REQUEST FOR QUALIFICATIONS CAMP HALL RAILROAD BUILD-IN DESIGN-BUILD PROJECT

Similar documents
Request for Qualifications (RFQ) #HM-R6-RFQ1 2018/2019 Highway Maintenance Agreements Prequalification RESPONSES TO RESPONDENT QUESTIONS SUMMARY #1

PROFESSIONAL CONSULTANT SERVICES REQUEST FOR QUALIFICATIONS (RFQ)

Gloucester Parkway Extension RFQ Information Meeting

SH 183 Managed Lanes Project RFQ Q & A MATRIX #2. (June 4, 2013)

Odd Fellows Road Interchange at US Route 29/460 and Road Improvements UPC # RFQ Information Meeting

I-95 Southbound CD Lanes Rappahannock River Crossing Stafford County/ City of Fredericksburg, Virginia. RFQ Information Meeting - November 9, 2016

REQUEST FOR PROPOSAL PROFESSIONAL SERVICES FOR ENGINEERING, ENVIRONMENTAL, PERMITTING, RIGHT-OF-WAY PLANNING, AND RELATED SERVICES FOR

Request for Qualifications Information (RFQI) No C146. Mechanical, Electrical, Plumbing and Fire Protection Engineering Design Services

RFQ Information Meeting

FREQUENTLY ASKED QUESTION FOR VDOT DESIGN-BUILD PROJECTS. June 1, 2013

Ohio Department of Transportation. Conflict of Interest Waiver Process Guidance Concerning Review of Conflict of Interest Waiver Requests

SH99 Grand Parkway Segments H, I1, and I2 Proposer RFQ Q&A Matrix No. 3 September 22, 2014

PIEDMONT TRIAD AIRPORT AUTHORITY

Environmental Monitoring of the Bedrock Landfill Sites

Request for Qualifications Statements

Subject: Statement of Qualifications for Public Safety Building Design

REQUEST FOR QUALIFICATIONS. Rail feasibility-level alignment, revenue and cost forecast, and regulatory draft

RFP 3512R09 Strategic Consultant Services for the Office of Policy and Public Private Partnerships Addendum 3 Appendix H Questions & Answers

REQUEST FOR QUALIFICATIONS ADDENDUM. Rail feasibility-level revenue and cost forecast, and legal regulatory draft

I-74 Final Design Request For Proposal

I-64/ Route 15 (Zion Crossroads) RFQ Information Meeting

Request for Qualifications for Master Agreement

I-64 Capacity Improvements Segment III RFQ Information Meeting

ALTERNATIVE PROJECT DELIVERY DIVISION

I-64 Hampton Roads Bridge-Tunnel Expansion Responses to Questions (Questions received as of January 22, 2018)

NOTICE TO DESIGN PROFESSIONALS / CONTRACTORS REQUEST FOR LETTERS OF INTEREST S.R. 408/ S.R. 417 INTERCHANGE IMPROVEMENTS PHASE 2 PROJECT NO.

Request for Letter of Interest (Electronic Submittal Required)

Metropolitan Washington Airports Authority. Request for Qualifications Information. Architectural / Engineering Task Contract Design Services

ENGINEERING SERVICES Phase III Construction Engineering Services for the Benedictine Parkway Improvement Project

VILLAGE OF GLENDALE, OHIO REQUEST FOR QUALIFICATIONS CIVIL ENGINEERING SERVICES JULY 2015

ADDENDUM No. 1 PROGRAM MANAGEMENT CONSTRUCTION MANAGEMENT SERVICES

Proposals will be received at 101 East 11 th Street, Suite G13, Chattanooga, TN until 4:00 P M, EST. End of Day on February 3, 2012 End of Day

ADDENDUM NO. 1. Re: Expression of Interest for RFP CB-18

Metro Gold Line Foothill Extension Construction Authority

If you are downloading the RFQ from the website, continue to monitor the website for addenda. Failure to incorporate any addenda into your submittal

PROFESSIONAL SERVICES REQUEST FOR PROPOSALS Moffat Collection System Siphon 1 River Crossing

South Carolina Department of Transportation REQUEST FOR PROPOSALS

Programmatic Environmental Impact Statement (EIS) for Lower Green River Corridor Plan Request for Proposals:

The Caltrans Contract Manager will assign specific projects to the Consultant through the issuance of Task Orders.

Pioneering Alternative Project Delivery in Ohio

Vista Ridge Integration Project Progressive Design-Build Services

REQUEST FOR QUALIFICATIONS

Route 7 Truck Climbing Lane. RFQ Information Meeting

Fair Oaks Water District

Addendum 3 publishes and answers questions related to the Request for Qualifications ( RFQ ) issued on November 24, 2014:

REQUEST FOR QUALIFICATIONS (RFQ)

REQUEST FOR QUALIFICATIONS FOR Design-Build Services for the University of Washington Seismic Improvements

Questions Due: 12/11/14; Proposals Due 12/30/14: each by 2:00PM Central Standard Time

ADDENDUM NO. 1. Date: January 11, for. RFQ for Design-Build Entity, Health Center/ Concession Project at Irvine Valley College. BID No.

REQUEST FOR QUALIFICATIONS CIVIL ENGINEERING PROFESSIONAL SERVICES VILLAGE OF BARTLETT COUNTRY CREEK LIFT STATION PROJECT

REQUEST FOR PROPOSALS (RFP)

QUESTIONS FROM EIS PROPOSERS AND ANSWERS 3/19/2012

Metropolitan Washington Airports Authority. Request for Qualifications Information. On-Call Consultant for Construction Claims Analysis Services.

Interstate 66 Widening from. RFQ Information Meeting. January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager

South Carolina Department of Transportation REQUEST FOR PROPOSALS

August 31, To Whom It May Concern:

Request for Proposals Final with Addendum 3

SELECTION CRITERIA AND PROCESS

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER SERVICES AT RISK WITH GUARANTEED MAXIMUM PRICE

Request for Proposal Energy Efficiency (Conservation) Potential Assessment and Modeling Software Tool


Terminal D South Expansion - Construction Manager-At-Risk (CMAR)

DOTD Form January 1, By Rhonda F. Braud, P.E. Contract Advertisement Engineer

Request for Qualifications: City Engineering and Architectural Services

REQUEST FOR PROPOSALS FOR AN INTEGRATED PROJECT DELIVERY METHOD UTILIZING DESIGN/BUILD GUARANTEED MAXIMUM PRICE (GMP) SERVICES

REQUEST FOR QUALIFICATIONS. for GENERAL ENGINEERING CONSULTANT SERVICES

Missoula Parks & Recreation Missoula, Montana. California Street Bridge Repair and Maintenance PROJECT PR10-08CSB DESIGN/BUILD RFQ & PROJECT SCOPE

Understanding NC House Bill 857 Design Build and Public-Private Partnerships

Trans Canada Hwy. No.1 Donald Bridges and Approaches

REQUEST FOR QUALIFICATIONS ARCHITECTURAL

Please note the following policy concerning communication between Consultants and Pike County Engineer during the announcement and selection process:

RFQ /ME - ADDENDUM 3

ADDITIONAL TYPES OF WORK REQUIRING PRE-QUALIFICATION:

Manhattan Greenway Harlem River Project 7394 / Contract Questions & Answers September 13 th, 2018

REQUEST FOR QUALIFICATIONS

Gerald Desmond Bridge. Design-Build Industry Workshop August 10, 2010

Denver Water Capital Projects Contractor Prequalification REQUEST FOR QUALIFICATIONS

REQUEST FOR PROPOSALS. For CONSTRUCTION MANAGER/GENERAL CONTRACTOR SERVICES EOU DATA CENTER PROJECT. May 1, 2018

Chapter 1 INTRODUCTION

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS

CITY OF BLUE ASH REQUEST FOR QUALIFICATIONS TO PROVIDE ARCHITECTURAL AND ENGINEERING SERVICES FOR THE DESIGN OF THE

Pre-Proposal Meeting January 23, #428 01/11/2019 RFQ Indefinite Delivery Contract for Engineering

REQUEST FOR QUALIFICATIONS (RFQ):

Advanced Construction Techniques

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER AT RISK (CMAR) SERVICES WITH GUARANTEED MAXIMUM PRICE

Chapter 2 PROJECT COORDINATION PROCESS

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO.

PRELIMINARY SCOPE OF SERVICES

Engineering Request for Proposals BJWSA Project CIP #1894 Raw Water Canal Improvements Engineering Contract

I-64 Hampton Roads Bridge-Tunnel Expansion Responses to Questions (Questions received as of February 7, 2018)

NORFOLK SOUTHERN RAILWAY COMPANY FILES: BR & BR

ADDITIONAL TYPES OF WORK REQUIRED

ADDENDUM #1 Construction Support Services for the Water Treatment Plant Project PW

REQUEST FOR QUALIFICATIONS FOR CARSON RIVER WATERSHED WATER MARKET (EXCHANGE/TRANSFER) PROGRAM

REQUEST FOR PROPOSALS

Request for Qualifications. for. Advanced Metering Infrastructure. Stillwater Utilities Authority (SUA) City of Stillwater, Oklahoma

Request for Proposals For Wastewater Treatment Plant Expansion and other Plant Improvements

Transcription:

REQUEST FOR QUALIFICATIONS CAMP HALL RAILROAD BUILD-IN DESIGN-BUILD PROJECT Camp Hall Commerce Park (Camp Hall) Ridgeville, South Carolina March 2, 2018 Addendum 2 March 29, 2018

Comment Sheet 1 of 5 Sheets 1 Page 17, 6.D 6.D: Conflict of Interest states that the Lead Contractor and Lead Designer on a designbuild team are prohibited from submitting on multiple proposal for the Project. Please advise if a Lead Contractor on a design-build could be submitted as a dedicated subcontractor for a specific scope of work on a separate design-build team. The lead contractor is prohibited from submitting on multiple proposals. 2 Page 11, E.1 E.1: Experience of Proposer s Team states to provide descriptions for a maximum of 10 representatives projects. There are 10 pages allowed for these 10 projects. In order to provide the required project information, would Palmetto Railways increase the allowable number of pages to 20? The maximum page limit will not be changed. 3 5.B.5 (p16 of 23) and 3.D (p8 of 23) The font size of 12-point Times New Roman and double space requirements will limit the information provided in the resumes. We request Palmetto Railways consider making the font size 10-point Times New Roman and single space for the resumes so responders will be able to submit the information needed to provide all the necessary qualifications for each key personnel positions. 1.5 spacing will be allowed. A change to 5.B.5.c. will be reflected in Addendum 2 to the RFQ. 4 3.C.1 Organizational Chart and Team Structure is limited to one (1) page but this section also requires a) narrative describing functional relationships, b) One (1) additional page will be allowed for the Team Structure narrative. A change to s 3.C.1 and 5.B.2 will be reflected in Addendum 2 to the RFQ. Camp Hall Railroad Build-In Design-Build Project Page 1 of 5 Request for Qualifications

Comment Sheet 2 of 5 Sheets past experience working together and c) how the proposed organization will function as a team. In addition to the 11x17 Organizational Chart, we kindly suggest at least two additional pages be added to this section in order to include the requested narrative. 5 D Experience of Key Personnel is limited to 16 pages. Can we reduce the requirement for line spacing from double space to 1.5 or single spacing in order to fully demonstrate our Key Personnel capabilities and most relevant experience? Otherwise, we kindly suggest using the 2-page SCDOT D/B Resume Template (copy attached). 1.5 spacing will be allowed. A change to 5.B.5.c. will be reflected in Addendum 2 to the RFQ. 6 E.2 Can we include the Quality of Past Performance narrative behind each corresponding Project Description form in the appendix? If not, where should we include this narrative? SCDOT allows separate forms for the Quality of Past Performance (copy attached). Quality of Past Performance should be addressed within the 10 page limit of E and/or within D of the Project Description Form (Attachment B). 7 G In addition to the contracting entity, are the other firms on the Team required to sign the Disclosure of Potential Conflict of Interest Statement forms (Lead Design Firm as well as subcontractors, and subconsultants)? Disclosure of Potential Conflict of Interest Statement. 6E states that If no member of a Proposer s team has a potential conflict of interest, the Proposer shall submit only one Disclosure of Potential Conflict of Interest Statement. Otherwise, any team member with a potential conflict of interest shall submit a Disclosure of Potential Conflict of Interest Statement. 8 3.D.5.a.iii Referencing the requirement that the Camp Hall project be the Lead Design Engineer s sole responsibility which requires him to be dedicated No, it is not acceptable that the Lead Design Engineer have competing project responsibilities during the design phase of the Project. The intent of this requirement is that Camp Hall Railroad Build-In Design-Build Project Page 2 of 5 Request for Qualifications

Comment Sheet 3 of 5 Sheets only to this project and have no other outside project responsibilities for the duration of the Design. Given the quality of the Lead Design Engineer that we are intending to propose he will have some other responsibilities within the firm to guide design teams with various clients. We will commit that our Lead Design Engineer will be responsive and available for discussions throughout the design phase to ensure a quality design, we believe this complies with the intent of the RFQ, is this acceptable? the Lead Design Engineer is dedicated solely to the Project for the duration of the design phase. It is reasonable to assume that the Lead Design engineer would have other non-project and admininstrative responsibilities within his or her firm. 9 5.B Proposer requests that tabs, cover and table of contents do not count towards page restrictions. Cover page and Table of Contents shall not be counted towards the specified page limit in 5.B.2. 5.B.2 states that Dividers or tabs are not included in the specified page limit. 10 C.2.c Proposer requests that one 11x17, in place of an 8.5x11 sheet can be used to show project risks to better demonstrate the project approach. This page would only count as one page within the existing page restrictions. No change will be made in response to this question. The referenced, Resources and Project Approach, is limited to 7 8.5 x 11 pages. 11 4 12 Can Palmetto Railways provide a summary of the evaluation criteria metrics, and maximum points to be assigned on the selection criteria items to be used for scoring the Statements of Qualifications submitted by proposers? Does the Proposer need to prepare a formal presentation for the SOQ interview? If so, does Palmetto Railways have prescription for an outline on the SOQ interview? SOQ s will be evaluated against the Project goals and minimum requirements identified in the RFQ. Specific values for these will not be shared with Proposers. Additional guidance regarding the interview format and content will be provided as part of the invitation. Interviews will be 1 hour in length, and are open to 6 persons to be idendified by the Proposer. Camp Hall Railroad Build-In Design-Build Project Page 3 of 5 Request for Qualifications

Comment Sheet 4 of 5 Sheets a. Which team members will be required to attend the interview? b. What is the maximum time limit for the SOQ interview? c. How many members of the Proposer s team may be permitted to attend the SOQ interview? 13 3.D.4.e 14 15 Would you consider changing the requirement for the Project Manager to reside within thirty miles to forty miles to encompass the metropolitan Charleston area? In order to evaluate our project approach and critical risks, we need to know what materials will be supplied by the Owner and what is the delivery method of each? In particular, the following: a. Rail: What lengths will be supplied (ribbon rail or 80' lengths)? b. Rail, Turnouts, Ties & OTM: What is the delivery method? Can you provide the percent complete for the following design elements? This will allow us to determine the engineering and design needs to properly prepare the SOQ. Project site is approximately 30 miles from Charleston, and the Project Manager shall reside within 30 miles of the project site. Any reasonable deviation from this requirement, will be evaluated on a case-by-case basis. Final approval of any deviation will rest with Palmetto Railways. All materials will be provided by the owner and will be FOB a certain location. Details related to materials supplied by the Owner, if any, will be provided in the RFP. An Environmental Assessment (EA) is being prepared for the Project under the direction of the United States Army Corps of Engineers (USACE) and the Surface Transportation Board (STB). Currently, the design is Camp Hall Railroad Build-In Design-Build Project Page 4 of 5 Request for Qualifications

Comment Sheet 5 of 5 Sheets a. Bridge design. b. Rail alignment. c. Rail profile. d. Drainage feature design. e. Road crossings. underway to a level commensurate with the progress of the ongoing NEPA study. Upon issuance of the RFP, shortlisted Proposers will be given access to the available design information, which is anticipated to be at the 60% level for bridges and at the 30% level for all other elements. Along with the design products, it is anticipated that a preliminary drainage report, a preliminary geotechnical report, and a preliminary utility report will be provided to shortlisted Proposers. A draft outline of the RFP package is attached as information. 16 Can the Attachment B project forms, tables, charts and other graphics developed for the SOQ be single-spaced? Attachment B shall be formatted as required in 5.B and does not count against the. The Attachments B and C will be provided to Proposers in native Word format so that additional sace may be used if necessary. 17 Is the required one inch border to the text or to anything printed, i.e. to a header or footer for page top/bottom or pictures on the side? The 1 requirement is to text only. Camp Hall Railroad Build-In Design-Build Project Page 5 of 5 Request for Qualifications

29 March 2018 List of Camp Hall RFP Package Documents 1. DB RFP a. Instructions to Proposers (ITP) b. Draft Design Build Agreement (DBA) c. Exhibits Cost Proposal Bid Form Schedule of Values Form Schedule Days Form Scope of Work Performance Specifications Project Management Public Information Environmental Third Party Agreements Utility Adjustments Right-of-Way Geotechnical Land Surveying Railways Roadways Drainage Structures Traffic Control 2. Plans a. Camp Hall 30% Set 3. Basis of Design (BOD) 4. 60% Bridge Design Plans a. Camp Hall 60% Bridge 5. Preliminary Bridge Scour Report 6. Volvo Lead Track Design Plans a. 100% Volvo Lead Track Plans 7. Design Files a. Survey file(s) b. DGNs c. DTMs 8. Geotechnical Data and Reports a. Camp Hall Rail Geotechnical Base Line Report b. Volvo Car Yard and Spur Phase II - Geotechnical Exploration 9. Preliminary Hydraulic Study a. Preliminary Hydraulic Study

10. Phase 1 Environmental Site Assessment 11. Preliminary Utility Report a. SUE 12. USACE 404 Permit Application 13. Draft EA (when available)