Controlling noise on offshore installation during design and commissioning West Elara case

Similar documents
Stage 3 Noise and vibration analysis NOISE

Applied Noise Control. D. W. Herrin, Ph.D., P.E. University of Kentucky Department of Mechanical Engineering

Kinetics Noise Control

... Enclosures & walls. Experts in Noise Control Solutions

KEY FACTORS OF A SHIP INTERNAL NOISE PREDICTION PROCEDURE

COLD Heat Fire

Kinetics Noise Control

NEC Acostix. Sound Attenuation Calculations and Design Software. General Information

ACOUSTICAL TREATMENT OF EMERGENCY POWER GENERATOR. Dr. M.Abd El Gawad Saif

Alara-Lukagro. Krijgt alles stil. Cruise ships

NOISE IN HIGH RISE BUILDINGS

Equipment Noise Sources

Noise Control. Commercial, Industrial, and Environmental Products and Solutions.

Creating a World of Possibilities

Equipment Noise Sources

Acoustic Design Criteria

NOISE AND VIBRATIONS HIGH SPEED, LIGHT CRAFT AND NAVAL SURFACE CRAFT RULES FOR CLASSIFICATION OF DET NORSKE VERITAS

Measurement of room-to-room airborne sound insulation with an access floor in a dwelling unit of condominium

ASHRAE Chapter Meeting HVAC Noise & Vibration Control Specifications & Best Practices

Measurement of room-to-room airborne sound insulation with an access floor in a dwelling unit of condominium

NOISE IMPACT STUDY - HORIZONTAL DIRECTIONAL DRILLING FOR BLUEWATER RIVER CROSSING REPLACEMENT PROJECT

LIVING QUARTERS module building principles General Features

Specialist Study on Noise APPENDIX 4 : EXAMPLES OF GOOD OPERATING PRACTICES IN ORDER TO REDUCE NOISE EMISSIONS

Corporate Environments

LR SOFTWARE CONFORMITY ASSESSMENT SYSTEM. Assessment Module GENPMS Software Products for Planned Maintenance Schemes

Moduline. Acoustic Enclosure System. Rugged Noise Control Structures Using Acoustically Rated & Field Proven Demountable Components

BEAUDETTE 7, & & & ) BCE

From: Tyler Adams, Mei Wu Acoustics

Cabins Noise Control on the Large Oil-tanker

Temporary Living Quarters Ekofisk Field

NUMERICAL MODELLING IN ACOUSTICS, DYNAMICS AND VIBROACOUSTICS M G Smith ISVR Consulting, University of Southampton, University Road, SO17 1BJ, UK

Noise and Vibration Control in Wood-Framed, Multi-Family Buildings

No significant construction or operational vibration impacts are expected.

Lake Highlands North Recreation Center Summary

DESIGN CHECKLIST PROJECT NAME DISCIPLINE DATE TYPE REVIEW REVIEWER DRAWINGS REVIEWED

Noise and Vibrations

Treating Complex Shipboard Noise Problems Requires Customized Approach

CERTIFICATE OF FIRE APPROVAL

IAC Acoustics Moduline Noise Control Enclosures. Mark Simnick

Code on Noise Levels on Board Ships

A60 ACCOMMODATION MODULES

RIVER PUMP ROOM ISOLATION FROM STATE LIBRARY. David Borgeaud 1 and Michael Plumb 2. Brisbane, QLD 4000, Australia 2 GP Embelton & Co.

Design Standards Brief Section 13 Acoustics

The Perfect Choice for Mezzanines in Custom Metal Buildings

LEED for Homes Approved ID Request:

5045 Orbitor Dr., Building 8, Suite 200, Mississauga, ON L4W 4Y4 Phone: (905)

ACOUSTIC ENCLOSURES ACOUSTIC ENCLOSURES ACOUSTIC ENCLOSURES

Acoustical Engineering Solutions.

What is Noise? In daily life, noise means unwanted sound.

Association of Australian Acoustical Consultants Guideline for Commercial Building Acoustics. May 2011

SOUND INSULATION TESTING SITE READINESS CHECKLIST

Acoustic Performance

21 ST CENTURY LEARNING ACOUSTICS. Steve Meszaros, M.Sc., P.Eng Acoustical Technical Director / Associate

SWEDISH STANDARD SS

MSC Guidelines for Review of Ventilation System Plans

Minneapolis Community and Technical College T-Building Floor 2 Student Affairs Cost Estimating Form Templates - Exhibit C

8. Appendix F Acoustic Assessment

City of High Point Airport Overlay District Noise Level Reduction Design Standards

Power Plant Near-Field Noise Considerations

Identification and reduction of vibration and noise of a glass tempering system

DNVGL-OS-A301 Edition April 2016

Analytical Model of Vibration Transmission Through the 5M10000 Mount

UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION (UNIDO) Upgrading the Fishery Sector in South Sudan

Sound Attenuation. Slide 1 of 48. PAC International Inc START

NEW PAROC MARINE LIGHTWEIGHT SOLUTIONS

METLANEtm ACOUSTIC COMMERCIAL INDUSTRIAL ACOUSTICAL PRODUCTS

BUILDING SYSTEMS NOISE CONTROL

STATISTICAL ENERGY ANALYSIS OF A HIGH SPEED ELEVATOR CAB AND FRAME

Noise Control Case Studies TIM WIENS CONESTOGA-ROVERS & ASSOCIATES

Sales and Marketing :

New Stand at Edgbaston

CONSTRUCTION DUST AND NOISE MONITORING REPORT OFFICE DEVELOPMENT EXAMPLE LTD RP

MOBILITY PLUS. By ITEMDesign Works

Part 6 Additional class notations Chapter 6 Living and working conditions

GOOD PRACTICE GUIDELINES FOR CONTROLLING NOISE ON OFFSHORE INSTALLATIONS

ACOUSTIC INSULATION. ArmaComfort - the comfort of quiet equipment

Approved Document E Technical Design Report

Dyno Test Rooms Professional Chassis, Engine & Specialty Test Rooms for the PowerSports & Product Testing Market

Acoustics and Classrooms BARD MANUFACTURING COMPANY REGISTERED AIA PRESENTER VAUGHAN SMITH

APPLICATIONS HVAC Acoustics and Vibration

White Paper. A guide to the acoustic performance of Smarts Systems Products. Building Regulations Document E Resistance to the passage of sound

Day Night Day Night Day Night Residential site and amphitheatre Green Non residential site boundary Red

Chapter 8: Indoor Environmental Quality

Accutone2 Architectural Enclosures

9 October Town of Medway 155 Village Street Medway, MA Chair, Medway Board of Selectmen

Bespoke Exhaust Systems & Environmental Protection

Modular, Durable, Easy To Install Acoustical Panels For Maximum Noise Reductions

Noise Compliance Requirements for Distribution Transformers

Achieving acoustical standards in the classroom Study of HVAC systems and classroom acoustics

JUNIPER CRESCENT AND GILBEYS YARD. 11. Mechanical and electrical services strategy

KOBELCO CONSTRUCTION MACHINERY CO., LTD.

STRUCTURE-BORNE SOUND CONTRIBUTION INTO EARTH-MOVING MACHINE CABS.

CERTIFICATE OF FIRE APPROVAL

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...

Smart Lining - acoustic requirements on future lightweight structures

J. NEGREIRA DIVISION OF ENGINEERING ACOUSTICS, LUND UNIVERSITY

RETROFIT SOLUTIONS. For Gas Turbines And Rotating Machinery

FRIDLEY SCHOOL DISTRICT West Moore Lake Drive Fridley, MN REVIEW AND COMMENT DOCUMENT

Sound, Noise and Vibration

Transcription:

Controlling noise on offshore installation during design and commissioning West Elara case Philippe Loustau engineering manager October 18, 2012

Offshore noise control What are the challenges for offshore noise control? Compact environment: proximity of noise sources Compact environment: little space availability for noise control measure Use of high power equipment: high strength of noise sources Rig weight must be kept under control Drilling assets specificities Moving around the world and need to comply with local regulations

Noise Damage Factors which increase the risk of hearing damages Duration Volume High frequencies more than low Pure tones more than broadband noise Strong sound impulses Individual sensitivity (glass hear) Secondary adverse effect Stress Tinnitus High blood pressure Changed breathed rhythm Reduced power of concentration

Typical NORSOK S-002 scheme NORSOK S-002 regulation suggests a framework for performing noise study Step 1: Establish noise specification for equipment through noise maps calculations, using baseline sound level from experience Step 2: Update noise maps with OEMs data (working with the noise source) Step 3: Implement noise control measures if needed (working with the noise transfer path) Step 4: Implement signaling for hearing protection if an area cannot reach the noise level target (working at the receiver) Noise is not only propagating airborne, structure borne propagation is not to be neglected.

West Elara assessment facility presentation : 1.5 mm steel plate : 1.5+3 mm steel plate : 2+3 mm steel plate + viscoelastic glue

West Elara assessment requirements Area noise level Per Norsok S-002 From 45 db(a) for medical room to 110 db(a) for unmanned machinery room or emergency generator room Sound insulation From 35 to 45 db between cabins in the living quarter Other acoustic requirements Corridors, not more than 5 db more than the quiet room noise level (working area) Access to walkways to permanently manned areas should be provided without passing through a zone with a noise level above 83 db(a) Vibration Exposure Table from Norsok for human body vibration (acceleration levels depending on frequency)

West Elara assessment living quarters Area noise level Laundry room (rigid mounting) Piping vibration (rigid mounting) Equipment vibration (rigid mounting) Sound Insulation between cabins From 31dB to 38dB. Below required 40 db. Door Vibration exposure Equipment vibration (rigid mounting) Floor Lining panel Window Ceiling HVAC (extract) HVAC (supply) Partition panel (towards corridor) partition panel (towards desk) 0 10 20 30 40 50 60 70 80 90 Lp [dba, ref. 20 micropa]

West Elara assessment utility area Mechanical workshop Next to the engine room and separation by a single steel bulkhead covered with fire protection and a single door Influence from pump room identified during testing Platform deck Mud lab: likely excess of area noise due to poor sound isolation properties of door Main Deck High noise level from extraction fan 85 db(a) HVAC contribution Significant excess from +6dB in rubber good store to +26dB in electrical workshop PA-system intelligibility Recommended RASTI of 0.7 in recreation areas and 0.35 in work areas with up to 85 db(a) noise level

Step by step procedure for troubleshooting 1. Noise survey including determination of sound power 2. Analyze the survey 3. Suggest noise reducing remedies including the likelihood of the cause 4. Client choose noise insulation 5. Verification by measuring 6. Evaluation of changes

Offshore noise control Noise control measure for offshore installation Acoustic control Sound insulation Noise from pipes and valves Noise attenuating enclosure Silencers Vibration isolation Other conditions to take into consideration Resistance to water / oil Maintenance (washing / cleaning) Impact strength Fire Paint Corrosion condition (CUI )

Examples of recommendations living quarters Partition panels covered with steel plate in test cabin Actual panel not performing according to spec Mock up cabin built for testing

Example of recommendations Utility area Air exhaust - silencers Additional silencers Air exhaust and inlet on main deck injection fans - exhaust line

Forklift corridor Left: May 2011, Pump Room #2 with forklift corridor before installation of wall. Right: July 2011, Screening wall installed between equipment and walkway/fork lift area.

Chiller foundations Chiller foundations E deck On top of some cabins

Example of recommendations Utility area Hvac extracts - silencer Silencer HVAC extract on top of driller s cabin used to avoid the noise from drill floor to the cabins

Mechanical workshop buffer zone Left: before installation of buffer zone (between engine room) Right: buffer zone installed with an other door

Conclusion As regulators are moving towards more and more stringent regulations in the area of noise, it is important to consider noise control as early as possible. It is a complex discipline and a simple review of the initial layout can save a lot of future headhaches. Nevertheless, there are some practical mitigation measures that can be applied even during construction or in service. The NORSOK S-002 standard provides some good guidance and methodology for noise control.

For more information, please contact: Philippe Loustau engineering manager Lloyd s Register Energy Americas, Inc. 1330 Enclave Parkway, Suite 200 Houston, Texas 77077 T +1 281 649 2259 E philippe.loustau@lr.org w www.lrenergy.org Lloyd s Register Group Limited, its affiliates and subsidiaries and their respective directors, officers, employees, or agents, individually and collectively, are referred to here as Lloyd s Register. Lloyd s Register assumes no responsibility and will not be liable to any person for any loss, damage, or expense caused by reliance on the information or advice provided in this document or in any other manner, unless that person has signed a contract with the relevant Lloyd s Register entity for the provision of this information or advice, and in that case any responsibility or liability is exclusively on the terms and conditions set out in that contract. ModuSpec USA, Inc. and its affiliates are a subsidiary of Lloyd s Register.