INVITATION FOR BIDS FOR

Similar documents
TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

RWA, Inc. TECHNICAL SPECIFICATIONS NORTH COLLIER BOULEVARD PAVING AND DRAINAGE IMPROVEMENTS Willow Park Drive Suite 200 Naples, FL 34109

East Central College

TOWNES + architects, P.A.

New Mexico State University Herritage Farm Interpretive Trail

DIVISION 10 - SPECIALTIES Toilet, Bath, and Laundry Accessories Fire Extinguishers

SECTION CONSTRUCTION PROGRESS DOCUMENTATION

PROJECT MANUAL POINT BLANK RANGE & GUN SHOP. 600 Corporate way Knoxville, TN. Bid/Permit Set

SECTION PAYMENT PROCEDURES

County of Elko, Nevada Requirements, Specifications and Contract Documents. Mechanical System Upgrade, Project Manuel. Jackpot, Elko County, Nevada

CITY OF RICHMOND EDI BUILDING WINDOW REPLACEMENT PROJECT MANUAL. Commonwealth Architects

CITY OF RICHMOND EDI BUILDING WINDOW REPLACEMENT 701 North 25th Street Richmond, Virginia PROJECT MANUAL BID SET April 4, 2018

TRUMAN STATE UNIVERSITY SITE IMPROVEMENTS, KIRK BLDG, MISSOURI HALL & STUDENT REC CENTER LTD RENOVATIONS

DeKalb County Library Dunwoody Library Staff Area Renovation

RANDOLPH COMMUNITY CENTER GYMNASIUM FLOOR REPLACEMENT

AWT 9TH FLOOR IMPROVEMENTS CITY OF ANAHEIM, CALL CENTER CREDIT & BILLING DEPARTMENTS, ANAHEIM, CA TECHNICAL SPECIFICATIONS AUGUST 2, 2018

University of Oklahoma Sarkeys Energy Center Atriums Waterproofing Project mass project no Set no. project manual.

HILLSBOROUGH COUNTY SHERIFF'S OFFICE FIRING RANGE AND WORKOUT GYM PINEBROOKE BUSINESS PARK

AWT 2ND FLOOR IMPROVEMENTS CITY OF ANAHEIM, HOUSING AUTHORITY & WORKPLACE, ANAHEIM, CA TECHNICAL SPECIFICATIONS OCTOBER 24, 2017

VAE VIEW ELEMENTARY WINDOW REPLACEMENT West 1600 North Layton, UT Specifications. Construction Documents

Ogden Regional Medical Center Courtyard Remodel. Construction Documents. MountainStar Healthcare PROJECT MANUAL FOR

PROJECT MANUAL UNIVERSITY HALL BOILER REPLACEMENT PROJECT NO. EM 610

GADSDEN ELEMENTARY SCHOOL PHOTOVOLTAIC SYSTEM PROJECT

SSM Project: Centennial School District Issued for Bid AC Unit Replacements 05/16/2014 Klinger and Log College Middle Schools

SPECIFICATIONS. September 27, 2016 Bid Set

IBMF STATE OF GOOD REPAIR UPGRADES

CHAPEL HILL TOWN HALL RENOVATIONS UPPER LEVEL, SOUTH CHAPEL HILL, NORTH CAROLINA

SPECIFICATIONS May 25, Ellicott Station Redevelopment Brewery Building - 40 Ellicott Street Ellicott Street Batavia, New York United States

THE FORUM ROME, GEORGIA FOR FLOYD COUNTY PROJECT MANUAL (BALLROOM AND CONCESSIONS) Construction Documents

OSNI PONCA OFFICE REMODEL

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

George Washington Middle School - HVAC Replacement 100% Construction Documents May 7, 2018 TABLE OF CONTENTS

1ARCHITECTURE TABLE OF CONTENTS

SPECIFICATIONS. Permit Set RICHMOND CITY HALL: SUITE 110 RENOVATIONS. City of Richmond, Virginia Architect s Project No

PROJECT SPECIFICATIONS PENSACOLA INTERNATIONAL AIRPORT PARKING GARAGE REHABILITATION

University Apartments on Brooklyn PROJECT MANUAL

ORANGE COUNTY UTILITIES RS&H OPERATIONS CENTER PEMB PACKAGE TABLE OF CONTENTS

Hard Rock Hotel and Casino - Tulsa Casino 3 and Suite Hotel Exterior Painting Bid Issue Issue Date: 18 March 2013 Project Number

RICHMOND PUBLIC SCHOOLS

CONTRACTOR S PROPOSAL

WAYNE COMMUNITY COLLEGE SECTION

RICHMOND PUBLIC SCHOOLS

TRUMAN STATE UNIVERSITY BALDWIN HALL, PERSHING BLDG AND VIOLETTE HALL ROOFING & EXT. RENOV.

LCCC MAIN PLANT BOILER BURNER UPGRADES

BOWIE STATE UNIVERSITY CAR PARKING LOT

PARKING LOTS 4 AND 5 (DEMOLITION)

NMSU Carlsbad Campus Main Building and Computer Building DDC Control Upgrade. Project Manual Technical Specifications Review Submittal May 12, 2017

ENTRY SECURITY MODIFICATIONS

1) Unified School District No. 489 reserves the right to reject any or all bids and to waive any informalities in the bid procedure.

Project Manual. Unitarian Universalist Congregation of Princeton 50 Cherry Hill Road Princeton, New Jersey Lot: 11 Block: 5201

ANTELOPE VALLEY COLLEGE PALMDALE AIRPORT TERMINAL REMODEL

1. Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.

PROJECT SPECIFICATIONS. for. Grossmont Community College. Main Chiller Plant Repair. El Cajon, CA. Bid Number B18.014

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS

Southwest Middle School 6030 Ogeechee Road, Savannah Georgia

Project Manual OVERLAND PARK BRANCH & ESIS RELOCATION. for

1. Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.

Willow Oak Veterinary Hospital

SECTION CONSTRUCTION PROGRESS DOCUMENTATION SECTION CONSTRUCTION PROGRESS DOCUMENTATION

August 15, 2009 Project No RMW 2009 ALL RIGHTS RESERVED

PROJECT MANUAL. Phi Delta Theta Phase NW 13 th Street Corvallis, OR Varitone Architecture LLC

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

1. This Section includes administrative and procedural requirements for contract closeout including, but not limited to, the following:

Northridge High School Remodel

Façade Access Upgrade Project

Baseball Performance Development Center A Prevailing Wage Project

Project Manual. Administration Building & North Pointe Center Window Replacement. Lewis Cass Intermediate School District Cassopolis, Michigan

DIVISION 1 GENERAL REQUIREMENTS SECTION PROJECT SCHEDULE

Grossmont-Cuyamaca College District Bldg. D Central Chilled Water Loop Tie-in SPECIFICATION MANUAL CUYAMACA COLLEGE, EL CAJON, CA

Renovations for South Morrison Library 746 Adams Drive Newport News, Virginia

PROJECT MANUAL Volume 1. Project: Clayton Greenway System -Mark s Creek Bridge Replacement

Document B252TM 2007

Project Manual. Beaverton School District Beaverton High School Gymnasium Improvement Beaverton, Oregon. Issue date: December 21st 2017

ADDENDUM NO. 2 Consisting of 3 pages and Attachments

Richard B. Wilson K-8 School Roof Restoration

1.4 USE OF EXISTING ELEVATORS FOR CONSTRUCTION PURPOSES (NO ELEVATOR CONTRACTOR IS CONTRACTED FOR THE PROJECT)

SPECIFICATIONS VOLUME II August 26, 2016

ruby ridge terrace apartments

1. Instructions to Bidders AIA Document A701, 1997 Section of the above referenced IFB is hereby amended and restated as follows:

SANTA FE STATION KDOT Grant No. 23 TE

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower

PROJECT MANUAL LAKE SERENE CENTER Building A. Project # For: Emerald Bay Equity, LLC. June 17, 2010

Amphitheater High School Roof Replacement

EXHIBIT 2-2-C SCHEDULES

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

Project Manual Index of Specifications Shenandoah Schools Concession Building

UMC El Paso Far East Clinic and Neighborhood Healthcare Center West Issue for Construction Page Project No and April 13, 2015

HVAC SYSTEM REPLACEMENT PHASE 1 PROJECT MANUAL Durham, NH

TABLE OF CONTENTS VOLUME 1. DIVISION 00 - INTRODUCTORY INFORMATION, BIDDING REQUIREMENTS, CONTRACT FORMS & CONDITIONS OF THE CONTRACT Pages

R E G A R C H I T E C T S, I NC. ARCHITECTURE * INTERIOR DESIGN * PLANNING

SECTION NETWORK ANALYSIS SCHEDULES (NAS) FOR DESIGN-BUILD 8/10

Illinois State University Softballl Dugout Replacement Normal, Illinois

PROJECT MANUAL ISSUE FOR PERMIT 08 AUGUST 2018 Volume 1 of 1 Divisions 00 through 33 ASTERISK EVENT SPACE DENVER, COLORADO Path21 Project No.

A62 UT PRE-CONSTRUCTION MEETING AGENDA

WEAVER MOUNTAIN FIRE STATION OPERATIONS BUILDING SOUTH HIGHWAY 89 WICKENBURG, AZ PROJECT NO. L140D00737 BUREAU OF LAND MANAGEMENT

PROJECT MANUAL VOLUME ONE EOP Project # August 17, 2018

REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility. RFP Components

QUALITY REQUIREMENTS

[FIELDHOUSE] FLOOR R E P L A C E M E N T FLAGSTAFF, AZ

Transcription:

********************************************************************************************** IFB NO. Y18-749-RM ISSUED: March 16, 2018 INVITATION FOR BIDS FOR EAST ORANGE HEAD START MODULAR RELOCATION ****************************************************************************** PART H TECHNICAL SPECIFICATIONS ****************************************************************************************************************************************************** PART H Volume II

SECTION 0001 TABLE OF CONTENTS TABLE OF CONTENTS DIVISION 1 - GENERAL REQUIREMENTS SECTION TITLE 01100 Summary 01250 Contract Modification Procedures 01290 Payment Procedures 01310 Project Management And Coordination 01320 Construction Process Documentation 01330 Submittal Procedures 01400 Quality Requirements 01420 References 01500 Temporary Facilities and Controls 01600 Product Requirements 01700 Execution Requirements 01731 Cutting and Patching 01770 Closeout Procedures 01782 Operation and Maintenance Data 01820 Demonstration and Training DIVISION 2 SITE WORK SECTION TITLE 02110 Site Clearing 02200 Earthwork 02210 Earthwork - Underground Utilities 02270 Erosion & Sedimentation 02510 Subgrade Stabilization 02511 Soil Cement 02513 Asphalt Concrete Paving 02577 Pavement Marking 02580 Concrete Curbs and Walks 02666 Potable Water Systems 02720 Storm Water Sewage 02730 Sanitary Sewage Systems END TABLE OF CONTENTS EAST ORANGE 00010-1 TABLE OF CONTENTS

SECTION 01100 SUMMARY PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section. 1.02 WORK COVERED BY CONTRACT DOCUMENTS A. Project Identification: The Project involves the relocation of a Head Start modular building and related site construction and MEP, including a new foundation, a precast deck and accessible ramp and stair system to access the modular building. 1. Project Location: Orange County, Florida. 2. Owner: Board of Orange County Commissioners, Orange County, Florida B. Work of this Contract may include, but not limited to: 1. Construction administrative and procedural requirements as necessary to produce a complete and properly functioning facility. 2. Sitework, foundation and slab work, including earthwork excavation and compaction for building and utilities. 3. Cast-in-place and pre-cast concrete. 4. Metal work, including light gauge metal framing, and related metal fabrications. 5. Rough carpentry and architectural woodwork. 6. Thermal, moisture protection, insulation, sheet metal roofing, waterproofing, joint sealants, and firestopping. 7. Wood and steel doors, frames, access doors, aluminum storefront and entrances, sectional doors and building hardware. 8. Gypsum board, acoustical suspended ceiling systems, resilient flooring, painting and related finishes. 9. Toilet room accessories and other specialty items. 10. Related mechanical, plumbing and electrical work. 1.03 CONTRACTS A. Project will be constructed under a General Construction Agreement. 1.04 USE OF PREMISES A. Contractor shall have full use of existing site premises for construction operations during construction period. Contractor's use of premises is limited only by the EAST ORANGE 01100-1 SUMMARY

County's right to perform work or to retain other contractors on portions of Project, when established at designated times. 1.05 OWNER-FURNISHED PRODUCTS A. The County may choose to furnish certain portions of work, materials, equipment and systems. When such is to be furnished, the County will provide descriptions of work to Contractor, who will in turn notify related parties. 1. The County will arrange for and deliver Shop Drawings, Product Data, and Samples to Contractor. 2. Unless noted otherwise, the County will arrange and pay for delivery of the County-furnished items according to Construction Schedule. 3. After delivery, the County will inspect delivered items for damage. Contractor shall be present for and assist in the County's inspection. 4. If the County-furnished items are damaged, defective, or missing, the County will arrange for replacement. 5. The County will arrange for manufacturer's field services and for delivery of manufacturer's warranties to Contractor. 6. The County will furnish Contractor the earliest possible delivery date for the County-furnished products. Using the County-furnished earliest possible delivery dates, Contractor shall designate delivery dates of the Countyfurnished items in Construction Schedule. 7. Architect / Engineer shall review Shop Drawings, Product Data, and Samples and return them to appropriate parties noting discrepancies or anticipated problems in use of product. 1.06 SPECIFICATION FORMATS AND CONVENTIONS A. Specification Format: These Specifications are organized into Divisions and Sections using the 16-division format and the CSI "MasterFormat" numbering system. 1. Section Identification: The Specifications use section numbers and titles to help cross-referencing in the Contract Documents. Sections in the Project Manual are in numeric sequence; however, the sequence is incomplete. Consult the Table of Contents at the beginning of the Project Manual to determine numbers and names of Sections in the Contract Documents. B. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows: 1. Abbreviated Language: Language used in the Specifications and other Contract Documents is abbreviated. Words and meanings shall be interpreted as appropriate. Words implied, but not stated, shall be inferred as the sense requires. Singular words shall be interpreted as plural, and plural words shall be interpreted as singular where applicable as the context of the Contract Documents indicates. EAST ORANGE 01100-2 SUMMARY

2. Imperative mood and streamlined language are generally used in the Specifications. Requirements expressed in the imperative mood are to be performed by Contractor. Occasionally, the indicative or subjunctive mood may be used in the Section Text for clarity to describe responsibilities that must be fulfilled indirectly by Contractor or by others when so noted. a. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase. PART 2 - PRODUCTS PART 3 - EXECUTION (Not Used) (Not Used) END OF SECTION EAST ORANGE 01100-3 SUMMARY

SECTION 01250 CONTRACT MODIFICATION PROCEDURES PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section. 1.02 SUMMARY A. This Section specifies administrative and procedural requirements for handling and processing Contract modifications. 1.03 MINOR CHANGES IN THE WORK A. The County Representative will issue supplemental instructions authorizing Minor Changes in the Work, not involving adjustment to the Contract Sum or the Contract Time, on AIA Document G710, "Architect's Supplemental Instructions." 1.04 PROPOSAL REQUESTS A. The County-Initiated Proposal Requests: The County will issue a detailed description of proposed changes in the Work that may require adjustment to the Contract Sum or the Contract Time. If necessary, the description will include supplemental or revised Drawings and Specifications. 1. Proposal Requests issued by the County Representative are for information only. Do not consider them instructions either to stop work in progress or to execute the proposed change. 2. Within 20 days after receipt of Proposal Request, submit a quotation estimating cost adjustments to the Contract Sum and the Contract Time necessary to execute the change. a. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities. b. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts. c. Include an updated Contractor's Construction Schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time. EAST ORANGE SPAY/NEUTER CLINIC 01250-1 CONTRACT MODIFICATIONS

B. Contractor-Initiated Proposals: If latent or unforeseen conditions require modifications to the Contract, Contractor may propose changes by submitting a request for a change. 1. Include a statement outlining reasons for the change and the effect of the change on the Work. Provide a complete description of the proposed change. Indicate the effect of the proposed change on the Contract Sum and the Contract Time. 2. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities. 3. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts. 4. Include an updated Contractor's Construction Schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time. 5. Comply with requirements in Division 1 Section "Product Requirements" if the proposed change requires substitution of one product or system for product or system specified. C. Proposal Request Form: Use AIA Document G709 for Proposal Requests. 1.05 CHANGE ORDER PROCEDURES A. On the County's approval of a Proposal Request, the County Project Manager will issue a Change Order for signatures of the County and Contractor on AIA Document G701. 1.06 CONSTRUCTION CHANGE DIRECTIVE A. Construction Change Directive: Architect may issue a Construction Change Directive on AIA Document G714, Construction Change Directive instructs Contractor to proceed with a change in the Work, for subsequent inclusion in a Change Order. 1. Construction Change Directive contains a complete description of change in the Work. It also designates method to be followed to determine change in the Contract Sum or the Contract Time. B. Documentation: Maintain detailed records on a time and material basis of work required by the Construction Change Directive. 1. After completion of change, submit an itemized account and supporting data necessary to substantiate cost and time adjustments to the Contract. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used) END OF SECTION EAST ORANGE SPAY/NEUTER CLINIC 01250-2 CONTRACT MODIFICATIONS

PART 1 - GENERAL SECTION 01290 PAYMENT PROCEDURES 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section. 1.02 SUMMARY A. This Section specifies administrative and procedural requirements necessary to prepare and process Applications for Payment. 1.03 DEFINITIONS A. Schedule of Values: A statement furnished by Contractor allocating portions of the Contract Sum to various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment. 1.04 SCHEDULE OF VALUES A. Coordination: Coordinate preparation of the Schedule of Values with preparation of Contractor's Construction Schedule. 1. Correlate line items in the Schedule of Values with other required administrative forms and schedules, including the following: a. Application for Payment forms with Continuation Sheets. b. Submittals Schedule. 2. Submit the Schedule of Values to the County at earliest possible date but no later than seven days before the date scheduled for submittal of initial Applications for Payment. B. Format and Content: Use the Project Manual table of contents as a guide to establish line items for the Schedule of Values. Provide at least one line item for each Specification Section. 1. Identification: Include the following Project identification on the Schedule of Values: a. Project name and location. b. Name of Architect. c. County Representative's name and address. d. Architect's project number. e. Contractor's name and address. f. Date of submittal. EAST ORANGE 01290-1 PAYMENT PROCEDURE

2. Arrange the Schedule of Values in tabular form with separate columns to indicate the following for each item listed: a. Related Specification Section or Division. b. Description of the Work. c. Name of subcontractor. d. Name of manufacturer or fabricator. e. Name of supplier. f. Change Orders (numbers) that affect value. g. Dollar value. 1) Percentage of the Contract Sum to nearest one-hundredth percent, adjusted to total 100 percent. 3. Provide a breakdown of the Contract Sum in enough detail to facilitate continued evaluation of Applications for Payment and progress reports. Coordinate with the Project Manual table of contents. Provide several line items for principal subcontract amounts, where appropriate. 4. Round amounts to nearest whole dollar; total shall equal the Contract Sum. 5. Provide a separate line item in the Schedule of Values for each part of the Work where Applications for Payment may include materials or equipment purchased or fabricated and stored, but not yet installed. a. Differentiate between items stored on-site and items stored off-site. Include evidence of insurance or bonded warehousing if required. 6. Provide separate line items in the Schedule of Values for initial cost of materials, for each subsequent stage of completion, and for total installed value of that part of the Work. 7. Each item in the Schedule of Values and Applications for Payment shall be complete. Include total cost and proportionate share of general overhead and profit for each item. a. Temporary facilities and other major cost items that are not direct cost of actual work-in-place may be shown either as separate line items in the Schedule of Values or distributed as general overhead expense, at Contractor's option. 8. Schedule Updating: Update and resubmit the Schedule of Values before the next Applications for Payment when Change Orders or Construction Change Directives result in a change in the Contract Sum. 1.05 APPLICATIONS FOR PAYMENT A. Each Application for Payment shall be consistent with previous applications and payments as certified by Architect and County Representative and paid for by the County. EAST ORANGE 01290-2 PAYMENT PROCEDURE

1. Initial Application for Payment, Application for Payment at time of Substantial Completion, and final Application for Payment involve additional requirements. B. Payment Application Times: The date for each progress payment is indicated in the Agreement between the County and Contractor. The period of construction Work covered by each Application for Payment is the period indicated in the Agreement. C. Payment Application Times: The date for each progress payment is the 15th day of each month. The period covered by each Application for Payment starts on the day following the end of the preceding period and ends 15 days before the date for each progress payment. D. Payment Application Forms: Use forms provided by the County for Applications for Payment. E. Application Preparation: Complete every entry on form. Notarize and execute by a person authorized to sign legal documents on behalf of Contractor. Architect / County Representative will return incomplete applications without action. 1. Entries shall match data on the Schedule of Values and Contractor's Construction Schedule. Use updated schedules if revisions were made. 2. Include amounts of Change Orders and Construction Change Directives issued before last day of construction period covered by application. F. Transmittal: Submit signed and notarized original copies of each Application for Payment to Architect by a method ensuring receipt within 24 hours. One copy shall include waivers of lien and similar attachments if required. 1. Transmit each copy with a transmittal form listing attachments and recording appropriate information about application. G. Initial Application for Payment: Administrative actions and submittals that must precede or coincide with submittal of first Application for Payment include the following: 1. List of subcontractors. 2. Schedule of Values. 3. Contractor's Construction Schedule (preliminary if not final). 4. Products list. 5. Schedule of unit prices. 6. Submittals Schedule (preliminary if not final). 7. List of Contractor's staff assignments. 8. List of Contractor's principal consultants. 9. Copies of building permits. 10. Copies of authorizations and licenses from authorities having jurisdiction for performance of the Work. 11. Initial progress report. 12. Report of preconstruction conference. 13. Certificates of insurance and insurance policies. 14. Performance and payment bonds. 15. Data needed to acquire the County's insurance. EAST ORANGE 01290-3 PAYMENT PROCEDURE

16. Initial settlement survey and damage report if required. H. Application for Payment at Substantial Completion: After issuing the Certificate of Substantial Completion, submit an Application for Payment showing 100 percent completion for portion of the Work claimed as substantially complete. 1. Include documentation supporting claim that the Work is substantially complete and a statement showing an accounting of changes to the Contract Sum. 2. This application shall reflect Certificates of Partial Substantial Completion issued previously for the County occupancy of designated portions of the Work. I. Final Payment Application: Submit final Application for Payment with releases and supporting documentation not previously submitted and accepted, including, but not limited, to the following: 1. Evidence of completion of Project closeout requirements. 2. Insurance certificates for products and completed operations where required and proof that taxes, fees, and similar obligations were paid. 3. Updated final statement, accounting for final changes to the Contract Sum. 4. AIA Document G706, "Contractor's Affidavit of Payment of Debts and Claims." 5. AIA Document G706A, "Contractor's Affidavit of Release of Liens." 6. AIA Document G707, "Consent of Surety to Final Payment." 7. Evidence that claims have been settled. 8. Final meter readings for utilities, a measured record of stored fuel, and similar data as of date of Substantial Completion or when the County took possession of and assumed responsibility for corresponding elements of the Work. 9. Final, liquidated damages settlement statement. PART 2 - PRODUCTS PART 3 - EXECUTION (Not Used) (Not Used) END OF SECTION EAST ORANGE 01290-4 PAYMENT PROCEDURE

SECTION 01310 PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section. 1.02 SUMMARY A. This Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: 1. General project coordination procedures. 2. Conservation. 3. Coordination Drawings. 4. Administrative and supervisory personnel. 5. Project meetings. B. Contractor shall have each subcontractor participate in coordination requirements 1.03 COORDINATION A. Coordination: Coordinate construction operations included in various Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections that depend on each other for proper installation, connection, and operation. 1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation. 2. Coordinate installation of different components with other contractors to ensure maximum accessibility for required maintenance, service, and repair. 3. Make adequate provisions to accommodate items scheduled for later installation. B. If necessary, prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings. 1. Prepare similar memoranda for Owner and separate contractors if coordination of their Work is required. EAST ORANGE 01310-1 PROJECT MGMT & COORD

C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following: 1. Preparation of Contractor's Construction Schedule. 2. Preparation of the Schedule of Values. 3. Installation and removal of temporary facilities and controls. 4. Delivery and processing of submittals. 5. Progress meetings. 6. Preinstallation conferences. 7. Project closeout activities. D. Conservation: Coordinate construction activities to ensure that operations are carried out with consideration given to conservation of energy, water, and materials. 1. Salvage materials and equipment involved in performance of, but not actually incorporated into, the Work. 1.04 SUBMITTALS A. Coordination Drawings: Prepare Coordination Drawings in areas of limited space availability for maximum utilization of space for efficient installation of different components and where coordination is required for installation of products and materials fabricated by separate entities. 1. Indicate relationship of components shown on separate Shop Drawings. 2. Indicate required installation sequences. 3. Refer to Division 15 Section "Basic Mechanical Materials and Methods" and Division 16 Section "Basic Electrical Materials and Methods" for specific Coordination Drawing requirements for mechanical and electrical installations. B. Staff Names: Within 15 days of starting construction operations, submit a list of principal staff assignments, including superintendent and other personnel in attendance at Project site. Identify individuals and their duties and responsibilities; list addresses and telephone numbers, including home and office telephone numbers. Provide names, addresses, and telephone numbers of individuals assigned as standbys in the absence of individuals assigned to Project. 1. Post copies of list in Project meeting room, in temporary field office, and by each temporary telephone. 1.05 PROJECT MEETINGS A. Schedule and conduct meetings and conferences at Project site, unless otherwise indicated. 1. Attendees: Inform participants and others involved, and individuals whose presence is required, of date and time of each meeting. Notify Owner and Architect of scheduled meeting dates and times. EAST ORANGE 01310-2 PROJECT MGMT & COORD

2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees. 3. Minutes: Record significant discussions and agreements achieved. Distribute the meeting minutes to everyone concerned, including Owner and Architect, within 3 days of the meeting. B. Preconstruction Conference: Schedule a preconstruction conference before starting construction, at a time convenient to Owner, Construction Manager, if one is retained by Owner, and Architect, but no later than 15 days after execution of the Agreement. Hold the conference at Project site or another convenient location. Conduct the meeting to review responsibilities and personnel assignments. 1. Attendees: Authorized representatives of Owner, Construction Manager, if one is retained by Owner, Architect, and their consultants; Contractor and its superintendent; major subcontractors; manufacturers; suppliers; and other concerned parties shall attend the conference. All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work. 2. Agenda: Discuss items of significance that could affect progress, including the following: a. Tentative construction schedule. b. Phasing. c. Critical work sequencing. d. Designation of responsible personnel. e. Procedures for processing field decisions and Change Orders. f. Procedures for processing Applications for Payment. g. Distribution of the Contract Documents. h. Submittal procedures. i. Preparation of Record Documents. j. Use of the premises. k. Responsibility for temporary facilities and controls. l. Parking availability. m. Office, work, and storage areas. n. Equipment deliveries and priorities. o. First aid. p. Security. q. Progress cleaning. r. Working hours. C. Preinstallation Conferences: Conduct a preinstallation conference at Project site before each construction activity that requires coordination with other construction. 1. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by the installation and its coordination or integration with other materials and installations that have preceded or will follow, shall attend the meeting. Advise Architect and Construction Manager, if one is retained by Owner, of scheduled meeting dates. EAST ORANGE 01310-3 PROJECT MGMT & COORD

2. Agenda: Review progress of other construction activities and preparations for the particular activity under consideration, including requirements for the following: a. Contract Documents. b. Options. c. Related Change Orders. d. Purchases. e. Deliveries. f. Submittals. g. Review of mockups. h. Possible conflicts. i. Compatibility problems. j. Time schedules. k. Weather limitations. l. Manufacturer's written recommendations. m. Warranty requirements. n. Compatibility of materials. o. Acceptability of substrates. p. Temporary facilities and controls. q. Space and access limitations. r. Regulations of authorities having jurisdiction. s. Testing and inspecting requirements. t. Required performance results. u. Protection of construction and personnel. 3. Record significant conference discussions, agreements, and disagreements. 4. Do not proceed with installation if the conference cannot be successfully concluded. Initiate whatever actions are necessary to resolve impediments to performance of the Work and reconvene the conference at earliest feasible date. D. Progress Meetings: Conduct progress meetings at regular intervals. Coordinate dates of meetings with preparation of payment requests. 1. Attendees: In addition to representatives of Owner, Construction Manager, if one is retained by Owner, and Architect, each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work. 2. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project. a. Contractor's Construction Schedule: Review progress since the last meeting. Determine whether each activity is on time, ahead of schedule, or behind schedule, in relation to Contractor's Construction Schedule. Determine how construction behind schedule will be expedited; secure commitments from parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time. EAST ORANGE 01310-4 PROJECT MGMT & COORD

b. Review present and future needs of each entity present, including the following: 1) Interface requirements. 2) Sequence of operations. 3) Status of submittals. 4) Deliveries. 5) Off-site fabrication. 6) Access. 7) Site utilization. 8) Temporary facilities and controls. 9) Work hours. 10) Hazards and risks. 11) Progress cleaning. 12) Quality and work standards. 13) Change Orders. 14) Documentation of information for payment requests. 3. Reporting: Distribute minutes of the meeting to each party present and to parties who should have been present. Include a brief summary, in narrative form, of progress since the previous meeting and report. a. Schedule Updating: Revise Contractor's Construction Schedule after each progress meeting where revisions to the schedule have been made or recognized. Issue revised schedule concurrently with the report of each meeting. E. Coordination Meetings: Conduct Project coordination meetings at regular intervals. Project coordination meetings are in addition to specific meetings held for other purposes, such as progress meetings and preinstallation conferences. 1. Attendees: In addition to representatives of Owner, Construction Manager, and Architect, each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work 2. Agenda: Review and correct or approve minutes of the previous coordination meeting. Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project. a. Combined Contractor's Construction Schedule: Review progress since the last coordination meeting. Determine whether each contract is on time, ahead of schedule, or behind schedule, in relation to Combined Contractor's Construction Schedule. Determine how construction behind schedule will be expedited; secure commitments from parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time. EAST ORANGE 01310-5 PROJECT MGMT & COORD

b. Schedule Updating: Revise Combined Contractor's Construction Schedule after each coordination meeting where revisions to the schedule have been made or recognized. Issue revised schedule concurrently with report of each meeting. c. Review present and future needs of each contractor present, including the following: 1) Interface requirements. 2) Sequence of operations. 3) Status of submittals. 4) Deliveries. 5) Off-site fabrication. 6) Access. 7) Site utilization. 8) Temporary facilities and controls. 9) Work hours. 10) Hazards and risks. 11) Progress cleaning. 12) Quality and work standards. 13) Change Orders. 3. Reporting: Record meeting results and distribute copies to everyone in attendance and to others affected by decisions or actions resulting from each meeting. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used) END OF SECTION EAST ORANGE 01310-6 PROJECT MGMT & COORD

PART 1 - GENERAL SECTION 01320 CONSTRUCTION PROGRESS DOCUMENTATION 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section. 1.02 SUMMARY A. This Section includes administrative and procedural requirements for documenting the progress of construction during performance of the Work, including the following: 1. Preliminary Construction Schedule. 2. Contractor's Construction Schedule. 3. Submittals Schedule. 4. Daily construction and field condition. 5. Special reports. 6. Construction photographs. 1.03 DEFINITIONS A. Activity: A discrete part of a project that can be identified for planning, scheduling, monitoring, and controlling the construction project. Activities included in a construction schedule consume time and resources. 1. Critical activities are activities on the critical path. They must start and finish on the planned early start and finish times. 2. Predecessor activity is an activity that must be completed before a given activity can be started. B. Critical Path: The longest continuous chain of activities through the network schedule that establishes the minimum overall Project duration and contains no float. C. Event: The starting or ending point of an activity. D. Float: The measure of leeway in starting and completing an activity. 1. Float time is not for the exclusive use or benefit of either the County or Contractor, but is a jointly owned, expiring Project resource available to both parties as needed to meet schedule milestones and Contract completion date. 2. Free float is the amount of time an activity can be delayed without adversely affecting the early start of the following activity. 3. Total float is the measure of leeway in starting or completing an activity without adversely affecting the planned Project completion date. EAST ORANGE 01320-1 CONSTRUCTION PROG DOC

E. Major Area: A story of construction, a separate building, or a similar significant construction element. F. Milestone: A key or critical point in time for reference or measurement. 1.04 SUBMITTALS A. Qualification Data: For firms and persons specified in "Quality Assurance" Article to demonstrate their capabilities and experience. Include lists of completed projects with project names and addresses, names and addresses of architects and the County, and other information specified. B. Submittals Schedule: Submit three copies of schedule. Arrange the following information in a tabular format: 1. Scheduled date for first submittal. 2. Specification Section number and title. 3. Submittal category (action or informational). 4. Name of subcontractor. 5. Description of the Work covered. 6. Scheduled date for Architect's and Construction Manager's final release or approval. 7. Scheduled dates for purchasing. 8. Scheduled dates for first installation. C. Preliminary Construction Schedule: Unless directed otherwise, submit two printed copies; one a single sheet of reproducible media, and one a print. D. Contractor's Construction Schedule: Unless directed otherwise, submit/email electronic and two printed copies of initial schedule, one a reproducible print and one a blue- or black-line print, large enough to show entire schedule for entire construction period. E. Construction Photographs: Unless directed otherwise, submit two prints of each photographic view within seven days of taking photographs. 1. Format: 8-by-10-inch smooth-surface matte prints on single-weight commercial-grade stock, enclosed back to back in clear plastic sleeves that are punched for standard 3-ring binder. 2. Identification: On back of each print, provide an applied label or rubberstamped impression with the following information: a. Name of Project. b. Name and address of photographer. c. Name of Architect and Construction Manager. d. Name of Contractor. e. Date photograph was taken. f. Description of vantage point, indicating location, direction (by compass point), and elevation or story of construction. EAST ORANGE 01320-2 CONSTRUCTION PROG DOC

3. Media: Submit a complete set of photographic media in protective envelopes, with each submittal of prints as a Project Record Document. Identify date photographs were taken. a. Provide digital images on CD-R Discs. F. Daily Construction Reports: Submit three copies at weekly intervals. I. Special Reports: Submit three copies at time of unusual event. H. Field Condition Reports: Submit three copies at time of discovery of differing conditions. 1.05 COORDINATION A. Coordinate preparation and processing of schedules and reports with performance of construction activities and with scheduling and reporting of separate contractors. B. Coordinate Contractor's Construction Schedule with the Schedule of Values, list of subcontracts, Submittals Schedule, progress reports, payment requests, and other required schedules and reports. 1. Secure time commitments for performing critical elements of the Work from parties involved. 2. Coordinate each construction activity in the project with other activities and schedule them in proper sequence. C. Auxiliary Services: Provide auxiliary services requested, including access to Project site and use of temporary facilities including temporary lighting. PART 2 - PRODUCTS 2.01 SUBMITTALS SCHEDULE A. Preparation: Submit a schedule of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, resubmittal, ordering, manufacturing, fabrication, and delivery when establishing dates. 1. Coordinate Submittals Schedule with list of subcontracts, the Schedule of Values, and Contractor's Construction Schedule. 2. Initial Submittal: Submit concurrently with preliminary bar-chart schedule. Include submittals required during the first 60 days of construction. List those required to maintain orderly progress of the Work and those required early because of long lead time for manufacture or fabrication. a. At Contractor's option, show submittals on the Preliminary Construction Schedule, instead of tabulating them separately. EAST ORANGE 01320-3 CONSTRUCTION PROG DOC

3. Final Submittal: Submit concurrently with the first complete submittal of Contractor's Construction Schedule. Issue updates as they occur, when agreed by all parties. 2.02 CONTRACTOR'S CONSTRUCTION SCHEDULE, GENERAL A. Procedures: Comply with procedures contained in AGC's "Construction Planning & Scheduling." B. Time Frame: Extend schedule from date established the Notice to Proceed to date of Final Completion. 1. Contract completion date shall not be changed by submission of a schedule that shows an early completion date, unless specifically authorized by Change Order. C. Activities: Treat each separate area as a separate numbered activity for each principal element of the Work. 1. Procurement Activities: Include procurement process activities for long lead items and major items, requiring a cycle of more than 60 days, as separate activities in schedule. Procurement cycle activities include, but are not limited to, submittals, approvals, purchasing, fabrication, and delivery. 2. Submittal Review Time: Include review and resubmittal times indicated in Division 1 Section "Submittal Procedures" in schedule. Coordinate submittal review times in Contractor's Construction Schedule with Submittals Schedule. 3. Startup and Testing Time: Include necessary number of days for startup and testing. 4. Substantial Completion: Indicate completion in advance of date established for Substantial Completion, and allow time for Architect's and the County's administrative procedures necessary for certification of Substantial Completion. D. Constraints: Include constraints and work restrictions indicated in the Contract Documents and as follows in schedule, and show how the sequence of the Work is affected. 1. Phasing: When phasing is required, arrange list of activities on schedule by phase. 2. Work under More Than One Contract: Include a separate activity for each contract. 3. Work by the County: Include a separate activity for each portion of the Work performed by the County. 4. Products Ordered in Advance: Include a separate activity for each product. Include delivery date indicated in Division 1 Section "Summary." Delivery dates indicated stipulate the earliest possible delivery date. 5. County-Furnished Products: Include a separate activity for each product. Include delivery date indicated in Division 1 Section "Summary." Delivery dates indicated stipulate the earliest possible delivery date. 6. Work Restrictions: Show the effect of the following items on the schedule: a. Uninterruptible services. b. Partial occupancy before Substantial Completion. EAST ORANGE 01320-4 CONSTRUCTION PROG DOC

c. Use of premises restrictions. d. Provisions for future construction. e. Seasonal variations. f. Environmental control. 7. Work Stages: Indicate important stages of construction for each major portion of the Work, including, but not limited to, the following: a. Subcontract awards. b. Submittals. c. Purchases. d. Mockups. e. Fabrication. f. Sample testing. g. Deliveries. h. Installation. i. Tests and inspections. j. Adjusting. k. Curing. l. Startup and placement into final use and operation. 8. Area Separations: Identify each major area of construction for each major portion of the Work. Indicate where each construction activity within a major area must be sequenced or integrated with other construction activities to provide for the following: a. Structural completion. b. Permanent space enclosure. c. Completion of mechanical installation. d. Completion of electrical installation. e. Substantial Completion. E. Milestones: Include milestones indicated in the Contract Documents in schedule, including, but not limited to, the Notice to Proceed, interim milestones, and Final Completion. F. Contract Modifications: For each proposed contract modification and concurrent with its submission, prepare a time-impact analysis using fragnets to demonstrate the effect of the proposed change on the overall project schedule. G. Computer Software: Prepare schedules using a program that has been developed specifically to manage construction schedules. 2.03 PRELIMINARY CONSTRUCTION SCHEDULE A. Bar-Chart Schedule: Submit preliminary horizontal bar-chart-type construction schedule within 15 days of date established for the Notice to Proceed. B. Preparation: Indicate each significant construction activity separately. Identify first workday of each week with a continuous vertical line. Outline significant construction EAST ORANGE 01320-5 CONSTRUCTION PROG DOC

activities for first 60 days of construction. Include skeleton diagram for the remainder of the Work and a cash requirement prediction based on indicated activities. 2.05 REPORTS A. Daily Construction Reports: Prepare a daily construction report recording the following information concerning events at Project site: 1. List of subcontractors at Project site. 2. List of separate contractors at Project site. 3. Approximate count of personnel at Project site. 4. High and low temperatures and general weather conditions. 5. Accidents. 6. Meetings and significant decisions. 7. Unusual events (refer to special reports). 8. Stoppages, delays, shortages, and losses. 9. Meter readings and similar recordings. 10. Emergency procedures. 11. Orders and requests of authorities having jurisdiction. 12. Change Orders received and implemented. 13. Construction Change Directives received. 14. Services connected and disconnected. 15. Equipment or system tests and startups. 16. Partial Completions and occupancies. 17. Substantial Completions authorized. B. Material Location Reports: At weekly intervals, prepare a comprehensive list of materials delivered to and stored at Project site. List shall be cumulative, showing materials previously reported plus items recently delivered. Include with list a statement of progress on and delivery dates for materials or items of equipment fabricated or stored away from Project site. C. Field Condition Reports: Immediately on discovery of a difference between field conditions and the Contract Documents, prepare a detailed report. Submit with a request for information on CSI Form 13.2A. Include a detailed description of the differing conditions, together with recommendations for changing the Contract Documents. PART 3 - EXECUTION 3.01 CONTRACTOR'S CONSTRUCTION SCHEDULE A. Contractor's Construction Schedule Updating: At monthly intervals (as a minimum), update schedule to reflect actual construction progress and activities. Issue schedule one week before each regularly scheduled progress meeting. EAST ORANGE 01320-6 CONSTRUCTION PROG DOC

B. Distribution: Distribute copies of approved schedule to Architect, Construction Manager, the County, separate contractors, testing and inspecting agencies, and other parties identified by Contractor with a need-to-know schedule responsibility. 1. Post copies in Project meeting rooms and temporary field offices. 2. When revisions are made, distribute updated schedules to the same parties and post in the same locations. Delete parties from distribution when they have completed their assigned portion of the Work and are no longer involved in performance of construction activities. 3.02 CONSTRUCTION PHOTOGRAPHS A. Photographic Media: Provide either of the following. 1. Digital: Minimum image resolution of 1600 by 1200 pixels. Minimum camera resolution of 3.1 megapixels. B. Date Stamp: Unless otherwise indicated, date and time stamp each photograph as it is being taken so stamp is integral to photograph. C. Periodic Construction Photographs: Unless directed otherwise, take not less than four color photographs monthly, coinciding with cutoff date associated with each Application for Payment. Photographer shall select vantage points to best show status of construction and progress since last photographs were taken. 1. Field Office Prints: Retain one set of prints of periodic photographs in field office at Project site, available at all times for reference. Identify photographs the same as for those submitted to Architect and Construction Manager. 2. Digital Media File Type: tif or jpeg. D. Final Completion Construction Photographs: Unless directed otherwise, take not less than eight color photographs after date of Substantial Completion for submission as Project Record Documents. Architect and Construction Manager will direct photographer for desired vantage points. 1. Digital Media File Type: tif or jpeg. END OF SECTION EAST ORANGE 01320-7 CONSTRUCTION PROG DOC

SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section. 1.02 SUMMARY A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals. 1.03 DEFINITIONS A. Action Submittals: Written and graphic information that requires responsive action. B. Informational Submittals: Written information that does not require approval. Submittals may be rejected for not complying with requirements. 1.04 SUBMITTAL PROCEDURES A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities. 1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity. 2. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination. a. Architect reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received. B. Submittals Schedule: Comply with requirements in Division 1 Section "Construction Progress Documentation" for list of submittals and time requirements for scheduled performance of related construction activities. C. Processing Time: Allow enough time for submittal review, including time for resubmittals, as follows. Time for review shall commence on Architect's receipt of submittal. EAST ORANGE 01330-1 SUBMITTAL PROCEDURES

1. Initial Review: Allow 7 days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. Architect will advise Contractor when a submittal being processed must be delayed for coordination. 2. Concurrent Review: Where concurrent review of submittals by Architect's consultants, the County, or other parties is required, allow 14 days for initial review of each submittal. 3. If intermediate submittal is necessary, process it in same manner as initial submittal. 4. Allow 7 days for processing each resubmittal. Allow 14 days for processing each concurrent resubmittal review. 5. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing. D. Identification: Place a permanent label or title block on each submittal for identification. 1. Indicate name of firm or entity that prepared each submittal on label or title block. 2. Provide a space approximately 4 by 5 inches on label or beside title block to record Contractor's review and approval markings and action taken by Architect.. 3. Include the following information on label for processing and recording action taken: a. Project name. b. Date. c. Name and address of Architect and OC Capital Projects Manager. d. Name and address of Contractor. e. Name and address of subcontractor. f. Name and address of supplier. g. Name of manufacturer. h. Unique identifier, including revision number. i. Number and title of appropriate Specification Section. j. Drawing number and detail references, as appropriate. k. Other necessary identification. E. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals. F. Additional Copies: Unless additional copies are required for final submittal, and unless Architect observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal. 1. Submit one copy of submittal to OC PM and concurrent reviewer in addition to specified number of copies to Architect. 2. Additional copies submitted for maintenance manuals will be marked with action taken and will be returned. EAST ORANGE 01330-2 SUBMITTAL PROCEDURES

G. Transmittal: Package each submittal individually and appropriately for transmittal and handling. Transmit each submittal using a transmittal form. Architect will return submittals, without review, received from sources other than Contractor. 1. On an attached separate sheet, prepared on Contractor's letterhead, record relevant information, requests for data, revisions other than those requested by Architect on previous submittals, and deviations from requirements of the Contract Documents, including minor variations and limitations. Include the same label information as the related submittal. 2. Include Contractor's certification stating that information submitted complies with requirements of the Contract Documents. 3. Transmittal Form: Unless directed otherwise, use AIA Document G810. H. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms. I. Use for Construction: Use only final submittals with mark indicating action taken by Architect in connection with construction. PART 2 - PRODUCTS 2.01 ACTION SUBMITTALS A. Prepare and submit Action Submittals required by individual Specification Sections. 1. Number of Copies: Submit four copies (or email if color selection is not required) of each submittal, unless otherwise indicated. Architect will email or return three copies. Mark up and retain one returned copy as a Project Record Document. B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment. 1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data. 2. Mark each copy of each submittal to show which products and options are applicable. 3. Include the following information, as applicable: a. Manufacturer's written recommendations. b. Manufacturer's product specifications. c. Manufacturer's installation instructions. d. Standard color charts. e. Manufacturer's catalog cuts. f. Wiring diagrams showing factory-installed wiring. g. Printed performance curves. h. Operational range diagrams. EAST ORANGE 01330-3 SUBMITTAL PROCEDURES