HYDROLOGY STUDY LA MIRADA BOULEVARD La Mirada, California

Similar documents
PRELIMINARY DRAINAGE STUDY

PRELIMINARY HYDROLOGY STUDY

Appendix G Preliminary Hydrology Study

Appendix E.2 Preliminary Hydrology Report

City Plaza Residential (TPM ) Preliminary Hydrology Report

Preliminary Stormwater Quality Mitigation Report

G. HYDROLOGY Existing Conditions

Hydrology Study. Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated)

Capturing Storm Water in Semi-arid Climate

Appendix L. Drainage Report

IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY

Preliminary Drainage Analysis

Appendix B. Storm Drain System Data

Appendix H Amanda Estates Drainage Study

Subject: Mt. San Antonio College- Measure RR Updated Hydrology Study

HYDROLOGY STUDY PREPARED FOR: MARKHAM PERRIS LLC 302 WEST FIFTH STREET, SUITE 103 SAN PEDRO, CA (310) FOR THE PROJECT:

CORBIN AND NORDHOFF IV. ENVIRONMENTAL IMPACT ANALYSIS ENV EIR F. HYDROLOGY

PRELIMINARY DRAINAGE REPORT FOR THE EDI MASTER PLAN

DESIGN DEVELOPMENT HYDROLOGY REPORT & LOW IMPACT DEVELOPMENT PLAN (LID PLAN)

Stormwater Control Plan for Post Construction Requirements Exhibit 4

PRELIMINARY DRAINAGE REPORT NEWCASTLE FIRE STATION OLD STATE HIGHWAY

Hydrology Study. For Bella Terrazza Portion of Lot 1, Block 39, Subdivision of S Tract, Rancho El Cajon El Cajon, CA 92021

PART V - STORM DRAIN DESIGN CRITERIA

PART V - STORM DRAIN DESIGN CRITERIA

THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN. 4. Drainage Plan. a. Drainage Plan Description

IV. ENVIRONMENTAL IMPACT ANALYSIS D. DRAINAGE AND SURFACE WATER QUALITY

IV.E. HYDROLOGY AND WATER QUALITY

APPENDIX J-3. Orcem Stormwater Management and Treatment Facilities Design Summary

TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA (706) x 42228

Activity Calculating Property Drainage

HYDROLOGY CHECKLIST FOR LAND DISTURBANCE PERMITS

Introduction to Storm Sewer Design

HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR

Appendix F HYDROLOGY/WATER QUALITY REPORT TIESLAU CIVIL ENGINEERING

PRELIMINARY DRAINAGE STUDY

100-yr Design Runoff (cfs) Basin ID 103b A a B B C Totals

FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 1.0 Overview

January 20, Nate Hatleback Project Manager, City of Thornton Development Engineering 9500 Civic Center Drive Thornton, CO (303)

STORM DRAINS AND IRRIGATION

Porous Pavements. By Michael Drennan, P.E. Weston Solutions, Inc.

DRAINAGE REPORT. Project Name: PG&E Gas Operations Technical Training Center Winters, CA. Date: February 4, Prepared by: BKF Engineers

DRAINAGE PLAN AND REPORT OLD DENVER ROAD

Stormwater Local Design Manual For Houston County, Georgia

ENGINEERING REVIEW CHECKLIST City of Mount Clemens

12 DRAINAGE General Administrative Requirements Standards

Sump Pumps Office procedures for the Drainage & Grading section

Rainfall, Runoff and Peak Flows: Calibration of Hydrologic Design Methods for the Kansas City Area

Storm Sewers, Page 2

MODEL Stormwater Local Design Manual. City of Centerville

APPENDIX H. Draft Storm Drainage Master Plan

RE: Final Drainage Letter: Northwest Aurora Alley Improvements 2016

RUBONIA SUBDIVISION DRAINAGE AND ROADWAY IMPROVMENTS PREPARED BY: MANATEE COUNTY PUBLIC WORKS ENGINEERING SERVICES DIVISION

ATTACHMENT 4 Section Project Status Quarterly Report - Dec 31, 2015 Measure V - Clean Beaches and Ocean Parcel Tax

acquiring, managing, and disposing of federal lands and facilities;

IBS Site Drainage: Senior Design Project

a. Title of Report Example: Final Hydrologic and Hydraulic Drainage Report For Tract #### (or Planning and Zoning Permit ##-###-###)

Design Handbook. Low Impact Development Best Management Practices

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)

SAN GORGONIO PASS CAMPUS - PHASE I

Example 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond)

Home Remodeling Projects

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY

SIZING. MWS Linear. Hybrid Stormwater Filtration System. P.O. Box 869 P Oceanside, CA F

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUILDING AND SAFETY DIVISION - DRAINAGE & GRADING SECTION

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR

STORMWATER MANAGEMENT REPORT FOR. Chick-Fil-A S Ferdon Blvd, Crestview FL. February 10 th, 2017

AS A COURTESY, PLEASE TURN OFF CELL PHONES AND PAGERS WHILE MEETING IS IN PROGRESS.

STORM DRAINAGE DESIGN MANUAL

Appendix D. Civil Engineering Reports

4.7 HYDROLOGY AND WATER QUALITY

LOW IMPACT DEVELOPMENT ( LID ) STANDARDS

LIST OF TABLES... ii LIST OF FIGURES... iii LIST OF APPENDICES... iv. Section 1 - Introduction Purpose of Study... 1

3.10 Hydrology and Water Quality. Environmental Setting

Report. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI

Appendix IS-5. Drainage Study

3.3 Acceptable Downstream Conditions

Stormwater Management Impacts Resulting from the Volumetric Abstraction of Runoff from Frequent Storms per PADEP CG-1. Geoffrey A. Cerrelli 1, P.E.

3F. Hydrology and Water Quality

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

E. STORMWATER MANAGEMENT

DRAINAGE PLAN OF NAU S EASTBURN EDUCATION AND GAMMAGE BUILDINGS FINAL PROPOSAL

City of Santa Clarita

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

APPENDIX N Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

November 21, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

City of Beverly Hills Low Impact Development (LID) Fact Sheet

APPENDIX F RATIONAL METHOD

3.3 FLOOD CONTROL AND HYDROLOGY

HYDROLOGIC CONSIDERATIONS. 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY

1.1 MONITORING PROGRAM OBJECTIVES The major objectives of the Monitoring Program outlined in the Municipal Stormwater Permit are to:

Warner Robins Stormwater Local Design Manual

Appendix J: The Project Stormwater Control Plan by Lea & Braze Engineering, Inc.

3.3 FLOOD CONTROL AND HYDROLOGY

County of Los Angeles - Department of Public Works

COYOTE CREEK 3 LEVEE SYSTEM LOS ANGELES COUNTY AND ORANGE COUNTY, CALIFORNIA NLD SYSTEM ID #

DRAFT. Technical Memorandum. Whitney Road Drainage & Safety Enhancements Phase III Hydraulic Update. Prepared For:

Transcription:

HYDROLOGY STUDY 12000 LA MIRADA BOULEVARD La Mirada, California TTM 73119 Prepared for: The Olson Company 3010 Old Ranch Parkway, Suite 100 Seal Beach, CA 90740 Contact: Mr. Aaron Orenstein (562) 370-9531 Property: 12000 La Mirada Boulevard La Mirada, California 90638 APN: 8034-012-018 Prepared by: C&V Consulting, Inc 27156 Burbank Foothill Ranch, California 92610 (949) 916-3800 Contact: Mr. Ryan Bittner, P.E. & Mr. Gerardo Garduno, Project Manager March 2015

TABLE OF CONTENTS I. Acknowledgement and Signature Page...1 II. Introduction & Methodology.....2 1. Site Location Map...2 III. Design Criteria.....4 IV. Conclusion..4 V. References.. 5 Supporting Calculations Existing Condition Area A: 10-Year Storm Event...7 Existing Condition Area A: 25-Year Storm Event...8 Proposed Condition Area A: 10-Year Storm Event...9 Proposed Condition Area A: 25-Year Storm Event...10 Proposed Condition Area B: 10-Year Storm Event...11 Proposed Condition Area B: 25-Year Storm Event...12 Proposed Condition Area A: 85 th Percentile, 24-hr Storm...13 Proposed Condition Area B: 85 th Percentile, 24-hr Storm...14 Street Capacity Analysis...15 Exhibits 1. 50-Year 24 Hour Isohyet Map 1-H1.20 Showing Site Location 2. Hydrology Map (1) Existing Development 3. Hydrology Map (1) Proposed Development

HYDROLOGY STUDY 12000 La Mirada Boulevard C&V Consulting, Inc. Hydrology Study For La Mirada Boulevard and Granada Avenue La Mirada, California TTM 73119 ACKNOWLEDGEMENT AND SIGNATURE PAGE This Hydrology Study has been prepared by C&V Consulting, Inc. under the supervision of Ryan Bittner, P.E. Ryan Bittner, P.E. C&V Consulting, Inc Date 1

HYDROLOGY STUDY 12000 La Mirada Boulevard C&V Consulting, Inc. Introduction / Methodology: The project site consists of approximately 2.72 acres of generally flat land which is currently zoned R-1-6000 (A)(F) Single Family Residential with two overlay districts, (A) Farm Animal and (F) Flood Hazard. The project site falls under the Low Density Residential category of the City of La Mirada s General Plan Land Use Policy Map, Figure LU-2 which allows for a maximum density of 6.0 units per acre. We propose the development of 33 residential condominiums, a density of 12.1 homes per acre. Through entitlement, a zone change and general plan amendment will be processed. The subject project is located at 12000 La Mirada Boulevard, in the City of La Mirada. North of the project site is the Imperial Convalescent Hospital. La Mirada Boulevard borders the site on the west. There are Single-Family Residential homes which border the site to the east and south. Figure 1 Site Location Map 2

HYDROLOGY STUDY 12000 La Mirada Boulevard C&V Consulting, Inc. Pre-Development Condition: Under the existing condition, the onsite runoff generally sheet flows in a south and southwesterly direction towards La Mirada Boulevard, then south along La Mirada Boulevard into an existing off site catch basin which diverts the runoff to the existing storm drain infrastructure in La Mirada Boulevard. The existing 27 RCP storm drain system in La Mirada Boulevard is owned and maintained by the City of La Mirada. Ultimately, runoff entering this storm drain system within La Mirada Boulevard is discharged into Milan Creek which connects to Coyote Creek- North Fork, then converges with Coyote Creek which connects to the San Gabriel River Reach 1 (Estuary to Firestone) then the San Gabriel River Estuary prior to discharging to the Pacific Ocean. Currently the site consists of a two-story building (the La Mirada Friends Christian Pre-School) on the west side and a one story building, temporary building and shed on the east portion of the site. The remainder of the site contains parking areas, drive aisles, landscaped areas and playground facilities. Access can be made from La Mirada Boulevard. The existing site is approximately 57% impervious surface. The site is projected to have 80% impervious surface. Proposed Condition: The proposed development will consist of 33 condominium units consisting of 18 buildings and associated improvements (internal roadways, walkway and landscaping). Overall, the site is estimated to be 80% impervious. The onsite runoff will flow towards the curb and gutter located on each side of the main drive aisle. The flow will be conveyed in a southwesterly direction towards the two on-site catch basins which will connect to the existing storm drain system in La Mirada Boulevard. Based on a site visit and the plans provided by the City of La Mirada, there is an existing catch basin located south of the southwest corner of the project site that connects to an existing 18 Reinforced Concrete Pipe (RCP) storm drain main within La Mirada Boulevard. The 18 RCP main flows south in La Mirada Boulevard and connects to an existing 27 RCP storm drain main. Additionally, per plan P.C. 3658, provided by the Los Angeles Department of Public Works (LACDPW), there is an existing 6 storm drain easement that is located south of the southerly property line. For water quality treatment requirements two Biofiltration Systems are proposed to intercept the first 0.9 of rainfall, the 85 th percentile 24-hr storm event. A Standard Urban Stormwater Mitigation Plan (SUSMP) has been prepared according to the City of La Mirada standards to address water quality calculations. 3

HYDROLOGY STUDY 12000 La Mirada Boulevard C&V Consulting, Inc. Design Criteria: 1. According to the Los Angeles County Department of Public Works Hydrology Manual 50- Year 24-Hour Isohyet Map 1-H1.10, the drainage area is located in Soil Group 009, the site receives 5.8 inches of rainfall over a 24-Hr storm (Q 50 ). 2. The LACDPW Time of Concentration Calculator Program was used to determine the Tc, run-off flow, run-off volume for site, and the first 0.9 run-off from site (85 th Percentile 24- hr Isohyet). 3. The site was analyzed for a 10 & 25-year storm event per the requirements of the January 2006 Los Angeles County Department of Public Works Hydrology Manual. A Rational Method Analysis was performed and the appropriate calculations are provided herein. 4. The drainage areas for the proposed development were determined based on the proposed street/land flow areas and the existing offsite topography. Based on the available information, off-site flows to the project are not anticipated at this time. 5. The length of the flow path used to calculate the time of concentration was the longest runoff distance to the point of discharge for that sub area. 6. The slope of the flow path used to calculate the time of concentration was determined based on the total elevation change across that flow path per the proposed grades. 7. The percent impervious area for the existing condition was calculated based on the existing topographic map and photos from the site. 8. The percent impervious area for the proposed condition was calculated based on the proposed site plan. 9. The Hydrology Map attached to this study is made part of this study. 10. The rainfall frequency multiplication factors used to estimate peak runoff for additional storm events were taken from Table 5.3.1 of LACDPW Hydrology Manual. Conclusions: The results from this hydrology and hydraulic analysis demonstrate the following: The drainage design for this site meets or exceeds the level of urban flood protection as described in the Los Angeles County Department of Public Works Hydrology Manual. The estimated 10-year, 24-hour peak flow of the proposed development is 4.42 cfs. The estimated 25-year, 24-hour peak flow of the proposed development is 5.88 cfs. 4

HYDROLOGY STUDY 12000 La Mirada Boulevard C&V Consulting, Inc. Flow rates increased, approximately 3.5% in the proposed conditions due to an increase in impervious area in the proposed condition. Existing Flow Rates (cfs) 10 Yr Storm Event 25 Yr Storm Event Area A 4.27 5.75 Total 4.27 5.75 Proposed Area A 2.73 3.63 Area B 1.69 2.25 Total 4.42 5.88 Existing & Proposed Impervious vs. Pervious Table Size % % Size Impervious Pervious Pre-Development 1.56 ac 57% 1.16 ac 43% Post-Development 2.18 ac 80% 0.54 ac 20% Refer to the Exhibit 2 and 3 for Existing and Proposed Hydrology Maps in this report for information pertaining to land use and imperviousness coverage. Regarding design capture volume and post-development water quality information, refer to separately prepared SUSMP report by C&V Consulting, Inc. dated March 2015 for additional information. REFERENCES 1. Los Angeles County Department of Public Works, Hydrology Manual, January 2006. 2. Los Angeles County Department of Public Works, Tc Calculator Excel Spreadsheet. 3. Hydraflow Express Extensions for Civil 3D 2013. 4. Preliminary Grading Plan for this project by C&V consulting. 5

HYDROLOGY STUDY 12000 La Mirada Boulevard C&V Consulting, Inc. Supporting Calculations 6

C&V Consulting, Inc. Hydrology Calculation Sheet Existing Condition Area A 10-Year Storm Event 7

C&V Consulting, Inc. Hydrology Calculation Sheet Existing Condition Area A 25-Year Storm Event 8

C&V Consulting, Inc. Hydrology Calculation Sheet Proposed Condition Area A 10-Year Storm Event 9

C&V Consulting, Inc. Hydrology Calculation Sheet Proposed Condition Area A 25-Year Storm Event 10

C&V Consulting, Inc. Hydrology Calculation Sheet Proposed Condition Area B 10-Year Storm Event 11

C&V Consulting, Inc. Hydrology Calculation Sheet Proposed Condition Area B 25-Year Storm Event 12

C&V Consulting, Inc. Hydrology Calculation Sheet Proposed Condition Area A Volume for first 0.9 inch run-off 85 th Percentile 24-hr Isohyet (http://ladpw.org/wrd/hydrologygis/) 13

C&V Consulting, Inc. Hydrology Calculation Sheet Proposed Condition Area B Volume for first 0.9 inch run-off 85 th Percentile 24-hr Isohyet (http://ladpw.org/wrd/hydrologygis/) 14

C&V Consulting, Inc. Hydraulic Calculation Sheet Street Flow: Analysis was performed to inspect the surface flow capacity of the proposed internal roadway before flooding would occur outside of the roadway improvement. The following calculation depicts the water surface elevation conveying the 25-year storm event along the typical street section. A flow rate of 5.88 was used in this calculation consistent with the largest flow rate being conveyed within the site. 15

Exhibits

Exhibit 1 50-Year 24 Hour Isohyet Map 1-H1.20 Showing Site Location

Exhibit 2 Hydrology Map (1) Existing Development

Exhibit 3 Hydrology Map (1) Proposed Development