Ministry of the Environment and Climate Change. Transfer of Review. Presentation for Wastewater Practitioners Group.

Similar documents
The Corporation of the Town of Milton

City of Guelph Transfer of Review Procedures 7 March, 2017

Section 3 General Development Policies

The proponent is responsible for meeting all approval requirements from relevant agencies.

Overview on Green Infrastructure Actions within the Draft Canada-Ontario Action Plan for Lake Erie

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)

FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY 405 TWEEDSMUIR AVENUE

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)

7.00 INTRODUCTION... 1

Metropolitan St. Louis Sewer District Statement of Policy for Maintenance of Stormwater Sewer Systems

S.O.P. No. HMD

Policy Review of Municipal Stormwater Management in the Light of Climate Change Summary Report

BMP FACT SHEET DF-1 HOA Annual Self-Certification Report

Stormwater Management Practices and Design Manual. Clemson University

NJ Future CSO Permittee Meeting

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

SNOW REMOVAL & DISPOSAL POLICY

Chapter 7: Utilities and Stormwater Management

Storm Water Management Pollution and Treatment

Practices that capture and temporarily store the WQ v before allowing it to infiltrate into the soil.

Municipal Stormwater Ordinances Summary Table

Chapter 21 Stormwater Management Bylaw

City of Tacoma Stormwater Management Program Assessment. Attachment B3

WELCOME. Eastern Subwatersheds Stormwater Management Retrofit Study. Online Information Session

APPENDIX I WATER QUALITY FACTORS FOR FEE CREDIT CALCULATIONS

Ordinance No Lot Surface Drainage

TITLE 250 DEPARTMENT OF ENVIRONMENTAL MANAGEMENT

CONSTRUCTION SPECIFICATION FOR SITE PREPARATION FOR PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES

Flood-Resilient Community Design: Disaster Mitigation, Best Practices for Building New Residential Subdivisions

Item No Environment and Sustainability Standing Committee December 7, 2017

The City of Lake Forest Stormwater Management Policy Approved by City Council on March 7, 2016

REQUIRED SEPTIC DRAWINGS

Both programs protect coastal water resources.

Project Priority List scoring worksheet - stormwater Guidance document

Infiltration Trench Factsheet

Stormwater Self Assessment Profile (SWSAP) Compliance Guide Revised June 2016

Appendix A Stormwater Site Plan Report Short Form

CONSTRUCTION SPECIFICATION FOR SUPPORT SYSTEMS

Goals, Objectives, and Policies Infrastructure Element Introduction

Amendment to OPSS 518 (Nov 2011) Construction Specification for Control of Water from Dewatering Operations

STORMWATER MANAGEMENT AND IMPAIRED WATERS. Eric H. Livingston Watershed Management Services, LLC Crawfordville, FL

CONSTRUCTION SPECIFICATION FOR SITE PREPARATION FOR PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES

TOWN OF BETHLEHEM SWPPP APPLICATION REVIEW CHECKLIST

Controlling CSO Discharges in the City of Toronto: Don River and Central Waterfront Project

Low Impact Industrial Development

REGIONAL OFFICIAL PLAN AMENDMENT 5 TO THE OFFICIAL PLAN FOR THE NIAGARA PLANNING AREA

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW

Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

RULES AND REGULATIONS FOR THE OPERATION AND MAINTENANCE OF WASTEWATER TREATMENT FACILITIES

A Primer on Stormwater Management, your Facility and the Chesapeake Bay. Tom Schueler Chesapeake Stormwater Network June

Module 8 (L31 L34): Storm Water & Flood Management : Storm water management, design of drainage system, flood

APPENDIX 14. Inflow and Infiltration in the CRD

Business Plan Summary

Stormwater Infrastructure Funding Study Public Education Session May 27, :00 9:00 pm City Hall, Multi-Purpose Room Level 100

Bioswales, Wetlands, and Trees: How going green can be a part of a Wet Weather Management Plan. Presented by Brian Tornes, PE

MARION COUNTY COMPREHENSIVE PLAN 2035

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MARCH 20, WASTEWATER COLLECTION SYSTEM AND STORMWATER MANAGEMENT REPORT

Design Example Residential Subdivision

Tackling Stormwater Education and Outreach: Developing A Master Strategy for Lincoln

Nonpoint Source Storm Water Management Plan

INDIVIDUAL PERMIT (IP) FOR STORMWATER DISCHARGES FROM SMALL MUNICIPAL SEPARATE STORM SEWER SYSTEMS (MS4s)

SUMMARY OF COMMENTS/RECOMMENDATIONS

STORMWATER AND EROSION CONTROL PERMIT

Watershed Management Ordinance

STORMWATER AND EROSION CONTROL PERMIT

City of Fairmont Storm Water Pollution Prevention Plan Annual Public Meeting. June 11, 2018

BUREAU OF CLEAN WATER

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas.

Division 33. Utilities

Stormwater Utility. Frequently Asked Questions

2019 Annual Review of Sewer Rates and Environmental Updates Under the Sewer & Watercourse By-law

CITY OF BROOKFIELD STORMWATER MANAGEMENT PLAN APPLICATION PACKAGE STANDARD FORM

Clean Water is Everyone s Business. A commercial & industrial property owner s guide to improving Lake Tahoe s clarity

ARTICLE 14: ADMINISTRATION

Content Copy Of Original

Project Name: Add a unique name that appropriately identifies the submission

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E

City of Charlottesville Water Resources Protection Program

Content Copy Of Original

Downspout Disconnection Program FAQs

c: Don Labossiere, Director, Environmental Compliance and Enforcement Public Registries

TABLE B.3 - STORMWATER BMP POLLUTANT REMOVAL EFFICIENCIES

Preface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF)

Preliminary Design Report: Prices Subdivision Drainage Improvements & Wastewater Servicing

WEAO STUDENT DESIGN COMPETITION 2018 PROJECT STATEMENT

APPENDIX F DRAINAGE AND STORMWATER MANAGEMENT TECHNICAL MEMO

ORDINANCE # 854. Stormwater Management / Operation and Maintenance Requirements

Stormwater design considerations

Monarch Castlepoint Kipling South Development Limited Bathurst St Vaughan, ON L6A 4B6

OLD DUNDAS ROAD SEWAGE PUMPING STATION (HC005) EMERGENCY OVERFLOW SCHEDULE C MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT (EA)

E. STORMWATER MANAGEMENT

City of Greater Sudbury Infrastructure Background Study APPENDIX A.1. Guideline for Sewage and Water Services

Water Resources Management Plan

Homeowner Incentive Program

Chapter 3 Dispersion BMPs

Recent Changes in Phase II MS4 Permitting

Planning Considerations for Stormwater Management in Alberta. R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013.

Transcription:

Ministry of the Environment and Climate Change Transfer of Review Presentation for Wastewater Practitioners Group November 29, 2017

Outline of Presentation Transfer of Review (TOR) Program Context TOR Background TOR Process vs Direct Submission Other Salient Program Features Program Status and Realized Benefits Concerns and Areas for Improvement Proposed Updated Agreements New Initiatives Next Steps 2

Program Context: MOECC Approvals Framework Environmental Compliance Approval (ECA) applications for sewage works are reviewed by two branches within the Ministry of the Environment and Climate Change (ministry). Environmental Approvals Services (EAB) Detailed engineering review Applications with higher risk of adverse impacts Sanitary conveyance systems that discharge directly to wastewater treatment plants, wastewater treatment plants, subsurface disposal works, complex industrial stormwater management works, applications requiring effluent criteria and monitoring Environmental Approvals Access and Service Integration Branch (EAASIB) Streamlined engineering review Applications with lower risk and relatively predictable impacts Conveyance systems, pumping stations, municipal and private stormwater management works, and less complex industrial stormwater management works 3

Risk and Complexity of Sewage Works Risk-Based Approach to Approvals Mines & quarries Expanded TOR Program Approvals Process Ponds Subsurface disposal works Industrial sewage works Wastewater treatment plants Pumping Stations Low-risk LIDs Sewers Ditches & culverts Resources Involved in Engineering Review at Approvals 4

Background of the TOR Program The Transfer of Review (TOR) Program is a voluntary program implemented in 1978 to create efficiencies in the review of environmental approval applications for certain low-complexity sewage works (e.g. pipes). Some of the goals of the TOR Program: o o o Allow the ministry to focus resources on more complex applications Reduce overlaps between municipal and provincial approvals processes Improve approval timelines to enable municipalities to better plan their infrastructure investments Under the TOR Program, partner municipalities and the ministry enter into an agreement which allows qualified/designated municipal engineers to conduct, on behalf of the ministry, the administrative and technical review of ECA applications for a defined range of sewage works. o o For eligible sewage works proposed in a participating municipality, an applicant may submit their ECA application to the municipality for review instead of the ministry. The ECA is still issued by the ministry. The TOR Program recognizes that the municipality assumes ownership of these sewage works and is consequently highly involved in the development process to ensure they are properly designed and constructed. 5

TOR Process vs Direct Submission Transfer of Review Process Technical review of the ECA package by municipal authority Municipal authority provides letter of recommendation to the MOECC to approve the proposal Screening and documentation review of the ECA submission by MOECC MOECC issues approval Applicant prepares ECA application and supporting documents Municipal authority Direct Submission to MOECC MOECC Completeness screening of the ECA submission by AAU Supplementary review from MOECC District Office Technical review of the ECA package by MOECC technical reviewer MOECC issues approval MOECC 6

Other Salient Program Features Participating upper-tier municipalities may provide TOR Program-related services to all their respective lower-tier municipalities. Municipalities collect and retain application fees as per the ministry s current fee schedule. Currently, only licensed professional engineers on municipal staff are authorized to conduct the reviews. Ministry performs audits to ensure participants are complying with requirements. Ministry turnaround times are shorter allowing for better municipal and project planning. The ministry does not have a service guarantee for TOR application review, but they are typically processed quickly due to the work already completed by the partner municipality. The ministry will endeavor to issue the ECA within 30 business days from the date the application is deemed complete. o In 2016-2017, the average turnaround time for processing TOR applications in the ministry was 13 business days. o The ministry has committed to reduce the average turnaround time as a result of discussions at the Development Approval Roundtable. 7

Joining the Program Entry into the TOR Program is a simple process: Municipal staff must have sufficient engineering expertise (i.e. licensed engineers on staff who can review ECA applications) Either the municipality (through sending a letter of interest to the Ministry) or the Ministry (through sending a letter of invitation to a municipality) can initiate the participation process Once the process is initiated, a series of meetings will be held to facilitate a common understanding of the program Based on this understanding, a TOR agreement is drafted and signed TOR Agreement Municipality reviews application Municipality submits application to ministry Ministry issues ECA Municipality and ministry enter into a TOR agreement Qualified and designated municipal engineers conduct, on behalf of the ministry, administrative and technical review of the ECA application for sewage works Municipality submits to the ministry the complete ECA application package and letter of recommendation to approve the proposed sewage works Ministry issues final ECA for sewage works 8

Program Status 75% of Ontario s population in 95 participating municipalities 444 Municipalities in Ontario 25% of Ontario s population in 349 of nonparticipating municipalities Population of Ontario and TOR Municipal Participation Participating Not Participating 520 1370 ECA Applications for Sewage Works 550 300 No. of ECA Applications for Sewage Works Received by MOECC in the 2016-17 Fiscal Year Complex Less complex Transfer of Review Currently, 37 TOR agreements cover 95 municipalities that serve 75% of Ontario s population. The ministry issues about 500-600 ECAs under this program annually. Examples of Sewage Works Complex Municipal sewage treatment plants and combined sewers Industrial wastewater treatment plants Industrial stormwater management works Less Complex Storm and sanitary sewers, pump stations Low Impact Development Municipal stormwater management works including wet and dry ponds 9

Realized Program Benefits Increased review efficiency of ECAs, allowing the ministry to focus resources on more complex applications Improved timelines of issuing such ECAs to allow better municipal planning Reduced overlap between municipal and ministry approval processes Municipalities able to ensure proper design and construction of sewage works 10

Updating the TOR Program The ministry is implementing enhancements to the TOR Program to create efficiencies in program delivery and find opportunities to broaden the program o introduce more rigor to the program o attract new municipalities o allow additional works to be reviewed o focus ministry resources on higher risk applications 11

Concerns and Areas for Improvement The last update to the TOR Program was in 2009 Number of issues driving need to introduce program updates include: o Outdated legislation and regulatory references in existing agreements o Lack of clarity on program scope (eligible and ineligible works) o No formal acknowledgement/acceptance of TOR agreement (e.g. no sign-off required by participating municipality) o No defined process for handling changes to TOR agreements o Ad hoc record keeping and custodianship of agreements o Lack of municipal reporting to support effective program monitoring, and o Lack of defined audit process & service standards for issue of TOR ECAs. List of eligible works has largely remained static for life of the TOR Program 12

Why Update TOR Agreements? In addition to the need to address current issues/concerns, updating and promoting TOR agreements has following benefits/advantages: o Supports a number of initiatives and sub-initiatives in the Ministry s Strategic Plan o Will further help ministry achieve one-year service standard for higher risk approvals as per 2015 Fall Economic Statement by expanding list of eligible works and reducing the number of applications needing direct Ministry review o Can be used to incentivise and promote use of new/emerging technologies and innovative design (e.g. low impact development, enhanced quality control) o Can be used to promote/facilitate related ministry initiatives (e.g. Lake Simcoe protection initiatives) o Provides opportunity for ministry to explore partnerships with various Qualified Persons to facilitate application reviews (e.g. municipal engineers, Conservation Authority engineers) o Provides ability for ministry to become aware of projects earlier in the process if pre-application consultation is deemed necessary 13

Proposed Updates & Rationale Proposed changes to the agreement are designed to bring greater integrity & efficiency to the program by: o Providing additional guidance about ministry expectations on quality of applications/municipal reviews o Simplification of certain requirements (e.g. requirement for submission of signing officers) & introduction of rigor into other processes (i.e. audits) o Establishing clear roles & accountabilities (controllership & custodianship) o Improving tracking/monitoring of program performance (e.g. requiring municipalities to submit to ministry a list of completed projects periodically) o Providing tools & templates to facilitate reviews/approvals o Allowing for amendments & expansion of agreements 14

Updated TOR Agreement Structure Revised TOR Agreement Schedules (can be amended w/o new agreement) Core Agreement (signed by the ministry and municipality) Supporting Documents (can be amended w/o new agreement) Schedule A (list of allowed works) Schedule B (required documents) Annual Summary Report Template Recommendation Letter Template Schedule C (recommendation letter requirements) Schedule D (sample descriptions, terms and conditions) Submission Checklist 15

Updated TOR Agreement - Highlights Existing Agreement A letter issued by the ministry with no signature other than ministry s on the agreement letter No reporting, record keeping and auditing provisions Updated Agreement Formalized agreement, requiring signatures from the municipality and the ministry Includes record keeping requirements, annual reporting of projects to the ministry and auditing requirements Requires municipalities to submit list of individuals allowed to conduct reviews to ministry Lack of clarity in works allowed due to outdated descriptions Lack of clarity on minimum quality of submitted applications and municipal reviews Minimal terms and conditions in ECAs The agreement covers Standard Works Requires the person that conducted the review to attest and sign their review and recommendation Includes definitions consistent with current guidelines, clearly outlines allowable sewage works under the TOR program along with eligibility criteria Details minimum submission requirements and minimum quality of municipal reviews ECAs will have same terms and conditions as those reviewed by the ministry Agreement structure is flexible to facilitate addition/removal of allowed works 16

Updated TOR Agreement: Standard and Additional Works Must be designed in accordance with the ministry s guidance documents Design Guidelines for Sewage Works, 2008 (PIBS 6879) and Stormwater Management Planning and Design Manual, 2003 (PIBS 4329e), as amended A detailed list of eligibility criteria and limitations is included in the agreement Standard Works Sanitary sewers, forcemains and siphons Sanitary sewage pumping stations Storm sewers, ditches, culverts, grassed swales Oil/grit separators Additional Works Rehabilitation of existing combined sewers Wet/dry/hybrid ponds, wetlands (incl. stormwater outfalls)* Stormwater pumping stations Lot level and conveyance control (LID) measures (incl. stormwater outfalls)* *Enhanced level water quality control (80% TSS removal) and erosion protection required 17

Updated TOR Agreement: Excluded Works Works that meet any of the following will not be allowed under the program: If works are located on industrial land or are designed to service industrial land; If works are identified as being within zone of influence of a landfill area; Sanitary sewage works that provide any treatment of sanitary sewage; Applications for Regional Stormwater Control Facilities or Regional Flood Control Facilities consisting of storm water management ponds that are designed to provide quality control or contain floods greater than the 100 year flood event; Applications that are for airports or airparks; Applications that are for pumping stations that service combined sewer systems; Applications for projects that have received a Part II Order request; Applications for projects that have undertaken an individual Environmental Assessment; Applications that are likely to trigger the Duty to Consult; and Applications where the municipality determines that the works have been constructed or are being constructed before an ECA has been issued. 18

New Initiative: Partnership with Lake Simcoe Region Conservation Authority In September 2017, Lake Simcoe Region Conservation Authority (LSRCA) launched the Lake Simcoe Phosphorus Offsetting Program (LSPOP) The LSPOP will address nutrient contributions from residential development sources and help finance phosphorus reduction activity across a broad range of opportunities Currently, the LSRCA currently reviews municipal stormwater management projects as part of the development planning process. o Allowing LSRCA to be a 3rd party reviewer under the TOR Program would result in a faster approval timeframe and simplify the process thereby providing an incentive for developers to participate in the LSPOP pilot It will also help promote use of low impact development (LID) or other innovative lot-level stormwater technologies vs. traditional methods (e.g. ponds) to help reduce phosphorus entering the watershed To enable LSRCA to conduct the engineering review, MOECC would need to prepare new TOR agreements with municipalities to allow this currently 15 of the 20 municipalities within Lake Simcoe Watershed have a TOR agreement 19

Next Steps Notification of TOR Program updates and enhancements to all municipalities including invitation to webinars Webinars for participating and nonparticipating municipalities Development/ transition to new agreements for participating municipalities 20

Thank you Contacts: Christina Labarge, P.Eng. Supervisor, Application Review Unit Environmental Approvals Access and Service Integration Branch 416-314-8172 christina.labarge@ontario.ca Maria Lagarde Program Support Coordinator, Program Support Unit Environmental Approvals Access and Service Integration Branch 416-314-7173 maria.lagarde@ontario.ca Justie Chung, P.Eng. Review Engineer, Application Review Unit Environmental Approvals Access and Service Integration Branch 416-314-6393 justie.chung@ontario.ca 21

Appendix 1: General Limitations General limitations for all eligible works: The works must be designed in accordance with ministry documents o Design Guidelines for Sewage Works, 2008 (PIBS 6879) o Stormwater Management Planning and Design Manual, 2003 (PIBS 4329e) The works must receive drainage from only nonindustrial lands For drainage works under the Drainage Act, approval of a petition must be obtained under the Drainage Act prior to submitting an ECA application 22

Appendix 1: General Limitations (continued) The application must not have received an elevation request, undertaken an individual environmental assessment, or triggered the Duty to Consult The site must not be within the zone of influence of a landfill area Pre-application consultation with the local ministry District Office is recommended where appropriate Consultation with the local Conservation Authority and clearance, if applicable Works must not already be constructed or under construction 23

Appendix 2: Updated TOR Agreement for Standard Works Table 1: Standard Works Types of Works Eligibility Criteria Limitations New or modified sanitary sewers, forcemains and siphons No combined sewers No direct discharge to a sewage treatment plant No treatment of sanitary sewage New or modified sanitary pumping stations Do not service combined sewer systems No direct discharge to a sewage treatment plant No treatment of sanitary sewage New or modified storm sewers, ditches, culverts and grassed swales Designed primarily for the collection and transmission of stormwater Discharge to existing, previously approved stormwater conveyance works or stormwater management works, or to a Municipal Drain No combined sewers or superpipes Do not propose to collect, store or discharge stormwater containing substances or pollutants (other than Total Suspended Solids, or oil and grease) detrimental to the environment or human health No direct discharge to a surface water body Does not require establishment and monitoring of effluent quality criteria 24

Appendix 2: Updated TOR Agreement for Standard Works (continued) Table 1: Standard Works Types of Works Eligibility Criteria Limitations Oil/grit separators Discharge to existing, previously approved stormwater conveyance works or stormwater management works, or to a Municipal Drain Do not propose to collect, store or discharge stormwater containing substances or pollutants (other than Total Suspended Solids, or oil and grease) detrimental to the environment or human health No direct discharge to a surface water body Do not require establishment and monitoring of effluent quality criteria 25

Appendix 3: Updated TOR Agreement for Additional Works Table 2: Additional Works Types of Works Eligibility Criteria Limitations Combined sewer overflows Rehabilitation of existing combined sewers No increase in combined sewage overflow (CSO) Conform to Ministry Procedure F-5-5, Determination of Treatment Requirements for Municipal and Private Combined and Partially Separated Sewer Systems, as amended Stormwater Management Facilities (wet pond, wetlands, hybrid ponds, dry ponds) Altering, modifying, adding, optimizing or expanding the retention capacity for existing approved stormwater management facilities, including stormwater outfalls New stormwater management facilities, including stormwater outfalls If required to provide quality control, Enhanced Level water quality control and erosion protection (i.e. 80% TSS removal) provided Any attenuation design requirements are satisfied Not used as a snowmelt facility 26

Appendix 3: Updated TOR Agreement for Additional Works (continued) Table 2: Additional Works (cont d) Types of Works Eligibility Criteria Limitations Stormwater Pumping Stations High level alarm systems, appropriate response time during emergency conditions, and redundancy in pumping arrangement must be provided Lot Level and Conveyance Controls (Low Impact Development) Measures Altering, modifying, adding, optimizing or expanding the retention capacity for existing approved LID measures, including stormwater outfalls Installing new LID measures, including stormwater outfalls For existing and new LID measures, if required to provide quality control, Enhanced Level water quality control and erosion protection (i.e. 80% TSS removal) provided For existing and new LID measures, any attenuation design requirements are satisfied Rooftop, surface and underground storage with inlet control devices For new LID measures, the design considers corrective and remediation measures in the event of lack of performance of the LID measures; 27

Appendix 3: Updated TOR Agreement for Additional Works (continued) Table 2: Additional Works (cont d) Types of Works Eligibility Criteria Limitations Lot Level and Conveyance Controls (Low Impact Development) Measures Infiltration or exfiltration stormwater works include: pervious pipes and catch-basins filtering systems, and infiltration trenches, such as, soak away pits attached to pervious catch-basins and sand filter beds infiltration basins pervious pipes and catch-basins with infiltration trench systems, rainwater and snow melt into the surrounding soils during high flow conditions Infiltration or exfiltration stormwater works: Based on the type of works, the vertical separation distance between the highest groundwater table (i.e. spring runoff) and the lowest elevation of the works shall adhere to Table 4.1 of the Ministry document Stormwater Management Planning and Design Manual, 2003 (PIBS 4329e) Groundwater must not be utilized as a potable water resource anywhere drainage is captured by the stormwater management works; open channels, ditches, swale drainage systems, bio-swales, tree pits, and infiltration trenches on public roads, or right-of-ways, designed to exfiltrate part or all of the stormwater runoff from the adjacent road into the surrounding soils. These types of works are to include vegetative surfaces 28

Additional Guidance and Resources Design Guidelines for Sewage Works, 2008 (PIBS 6879) Stormwater Management Planning and Design Manual, 2003 (PIBS 4329e) Ministry Procedure F-5-5 Determination of Treatment Requirements for Municipal and Private Combined and Partially Separated Sewer Systems Guide to Applying for an Environmental Compliance Approval (PIBS 8527e) Source Protection Information Atlas https://www.gisapplication.lrc.gov.on.ca/sourcewaterpr otection/index.html?site=sourcewaterprotection&view er=swpviewer&locale=en-us 29