PROCUREMENT DOCUMENT QUALITY ASSURANCE REQUIREMENTS

Similar documents
SUPPLIER QUALITY CODES

SUPPLIER REQUIREMENTS FOR QUALITY, DESIGN & MANUFACTURING

Supplier Quality Clauses

PURCHASE ORDER QUALITY SYSTEM REQUIREMENTS

Trident Precision Manufacturing

UNIVERSAL QUALITY NOTE

Special Purchase Order Clauses

PROCUREMENT QUALITY PROVISIONS Revision G January 9, 2017

Atrenne Computing Solutions Quality Clauses

Controlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70

PURCHASE ORDER PROCUREMENT CLAUSES QA25 Rev N Date: 11/13/2016

QUALITY CLAUSES. Real Time Logic, Inc Academy Ridge View, Colorado Springs, CO Phone: (719) Fax: (719)

Rosen Aviation Supplier Quality Assurance Requirements

Supplier Quality Clauses

Apex Industries Inc. 100 Millennium Blvd. Moncton, New Brunswick, Canada E1E 2G8 Purchase Order Quality Assurance Clauses

PURCHASE ORDER QUALITY CLAUSES

Compliance with YFTFC001 Quality System for Manufacturers is required for this Purchase Order.

Supplier Quality Clauses

QUALITY CONTROL INSTRUCTION

Requirements for Suppliers

002 Supplier Quality System Compliance with Rocker Quality System for Suppliers is required for this Purchase Order.

Quality Flow-Down Requirements to Suppliers

Purchase Order Quality Clause SCC40 Revision G, Effective 1/20/2015

AC Incorporated Quality Clauses

Quality Flow-Down Requirements to Suppliers

PPI/TZ Standard Quality Requirements for Suppliers -SQRS-

Orbel Corporation Quality Assurance Provisions (QAP) for Suppliers

Purchase Order Quality Clause SCC20 Revision E, Effective 1/20/2015

ALVA MANUFACTURING PURCHASE ORDER QUALITY CLAUSES

Orbel Corporation Quality Assurance Provisions (QAP) for Suppliers

Supplier Quality Requirements Manual AEC-300

PO QUALITY CLAUSES PRODUCT MUST COMPLY WITH DFARS PREFERENCE FOR DOMETIC SPECIALTY METALS. MELTED IN USA OR QUALIFYING COUNTRY.

APPENDIX A QUALITY ASSURANCE REQUIREMENTS FOR SUPPLIERS

FIDELITY TECHNOLOGIES CORPORATION QUALITY CLAUSES

ThinKom Purchase Order Quality Provisions Number: Q4000 Revision: D

In addition to specific quality clauses listed in the body of the Purchase Order, the following General Clauses apply

NEXT ASSY. USED ON REV DESCRIPTION DATE APPROVED OF SHT

Q NOTE Revision Date Sheet BF 1 8/20/13 1 of 8. Revised / Date Approval / Date: Description: UNIVERSAL QUALITY NOTE

TITLE: TEKTRONIX COMPONENT SOLUTIONS SUPPLIER QUALITY MANUAL

Title: PROCUREMENT QUALITY REQUIREMENTS CWCDS Dayton, OH

THE FOLLOWING GENERAL REQUIREMENTS APPLY ON ALL ORDERS

Satellite Aerospace, Inc. TERMS & CONDITIONS Page 1 of 6

SUPPLIER QUALITY ASSURANCE REQUIREMENTS

A1 The supplier shall operate and maintain an approved Quality System that is subject to approval by Curtiss Wright Defense Solutions Dayton.

L-3 PHOTONICS QUALITY CODES Reference

SHELTON INDUSTRIAL PATTERN INC.

Quality System Document DOC #

TURBO MACH A DIVISION OF VT SAA

QUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised.

QUALITY CLAUSES. As A Minimum The ATP Shall Include: Test Equipment to be used Alternate Test Equipment specified (If applicable)

Purchase Order Quality Clauses

HDL RESEARCH LAB, INC.

HILLPRO LLC PURCHASE ORDER TERMS AND CONDITIONS

SUPPLIER QUALITY REQUIREMENTS

EP-QC Supplier s General Requirements. Revision AH

Supplier Requirements Manual

GKN Aerospace Advanced Composite Structure

REFERENCES (Use latest revision)

ALTA Precision Inc. Quality Procedure

Supplier Quality Codes

Axiom Electronics LLC. Axiom Electronic LLC AS9100 Flow-down Requirements for Suppliers

Revision Date Change Author Change Summary A 04/23/2015 S. Oluwole

Teledyne QPR 001 Electronic Safety Products Rev F Page 1 of 9 QUALITY INSTRUCTION

EP-QC Supplier s General Requirements. Revision AK

MAGNETIC COMPONENT ENGINEERING, INC.

REFERENCES (Use latest revision)

2.1. The Seller s Quality Management System shall ensure all relevant Purchase Order requirements are flowed down to their sub-tier sellers.

Helical Products Company

SL - MONTEVIDEO TECHNOLOGY, INC.

SQR Supplier Quality Requirements TRANSLINE TECHNOLOGY, INC. (TTI) SQRs SUPPLIER QUALITY REQUIREMENTS

Satellite Aerospace, Inc. TERMS & CONDITIONS Page 1 of 5

PP Quality Assurance Procurement Clauses for Suppliers

Supplier Quality Requirements (ASQR)

CTM. SUBJECT: Quality Clauses (Q Clauses) WI The purpose of this work instruction is to control the content of the CTM Quality clauses.

PCB IPC-A 600 PCB IPC- 6012, 6018

1.1 Wesco Aircraft Supplier Quality Flow Down Requirements to Subtier Sources.

Quality Assurance Procurement Clauses and Flow Down Requirements

STANDARD QUALITY REQUIREMENTS FOR SUPPLIERS F05-QP008 Rev A Dated 08/12/2010

PROCUREMENT QUALITY REQUIREMENTS

QUALITY CLAUSES. As A Minimum The ATP Shall Include: Test Equipment to be used Alternate Test Equipment specified (If applicable)

SL - MONTEVIDEO TECHNOLOGY, INC.

Strata-G Solutions Quality Assurance Clauses

Quality Management Systems - Requirements for Aviation, Space and Defense Organizations (AS9100)

STRAN Technologies Quality Notes

MAGNETIC COMPONENT ENGINEERING, INC.

PROCUREMENT QUALITY REQUIREMENTS

AEROJET PURCHASE ORDER QUALITY CLAUSES (FULL TEXT) CONTENTS

Procurement Quality Requirements

Type : Quality Procedure: Q - 023CLR Titre / Title: Flow Down of Additional Requirements Revised Date: May

VOLTAGE MULTIPLIERS, INC. QUALITY SUPPLEMENT TO PURCHASE ORDERS

Supplier Quality RUSSTECH Purchase Order Clauses (RPOC s)

Supplier Quality Requirements (SQR)

TABLE 1 PCB IPC-A 600 PCB IPC- 6012, 6018

Strata-G Solutions Quality Assurance Clauses

1.0 Purpose. 2.0 General notes 3.0 QUALITY SYSTEM REQUIREMENTS. Approved by: G. Stugart Prepared by: Schelert

Procedure Documentation

Purchase Order Quality Requirement Clauses

Supplier Quality Manual

Transcription:

Document Title Document Number PROCUREMENT DOCUMENT QUALITY ASSURANCE REQUIREMENTS STO-QR-0310 Rev. Change Order Checked by: Date Approved by: Date Safety* Date C REVISED PER TR 0051-96 XXXX XX M. Devoe 3/28/96 --- --- D REVISED PER DCO 98-0761 XXXX XX M. Devoe 11/9/98 ---- --- E REVISED PER DCO 01-0133 XXXX XX S. St.Hilaire 4/30/01 ---- --- F REVISED PER DCO 01-0370 XXXX XX S. St.Hilaire 3/8/02 ---- --- G REVISED PER DCO 03-0123 XXXX XX B. Christie 5/8/03 ---- --- H REVISED PER DCO 03-0209 XXXX XX S. Francisco 5/30/03 ---- ---- J REVISED PER DCO 05-0371 XXXX XX M. Culmone 8/3/05 ---- ---- K REVISED PER DCO 06-0014 XXXX XX W. Eckel 1/9/06 ---- ---- L REVISED PER DCO 06-0025 XXXX XX M. Culmone 1/16/06 ---- ---- M REVISED PER DCO 06-0126 XXXX XX J. Anderson 2/13/06 ---- ---- N REVISED PER DCO 06-0213 XXXX XX W. Eckel 3/20/06 ---- ---- P REVISED PER DCO 06-0512 XXXX XX K. Olivieri 9/6/06 ---- ---- R REVISED PER DCO 06-0685 XXXX XX S. St.Hilaire 11/13/06 ---- ---- T REVISED PER DCO 06-0736 XXXX XX S. St.Hilaire 11/30/06 ---- ---- U REVISED PER DCO 07-0155 XXXX XX M. Culmone 2/27/07 ---- ---- V REVISED PER DCO 07-0702 XXXX XX M. Culmone 10/29/07 ---- ---- W DCO DATABASE SKIPPED REV. W, THEREFORE IT CANNOT BE USED Y REVISED PER DCO 09-0204 XXXX XX S. St.Hilaire 2/21/08 ---- ---- AA REVISED PER DCO 09-0204 D. Wadleigh 5/19/09 S. St.Hilaire 5/18/09 ---- ---- AB REVISED PER DCO 09-0428 S. St.Hilaire 10/21/09 K. Olivieri 10/21/09 ---- ---- *If procedure is an STO-MP (Manufacturing Procedure), the Facilities Safety Officer must also initial and date each revision. (STO-F-1019 REV. E)

Rev. Change Order Checked by: Date Approved by: Date Safety* Date AC REVISED PER DCO 10-0036 D. Wadleigh 2/3/10 S. St.Hilaire 2/3/10 ---- ---- AD REVISED PER DCO 10-0277 D. Wadleigh 5/21/10 S. St. Hilaire 5/21/10 ---- --- REVISED PER DCO 11-0358 S. St. Hilaire 8/25/11 J. Watson 8/25/11 ---- ---

Page: 1 of 3 PROCUREMENT DOCUMENT QUALITY ASSURANCE REQUIREMENTS Reference should be made on the - purchase order or request for quote, which incorporated this attachment, to determine which of the codes listed below are applicable. CODE A SOURCE INSPECTION is required prior to shipment from your plant. Notify the cognizant Crane Electronics, Inc. buyer four (4) days in advance of date material is ready for our inspection/test. CODE A1 Supplier shall provide accessibility to their facility for s customers, as well as their customer s. CODE B - The supplier system shall have in place the requirements for an ESD control program in accordance with ANSI/ESD-S-20.20 to minimize the effects of ESD on parts, assemblies, and equipment. CODE B1 The supplier shall have in place the requirements and training for a zero ESD control program in accordance with ANSI/ESD-S-20.20 to eliminate the effects of ESD on parts, assemblies & equipment. CODE C - CERTIFICATES OF CONFORMANCE - Required from the supplier stating that the shipment of articles on this order conform to applicable material and/or process specifications. Supplier must retain on file, material test results and process records, as applicable, including his supplier and their supplier certifications. These records must be maintained for ten (10) years, and available upon request or as required on the purchase order. CODE D - TEST/ INSPECTION DATA - Supplier shall provide a complete set of Test/Inspection Data as recorded during acceptance test for purpose of quality analysis with each shipment. CODE E - FIRST PIECE INSPECTION - Supplier first piece inspection is required on three (3) pieces of the first lot to be shipped on this order. Vendor is to submit a complete inspection report with the parts. CODE F - CONFIGURATION CONTROL - No changes to product drawings or processes are to be made without s approval. Supplier requested changes/deviations shall be submitted using STO-F-1241, Supplier Change/Deviation Request Form, sent to the Crane Electronics, Inc. s buyer. CODE G - STATISTICAL PROCESS CONTROL - Supplier shall provide with each shipment, evidence of variable or attribute measurements, as applicable, for the purpose of quality analysis. CODE H - SHELF LIFE MATERIALS - Supplier shall provide shelf life materials with a life duration beginning on receipt date at. Shelf life shall be noted on Certificate of Conformance by the supplier. MSDS required. CODE J - CERTIFIED PROCESSES Contract manufacturers shall have personnel performing special processes, such as Soldering and Bonding, certified for proof of proficiency. CODE K - The requested method by, for shipping/storing of raw piece parts is to use anti-static bags, metal in, type bags. The bag(s) shall meet or exceed the requirements of MIL- PRF-81705D Type III, EIA 625, MIL-HDBK-263, MIL-STD-1686, ANSI/ESD-S20.20, and EOS/ESD

Page: 2 of 3 standards. All product packaging shall prevent damage to the product; physically and environmentally. CODE L PREFERENCE FOR DOMESTIC SPECIALTY METALS This purchase order incorporates Group Purchase Order Terms and Conditions which impose requirements with which you must comply when filling this purchase order. Also, this purchase order incorporates the contract clause at DFARS 252.225-7014 (Deviation No.2006-O0004; or Deviation No. 2007-O0011; or Deviation No. 2008-O0002) and/or DFARS 252.225-7014 Alt. l and/or DFARS 252.225-7014 Alt. l (Deviation; or Deviation No.2006-O0004; or Deviation No. 2007-O0011; or Deviation No. 2008-O0002) (applicable to prime contracts entered into after November 15, 2006), which you must flow down to all of your vendors that supply any articles delivered under this purchase order that include specialty metals. Both clauses provide the same definition of specialty metals and prohibit Crane and all of its suppliers at every tier from incorporating specialty metals into military parts, components and/or end item deliverables unless the specialty metals have been melted (the Deviation clause adds or produced ) in the United States, its outlying areas, or a qualifying country listed in DFARS 225.872-1. Exemptions to requirements of the above clauses may exist, as outlined in the clauses themselves or by operation of applicable Department of Defense Domestic Non-Availability Determinations (DNADs) posted on its public web site for that purpose (http://www.dcma.mil/dnad/) if you believe an exemption(s) apply, please specify the specifics and provide Crane with documents and information sufficient to demonstrate your entitlement thereto. CODE M The use of pure tin as a finish is prohibited. Finishes containing tin must have a minimum of no less than 3% lead. CODE N The supplier shall comply with the following unless otherwise approved by Crane. NADCAP Approved Processor Plating, surface finishes or conditioning shall be performed by an approved NADCAP (National Aerospace and Defense Contractors Accreditation Program)** processor in the applicable plating, surface finish or conditioning process. **List of NADCAP approved can be found at www.eauditnet.com by creating an account. Upon access, refer to Buyer s Guide in the Public Documents. CODE P All components, equipment or materials used in the procurement of stated purchased items must not result in the evidence of fungus growth on any surface. This requirement must be verified by analysis and/or test. The analysis to include supplier certifications of potentially fungus nutrient materials, if supplier certifications are unavailable a representative sample of exposed coatings, cables, gaskets, and other potentially fungus nutrient materials shall be subjected to MIL-STD-810, Method 508.5.

Page: 3 of 3 CODE R The Supplier shall establish and maintain an effective Foreign Object Damage (FOD) Prevention Program to reduce FOD using NAS412 as a guideline. The material supplied on this PO shall be manufactured in an environment free of foreign objects. Additionally, the material supplied shall be free of foreign objects. CODE T SUPPLIER FLOW-DOWN - ALL Quality Codes listed on the Purchase Order are required to be flowed down to the Supplier s sub-tiers, when used. CODE W TOOLING AND/OR PROCESS CONTROLS Supplier shall notify the buyer for any of the following occurrences: Use of tooling that has not been in production for 1 year or more. Rework, refurbishment or replacement of any portion of the tooling used to produce the Purchase Order item. Any manufacturing process changes that alters the configuration, composition or physical properties of the produced item. Post notification the buyer will advise the supplier of a need for: First piece sample, new mold, die or tooling analysis. Buyer acceptance does not constitute acceptance of subsequent items or relieve the supplier from any obligations in compliance with the purchase order requirements.