

Power Quality Improvement in Distribution System Using Distribution Static Compensator

A JOINT DSO-TSO REACTIVE POWER MANAGEMENT FOR AN HV SYSTEM CONSIDERING MV SYSTEMS SUPPORT

Transmission System Security and Planning Standards

The Effect of the Volt/Var Control of Photovoltaic Systems on the Time-Series Steady-State Analysis of a Distribution Network

Investigation of Impacts of Solar PV on Transmission System Voltage Stability Considering Load Characteristics and Protection

Orkney Active Network Management system Technical Session 1 Accessing capacity in a constrained network Active Network Management

Project: Increased Utilisation of the Nordic Power Transmission System

Introduction to local flexibility markets What are flexibility services and how can I get involved? Jodie Giles Senior Project Manager

CHAPTER 6 TRANSMISSION SYSTEM EXPANSION PLANNING AND APPLICATION OF FACTS CONTROLLERS

BASIC CONCEPTS. Yahia Baghzouz Electrical & Computer Engineering Department

Grid Interconnection Issues for Wind Generation

Presentation: Optimal Planning of Renewable Energy Sources Integration in Smart Distribution Networks. GCC-Cigre. By Sultan S. Alkaabi, 9 th May 2017

Operating High Variable, Renewable Generation Power Systems Lessons Learned from Ireland and Northern Ireland

Outcomes and recommendations GREDOR

Generator Interconnection Affected System Impact Study. Plains & Eastern Clean Line Final Report

GOLDEN VALLEY ELECTRIC ASSOCIATION

Peak Time Demand Management Using Distributed Solar Inverters

What makes a Wind Plant Grid Friendly?

Daniel Feltes Phone: Fax:

Distribution Information Exchange Code

Determination of Smart Inverter Control Settings to Improve Distribution System Performance

Invitation for Expression of Interest to provide Flexible Services 3 April 2018

Future arrangements of the System Operator. Cathy McClay Head of Commercial Operations

Steady State Power System Security Analysis with PowerWorld Simulator

COLUMBIAGRID 2018 SYSTEM ASSESSMENT DRAFT STUDY PLAN

Markets for Demand-Side Flexibility based on the Transactive Energy Approach

Grid Connection and Power Quality Optimization of Wind Power Plants

Voltage Optimization: Distribution Planning Considerations and Demand Savings Potential for an Emerging IDSM Technology

TRANSMISSION PLANNING ASSESSMENT METHODOLOGY AND CRITERIA

Supporting Document 03. Information to support our proposed base capital expenditure programme

Harnessing Renewables in Power System Restoration

Transmission Losses Report 2015

Power Potential webinar

Connection Study Requirements

Case Metrics 2015 Summer Base Case Quality Assessment Phase I Powerflow and Dynamics Case Quality Metrics FINAL

Electricity Charging Seminar Level Playing Field

California Independent System Operator Renewable Integration Study

Modeling, Monitoring and Mitigating Geomagnetically Induced Currents

Shunt and series reactors for medium- and high-voltage grids siemens.com/transformers

Coordination of Multiple Voltage Controllers of Adjacent Wind Plants Connected to João Câmara II with Droop Function

(D2-01_28) ROLE OF ICT in Power System

DECISION 1 SCOPE AND CONSIDERATIONS... 2

How Do We Build the Efficient, Secure, Cost Effective Power Grid of Tomorrow? The Answer: Smart Grid. Bernard Norton Manager Energy Automation

Energy Networks Association

Standard MH-TPL Transmission System Planning Performance Requirements

TSOs, taking into account the following: Whereas

Electric Power Systems An Overview

Large-scale Wind Power Integration and Voltage Stability Limits in Regional Networks

Reactive power and voltage control interaction and optimization in the Danish largest wind power plant at Kriegers Flak

Long-term forecasting of reactive power demand in distribution networks Dr Christos Kaloudas / Dr Rita Shaw. 3 rd November 2017

ReliabilityFirst Regional Criteria 1. Verification and Data Reporting of Generator Gross and Net Reactive Power Capability

DECISION 1 SCOPE AND CONSIDERATIONS... 2

Comparative Analysis between IG and DFIG for Wind Energy Conversion Systems using STATCOM

Meeting Today s Planning Study Demands with Automation

Technical considerations for integration of distributed renewables on the grid

POTOMAC ELECTRIC POWER COMPANY

CIRED Workshop - Helsinki June 2016 Paper ABSTRACT PROPOSED APPROACH INTRODUCTION. N. Natale, F. Pilo, G. Pisano, G. G.

Efficient Rules for Planning and Regulating a Smart Grid

Emergency Disconnection of Embedded Generation. Draft paper for discussion at the Grid Code Development Forum

Electric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas

Safe Integration of Renewables at Transmission and Distribution Level. Alexander Krauss - Digital Grid Software and Solutions

Renewable Energy in Power Systems

Improved transformer temperature monitoring. Increasing the availability, reliability, and reducing maintenance costs COLUMN ABSTRACT KEYWORDS

WIND TURBINES IN WEAK GRIDS CONSTRAINTS AND SOLUTIONS. J O G Tande and K Uhlen. SINTEF Energy Research, Norway SUMMARY

BPA Wind Voltage Control Requirements

FRCC 2007 SYSTEM OPERATOR TRAINING SEMINARS. Reliability Coordinator Processes and Tools

Optimal DG Location and Size for Power Losses Minimization in Al-Najaf Distribution Network Based on Cuckoo Optimization Algorithm

Addressing System Restoration Issues for the ISO New England System. Michael I. Henderson ISO New England Inc. PES General Meeting July 2015

Improving Power Distribution Efficiency On Power Lines

The National Commission for Energy State Regulation of Ukraine Energy The Public Utilities Commission of Ohio Distribution System Losses

AVC of Danish Transmission System Concept design

The Power Potential project Heads of Terms Subject to contract

IEEE Transactions on Power Systems, 26 (1):

Energy Efficiency A Major Challenge for Future City Infrastructure. Dr. Fritz Rettberg Sydney

2012 NCTPC PJM Joint Interregional Reliability Study. PJM Interconnection. Duke Energy Carolinas. Progress Energy Carolinas

PJM Roadmap for edart

Power Quality Assessment of Large Motor Starting and Loading for the Integrated Steel-Making Cogeneration Facility

Contents. xiv xv xvii xviii

International Journal of Advance Engineering and Research Development

Feasibility Study Report

Transmission Losses Report 2017

Durham Research Online

Preferential Subjects for the 2010 Session

Utilizing a Smart Grid Monitoring System to Improve Voltage Quality of Customers

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Delaney to Colorado River 2014

Critical Load Serving Capability by Microgrid using 100% Renewable Energy

Product Roadmap. For Reactive Power

Transcription:

1 Ancillary Service for Transmission Systems By Tap Stagger Operation in Distribution Networks Linwei Chen, Haiyu Li, Steve Cox, and Kieran Bailey Presented by Dr Haiyu Li haiyu.li@manchester.ac.uk Senior Lecturer in Power System Automation & Communication Systems The University of Manchester, UK

2 Outline Motivations VAr Supports to Transmission Systems by Tap stagger Operation in Distribution Networks Voltage Problem Case Studies in Transmission System Economic Studies Dynamic Response Studies Conclusions

3 Motivations The growing integration of low carbon technologies, e.g. wind power and electric vehicles, into the grid has increased the difficulties in balancing generation and demand. Voltage issues in transmission systems have become more dynamic and may occur in different time periods or in different regions. The UK transmission grid currently has experienced high voltage situations under low demand conditions [1]. [1] National Grid, "Electricity Ten Year Statement 2014," pp. 269 271, 2014. [Online]. Available: http://www2.nationalgrid.com/uk/industry information/future of Energy/Electricity ten year statement/

4 Motivations The main reasons for UK high voltage issues: Development of underground cables in transmission & distribution networks. Decommissioning of coal generators in specific areas, resulting in a lack of generator voltage control. Reduction in reactive power demand during periods of minimum load. Negative reactive power demands have been observed at the National Grid transmission system. Possible contributing factors: changes in line loading patterns due to embedded generation, energy efficiency measures, e.g. a switch to energy efficient lighting.

5 Motivations In 2013, The UK Office of Gas and Electricity Markets (Ofgem) approved the 9 million Customer Load Active System Services (CLASS) project to investigate new techniques for a smarter integration between transmission and distribution networks. CLASS was led by Electricity North West (ENW), with collaborations from experienced partners (http://www.enwl.co.uk/class).

6 Motivations CLASS has carried out site trials to investigate: Demand reduction/boost for the purpose of frequency response; Demand reduction at time of system peak through the voltage reduction of primary substations; Reactive power supports through the tap staggering operation of primary substation transformers; and The impacts on transformer health and the quality of supply to customers. Academic outcomes from the University of Manchester: Voltage/demand relationship matrices with 24 h / 4 seasons; Demand response capabilities; Reactive power absorption capabilities; and Healthy analysis for Transformer and tap changer operation.

7 VAr Supports by Tap Stagger Operation of Parallel Transformers in Distribution Networks To apply the tap stagger operation to primary substation transformers in distribution networks....

8 Methodology of VAr Supports using Tap Stagger Tap stagger is used to introduce inductive loading onto the system by circulating reactive power. Source V p V p (Primary voltage) -k taps T 1 T 2 I c +k taps I L + I c I L -I c V s V s (Secondary voltage) Load

9 Methodology of VAr Supports using Tap Stagger The difference in tap positions should only be allowed within a small range to prevent the transformers from overloading. The transformer heath studies based on CLASS site trials have confirmed that the impact of tap stagger is minimal. % per unit % per unit per unit TAP % :the tap position increment per tap on the pair of parallel transformers, k: an integer representing the number of tap steps different from the initial position TAP.

10 Methodology of VAr Supports using Tap Stagger With small staggered taps (e.g. k = 1 or 2), the secondary voltage V S will remain almost constant, leaving the downstream network voltages and demands unaffected. % per unit

11 Methodology of VAr Supports using Tap Stagger The potential reactive power absorption capability for the entire GB distribution network based on the CLASS research [2] : Load flow studies were carried out for primary substation transformers with up to 6staggered taps (i.e. 3 taps up for one and 3 taps down for the other). The amount of VAr absorption changes slightly with load demands, due to the change of line reactive power losses. An optimal control scheme for the tap stagger to minimise the power losses as well as the number of OLTC switching operations was proposed in [3]. [2] Electricity North West, Reactive power absorption capability assessment final report CLASS research," Sep. 2015. [Online]. Available: http://www.enwl.co.uk/class/knowledge learning/closedown report/class research. [3] L. Chen, and H. Li, Optimised reactive power supports using transformer tap stagger in distribution networks, IEEE Transactions on Smart Grid, accepted in Mar. 2016, In Press.

12 Voltage Case Studies in Transmission System To analyse the economic and dynamic impacts of the tap staggering technique on the transmission system. Bus 6: occasionally (358 hours in a year), Bus 10: frequently (2000 hours in a year).

13 Voltage Case Studies in Transmission System The tap staggering technique has been applied to mitigate high voltages. The tap staggering impacts have been simulated by equivalently increasing the load consumption at the transmission bus. The load increment was determined using the VAr absorption capability matrix:,,,,, where the matrix element Q i,t indicates the aggregated VAr absorption measured at the GSPs by tap staggering i pairs of primary transformers at the time point t. The matrix Q was determined based on the VAr capability study from the previous work [4]. [4] L. Chen, H. Li, V. Turnham, and S. Brooke, Distribution network supports for reactive power management in transmission systems, IEEE PES Innovative Smart Grid Technologies (ISGT) European, Istanbul, Oct. 2014.

14 Economic Studies Cost analyses of applying the tap staggering technique when high voltage problems arise occasionally or frequently. Results have been compared to the use of shunt reactors. The annual cost for the TSO to apply tap stagger: where h denotes the total hours of using tap stagger in a year (i.e. utilisation hour). The first term C gen (h) represents the cost to compensate the generation changes. The second term represents the payment for the VAr support providers, i.e. calculated based on the unit price of reactive energy C VAr (in $/MVArh).

15 Economic Studies The annual cost for the TSO to apply a shunt reactor: where: C gen (h) is the cost for generation changes, which can be negative as the reactor can reduce system losses. I is the annual equivalent investment cost for a shunt reactor.

16 Economic Studies Case 1: Cost analysis for bus 6 with 358 hours (occasional V problems) Solution 1: Installing an additional shunt reactor of 6 MVAr at bus 6, Solution 2: Applying tap stagger at bus 6. 358

17 Economic Studies Case 2: Cost analysis for bus 10 with 2000 hours (frequent V problems) Solution 3: Installing shunt reactors of 6 MVAr at buses 6 and 10, Solution 4: Applying tap stagger at buses 6 and 10. Bus 10 requires 35 MVAr to eliminate all high voltage issues. In practice, distribution networks may not be able to provide such large VAr absorption through the use of tap stagger.

18 Economic Studies Case 3: Combined methods of reactors and tap stagger: Solution method Utilisation hour of tap stagger (hrs) Bus 6 Bus 10 Annual cost ($/year) Cost reduction (%) Solution 5 (reactors only) Solution 6 (stagger at bus 6 with 4 MVAr & reactor at bus 10 with 28 MVAr) Solution 7 (stagger at bus 6 with 4 MVAr & reactor with 24 MVAr + stagger with 4 MVAr at bus 10) 0 0 145.8k 0 358 0 138.1k 5% 358 189 124.5k 15% The potential cost reduction for the UK VAr compensation could be $8 million. An average of 7.5 $/MVArh cost reduction was estimated based on Case 3. The annual reactive energy absorption required by the UK transmission system was 22 10 6 MVArh in 2014. The utilisation factor of tap stagger is assumed to be 5%.

19 Dynamic Studies Dynamic studies aim to analyse the transmission system voltage responses to the successive tap changer switching in the downstream distribution networks. Modified the transmission network model by connecting five pairs of primary substation transformers to bus 6.

20 Dynamic Studies Compare the tap stagger results with the reactor switching: Switched on Switched off Staggering activated Staggering deactivated Settling time (s) Overshoot (%) Settling time (s) Overshoot (%) Settling time * (s) Overshoot * (%) Settling time * (s) Overshoot * (%) Bus 6 0.99 0.020 0.74 0.046 Bus 2 0.97 0.016 0.81 0.015 Bus 10 0.94 0.011 0.66 0.019 Bus 6 0.093 0.010 0.076 0.024 Bus 2 0.084 0.008 0.052 0.009 Bus 10 0.070 0.007 0.047 0.018

21 Conclusions For buses with only occasional high voltage issues, the results indicate that the tap staggering technique is more cost effective than the use of reactors. For more frequent voltage violations, a combined method of applying tap stagger and reactors together can be used to reduce VAr compensation costs. In the transient studies, the tap staggering method has been adopted to reduce the settling time and overshoots of the transient voltages. The research outcomes may contribute to establishing a new reactive power ancillary service, which allows distribution networks to use their existing parallel transformers to absorb temporary reactive power surplus.

22 Thanks Questions & Answers