Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction Activities

Similar documents
Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction Activities

Erosion Control Inspection Form

ADDENDUM NUMBER TWO. A. SECTION ADVERTISEMENT FOR BIDS 1. REVISE Sealed Bid Date/Time/Location paragraph to read as follows:

City of Glendale Stormwater Management Plan Checklist

Performance Standards Compliance Checklist

Single Family Residential Construction Erosion/Sediment Control Standards

CITY OF CHICO. Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects. Project Address: Building Permit Number:

City of West Sacramento Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects

Project Information. Check all that are applicable to the construction project site: RIPDES CGP (construction) RIPDES RGP (dewatering)

Stormwater Management Permit Application LESS Than One Acre. Public Works Department st Ave East Kalispell, Montana (406)

STORMWATER POLLUTION PREVENTION PLAN (SWP3)

Building Better Storm Water Quality

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Storm Water Pollution Prevention Plan (SWP3) Checklist

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

LAND DISTURBANCE PERMIT

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E

Appendix B Construction SWPPP Short Form

2010 California Green Building Standards Code. Residential and Non-Residential Development

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

CITY OF VIRGINIA BEACH STORMWATER POLLUTION PREVENTION PLAN (SWPPP) FOR SINGLE FAMILY RESIDENCES AND ACCESSORY STRUCTURES ONLY

EROSION CONTROL AND GRADING PERMIT APPLICATION

APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER SHEET FOR SPECIAL CONDITIONS AND PERMIT NUMBERING

Common Plan SWPPP for

SECTION 11 PART I STORMWATER QUALITY PROTECTION Definitions / Acronyms 11-3 PART 1 CONSTRUCTION PRACTICES

GRADING, EROSION AND SEDIMENTATION CONTROL

CITY OF CAMARILLO STORMWATER POLLUTION CONTROL PLAN Demolition or Stockpile Activity Under One Acre

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

Paving and Grinding Operations

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water

Re: Erosion Control Report and Drawings Requirements Accompanying Document

October 2016 CDRPC Workshop

Blue Book Update Overview

WAKULLA SITE PLANNING

2.1 MINIMUM WATER QUALITY PROTECTION REQUIREMENTS FOR DEVELOPMENT CONSTRUCTION PROJECTS

Stormwater Pollution Prevention Plan

STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

SITE DESIGN ENGINEER'S STATEMENT:

Storm Water Minimum Requirements #2 ENGINEERING DEPARTMENT th Street Anacortes, WA

Concrete Waste Management

A. Each Contractor shall comply with the requirements outlined in these documents.

STORM WATER POLLUTION PREVENTION PLAN TEMPLATE

Planning & Building Department. Requirements for Erosion and Sediment Control

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

Construction Phasing Bad

DIVISION of WATER QUALITY NDPDES PROGRAM

Stormwater Pollution Prevention Plan (SWPPP) For Single Family Residential Construction within a larger plan of development

Step 1. Determine if a Small Utility GESC Permit is Applicable and if a Project Specific GESC Plan is Required.

LAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET

GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ

PHASE 1 UPDATES TO DESIGN AND CONSTRUCTION STANDARDS INITIAL DRAFT FOR. Chapter 6 EROSION PREVENTION AND SEDIMENT CONTROL

New Administration Building

LAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET

CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN

E. STORMWATER MANAGEMENT

Items in this checklist identify the base requirements that are to be provided by the design professional.

Construction Site Inspections

Stormwater Pollution Prevention Plan (SWPPP) For Single Family Residential Construction within a larger plan of development

Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below.

Erosion & Sedimentation Control Policy

Shelbyville, KY Stormwater Best Management Practices

CON APPENDIX C USAG HI Storm Water Pollution Prevention Plan Content Review Checklist

CHAPTER 6 - How to Prepare a SWPPP

City of El Centro. Erosion and Sediment Control Plan Review Checklist. Reviewer: Review Date:

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1

EXAMPLES OF GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ

D EROSION AND SEDIMENT CONTROL. Table of Contents

Stormwater Pollution Prevention Plan Engineering Department Requirements

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

Outline of Presentation. Inspecting Construction Site BMPs. Inspector. Back to Basics. Erosion Control. Erosion Control

CITY OF JENKS EARTH CHANGE PERMIT APPLICATION

The Good, The Bad, and The Ugly

BMP FACT SHEET DF-1 HOA Annual Self-Certification Report

CITY UTILITIES DESIGN STANDARDS MANUAL

A. PROJECT LOCATION. B. PERMITTEE (Responsible party for day to day supervision and control of the MANAGMENT PLAN)

Middle Tennessee State University (MTSU) Stormwater Plan Review Checklist

Hazardous Waste Management

SWPPP Checklist. Project Name: Review Date(s): Reviewer(s): Project Type: Subdivision. Site Plan City Project

Construction Site Runoff Inspections and Enforcement

Homeowner Incentive Program

LOUISIANA URBAN STORMWATER COALITION. EXECUTING A SWPPP DURING CONSTRUCTION Presented by: Diane T. Baum

INSPECTION, MAINTENANCE AND HOUSEKEEPING PLAN

Water Pollution Control for Work in Sensitive Areas

Building Permit Application Office Use Only Please Print Clearly in Ink or Type

Appendix A: SWPPP Template Instructions

SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY

COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia Tel.

SWPPP Inspection Procedures and Form 247 Instructions

Best Management Practice (BMP) Guidance Manual

Building Permit Application Office Use Only Please Print Clearly in Ink or Type

Construction Stormwater Best Management Practices

Rock Sock (RS) Rock Sock height.

APPENDIX C EROSION AND SEDIMENTATION CONTROL STANDARDS

Regulatory Requirements

NDDOT Erosion & Sediment Control Construction Course

Transcription:

Development Services 1775 12 th Ave. NW P.O. Box 1307 Issaquah, WA 98027 425-837-3100 issaquahwa.gov Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction Activities Type of Project: Commercial/Plat Project Information Project Name: Project Address/Site Location: Permit Number: Owner/Developer: General Contractor: Site Contractor: Certified Erosion and Sediment Control Lead (CESCL): Prepared by: Date Prepared: Site Information Property Area (sq ft/acres): Area to be Cleared and Graded (sq ft/acres): Estimated Total Fill (cu yds): Estimated Total Excavation (cu yds): Existing Impervious Area (sq ft/acres): New Impervious Area (sq ft/acres): Replaced Impervious Area (sq ft/acres) Form dt 2017-01-09 Page 1 of 6

1. INTRODUCTION This Temporary Erosion and Sediment Control Report and Stormwater Pollution Prevention Plan for the City of Issaquah (TESC Report) has been prepared as part of the City of Issaquah Permit for the construction project. The Contractor is required to comply with the terms of this TESC Report and the TESC measures shown on the approved permit plans. The Contractor s TESC Supervisor shall be responsible for the performance, maintenance, and review of TESC measures as described in this TESC Report and the approved plans. With the exception of small projects, the TESC supervisor shall be a Certified Erosion and Sediment Control Lead (CESCL). TESC measures shall be in accordance with the City of Issaquah are described in the 2017 City of Issaquah Stormwater Design Manual Addendum to the 2014 Stormwater Management Manual for Western Washington. This document is available at http://issaquahwa.gov/documentcenter/view/1049. 2. SITE DESCRIPTION Briefly describe below the existing conditions, topography, soils, etc, as appropriate. 3. PROPOSED CONSTRUCTION ACTIVITIES AND APPROXIMATE SCHEDULE Briefly describe below the proposed construction activities for the project. Describe or include as an attachment a schedule for the project activities. Typical activities include utility installation, building foundations, frontage improvements, paving, etc. 4. CONSTRUCTION TESC BEST MANAGEMENT PRACTICES (BMPS) Describe below how each of the following BMPs apply to the project. These BMPs are to be shown on the project plans as appropriate. Address the different phases of construction (e.g. clearing and grading, utility installation, building construction). a. Monitoring Points Identify Monitoring Points on the TESC plans for all locations where runoff discharges from the project site for all phases of construction. The City will measure the turbidity of the discharge at the Monitoring Points to verify compliance with the permit. Identify any temporary discharge points during construction and also the discharge points for all permanent storm drainage systems. Form dt 2017-01-09 Page 2 of 6

Description of Monitoring Points: b. Clearing Limits Describe the clearing and grading limits for the project. The purpose of the clearing limits is to define the project boundaries and to prevent disturbance of areas not designated for clearing and grading (e.g. critical areas and buffers). Description of Clearing Limits: c. Cover Measures Describe the temporary cover measures (e.g. straw or other mulch, erosion control blankets, plastic, etc) that will be used to protect disturbed areas. Providing cover measures for as much disturbed area as possible is the most practical way to reduce turbidity in runoff. Description of Cover Measures: d. Perimeter Protection Describe how and where perimeter protection (e.g. silt fence, straw/compost wattles) to filter sediment from sheet flow shall be provided downstream of all disturbed areas. Perimeter protection shall be provided to protect any critical areas and buffers. Description of Perimeter Protection: e. Traffic Area Stabilization (including Truck Wheel Wash Areas) Describe the locations and BMPs to be used to stabilize unsurfaced entrances, roads, and parking areas used by construction traffic to minimize erosion and tracking of sediment offsite. Alternative measures such as a wheel wash shall be used if traffic area stabilization does not prevent sediment from being tracked offsite. Description of Traffic Area Stabilization (including Truck Wheel Wash Areas): f. Sediment Retention Describe any temporary sediment ponds/traps, tanks, or other storage methods that will be used to treat surface water collected from disturbed areas prior to discharge from the site. Also describe how storm drain inlet protection measures (e.g. silt socks) will be used for the project. Description of Sediment Retention Measures: Form dt 2017-01-09 Page 3 of 6

g. Surface Water Collection Describe the surface water collection measures (e.g. ditches, berms, etc.) that will be used to intercept and direct surface water from disturbed areas to sediment ponds/traps, tanks, or other storage methods. This includes any diversions needed to address drainage uphill from the project site. Description of Surface Water Collection Measures: h. Dewatering Control Describe the BMPs to be used to manage turbid water resulting from the dewatering of utilities, excavations, foundations, etc. Water shall not be pumped offsite without prior approval from the City inspector. Description of Dewatering Control Measures: i. Dust Control Preventive measures shall be used as needed to minimize wind-borne dust from leaving the project site. Water used for dust control shall be minimized so that it does not generate runoff. Description of Dust Control Measures: j. Flow Control Provisions shall be made to prevent increases in the existing site conditions 2-year and 10- year runoff peaks discharging from the site during construction. Description of Flow Control Measures: k. Final Site Stabilization Describe how disturbed areas will be stabilized at the completion of the project (e.g. permanent landscaping, straw or other mulch, hydroseed, etc.) Description of Final Site Stabilization Measures: Form dt 2017-01-09 Page 4 of 6

5. WET SEASON REQUIREMENTS If construction is scheduled during the wet season (October 1st to April 30), describe any additional BMPs that may be used to meet wet season requirements. If the wet season BMPs can be addressed in these plans and TESC Report, an updated plan and TESC Report will not be required for construction during the wet season. 6. POLLUTION PREVENTION AND SPILL PREVENTION BMPS Describe the BMPs to be used for each of the following activities: a. Storage and Handling of Hazardous Materials Hazardous materials include petroleum products such as oil, fuel, cold mix, paint, solvents, curing compounds, etc. Liquid products stored outside that may contaminate stormwater runoff if spilled shall be stored under cover and in containment. Describe the BMPs for storage and handling of hazardous materials. b. Concrete Work and Paving Operations Describe the BMPs to be used to ensure materials used during concrete work and paving operations do not enter storm drainage systems, surface waters, or wetlands. c. Spill Kits and Spill Response Describe the spill control plan for the construction project. 7. DEVELOPER/CONTRACTOR SITE INSPECTIONS AND RECORDKEEPING Describe the TESC site inspections and recordkeeping that will be performed by the developer/contractor for the project: Form dt 2017-01-09 Page 5 of 6

8. CONTACTS Provide contact information (name and phone numbers) for the following: Owner/developer: General Contractor: Site Contractor: Certified Erosion and Sediment Control Lead (CESCL): Form dt 2017-01-09 Page 6 of 6