GLASS WINDOWS & DOORS. Please submit/upload plans in PDF format

Similar documents
Florida Extruder Milestone Series 500, 1000, 1500, 1750, 2000 & 3000 Aluminum Fenestration and Series 4000 Vinyl Fenestration

Florida Building Code 6th Edition (2017) High-Velocity Hurricane Zone Uniform Permit Application Form

FLORIDA BUILDING CODE

Go Green Thermal Imaging, LLC P.O. Box 1523 Hobe Sound, FL Phone: GGTI (4484)

EASTERN ARCHITECTURAL SYSTEMS SERIES HRP 1000F HORIZONTAL ROLLER - LMI

Window/Door Replacement - Residential Permit Guidelines

WEB BASED APPLICATION SPECIFIC INSTALLATION INSTRUCTIONS

Uniform Mitigation Verification Inspection Form Maintain a copy of this form and any documentation provided with the insurance policy

Uniform Mitigation Verification Inspection Form Maintain a copy of this form and any documentation provided with the insurance policy

CITY OF COOPER CITY BUILDING DEPARTMENT

Uniform Mitigation Verification Inspection Form Maintain a copy of this form and any documentation provided with the insurance policy

DATE:6/18/2013 INSPECTOR: ELEVATION

Uniform Mitigation Verification Inspection Form Maintain a copy of this form and any documentation provided with the insurance policy

Installation, Operation and Maintenance Manual

Go Green Thermal Imaging, LLC P.O. Box 1523 Hobe Sound, FL Phone: GGTI (4484)

Uniform Mitigation Verification Inspection Form Maintain a copy of this form and any documentation provided with the insurance policy

ICC/NSSA STANDARD FOR THE DESIGN AND CONSTRUCTION OF STORM SHELTERS

City of Pembroke Pines 601 City Center Way, Pembroke Pines, FL Tel# Fax# Cover Sheet for Permits Submitted Online

COMMERCIAL WINDSTORM MITIGATION INSPECTION REPORT Prepared for: Boca Vista Condominium Association, Inc th Avenue Madeira Beach, FL 33708

TABLE OF CONTENTS. 1.0 INTRODUCTION 1.1 Greenstone Structural Engineered Panels 1.2 Drawing and Element Numbers

Uniform Mitigation Verification Inspection Form Maintain a copy of this form with the insurance policy

General Specifications COMPLETE PRODUCT LINE

Siding and Soffit Installation Guidelines

Method of Design per FBC R X ASCE AF&PA SSTD Other X Enclosed with checklist

WINDOW AND DOOR REPLACEMENT SAMPLE PLAN

CBUCK Engineering. Evaluation Report MMI Off Ridge Vent

SECTION SECTIONAL OVERHEAD DOORS 416 SERIES SECTIONAL STEEL DOORS

WATERGATE COMMUNITY ASSOCIATION 8 Captain Drive Emeryville, California Office: / Fax: WINDOW REPLACEMENT GUIDELINES

Christopher North Builders, INC.

LARGE AND SMALL MISSILE IMPACT RESISTANT 2/SHEET2. Exterior. Interior 4/SHEET2

SECTION SECTIONAL OVERHEAD DOORS 424 SERIES SECTIONAL STEEL DOORS

Christopher North Builders INC

City of Republic Community Development Girder and Header Spans for Exterior Walls

BUILDING DIVISION 120 Malabar Road, S.E., Palm Bay, FL Phone: (321) Fax: (321)

AQUARIUS CONDOMINIUM 40 YEAR RESTORATION PROJECT & RELATED WORK. Wind Pressure Drawings: Openings, Specs, NOA s / Product Approvals

Uniform Mitigation Verification Inspection Form Maintain a copy of this form with the insurance policy

Uniform Mitigation Verification Inspection Form Maintain a copy of this form and any documentation provided with the insurance policy

Page Roof Covering Type: Permit Application Date FBC or MDC Product Approval #

SECTION WOOD FRAMING. A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents.

SECTION SECTIONAL OVERHEAD DOORS 418 SERIES INSULATED STEEL DOORS

SECTION SECTIONAL OVERHEAD DOORS 422 SERIES INSULATED STEEL DOORS

SECTION SECTIONAL OVERHEAD DOORS 432 SERIES INSULATED STEEL DOORS

Owner Information. Inspection Date:

UCC Permit Application Procedures

ELF6375DXD DRAINABLE STATIONARY LOUVER

BUILDING DIVISION 120 Malabar Road, S.E., Palm Bay, FL Phone: (321) Fax: (321)

2012 Code Update Training

* RESIDENTIAL PLAN REVIEW *

SOUTH AFRICAN NATIONAL STANDARD

Minimum Requirements For One & Two Family Structures FBC 6 th Edition (2017)

PRODUCT EVALUATION Effective Date: June 1, 2013 GDR-39

Uniform Mitigation Verification Inspection Form Maintain a copy of this form with insurance policy

SECTION SECTIONAL OVERHEAD DOORS 511 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

Re-Roof Permit Checklist

SECTION NON-STRUCTURAL METAL FRAMING

EVALUATION REPORT Firestone Building Products 525 Congressional Blvd. Carmel, IN 46032

ELF6375DXD DRAINABLE STATIONARY LOUVER

Residential Plan Review for New One and Two Family Dwellings

CBUCK Engineering. Evaluation Report Fixed Blades Wall Louver MPF G

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1

RESIDENTIAL RE-ROOFING PERMIT APPLICATION

1. Asphalt / Fiberglass Shingle / / 2. Concrete / Clay Tile 05_/_01 /_ Metal / / 4. Built Up / / 5. Membrane / / 6.

PRODUCT EVALUATION Effective Date: June 1, 2013 GDR-40

City of South Pasadena COMMUNITY IMPROVEMENT

Evaluation Report MMI Off Ridge Vent & Attached Permanent Baffle

Building Department Informational Handout. Residential Window Replacement Requirements

HILLSBOROUGH TOWNSHIP CODE ENFORCEMENT

CBUCK Engineering. Evaluation Report Zee-Lock Panel With Floating Zee-Clip Metal Roof Assembly

ICC/NSSA STANDARD FOR THE DESIGN AND CONSTRUCTION OF STORM SHELTERS ICC

Series - 1

Siding and Soffit Installation Guidelines

1. PREINSPECTION RESIDENTIAL ENERGY EFFICIENCY 7

Uniform Mitigation Verification Inspection Form Maintain a copy of this form with the insurance policy

A M E R I C A N A R C H I T E C T U R A L M A N U F A C T U R E R S A S S O C I A T I O N

FLEETWOOD Windows & Doors

The Loss Mitigation Grant Program Grants for Home Retrofits using Wind Resistive Devices Saturday June 2, 2007

CBUCK Engineering. Evaluation Report Flush Seam Metal Wall Assembly

Typical Deck Details. Albemarle County, Virginia. Based on the 2012 Virginia Residential Code

Size and performance summary. Glazing performance. Grille profiles and patterns. Size tables. Design Data. Detailed Product Description

SECTION WOOD FRAMING. A. Includes But Not Limited To: 1. Furnish and install wood framing and blocking as described in Contract Documents.

WEB BASED CORE APPLICATION SPECIFIC INSTALLATION INFORMATION AND METHODS

ThermaSteel Corporation ASSEMBLY MANUAL

ALL-ALUMINUM DOOR & WINDOW FRAMING

CBUCK Engineering. Florida Product Approval # FL R2

EME6325D WIND-DRIVEN RAIN RESISTANT STATIONARY LOUVER

Window Installation Instructions Fixed Systems with Subframes

Residential Patio Cover Specifications

Wall bracing panel requirements

SECTION NON-STRUCTURAL METAL FRAMING

NOTE: For construction other than new commercial or additions (renovations), only those areas below describing the scope of work will be applicable.

CBUCK Engineering. Evaluation Report Englert Series 1100 Metal Roof Assembly. Manufacturer:

Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08

RESIDENTIAL BUILDING PERMIT APPLICATION ( MINIMUM Building Requirements-Page 6)

SECTION COLD-FORMED METAL FRAMING

CODE COMPLIANCE GUIDELINE GENERAL BUILDING

2015 MICHIGAN UNIFORM ENERGY CODE Effective: February 8, 2016

Transcription:

GLASS WINDOWS & DOORS Please submit/upload plans in PDF format Applicant must submit the following items: Please indicate items submitted with a checkmark ( ) Create online as Permit Type: Building (R ) Workclass: Windows, Doors, Garage Door 1. Permit application (check appropriate trade) completed and signed 2. Plans with name and address of designer a. New window or door opening 1. Floor plan with location and sizes of new openings 2. Typical wall section 3. Beam or header sizes over new openings 4. Bedroom emergency egress windows located 5. Emergency egress window size given per FBC 2017 6 th Edition, Section 1029; FBC 2017 6 th Edition Residential 310 and FBC 2017 6 th Edition Existing 604 6. Location of electrical outlets and lights if installing new doors. 7. Elevation view of exterior walls with new doors or windows 8. Product Approvals a. Miami-Dade product approval report with referenced engineered plans. b. State of Florida/DCA product approval with Engineered plans c. Engineer s signed/sealed plans and calculations for custom design. b. Replacing window or doors with same size material 1. Floor plan with location and sizes to be replaced 2. Bedroom emergency egress windows located 3. Emergency egress window size given per FBC 2017 6 th Edition, Section 1029; FBC Residential 310 and FBC 2017 6 th Edition Existing 604 4. Product Approvals (one of the following) a. Miami-Dade product approval report with referenced engineered plans b. State of Florida/DCA product approval with. Engineered plans c. Engineer s signed/sealed plans and calculations for custom design. 3. Signed contract and copy of property appraisers structural valuation or other evidence of structure value 4. All project specific details must be identified on engineered plans including construction details of host structure, type and thickness of glazing, design pressures, anchor details, type of fasteners, etc. 5. Mean roof height of building, exposure category, zones and required design pressures IF THE BUILDING IS LOCATED IN THE SEA TURTLE PROTECTION ZONE (600 FT FROM THE BEACH), THEN TURTLE GLASS WILL BE REQUIRED. IN-PROGRESS INSPECTION IS REQUIRED FOR ALL WINDOW & DOOR INSTALLATIONS IN EXISTING BUILDINGS IF RESIDENT LIVES IN A DEED RESTRICTED COMMUNITY, OBTAIN HOMEOWNERS ASSOCIATION APPROVAL PRIOR TO COMMENCING WORK. TOWN OF JUPITER BUILDING DEPARTMENT 210 Military Trail, Jupiter, Florida 33458 Phone (561) 741-2286 Fax (561) 741-0911 Rev12/31/17

TOWN OF JUPITER BUILDING DEPARTMENT FIELD INSPECTION SERVICES IN-PROGRESS DOOR AND WINDOW INSPECTION Revision 3: Update to the Florida Building Code The purpose of this inspection is to insure the proper installation of window and door bucks, shims and anchors, as specified in the product approval and the Florida Building Code as written below. The text written in Italics is the commentary provided by the Town of Jupiter. FBC-R609.7.2 Masonry, concrete or other structural substrate. Where the wood shim or buck thickness is less than 1½ inches (38 mm), window and door assemblies shall be anchored through the main frame or by jamb clip or sub frame system, in accordance with the manufacturers published installation instructions. Anchors shall be securely fastened directly into the masonry, concrete or other structural substrate material. When the thickness of the buck or shim is less than 1 ½ inches, anchors shall be installed directly through the window/door frame, through the shims and buck, and into the masonry structure. Unless otherwise tested, bucks shall extend beyond the interior face of the window or door frame such that full support of the frame is provided. The buck shall be installed as displayed in the window/door Notice of Acceptance (NOA). If the existing buck fails to match the exact requirements as pictured in the NOA, then the existing buck shall be removed and a new buck installed in accordance with the NOA. It is not permissible to piece in additional wood in order to extend the width of the existing buck. Shims shall be made from materials capable of sustaining applicable loads, located and applied in a thickness capable of sustaining applicable loads. Wood, plastic, and metal are considered to be suitable shim materials. Anchors shall be provided to transfer load from the window or door frame to the rough opening substrate.

The type of anchor and the penetration depth is specified in the product approval and the manufacturer s installation instructions, which needs to be on site during installation and inspection. Where the wood buck thickness is 1½ inches (38 mm) or greater, the buck shall be securely fastened to transfer load to the masonry, concrete or other structural substrate and the buck shall extend beyond the interior face of the window or door frame. Where the thickness of the buck is 11/2 inches or more, the buck shall be anchored to the masonry structure first. The means and method of the buck-to-structure attachment shall be detailed in a signed and sealed engineered drawing that has been submitted with the plans and product approval at the time of permit application. After the window/door buck is installed, the window or door is then shimmed and anchored to the buck with anchors approved for the purpose. Window and door assemblies shall be anchored through the main frame or by jamb clip or sub frame system or through the flange to the secured wood buck in accordance with the manufacturers published installation instructions. Unless otherwise tested, bucks shall extend beyond the interior face of the window or door frame such that full support of the frame is provided. Shims shall be made from materials capable of sustaining applicable loads, located and applied in a thickness capable of sustaining applicable loads. Anchors shall be provided to transfer load from the window or door frame assembly to the secured wood buck. FBC-R609.7.2 Mullions occurring between individual window and glass door assemblies. All mullions have been engineered and tested to comply with specific performance criteria. It is not permissible to cut, notch, drill, alter, modify, or in any way change the mullion or the mullion mounting brackets. If you have any questions please contact Tim Lynch 561-741-2286 WINDOW/DOOR IN PROGRESS INSPECTION IS REQUIRED, (INSPECTION CONNECTION #157) CALL 561-741-2286 MORNING OF THE INSPECTION. Rev 12/31/17

Town of Jupiter BUILDING DEPARTMENT 561-741-2286 ATTENTION OWNERS / CONTRATORS WINDOW & DOOR INSTALLERS UNLESS OTHERWISE TESTED WINDOW BUCK INSTALLATION FOR RESIDENTIAL WINDOWS IN ACCORDANCE WITH FLORIDA BUILDING CODE RESIDENTIAL 609.7.2 Masonry, Concrete or Other Structural Substrate BUCK LESS THAN 1 ½ Where the wood shim or buck thickness is less than 1 ½ inches, window and door assemblies shall be anchored through the main frame or by jamb clip or subframe system, in accordance with the manufactures published installation instructions Anchors shall be securely fastened directly into the masonry, concrete of other structural substrate material. Unless otherwise tested, bucks shall extend beyond the interior face of the window or door frame such that full support of the frame is provided. Shims shall be made from materials capable of sustaining applicable loads, located and applied in a thickness capable of sustaining applicable loads. Anchors shall be provided to transfer load from the window or door frame to the rough opening substrate. BUCK GREATER THAN 1 ½ Where the wood buck thickness is 1 ½ inches or greater, the buck shall be securely fastened to transfer load to the masonry, concrete or other structural substrate and the buck shall extend beyond the interior face of the window or door frame. Window and door assemblies shall be anchored through the main frame or by jamb clip or subframe system or through the flange to the secured wood buck in accordance with the NOA or Florida Product Approval. Unless otherwise tested, bucks shall extend beyond the interior face of the window or door frame such that full support of the frame is provided. Shims shall be made from materials capable of sustaining applicable loads, located and applied in a thickness capable of sustaining applicable loads. Anchors shall b provided to transfer load from the window or door frame assembly to the secured wood buck. WINDOW SHOP DRAWINGS WILL BE REQUIRED AT TIME OF BUILDING FRAMING INSPECTION, PER INFORMATION SHEET ATTACHED TO APPROVED PLANS Rev 12/31/17

Permitting window/ doors. (cladding) I. Determine required design pressures for each opening. This may be accomplished using the tables on the Town s website in lieu of engineering design and ASCE 7-10. Building height, exposure category, wall zone and opening size will be required to calculate this. Most buildings in Jupiter are in wind speed 170. Any opening within 4 ft of a corner is in wall zone 5. II. Once the required design pressures have been established, the engineered drawings in the product approval must be consulted and project specific details must be identified for the plans examiner; such as attachment schedules, substrates, glazing type, etc. to demonstrate that the method of installation and each product will meet the required design pressures. See The sample from PGT s instruction. III. A worst case pressure may be utilized, but note that the field inspector will verify that all openings comply with this pressure. IV. In most cases, the window supplier can provide specification sheets for the products which provide this information. If you have this information submit it with the permit application. V. Do not remove the paper labels affixed to the glazing until after final inspection. These are called inspector labels and tell the inspector the pressure ratings, the light transmission and energy efficiency ratings of the products. VI. If the building is located in the sea turtle protection zone (600 ft from the beach), then turtle glass will be required. Turtle glass has a light transmittance of 45% or less. Evidence will be submitted. VII. If the window replacement equals or exceeds 30% of the host structure s value or is part of or supplemental to an improvement or improvements equivalent to or more than 30% of the host

structure s value, the glazing must meet the prescriptive requirements of the Energy code. (Max SHGC =.25 and Max U value=.65 for non-impact and.75 for impact glazing) For questions contact Tim lynch 741 2469 or timl@jupiter.fl.us

For questions contact Tim lynch 741 2469 or timl@jupiter.fl.us