PRELIMINARY HYDROLOGY STUDY

Similar documents
PRELIMINARY DRAINAGE STUDY

HYDROLOGY STUDY LA MIRADA BOULEVARD La Mirada, California

Hydrology Study. For Bella Terrazza Portion of Lot 1, Block 39, Subdivision of S Tract, Rancho El Cajon El Cajon, CA 92021

PRELIMINARY DRAINAGE REPORT FOR THE EDI MASTER PLAN

TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1

Appendix G Preliminary Hydrology Study

Appendix E.2 Preliminary Hydrology Report

Appendix H Amanda Estates Drainage Study

Hydrologic Study Report for Single Lot Detention Basin Analysis

SIZING. MWS Linear. Hybrid Stormwater Filtration System. P.O. Box 869 P Oceanside, CA F

HYDROLOGY STUDY PREPARED FOR: MARKHAM PERRIS LLC 302 WEST FIFTH STREET, SUITE 103 SAN PEDRO, CA (310) FOR THE PROJECT:

DIVISION 5 STORM DRAINAGE CRITERIA

Preliminary Stormwater Quality Mitigation Report

a. Title of Report Example: Final Hydrologic and Hydraulic Drainage Report For Tract #### (or Planning and Zoning Permit ##-###-###)

Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA (706) x 42228

Subject: Mt. San Antonio College- Measure RR Updated Hydrology Study

APPENDIX J-3. Orcem Stormwater Management and Treatment Facilities Design Summary

APPENDIX F RATIONAL METHOD

SAN GORGONIO PASS CAMPUS - PHASE I

3.3 Acceptable Downstream Conditions

STORMWATER MANAGEMENT REPORT FOR. Chick-Fil-A S Ferdon Blvd, Crestview FL. February 10 th, 2017

STORM DRAINS AND IRRIGATION

Hydrology Study. Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated)

PRELIMINARY DRAINAGE REPORT NEWCASTLE FIRE STATION OLD STATE HIGHWAY

LAKE COUNTY HYDROLOGY DESIGN STANDARDS

City Plaza Residential (TPM ) Preliminary Hydrology Report

PART V - STORM DRAIN DESIGN CRITERIA

PART V - STORM DRAIN DESIGN CRITERIA

CORBIN AND NORDHOFF IV. ENVIRONMENTAL IMPACT ANALYSIS ENV EIR F. HYDROLOGY

Calculating System Development Charges for Stormwater Facilities

ENGINEERING REVIEW CHECKLIST City of Mount Clemens

DESIGN DEVELOPMENT HYDROLOGY REPORT & LOW IMPACT DEVELOPMENT PLAN (LID PLAN)

PART 3 STORM WATER TECHNICAL MANUAL

G. HYDROLOGY Existing Conditions

HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR

CITY OF REDLANDS MASTER PLAN OF DRAINAGE San Bernardino County, California

HYDROLOGY CHECKLIST FOR LAND DISTURBANCE PERMITS

Preliminary Drainage Analysis

MODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1. Precipitation

CUYAHOGA COUNTY ENGINEER

Municipal Stormwater Ordinances Summary Table

SAMPLE DRAINAGE STATEMENT

HYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006

CCSD#1 Stormwater Standards

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY

FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 1.0 Overview

Appendix L. Drainage Report

Use of IDF Curves Design of a roof drainage system

VOLUME 1 TABLE OF CONTENTS

Master Plan of Storm Drainage for East Garden Grove Wintersburg Channel Tributary Area

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

RE: Final Drainage Letter: Northwest Aurora Alley Improvements 2016

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

I. RELEASE FROM PLANNING PRIOR TO SUBMITTAL TO ENGINEERING DEPARTMENT

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

PRELIMINARY DRAINAGE STUDY

DRAINAGE SUBMITTAL CHECKLIST

PRELIMINARY WASTEWATER CAPACITY STUDY

Appendix B. Storm Drain System Data

Contents. Drainage Analysis: Hunters Trace, Westpointe, and Hunters Creek

CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management

June 2017 C.3 Workshop Sizing Example. Section II.B Sizing Volume-Based Treatment Measures based on the Adapted CASQA Stormwater BMP Handbook Approach

Arvada Plaza Redevelopment. Walmart Store # (Lot 1) Industrial Realty Group, LLC (Lot 2)

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR

Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts

Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts

CITY OF SAN DIEGO COMMENTS ON THE SAFARI HIGHLANDS RANCH PROJECT (SUB ).

New Orleans Stormwater Regulations and Green Infrastructure Toolkit

STORM DRAINAGE DESIGN CRITERIA

CITY OF LEBANON CITY WIDE DRAINAGE EVALUATION EXECUTIVE SUMMARY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff

HERPIC County Storm Drainage Manual

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART PLANT DANIEL NORTH ASH MANAGEMENT UNIT MISSISSIPPI POWER COMPANY

RUBONIA SUBDIVISION DRAINAGE AND ROADWAY IMPROVMENTS PREPARED BY: MANATEE COUNTY PUBLIC WORKS ENGINEERING SERVICES DIVISION

Drainage Servicing Report - Terms of Reference

Design of Stormwater Wetlands

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY

THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN. 4. Drainage Plan. a. Drainage Plan Description

APPENDIX E APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

Appendix J: Storm Conveyance Design Parameters

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY

VOLUME 1 TABLE OF CONTENTS

Appendix F. Flow Duration Basin Design Guidance

APPENDIX F HYDROLOGY REPORT

Stormwater Local Design Manual For Houston County, Georgia

AS A COURTESY, PLEASE TURN OFF CELL PHONES AND PAGERS WHILE MEETING IS IN PROGRESS.

E. STORMWATER MANAGEMENT

City of Redwood City Stormwater Pollution Prevention Program. Drainage Guidelines for Residential Development

Example 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond)

PRELIMINARY DRAINAGE STUDY. Del Prado 2329 CENTRE CITY PARKWAY ESCONDIDO, CALIFORNIA

SECTION IV WATERSHED TECHNICAL ANALYSIS

RATIONAL METHOD INPUT PARAMETERS

Appendix D. Civil Engineering Reports

Introduction to Storm Sewer Design

Applying the Water Quality Volume

Transcription:

PRELIMINARY HYDROLOGY STUDY FOR Tentative Tract Map West Side of Loma Alta Drive City of Oceanside, CA Prepared For: EMERALD HILLS LLC 4272 Dogwood Avenue Seal Beach, CA 90740 Contact: Mr. Jimmy Chen Ph: (562) 644-7786 Prepared By: W&W LAND DESIGN & CONSULTANTS 2335 W. Foothill Blvd., Suite 1 Upland, CA 91786 (909) 608-7118 Email: winstonliu@ww-technologies.com October 1, 2014 Project job No. 1416

HYDROLOGY STUDY Oceanside-10 Lots Declaration of Responsible Charge I hereby declare that I am the engineer of work for this project, that I have exercised responsible charge over the design of the project as defined in section 6703 of the business and professions code, and that the design is consistent with current standards. I understand that the check of project drawings and specifications by the City of Oceanside is confined to a review only and does not relieve me, as engineer of work, of my responsibilities for project design. Winston Liu, RCE 66242 Date Seal Registered Civil Engineer 1416Hydrology Report

HYDROLOGY STUDY Oceanside-10 Lots TABLE OF CONTENTS Section I Section II Section III Appendix A Appendix B Appendix C Introduction Hydrology Methodology Project Description Existing Site Conditions Proposed Site Conditions Findings Vicinity Map Reference (Based on San Diego County Hydrology Manual June 2003): Soil Hydrologic Groups Map Runoff Coefficient for Urban Areas (Table 3-1) Rainfall Isopluvials 10 Year Rainfall Event 6 Hours Rainfall Isopluvials 10 Year Rainfall Event 24 Hours Rainfall Isopluvials 100 Year Rainfall Event 6 Hours Rainfall Isopluvials 100 Year Rainfall Event 24 Hours Hydrology Study: Intensity Duration Design Cart (Figure 3-1) 10 Year storm event Intensity Duration Design Cart (Figure 3-1) 100 Year storm event Existing Conditions Proposed Conditions Back Pocket Existing Hydrology Map Proposed Hydrology Map 1416Hydrology Report

HYDROLOGY STUDY Oceanside-10 Lots Section I Introduction The following hydrology study has been prepared for 10 residential lots subdivision project. The site is approximately 4.10 acre site with 8.36 acre drainage tributary area and is located on the west side of Loma Alta, in the City of Oceanside, County of San Diego, California. The general location of the site is illustrated on the Vicinity Map, included in the Appendix A of this report. Section II Methodology For both, the existing and proposed conditions, the peak storm discharge for the drainage sub-areas (see Hydrology Map in the pocket in the rear of this report) were calculated using the San Diego Hydrology Manual June 2003 version. Rational Method Equation was used to calculate the 10-year and 100-year storm event. The storm drain capacities calculations are calculated by using Flowmaster software. Section III Project Description Existing site conditions The existing site is approximately 4.10 acre vacant site with 9.36 acre drainage tributary land area. The site could be divided into six drainage sub areas and drainage towards southerly to the south end of project site, and ponding there in a low elevation at note 302; emergency flows to Walsh Street through an existing 12 drainage pipe crossing adjacent residential property. An existing 6 feet wide storm drain easement for the drainage pipe was shown on City drawing No. R-332. Refer to the Existing Hydrology Map for an illustration of the existing drainage zones. Rational method equation: Q=C x I x A, Soil Type D C Runoff Coefficient for Urban Areas (Table 3-1) C= 0.35 Undisturbed Natural Terrain C= 0.49 Low Density Residential (LDR) The following table illustrates the data and results for the existing 10-year and100-year storm events. 10-Year Storm Event Subarea Runoff Average Intensity Drainage Area Q (Peak Discharge) Coefficient (inch / hour) (acres) CFS H-1 0.35 2.0 0.78 0.55 H-2 0.35 2.0 1.64 1.15 H-3 0.35 2.0 0.63 0.44 H-4 0.35 2.0 1.26 0.88 H-5 0.35 2.0 1.1 0.77 H-6 0.35 2.0 2.95 2.07 Total 8.36 5.85 1416Hydrology Report

HYDROLOGY STUDY Oceanside-10 Lots 100-Year Storm Event Subarea Runoff Coefficient Average Intensity (inch / hour) Drainage Area (acres) Q (Peak Discharge) - CFS H-1 0.35 3.0 0.78 0.82 H-2 0.35 3.0 1.64 1.72 H-3 0.35 3.0 0.63 0.66 H-4 0.35 3.0 1.26 1.32 H-5 0.35 3.0 1.1 1.16 H-6 0.35 3.0 2.95 4.34 Total 8.36 10.02 Proposed site Conditions In the proposed condition, the project site will maintain existing drainage patterns and can be broken down into nine distinct drainage zones (E & A). Sub area E-1, E-2, A- through A- 3 drains to proposed interior private Street A curb and gutter connected into a proposed catch basin with a 24 storm drain pipe; that storm drain pipe drains into a proposal 4 feet wide concrete gutter along project southerly boundary; sub area E-3 through E-5 and A-4 will confluence with all other subareas flow into the 4 feet wife concrete drainage gutter and eventually go into a proposed water quality basin located at south end of the project site. All proposed runoff volume will be detained into the proposed basin and emergency over flow into Walsh Street through an existing 12 drainage pipe crossing adjacent residential property. An existing 6 feet wide storm drain easement for the drainage pipe was shown on City drawing No. R-332. Refer to the Proposed Hydrology Map in Appendix D in this report for an illustration of the proposed drainage zones. The following table illustrates the data and results for the proposed 10-year and100-year storm events. 10-Year Storm Event Subarea Runoff Coefficient Average Intensity (inch / hour) Drainage Area (acres) Q (Peak Discharge) - CFS E-1 0.35 2.0 0.82 0.57 E-2 0.35 2.0 0.78 0.55 E-3 0.35 2.0 0.17 0.12 E-4 0.35 2.0 0.78 0.55 E-5 0.35 2.0 2.01 1.41 A-1 0.49 2.0 0.43 0.42 A-2 0.49 2.0 0.84 0.82 A-3 0.49 2.0 1.53 1.50 A-4 0.49 2.0 1 0.98 Total 8.36 6.92 1416Hydrology Report

HYDROLOGY STUDY Oceanside-10 Lots 100-Year Storm Event Subarea Runoff Coefficient Average Intensity (inch / hour) Drainage Area (acres) Q (Peak Discharge) - CFS E-1 0.35 3.0 0.82 0.86 E-2 0.35 3.0 0.78 0.82 E-3 0.35 3.0 0.17 0.18 E-4 0.35 3.0 0.78 0.82 E-5 0.35 3.0 2.01 2.11 A-1 0.49 3.0 0.43 0.63 A-2 0.49 3.0 0.84 1.23 A-3 0.49 3.0 1.53 2.25 A-4 0.49 3.0 1 1.47 Findings Total 8.36 10.37 After development, more impervious surface will cover the proposed site than pre development condition. Total runoff was increased 1.07 cfs per 10-year storm event and 0.35 cfs per 100-year storm event only. A proposed water quality basin will be designed and installed to handle both of first ¾ flush in water quality purpose and detain additional runoff in proposed development condition. A detailed design and calculations for all proposed catch basins, concrete drainage gutter, storm drain pipe and water quality basin will be performed during final engineering design phase after entitlement approval. The hydrology and hydraulic analyses prepared in this report are comprehensive and evaluate the drainage impacts associated with the development of this project. The calculations within this report substantiate that the development can be constructed as shown on the proposed plans with no detrimental effect to surrounding properties. 1416Hydrology Report

HYDROLOGY STUDY Oceanside-10 Lots APPENDIX A VICINITY MAP 1416Hydrology Report

HYDROLOGY STUDY Oceanside-10 Lots APPENDIX B Reference (Based on San Diego County Hydrology Manual June 2003): Soil Hydrologic Groups Map Runoff Coefficient for Urban Areas (Table 3-1) Rainfall Isopluvials 10 Year Rainfall Event 6 Hours Rainfall Isopluvials 10 Year Rainfall Event 24 Hours Rainfall Isopluvials 100 Year Rainfall Event 6 Hours Rainfall Isopluvials 100 Year Rainfall Event 24 Hours 1416Hydrology Report

HYDROLOGY STUDY Oceanside-10 Lots APPENDIX C Hydrology Study: Intensity Duration Design Cart (Figure 3-1) 10 Year storm event Intensity Duration Design Cart (Figure 3-1) 100 Year storm event Existing Conditions Proposed Conditions 1416Hydrology Report

1416 - Oceanside - Rational Method Calculations Q = C * I * A BASED ON SAN DIEGO COUNTY HYDROLGOY MANUAL VERSION JUNE 2003 Proposed Condition 10-Year Storm Event Subarea Runoff Coefficient Average Intensity (inch / hour) Drainage Area (acres) Q (Peak Discharge) - CFS E-1 0.35 2.0 0.82 0.57 E-2 0.35 2.0 0.78 0.55 E-3 0.35 2.0 0.17 0.12 3.86 E-4 0.35 2.0 0.78 0.55 E-5 0.35 2.0 2.01 1.41 A-1 0.49 2.0 0.43 0.42 A-2 0.49 2.0 0.84 0.82 A-3 0.49 2.0 1.53 1.50 A-4 0.49 2.0 1 0.98 Total 8.36 Total (Q-10) 6.92 100-Year Storm Event Subarea Runoff Coefficient Average Intensity (inch / hour) Drainage Area (acres) Q (Peak Discharge) - CFS E-1 0.35 3.0 0.82 0.86 E-2 0.35 3.0 0.78 0.82 E-3 0.35 3.0 0.17 0.18 E-4 0.35 3.0 0.78 0.82 E-5 0.35 3.0 2.01 2.11 A-1 0.49 3.0 0.43 0.63 5.80 A-2 0.49 3.0 0.84 1.23 A-3 0.49 3.0 1.53 2.25 A-4 0.49 3.0 1 1.47 Total 8.36 Total (Q-100) 10.37

1416 - Oceanside - Rational Method Calculations Q = C * I * A BASED ON SAN DIEGO COUNTY HYDROLGOY MANUAL VERSION JUNE 2003 Existing Condition 10-Year Storm Event Subarea Runoff Coefficient Average Intensity (inch / hour) Drainage Area (acres) Q (Peak Discharge) - CFS H-1 0.35 2.0 0.78 0.55 H-2 0.35 2.0 1.64 1.15 H-3 0.35 2.0 0.63 0.44 3.76 H-4 0.35 2.0 1.26 0.88 H-5 0.35 2.0 1.1 0.77 H-6 0.35 2.0 2.95 2.07 Total 8.36 Total (Q-10) 5.85 100-Year Storm Event Subarea Runoff Coefficient Average Intensity (inch / hour) Drainage Area (acres) Q (Peak Discharge) - CFS H-1 0.35 3.0 0.78 0.82 H-2 0.35 3.0 1.64 1.72 H-3 0.35 3.0 0.63 0.66 H-4 0.35 3.0 1.26 1.32 H-5 0.35 3.0 1.1 1.16 H-6 0.49 3.0 2.95 4.34 6.88 Total 8.36 Total (Q-100) 10.02

HYDROLOGY STUDY Oceanside-10 Lots Back Pocket Existing Hydrology Map Proposed Hydrology Map 1416Hydrology Report