TF-14. TF-14 Installation Guide

Similar documents
TFX - Toggle Lock Installation Guide

Installation Instructions

TF-14. Trench Drain Forming System Design Manual. Today s Hydraulic Solutions

Zurn Z886. 6" Perma-Trench. Installation Instructions

Linear Drainage Z886. Perma-Trench. Installation Instructions. 100mm Clear Opening

INSTALLATION GUIDE PLEASE READ ENTIRE INSTRUCTION MANUAL BEFORE PROCEEDING!

LINEAR DRAINAGE. Z886 Perma-Trench. 6" Perma-Trench Installation Instructions

Linear Drainage ZF806 ZF812

PLEASE READ ENTIRE INSTRUCTION MANUAL BEFORE PROCEEDING!

II TECHNICAL INSTALLATION GUIDE

Zurn Z874. Trench Drain System. Installation Instructions

Zurn Z874. Trench Drain System. Installation Instructions

INSTALLATION INSTRUCTIONS

FLO-THRU ACCESSORIES Above are some of the trench drain components typical to an installation. Double check your order to ensure that you have all com

Trench Former 7 HD200 J / 300 J

Pre-Sloped Drain System

Trench Former 7 MD200 TM / 300 TM

ZURN INDUSTRIES, INC., FLO-THRU DIV.,

ACO DRAIN Site Installation Manual

Precast Concrete Trench Drain Systems INSTALLATION INSTRUCTIONS

Installation Guide. MEA-JOSAM 300 Size Pro-Plus Trench Drain

TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:

SECTION TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:

TrenchFormer TFX 6" - 24" Enhanced Heavy Duty Trench Drain Forming Systems. Pre-Engineered Concrete Forming Systems

Above are some of the trench drain components typical to an installation. Double check your order to ensure that you have all components particular to

SECTION PLUMBING DRAINAGE AND CONTAINMENT. Copyright Specialloy Industries Inc. dba Slot Drain Systems - All rights reserved

TraffikDrain. 2 bolts per half meter grates for removable grate option

PolyDrain. Pre-Engineered Surface Drainage. Installation Guide

Installation Guide. MEA-JOSAM 100 & 200 Size Pro-Plus Trench Drain

Installation Manual. ArchCast Bridge. 3-Sided Precast Concrete Bridge Structure

Installation Guide. MEA-JOSAM Pro-Plus Trench Drain

FreeStyle Linear Drain with Full Mortar Bed Adapter Kit

DETAIL INSTRUCTION No. 1

INSTALLATION CHECKLIST 2 ND EDITION. Fox Blocks Abbott Drive Omaha, NE

INSTALLATION MANUAL KOCH

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1

5.0 NUDURA PRODUCTS ON SITE STORAGE PACKAGING, UNIT ASSEMBLY, USAGE

A-ONE Insulated Forms Installation Manual

DRAINAGE SOLUTIONS SINCE 1908 SURFACE DRAINAGE. Installation Guide ARMTEC.COM

Series. 26 Wide NEENAH Unbolted Heavy Duty Trench Drain Grates and Frames

Before You Get Started, You Will Need

Multi-Piece Shower with Trench Drain

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )

Premier Railroad Grade Crossing Installtion Guide PREMIER RAILROAD GRADE CROSSING INSTALLTION GUIDE GUIDE GROUNDED IN STRENGTH

SECTION ALUMINUM HANDRAIL SYSTEMS

Important: Before You Start

SECTION NON-STRUCTURAL METAL FRAMING

SENTINEL BARRIER - GENERAL INSTALLATION GUIDELINES

Multi-Piece Shower with Trench Drain

VALLECITOS WATER DISTRICT SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE

Enviro-Flo II Trench Drain System Competitive Comparison Guide

SECTION STORM DRAINAGE

SECTION CONCRETE FORMWORK AND ACCESSORIES

simple, efficient, and cost effective floor and surface drainage system

The Most Advanced Name in Water Management Solutions TM. The most cost-effective slotted and trench surface drain systems.

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER

Multi-Piece Shower with Trench Drain

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

The Modern and Cost-Effective Solution for Track & Field Drainage and Player Safety TERMINATOR

Rough-in frame and flush-mount panel installation instructions

Welcome: What is U Drain? Drain Materials. Cost Comparisons

Reinforced Earth wall Construction Manual

SECTION CONCRETE FORMWORK

1 PVC or ABS drain with strainer

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS. A. Formwork complete with shoring, bracing and anchorage.

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

Table of Contents. 1 Introduction. 2 Description. 3 Tools and materials. 4 Footings or slabs. 5 Coursing placement. 6 Reinforcing steel

INSTALLATION INSTRUCTION FOR ACOUSTIC ENCLOSURES

N Scale Double Track Lift Bridge v1.2

Strengthened Soil Wall Construction Manual

Welcome: What is U-Drain? Drain Materials. Flow

SECTION UTILITY MANHOLES AND STRUCTURES

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

SECTION STORM SEWER COLLECTION SYSTEM

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

METALWorkS. RH200 Custom Hook-on Panels. General Installation Instructions. Ceiling 1.0 GENERAL Site Conditions Product Description

SECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller.

BioPrism Solid Surface

Site Preparation... 2

High Performance Insulating Concrete Form

WCU ALUMNI TOWER MASONRY & ENVELOPE REPAIRS

10 EXTREME BASEMENT PANELS

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

6x5. Assembly Manual CAUTION. Sharp Edges PATENTS ARE PENDING. Building Dimensions. Approximate Size. Storage Area. Interior Dimensions

PRODUCT INFORMATION Dero Hoop Rack

SECTION HANGERS AND SUPPORTS FOR PLUMBING

Underground Exhaust System

A. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets.

SYSTEMS LTD. Leader in Linear Drain Solutions. A Publication of. Page 1. Randy Franzke. Cellar Master Supplies. Phone:

C.R. LAURENCE CO., INC. Intelli-Track SPS. Phase One - Installation Instructions

1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards.

COMPOSITE (WPC) ENGINEERED VINYL FLOORING INSTALLATION

Guide Specification. Dayton Superior, plastic and elastomeric architectural form liners. Select paragraphs below applicable to project.

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu

Smarter. Safer. Leaner.

SECTION STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM

SMITH/ACO DRAINAGE SYSTEMS

UNIVERSITY OF MISSOURI Hydronic Energy Distribution 2016 Q1

Union County Vocational - Technical Schools Scotch Plains, New Jersey

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER. OPR:CT 1 of 5 APPR:JAR:DBP: FHWA:APPR:

Transcription:

TF-14 Trench Drain Forming System Installation Manual TF-14 Installation Guide P.O. Box 837 # 259 Murdock Road # Troutman, NC 28166 Tel (704) 528-9806 # Fax (704) 528-5478 Toll free in the U.S., Canada, and Mexico (800) 438-6057# www.abtdrains.com

www.abtdrains.com CONTENTS General Installation Tips....................3 Tools............................3 TF-14 Identification.....................4 Excavation........................5 System Pre-Assembly...............5 Component Placement..............6 Pipe Connections..................7 L-Rails...........................7 T-Rails...........................8 Catch Basins......................8 Concrete Placement................9 Deforming........................9 Special Cast Iron Frame & Grate...........10 2

BEFORE YOU BEGIN Toll Free: 800-438-6057 Installation Tips # Avoid costly mistakes! Read all installation notes pertaining to your particular type of installation before starting the job. # Trench excavation must allow for a minimum of six inches of bedding concrete to be placed under and alongside thetrench Former. In all cases, the thickness of the bedding concrete must be 6 or greater than that of the surrounding floor slab or pavement. # Lay out the Trench Former sections (in numerical sequence) along the trench excavation prior to installation. Consult the construction plans or shop drawings for correct numerical sequence. # Make the pipe connections and set the catch basins prior to Trench Former installation. # Begin the installation at the outlet or discharge end of each run and work backwards (upstream). Each form has a label on the deep end indicating the direction of flow. # If the Trench Former is to be installed in a structural or reinforced thick slab, follow the designer s or structural engineer s recommendations for bedding concrete and steel requirements. # Apply form release with a brush. # Consult engineer regarding expansion and control joints. #Do not use a petroleum based form release, as it will severely attack the foam. Tools # Large and small hammer # Stringline # Level # Wood or steel grade stakes # Hack saw # Hand saw # Pliers # 16 GA tie wire # Form release agent (not petroleum-based) #Brush and stir stick for form release #Wire cutters #Spade or flat shovel # Pry bar #2x4 lumber 3

www.abtdrains.com BEFORE YOU BEGIN CAST GRATE (Various Styles Available) BOLT CROSS TIE ALIGNMENT CLIP RAIL FORMER DUCTILE IRON LOCK TOGGLE NUT ANCHOR STUD DEFORM GROOVE END RAIL N0-FLOAT LEGS TF -14 COMPONENTS # Verify that all necessary components are on site before beginning the installation. # Refer to the shop drawing for Trench Former and rail layout numbers. Former Trench Former profiles arrive in a protective, expanded polystyrene (EPS) billet which serves as their shipping container. Forms are removed by pulling out nails and breaking off glue spots at top, then pushing on the shallow end. Part numbers and flow direction are marked on the deep end of each section with a color coded label. Minor damage to the Trench Former profiles on the top and end surfaces is of no consequence. If, during handling, Trench Former sides or bottom should be damaged, repairs can be done on site. Pieces of the EPS dunnage or scrap can be fitted to damaged area and taped or glued in place, or aerosol foam insulation can be applied, then trimmed to conform to the original shape. Test adhesive on a scrap piece to be sure that it does not attack the foam. 4 Rails For each Trench Former section, two rail sections are used. Right and left rails are identical and are not distinguished from each other. Each eight foot rail has anchoring studs on 11 inch centers and three tabs for attaching no-float legs. Each section receives three equal length no-float legs. Only when a trench enters a catch basin, is an additional catch basin leg used in place of the last trench leg. Depending on the specific layout, shorter length rails may be used and rail and Trench Former lengths may not match. Refer to shop drawings for detailed instructions. Accessories Check that the appropriate quantities of grates and grate locking devices are present. If trench end frames are provided, locate those pieces.

TF-14 INSTALLATION Toll Free: 800-438-6057 Excavation T = Thickness of slab design Excavation must provide for a minimum of six inches on both sides of the Trench Former and nine inches on the bottom. Bottom allowance includes a one inch clearance for the no-float legs, a non-structural anchoring slab which covers the no-float legs with two inches of concrete, and a six inch thick trench floor. Structural design considerations may dictate a greater amount of encasement concrete. Eg: 15" slab - 15" of encasement concrete. Please consult your structural engineer. In this case, longer no-float legs may be required. Consult plans, specifications and shop drawings for actual excavation depth. Slope the bottom of the excavation to match the Trench Former profiles provided. Remember, each eight foot section has three equal length no-float legs. Therefore, the excavation should be a series of twenty-four foot (24 ) long step-down sections, each section being slightly deeper than the distance from the top of the rail to the bottom of the no-float legs, unless neutral sections are used. Where soil conditions allow, trench walls may be excavated vertically, eliminating shoring for deeper trenches. System Pre-Assembly Lay out the Trench Former and rail sections along the excavation. Trench Former sections should be laid out in the proper numerical sequence. Trench Former and U-legs are colorcoded for easy assembly. Match the color of the thread caps on the nofloat legs to the color of the part number marked on the end of the form. Attach the legs to the rails by running a nut to the end of the threads, inserting threads through opposing rail brackets and then firmly securing with another nut, ensuring top nut is flush with top of leg. Apply the Trench Former Release to bottom and sides of the Trench Former. Donot use a petroleum based form release it will severely attack the foam. Spread the rails open, position the Trench Former between them and insert the flange of the rail into the groove on each side of the Trench Former. Trench Former cross ties are inserted into holes in flange and tapped into place. For secure snug fit, bend cross tie under flange with pliers. This will help ensure a uniform and parallel grate seat area. 5

www.abtdrains.com TF-14 INSTALLATION Component Placement The suspended method is the most widely used installation. This method involves suspending the Trench Former assemblies in the excavation using 2 x 4 lumber and wooden or steel grade stakes. Using tie wire, attach a length of supporting lumber across either end of the first Trench Former assembly. The lumber should be long enough to reach the grade stakes which are driven into the soil outside the excavation. Place the assembly into the excavation, set the top of the angle rail to finish grade and attach the supporting lumber to the grade stakes. The no-float legs should be suspended just above the floor of the excavation. They should not rest on the soil. They are designed as anchoring devices, not as support legs. Note, that the ends of all rail sections of standard TF 14 are punched to accept an alignment clip. Use of these alignment clips ensures correct and accurate longitudinal alignment of adjacent rails. To position subsequent sections, tap clips onto the rail ends of one section, then push rail end of the next assembled section into these clips until the rails lock into place. When clips are locked, the sections will be butted together. Suspend the free end of the assembly from another 2 x 4 board, adjusting to finish grade. To assist in longitudinal alignment, 2 x 4 s can be fitted to alignment groove in the top of the Form, preferably at joint locations. When all sections are in place, install the closing end frames provided by tapping the clips firmly onto both rail ends until they are completely seated. 6

TF-14 INSTALLATION Toll Free: 800-438-6057 Pipe Connections 90 Miters with L-Rails Vertical discharge piping should be installed at this time. Horizontal discharge or inlet piping may be installed after the anchoring slab is poured. Trace the outside of the pipe at the proper location on the Trench Former profile and cut a hole approximately 1.5" deep in the foam. Remove the plug and shape the inside to accommodate the end of the pipe. To prevent concrete from entering the pipe, cover the end with duct tape and embed it in the Trench Former profile. Insert the pipe firmly into the recess. The L-rail is used for right or left turns in a continuous trench run. The part incorporates an integral grate bridge for carrying the loads across the open trench span and is designed to use four feet of Trench Former. Cut the appropriate Trench Former section according to the diagram (left) and fit the Trench Former into the L-rail before assembling the L-rail to adjacent rails. Note that foam section C is notched to allow this section to slide under the grate bridge. All three cut foam sections should be captured by the rails when in the proper position, eliminating the need for gluing or taping the sections together. This cutting method will provide a proper transition at the radius bottom of the miter. 7

www.abtdrains.com T-Rails TF-14 INSTALLATION Catch Basins A T-rail is typically used when an auxiliary run flows into the side of a main trench run. The T-rail can be inserted into the layout of a trench run at any point. It also utilizes the grate bridge for H-20 load carrying capability. The rail is four feet long and is used in conjunction with an opposing four foot rail (#1494) or another T-rail to create a crossing trench layout. Wherever possible, the intersecting form should be a minimum of six part numbers less than the main trench run. This will keep the intersection within the vertical sidewall of the main run and eliminate complex cuts. The leading edge of the intersecting run should be notched to fit under the rail of the main run. The notch is to be 1 3 /4" deep and 1 1 /4" long. (Factory assistance can be provided for more complicated layouts.) Catch basins are installed by the same methods as the trench and are provided with deform grooves for easy removal. Pre-assemble the two foot long rails (#1492) with the appropriate nofloat legs and insert the foam form as with the trench. Locate and install the end frames by aligning the clips with the punched rail ends and tapping the end rail until seated. In line catch basins (#1900 series) attach to trench sections in the same fashion as adjacent trench sections. When a large catch basin (#1600 series) is used as a termination point of a trench, be sure to install the special end rail with receiver clips on the upstream end of the catch basin. These clips are positioned to accept the downstream end of the trench rails. Procedures for the anchoring slab and final concrete placement are the same as for the trench. Deforming of in line catch basins should be done last to facilitate access to the deep part of the catch basin. Stand alone catch basin forms should be removed starting at the center and working out toward the edges. The deform grooves will assist in releasing the form in large sections. 8

TF-14 INSTALLATION Toll Free: 800-438-6057 Concrete Placement Deforming T = Design thickness of slab design Pour an anchoring slab wall to wall in the bottom of the excavation. High slump or plasticizer enhanced concrete can be used to improve flowability. This concrete is not part of the structural slab. The slab should cover the nofloat legs with two inches of concrete and should be the full length and width of the trench. Care should be taken to avoid chuting concrete against the Trench Former profiles as this can cause misalignment of the sections. Allow the anchoring slab to set hard. Note that the embedded no-float legs provide significant lateral stability. However, leaving some supporting lumber in place is desirable in order to eliminate lateral shift. Concrete for trench bottom and sides can now be placed monolithically. Proper vibratory technique will assure a smooth trench wall finish and proper concrete support under the rails. If the no-float legs are properly anchored with an anchoring slab, the Trench Former is guaranteed not to float. Cut and remove the cross ties. The top edge of the rails can be used as a screed point when finishing the adjacent concrete. The concrete should set for 24 hours, but does not have to be fully cured before deforming. Starting at the shallow end of the trench, plunge a large pry bar into the center of the form and pull towards you until the V-shaped section lifts free. Remove and discard this section. With a flat shovel or spade, remove the remaining side sections of the form. ANGLE FRAME LOCK TOGGLE GRATE Remove all the foam debris from the finished trench and install the gratings and locking devices. NOTE: The Trench Former can be left in place until the trench is put in service. This will eliminate hazardous open pits onsite and will keep gratings clean until construction is completed. If fluids will be entering the trench during construction, deform the outlet end and open the masked end of the outlet pipe to avoid standing water. 9

www.abtdrains.com INSTALLATION COST SAVINGS TRENCH DRAIN COST BUILD-UP CAST-IN-PLACE vs TF-14 Job size lf CAST IN ITEM PLACE TF-14 1. Excavation a. Backhoe hrs @ $ per hr 2. Materials a. 2 x 4 for handforming pcs @ $ ea NA b. 5/8 plywood shts @ $ ea NA c. 1 3/4 x 1 3/4 x 1/4 angle iron lf @ $ per lf NA d. Waterstop, 4 x 3/16 ribbed w/bulb lf @ $ per lf NA e. Concrete - in place,.074 cy/lf yds @ $ per yd f. Grates - in wide lf @ $ per lf g. TF-14 System Complete lf @ $ per hr NA h. 2 x 4 for suspending lumber pcs @ $ ea NA 3. Labor - cast-in-place (rate = 50 lf/day) a. Carpenters ppl x hrs @ $ per hr NA c. Laborers ppl x hrs @ $ per hr NA Form, hang rails, install waterstop, strip, set grates b. Finishers ppl x hrs @ $ per hr NA Patch and grout-in slope 4. Labor - TF-14 (rate = 320 lf/day) a. Carpenters 1 ppl x 0.0 hrs @ $ per hr NA c. Laborers 1 ppl x 0.0 hrs @ $ per hr NA Assemble and set forming system, strip TOTALS $ $ 10 Savings with TF-14 $

NOTES Toll Free: 800-438-6057 11

For technical assistance contact the ABT Sales Support Team at 800-438-6057 CAST GRATE (Various Styles Available) BOLT CROSS TIE ALIGNMENT CLIP RAIL FORMER DUCTILE IRON LOCK TOGGLE NUT ANCHOR STUD DEFORM GROOVE END RAIL N0-FLOAT LEGS TF -14 COMPONENTS The information contained within is believed to be accurate but not guaranteed to be so. The customer should evaluate the suitability and safety of these products for any application. ABT assumes no liability for the end results since the conditions of installation and use are beyond the control of ABT. Concrete specifications, placement, reinforcement and structural considerations are the responsibility of the customer. ABT reserves the right to change the price, availability, specifications, and content of any of its products, literature or other information in all media at any time without notification. PO Box 837 n 259 Murdock Road n Troutman, NC 28166 n TEL 704-528-9806 n FAX 704-528-5478 Toll Free 800-438-6057 n Email:sales@abtdrains.com n www.abtdrains.com ABT, Inc. Printed in the U.S.A. 5/03