Hull Survey Report. 26 Cruiser Style Stern. Steel Narrowboat. Hull Survey 1. Prepared for:

Similar documents
SECTION B PLAN SUBMITTAL

REBUILDING VESSELS LESS THAN 90 METERS (295 FEET) IN LENGTH AND BARGES OF ANY LENGTH

Survey performance requirements. Periodic surveys of hull, decks and superstructure of fibre-reinforced plastic (FRP) ships

INSPECTION GRADING CRITERIA FOR THE ABS HULL INSPECTION AND MAINTENANCE PROGRAM (HIMP)

COMMON STRUCTURAL RULES FOR BULK CARRIERS AND OIL TANKERS RULE CHANGE PROPOSAL 1 This proposal contains amendments within the following Parts and chap

Eurobitume UK. Site Inspection for Delivery of Bitumen

Marine Galvanic Corrosion Made Easy. Brought to you by Marine Protection Systems Pty Ltd

PART 5 WELDING. 5.1 General 5.2 Preparation 5.3 Dimensions of welds 5.4 Materials 5.5 Aluminium alloys 5.6 Welding details 5.

Hull Surveys for Liquefied Gas Carriers

ISO INTERNATIONAL STANDARD. Small craft Hull construction and scantlings Part 6: Structural arrangements and details

Linings of Aboveground Petroleum Storage Tank Bottoms API RECOMMENDED PRACTICE 652 FOURTH EDITION, SEPTEMBER 2014

FMB15678 Steel Deck Cargo Barge

Marine Corrosion and its Prevention in Small Vessels

ISO INTERNATIONAL STANDARD. Small craft Hull construction and scantlings Part 6: Structural arrangements and details

Marina Coast Water District Marina, CA Steel Reservoir #2

Guideline No.: L -06(201510) L-06 LIFEBOATS. Issued date: October 20,2015. China Classification Society

Surveyor and Auditor Procedures for Subchapter M

BUREAU OF INDIAN STANDARDS Draft Indian Standard

Welding Job Readiness Arc Welding Information Sheet Welding Equipment

INTER-DEPARTMENTAL PROCEDURE

TM Series Induced Draft Cooling Tower Specifications

Euro Corner Entry Shower Screen Installation Instructions

European Technical Assessment. ETA-15/0540 of Member of. General part

Designer. Bathware. Collection. rickmcleans.com.au Edition 24

SUPERIOR DOORS. Product. Scope. Building Regulations. Appraisal No. 787 [2012] Appraisal No. 787 (2012) Amended 13 September 2016.

ISO Ships and marine technology Protective coatings and inspection method Part 3: Cargo oil tanks of crude oil tankers

This document is a preview generated by EVS

NEW BUILD m Deck Cargo Barge Listing ID: 3022

LNG Carriers Ship Life Extension. Ed Waryas. Lloyd s Register North America, Inc.

TABLE OF CONTENTS INTRODUCTION SCOPE NORMATIVE REFERENCES DEFINITIONS AND ABBREVIATIONS... 3

Guideline on Türk Loydu Hull Inspection and Maintenance Program-Grading for Findings During Inspections 2013

Euro Frameless Sliding Shower Screen Installation Instructions

Corrigenda 1. Rule Editorials

STANDARD PRACTICE INSTRUCTION

SPECIFICATIONS - DETAILED PROVISIONS Section Progressing Cavity Pump C O N T E N T S

EQUIPMENT DESIGN LECTURE TANKS, VESSELS & DRUMS - MECHANICAL DESIGN

Cassiopea Fashions Ltd. Cassiopea Apparels Ltd.

RULES FOR CLASSIFICATION Inland navigation vessels. Part 5 Ship types Chapter 1 Cargo vessels. Edition December 2015 DNV GL AS

Syllabus and Subjects: Quick Guide

Building a lower-carbon construction industry Turning good environmental performance into competitive advantage

PURPOSE OF THE PROCEDURE To minimize the incidence of employee injuries from machines and equipment as per OSHA

Mark Sweater Ltd. Structural Inspection Report Observations & Actions Authors: Dariusz Tomiak Checked by: Dariusz Tomiak Approved by: Dariusz Tomiak

SP Prop Steel prop. // Versatile, strong, safe

RETAIL SHOP AND BASEMENT PLUS 2 UPPER FLOORS TO LET 1300 SQ FT ( SQ M)

Pioneer Forced Draft Cooling Tower Specifications

Each enclosed presentation is copyrighted by the author of the presentation, and may not be used, re-used, or otherwise reproduced without the

Ships and marine technology Cathodic protection of ships

MSC Guidelines for Review of IMO High-Speed Craft Code General Arrangements, Structural Fire Protection, and Means of Escape

user guide SKIPPER PLUS non-destructive moisture meter for the marine industry

Galvanic and Stray Current Corrosion

Spacia Curved Shower Screen Installation Instructions

RULES PUBLICATION NO. 95/P SURVEY REQUIREMENTS FOR SHELL AND INNER DOORS OF RO-RO SHIPS

A M E R I C A N A R C H I T E C T U R A L M A N U F A C T U R E R S A S S O C I A T I O N

Ron White Consultant Composites Technology. including;

Hull Surveys for General Dry Cargo Ships

PREMIER Low Profile Induced Draft Cooling Tower Specifications

Maritime Rules Part 19: Maritime Transport Operator Certification and Responsibilities

AQUA UNO TUB DOOR INSTALLATION INSTRUCTIONS

SERIES & NO. SMI - 129

INSPECTION PROCEDURE FOR SHELL AND TUBE HEAT EXCHANGERS

Design of Diesel Storage Tank in Consonance with Requirements of American Petroleum Institute (API) Standard 650

SUBMITTAL PACKAGE CUSTOM HOLLOW METAL DOORS, FRAMES AND WINDOWS

BUREAU OF INDIAN STANDARDS. Draft Indian Standard

Tank Inspection Report Town of Christiansburg, VA Hills Tank Liquid Engineering Corporation 36903

STEEL SURFACE PREPARATION

ClassNK Business Planning Department ACADEMY ClassNK Academy Center, South Asia and Oceania

Model # 5803SM. 6/15/2018 Page 1 of 5

ADVANCE METAL INDUSTRIES L.L.C.

DYNAFLASH FLASHINGS. Product. Scope. Building Regulations. Appraisal No. 913 [2016] Appraisal No. 913 (2016) Amended 06 October 2016.

Clad steel and steel-aluminium transition joints

Installation Instructions

Structural Inspection Report

DELTA. Cooling Towers, Inc. Delta Cooling Towers. Leader in Non-Corrosive Cooling Tower Technology

MSC Guidelines for Review of Structural Plans for Wooden Vessels

Standard Specification for Seamless and Welded Ferritic/Austenitic Stainless Steel Tubing for General Service 1

Case Study: Failure Analysis of Sulfuric Acid Supply Line

DC STATIONS. DC Stations, Section 11, Investigating Damage Descriptions Tip 002

MCS 020. MCS Planning Standards. For permitted development installations of wind turbines and air source heat pumps on domestic premises

SHCM SHOWER COLUMN INSTALLATION INSTRUCTIONS

Model # 800SM-PS3. 8/3/2016 Page 1 of 8

CRA Clad or Lined Steel Pipe

Hull damage experience in CSR tankers

COATING SPECIFICATION ZINC RICH EPOXY PRIMER, EPOXY MASTIC COATING ON STEEL OR CAST IRON COATING SPECIFICATION: C3 ISSUE:2 DATE: OCTOBER 2016

SECTION SOLID PHENOLIC PLASTIC TOILET PARTITIONS

Rules for the Classification of. Dredgers

Model # SV-R32AU. 2/13/2015 Page 1 of 11

Regarding the code-compliance of a channel drain around the foundation of a house and garage at 533 Waitoki Road, Wainui, Auckland

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

Highfield boats Quality Presentation. Highfield 2014 World Conference

Resin Chocks JANUARY The electronic pdf version of this document found through is the officially binding version

RULES FOR CLASSIFICATION OF SEA-GOING STEEL SHIPS

Ship Design and Construction Training Module

DEVELOPMENT OF INTERNATIONAL MEASURES FOR MINIMIZING THE TRANSFER OF INVASIVE AQUATIC SPECIES THROUGH BIOFOULING OF SHIPS

Standards are finally approved by the Standards High Council of Iranian Ministry of Petroleum.

No part of this manual may be reproduced in any form or by any means, without prior written permission of Darrera.

FRAME INSPECTION REPORT & DEFECTS LIST. Lot 1461 Sample Dr, Craigieburn

Distribution Box INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS UGC

CORROSION PROTECTION INDEX

Transcription:

Ovation Boat Surveys Limited Mill Lane Sileby Loughborough Leicestershire LE12 7UX Tel. 07963 974793 chris@ovationboatsurveys.co.uk www.ovationboatsurveys.co.uk Hull Survey Report 26 Cruiser Style Stern Steel Narrowboat Hull Survey 1 Prepared for: Miss Jill Smith 1 Appleyard Close East Goscote Leicestershire LE7 5DU Sent by email to: jillsmith@yahoo.com Registered office: Mill Lane, Sileby, Loughborough, Leicestershire, LE12 7UX Registered in England and Wales Company No: 09886377

Introduction 1.1 Acting on instruction from Miss Jill Smith, a hull survey was carried out 24 January 2017 at Longport Brokerage, Longport Wharf, Station Street, Stoke-On-Trent ST6 4NB on the narrowboat Hull Survey 1, subject to the limitations below: 1.2 The report is issued on the understanding that Ovation Boat Surveys Ltd is legally bound to Miss Jill Smith and not to any subsequent holder of this report. 1.3 This survey report has been prepared for the named client and shall not be sold, transferred or gifted to any third party without the express permission of the undersigned surveyor. 1.4 This survey report may be shared with the broker, Longport Brokerage, to aid the purchase by Miss Jill Smith only and may be used by Miss Jill Smith for the purpose of vessel insurance or the arrangement of vessel finance, if required. 1.5 Copyright and intellectual rights of this report remain the property of the undersigned surveyor. 1.6 Hull Survey 1 was seen on the open slipway at the above address for examination of the hull. 1.7 No other person was in attendance during the survey. 2. Limitations and Conditions of Survey 2.1 Your attention is drawn to terms of business as issued by the YDSA (March 2010 edition). Copy issued Miss Jill Smith on receipt of instruction to survey. Further copy enclosed. 2.2 With the vessel on the slipway trolley reasonable access was provided to the base plate but restricted at contact points with the trolley. 2.3 Good access was provided to the hull side. 2.4 The hull had not been pressure washed prior to the survey which can hamper the identification of possible faults. 2.5 Linings and floor coverings fixed in place were not removed. Covered, unexposed or inaccessible parts of the structure have not been inspected. No dismantling has been carried out except for the removal of normally removable panels and hatches. It therefore has to be appreciated that significant areas of the internal surface of the vessel remained unavailable for close examination due to fastened down cabin sole, bulkheads, linings, lockers and other fixed elements of construction. 2.6 Based on the inspection, total water integrity of the vessel cannot be confirmed. 2.7 This hull survey report is a report on the integrity of the hull only. This survey does not report on or express an opinion on other parts of the structure, machinery or equipment within. 2.8 Compliance with the Recreational Craft Directive or the Boat Safety Scheme does not form part of this survey. 2.9 This survey does not cover planning for a service / maintenance programme although guidance may be given in some areas. 2.10 Highlighted points are the express opinion of the undersigned surveyor against facts gathered during the survey. Hull Integrity Requirement: Should be rectified immediately as hull integrity is compromised. Hull Survey January 2017 on Hull Survey 1 for Miss Jill Smith Page 2 of 5

Hull Integrity Recommendation: Indicates hull integrity could be compromised in the event of an unforeseen circumstance. Hull Integrity Advisory: Items that if not rectified may accelerate hull deterioration. 3. General Description 3.1 Hull Survey 1, a cruiser style stern narrowboat, is reported by the broker as manufactured in 1976 by Springer Engineering. 3.2 The vessel, with straight hull sides, shallow V base plate and narrow flat keel, is an all-welded steel narrowboat with square transom. Original plate thickness is indicated at 3.1mm ( 1 / 8 ). 3.3 Nominal principal dimension: Length: Measured at 7.92 metres (26 ) 4. Hull Structure 4.1 Hull side & Base plate 4.1.1 Hull Survey 1 presented with a covering of protective paint; thick in places and easily chipped when knocked. 4.1.2 No rust blisters are present on the vertical hull side and no concerning deterioration is sighted under sample areas cleared. ~ The shallow V base plate has a few active rust blisters. Pitting corrosion and general material loss is present; some pitting is seen at a depth close to 2mm. 4.1.3 Using a Tritex multigauge 5600 ultrasonic gauge, a range of sample thickness readings were taken along the hull side and transom which ranged 2.8 3.4mm. ~ Slightly lesser readings were found to the shallow V base plate. ~ Some readings on the 150mm wide flat keel were found with a material thickness close to 2mm. Hammer testing also indicated thinning of the plate thickness. 4.1.4 On visual inspection welds inspected were found continuous and fair and without concerning wear. As constructed, no sacrificial edge is provided. 4.1.5 Guards are of minimal strength and a good height above the waterline; fully welded to the top and tack welded to the bottom edge. The underlying bottom edge has a build-up of corrosion which was spike tested without concern. Ongoing monitoring is required. 4.1.6 The gas locker drain is close to the waterline making the gas locker part of the hull. Condition of the gas locker is seen as poor. 4.1.7 Hull Integrity Requirement: It is recommended to overplate the flat keel and extend up both sides of the V base plate by approximately 100mm, using fully welded plate of 5mm nominal thickness. The shallow V base plate needs to be cleared of any protective paint to reveal all pitting corrosion. Areas with material loss greater than 0.5mm should be filled with weld. Alternatively, the shallow V base plate could be overplated using fully welded plate of 5mm nominal thickness. Given the comparatively low cost of steel plate and consideration of time, overplating may be the better option. Hull Survey January 2017 on Hull Survey 1 for Miss Jill Smith Page 3 of 5

Overplate the base and lower sides of the gas locker using fully welded plate of 5mm nominal thickness. 4.1.8 Hull Integrity Advisory: The hull should be cleared of the thick build-up of protective paint, with new applied. 4.2 Hull Apertures 4.2.1 Distance above the waterline has been recorded as seen on the day of survey. Measurements should be reassessed with tanks and storage spaces full. 4.2.2 Any internal pipework and fittings to apertures below 250mm to the waterline should be routinely checked to ensure they remain sound and in good condition. Any push fit pipework should be replaced with screwed, glued or clamped fittings. Required weedhatch height is no less than 150mm. 4.2.3 The skin fitting to port approximately 3.9metres back relates to the shower waste outlet and is positioned at the waterline. 4.2.4 The skin fitting to port approximately 6.0 metres back relates to the galley sink waste outlet and is positioned below the waterline. 4.2.5 Hull Integrity Recommendation: The skin fittings to the shower and galley waste should be removed by fully welded plate. Shower waste should be routed through an in-line pump to a new skin fitting placed at least 300mm above the waterline. A new galley sink skin fitting should be positioned just below the bottom of the sink. Redundant skin fittings should be removed by fully welded steel plate. 4.2.6 The weedhatch was not accessed. Condition needs to be confirmed. With the overplating to be undertaken, a weedhatch height of least 150mm above the waterline needs to assured. 4.2.7 Hull Integrity Recommendation: Confirm the condition of the weedhatch and, with overplating complete, ensure at least a 150mm waterline distance. 4.3 Rudder and Steering 4.3.1 The rudder is positioned on the external transom and is seen without concern. 4.4 Stern Gear 4.4.1 On weight testing the prop shaft no concerning play was found. ~ The propeller shaft rotated freely by hand and is considered straight and true. ~ The propshaft was not withdrawn for inspection. 4.4.2 The vessel was not seen in water for an assessment of any water ingress through the gland. 4.5 Cathodic Protection 4.5.1 Hull Survey 1 has a good set of anodes with new not seen as required at this time. Hull Survey January 2017 on Hull Survey 1 for Miss Jill Smith Page 4 of 5

5. Summary of Findings Highlighted points contained in the main body of the report are the express opinion of the undersigned surveyor against facts gathered during the survey. As with any vessel, a regular & robust maintenance programme is required. Hull Integrity Requirement 1. It is recommended to overplate the flat keel and extend up both sides of the V base plate by approximately 100mm, using fully welded plate of 5mm nominal thickness. 2. The shallow V base plate needs to be cleared of any protective paint to reveal all pitting corrosion. Areas with material loss greater than 0.5mm should be filled with weld. Alternatively, the shallow V base plate could be overplated using fully welded plate of 5mm nominal thickness. Given the comparatively low cost of steel plate and consideration of time, overplating may be the better option. 3. Overplate the base and lower sides of the gas locker using fully welded plate of 5mm nominal thickness. Hull Integrity Recommendation 1. The skin fittings to the shower and galley waste should be removed by fully welded plate. Shower waste should be routed through an in-line pump to a new skin fitting placed at least 300mm above the waterline. A new galley sink skin fitting should be positioned just below the bottom of the sink. 2. Redundant skin fittings should be removed by fully welded steel plate. 3. Confirm the condition of the weedhatch and, with overplating complete, ensure at least a 150mm waterline distance. Hull Integrity Advisory 1. The hull should be cleared of the thick build-up of protective paint, with new applied. This report, copyright of which is vested in and will remain the property of Ovation Boat Surveys Limited. It is issued without prejudice and is issued in good faith, as a statement of fact ascertained at the time of the survey, during which reasonable care was taken. But it does not constitute either a guarantee or a warranty; as to the condition of parts it was not, for any reason whatsoever possible to see or hear at the time. Nor can responsibility be accepted for any faults or defects subsequently arising. And this Hull Survey Report must not be passed to or sold to a third party without the prior consent of the copyright holder. Chris Williams Director - For Ovation Boat Surveys Limited Hull Survey January 2017 on Hull Survey 1 for Miss Jill Smith Page 5 of 5