Update on Michigan Air Pollution Control Rules and Policies. MMEA Fall Conference October 4, 2017

Similar documents
TECHNICAL FACT SHEET September 24, 2018

Air Permi>ng: A Major Piece of the Puzzle or Trying to Keep All of

NSR Program for PM-2.5 NAAQS. Overview of Potential Proposal

DTE Electric Company Belle River Combined Cycle Power Plant

Air Pollution Control Program Permits Section

New Source Review Reform: What Lies Ahead

Biomass Emissions Permitting in Pennsylvania

NSR/PSD Reform: Does Reform Have Legs this Time?

Michigan Department of Environmental Quality - Air Quality Division ADDITIONAL TECHNICAL INFORMATION FOR BOILERS

CHP, Waste Heat & District Energy

PUBLIC PARTICIPATION DOCUMENTS For DCP Midstream, LP Hamilton Township, Michigan

PM2.5 NAAQS Implementation & Permitting in Georgia

TECHNICAL FACT SHEET June 19, 2018

PUBLIC PARTICIPATION DOCUMENTS For Holland Board of Public Works Holland, Michigan

NAAQS Update. Amy Marshall March 22, 2016

Clean Air Act Emission Limits

An Overview of GHG PSD Permitting. Melissa Hillman Managing Consultant Trinity Consultants

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. November 8, PERMIT TO INSTALL No A

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. March 17, 2004 NEW SOURCE REVIEW PERMIT TO INSTALL

PERMIT APPLICATION REVIEW SUMMARY

PUBLIC PARTICIPATION DOCUMENTS For

Michigan Department of Environmental Quality Air Quality Division RENEWABLE OPERATING PERMIT STAFF REPORT

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. November 15, 2013 PERMIT TO INSTALL

Table of Contents. (a) APPLICABILITY... 1 (b) EXEMPTIONS... 1 (c) DEFINITIONS... 1 (d) STANDARDS... 2

Minor Source BAT Programs

STATEMENT OF BASIS for NEWARK BAY COGENERATION PARTNERSHIP L.P.

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. November 19, 2009 PERMIT TO INSTALL B. ISSUED TO Musashi Auto Parts MI, Inc.

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. June 16, 2016 PERMIT TO INSTALL 71-03C ISSUED TO JBS USA

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. September 17, 2015 PERMIT TO INSTALL A

PUBLIC PARTICIPATION DOCUMENTS For Flakeboard America Limited, dba ARAUCO North America Grayling, Michigan

Air Regulations Impacting the Pipeline Industry

STATEMENT OF BASIS. For the issuance of Draft Air Permit # 1987-AOP-R4 AFIN:

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. January 26, NEW SOURCE REVIEW PERMIT TO INSTALL No.

Understanding the Permitting Impacts of the Proposed Ozone NAAQS

The 3 N s of Air. Diane H. Leche Air Permit Coordinator ExxonMobil Baton Rouge

Firnuently Asked Questir is rega 'ding. Act 1302 Implcmertation. Auzu-t 7, 2013

Table of Contents. (a) APPLICABILITY... 1 (b) EXEMPTIONS... 1 (c) DEFINITIONS... 1 (d) STANDARDS... 2

PSD Background Presentation

PERMIT TO INSTALL. Table of Contents

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. October 6, NEW SOURCE REVIEW PERMIT TO INSTALL No

Serving Two Masters; Understanding Texas and EPA Permitting Programs

Single-Source Impacts on Secondary PM 2.5 Formation A Case Study

MICHIGAN DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENT AIR QUALITY DIVISION. March 31, PERMIT TO INSTALL No A

Michigan Guide to Air Use Permits to Install

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. October 24, 2005 PERMIT TO INSTALL

NSR Update/Permit Streamlining

The Supreme Court and EPA Carbon Rules. Michael B. Gerrard Environmental and Energy Study Institute briefing March 6, 2014

SUNY Westchester Community College Air Emissions Permit Program Latest Revision Date January 2, 2016 Previous Revision Date June 12, 2015.

New Source Review (NSR) Program Review Questionnaire May 14, 2003

Naughton Power Plant. Chapter 6, Section 2 Construction Permit Application. Submitted to the Wyoming Air Quality Division And Prepared by

DTE Gas Company - Belle River Mills Compressor Station SRN: B6478. Located at Puttygut Road, China, Saint Clair County, Michigan

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. February 3, NEW SOURCE REVIEW PERMIT TO INSTALL No.

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. July 24, 2015 PERMIT TO INSTALL ISSUED TO St. Marys Cement, Inc.

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. May 14, 2015 PERMIT TO INSTALL ISSUED TO Cherished Memories Pet Cremation

Who is a Major Source?

Understanding the NAAQS and the Designation Process

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION MARCH 16, 2004 NEW SOURCE REVIEW PERMIT TO INSTALL 25-03A

Eastern Kern Air Pollution Control District

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. October 20, 2011 REVISED March 15, 2012 PERMIT TO INSTALL 16-11

FINAL DETERMINATION. To Grant a. Temporary Permit/Non-Attainment New Source Review Permit. For. Concord Steam Corporation.

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. November 29, 2016 PERMIT TO INSTALL ISSUED TO Neenah Paper, Inc.

Comments on ADEQ s NAAQS SIP/Minor NSR Permitting Guidance Document

EPNG is herein providing supplemental environmental information, including certain attachments, intended to clarify previously submitted data.

PERMIT TO INSTALL. Table of Contents

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. August 22, 2017 REVISED September 27, 2017 PERMIT TO INSTALL 99-17

PERMIT TO INSTALL. Table of Contents

New Source Review Staff Presentation Community Advisory Council

APPENDIX D MODELING AND DEPOSITION ANALYSIS

Michigan Department of Environmental Quality Air Quality Division RENEWABLE OPERATING PERMIT STAFF REPORT. General Motors LLC - Orion Assembly Plant

Air Permitting for Major Sources/Title V (Part 2)

CITY OF SPOKANE VALLEY Request for Council Action

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

North Central Indiana Air Quality Update

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. January 27, 2017 PERMIT TO INSTALL ISSUED TO Knoll, Inc.

Rule PREVENTION OF SIGNIFICANT DETERIORATION

ENVIRONMENTAL PROTECTION AGENCY. 40 CFR Parts 52 and 81. [EPA-R05-OAR ; FRL Region5]

MPCA Citizens Board. Michael Sandusky Director Environment Analysis and Outcomes Division

STATEMENT OF BASIS. NAICS Description: All Other Miscellaneous Chemical Product and Preparation Manufacturing NAICS Code:

Designation Categories

An Overview on GHG PSD Permitting

SLIDES: Details of the Regulatory Framework: Air Quality Regulation of Oil and Gas Development

AIR QUALITY PROGRAM. Policy for Air Toxics Review of Installation Permit Applications

PERMIT TO INSTALL. Table of Contents

ATTACHMENT-3 NEW JERSEY EMISSION OFFSET RULE FORMER SIP PROVISIONS

Evaluation of Gas Turbine Air Quality Impacts from a Community Perspective

ATTACHMENT-1 BACKGROUND:

TITLE V OPERATING PERMIT STATEMENT OF BASIS

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. April 17, 2018 PERMIT TO INSTALL B. ISSUED TO Motus Integrated Technologies

Technical Manual Guideline on Air Quality Impact Modeling Analysis

Implementation Updates for 2015 Ozone NAAQS

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. September 22, 2017 PERMIT TO INSTALL 18-07A. ISSUED TO Anchor Coupling

PROPOSED ADOPTION OF RULE 3.25, FEDERAL NEW SOURCE REVIEW FOR NEW AND MODIFIED MAJOR PM2.5 SOURCES FINAL STAFF REPORT

Municipal Solid Waste Landfill Air Regulation Updates Scott Martin, P.E. Burns & McDonnell July 1, 2014

Fourth Session Other Aspects of PSD and Title V Permitting

2:10-cv BAF-RSW Doc # Filed 09/06/13 Pg 1 of 32 Pg ID 7308 UNITED STATES DISTRICT COURT FOR THE EASTERN DISTRICT OF MICHIGAN

RULE Prevention of Significant Deterioration Adopted 9/24/84, Amended 11/18/85, 9/2/99, Amended 1/12/12 (Effective 2/8/13)

Time Again for NSR/PDS Reform? David Shanks 2017 Missouri Air Compliance Seminar March 2, 2017

A Review of Air Construction Permit Requirements for Pellet Production Facilities

Final Updates to National Ambient Air Quality Standards (NAAQS) for Ozone. October 2015

Transcription:

Update on Michigan Air Pollution Control Rules and Policies MMEA Fall Conference October 4, 2017

Rhiana C. Dornbos, PE Project Engineer Air Quality Permitting and Compliance 517-702-2953 616-265-5755 rdornbos@nthconsultants.com 2

Agenda Michigan Rule Changes AQD Policy and Procedures Air Permitting Developments Ozone Nonattainment Designations Dispersion Modeling Regulatory Horizon 3

Michigan Rule Changes

Changes to Air Pollution Control Rules Effective December 20, 2016 Goals: Clarify Existing Rules Provide additional Exemptions Respond to Objections raised by U.S. EPA Updates to Michigan Air Pollution Control Rules Part 1 Part 2 Part 9 General Provisions Air Use Approval Emission Limitation and Prohibitions - Miscellaneous 5

Exemption Changes/Additions NEW Rule 281(k): Aqueous based parts washers (<5% VOCs) Rule 285 Meaningful Change Exemption additions Rule 290 Limited Emissions Exemption additions NEW Rule 291 De minimis Emissions Exemption Rule 278 reminder 6

Rule 285 Meaningful Change Relatively small changes in permitted process equipment Meaningful increase and Meaningful change defined Increase in PTE or hazard potential of 10% or greater Causes an exceedance of a permit limit Policy and Procedure No. AQD-25 Effective May 9, 2017 Seven-step process to evaluate meaningful change 7

Rule 290 Emission Units with Limited Emissions Based on Actual Emissions Additional thresholds incorporated (Rule 290(2)(a)(ii) CO 2 equivalent Mercury Lead Proper control equipment operation Temperature monitoring 8

Rule 291 Emission Units with de minimis emissions Based on Emission Unit Potential to Emit Criteria pollutants CO 2 equivalent Various TACs and non-tacs 9

Rule 291 Example Emergency Diesel RICE Generator 10

Rule 291 Example Emergency Diesel RICE Generator Step 1: Calculate Potential to Emit 11

Rule 291 Example Emergency Diesel RICE Generator Step 2: Compare to Rule 291 Thresholds Pollutant Rule 291 Threshold (tpy) RICE PTE (tpy) PTE within Rule 291 Threshold? CO 2 e 75,000 930 Yes CO 10 4 Yes NO x 10 7 Yes SO 2 10 0.01 Yes VOC 5 0.5 Yes PM 10 0.2 Yes PM 10 5 0.3 Yes PM 2.5 3 0.3 Yes Total TACs 5 <1 Yes Refer to R 336.1291 for complete criteria 12

Rule 291 Example Emergency Diesel RICE Generator Step 2: Compare to Rule 291 Thresholds Pollutant Category Rule 291 Threshold (tpy) RICE PTE (tpy) PTE of all TACs with SLs 0.04 µg/m 3 and <2 µg/m 3 0.12 0.002 PTE of all TACs with SLs 0.005 µg/m 3 and <0.04 µg/m 3 0.06 0 PTE of all TACs with SLs <0.005 µg/m 3 0.006 0.0004 Refer to R 336.1291 for complete criteria 13

Rule 291 Example Emergency Diesel RICE Generator Step 3: Rule 278a and 278 Include Project or activity Documentation of applicability Requirements under federal standards (NSPS, NESHAP) 14

RMRR Policy for LFG-to-Energy Facilities Policy and Procedure No. AQD-23 Effective June 10, 2016 Rule 285(2)(a)(vi) RMRR as part of a Normal maintenance program Overhaul and repair activities Repairing or replacing components Replacing an engine with a like-kind engine Documentation requirements for equipment NSPS and NESHAP may be affected 15

RMRR Policy for LFG-to-Energy Facilities Exception to Policy and Procedure AQD-23: Catastrophic events Engine failures 16

Exemptions 17

Permitting Changes/Additions Rule 201(4) Permit void if project has not commenced within 18 months Change in RO an off-permit change (Rule 215(5)) Life After ROP Updated (August 2017) Rule 208a rescinded Remove major source requirements based solely on GHGs 18

Permitting Changes/Additions Air Toxics Rule 232: Change to averaging time for certain ITSLs Many ITSLs updated from 8-hour to 24-hour (less stringent) Rule Applicability Citation Rule 224 T-BACT Rule 225 Does not apply to sources in compliance with Rule 702 New Exemption for certain clean-burning equipment New Exemption for certain clean-burning equipment Rule 224(2)(c) Rule 224(2)(d) Rule 226(e) 19

New Exemption from Air Toxics Requirements Applicability Criteria Effective Dates Emission Units Fuels NEW Air Toxics Exemption (Rule 224 and 226) Effective December 20, 2016 Engines, turbines, boilers/process heaters Natural Gas, Diesel fuel, or Biodiesel Variance: Suspension of Enforcement of Rule 225 Extended until June 12, 2018 Fuel burning equipment Natural Gas Capacity 100 MMBtu/hr 50,000 cf/hr Stack Requirements Building Setback Requirement 1.5 x building height Vertical, unobstructed 100 feet from property line 1.5 x building height Vertical, unobstructed None 20

Air Permitting Developments

MDEQ Responding to Recent U.S. EPA Comments The use of Test Protocol The lack of Reference Test Methods Practical Enforceability of Permit Limits 22

Permit Language Revisions Recent changes and updates to Permit language: No longer using Test Protocol High level citation of reference test method Enhanced language for monitoring and recordkeeping 23

Removal of Test Protocol Change applied to: ROP Applications and Renewals New Installations or Modifications (NSR) Administrative changes/corrections opening a permit 24

Replacement of Test Protocol Averaging Time specified in place of Test Protocol 25

Permit Implications How is Averaging Time selected? Michigan Air Pollution Control Rule 205(1)(a): The time period shall be set in accordance with the applicable requirements 26

Permit Implications What are the applicable requirements? NAAQS or PSD Increment Air Toxics Health-Based Screening Level Opt-out Limit BACT Federal Standard (NSPS or NESHAP) What is my unit s operational variation? What does future compliance look like? 27

Reference Test Method Citation 28

Planning for Permit Changes Emission Estimates Compliance Methodology (Test Method) Operational Flexibility Discussion and Review Time Consider Permit Cleanup Options if available 29

Ozone Nonattainment Designations

Ozone (O 3 ) Formation 31

Air Quality Designations for Ozone October 1, 2015 Ozone NAAQS revised to 70 ppb (8-hour) EPA designations due October 1, 2017 June 6, 2017 Deadline extended one year due to insufficient information August 2, 2017 Extension withdrawn October 1, 2017 back on? 32

Air Quality Designations for Ozone MDEQ Designation Recommendations (October 2016) Recommended nonattainment: West Michigan: Allegan, Berrien, Muskegon Southeast Michigan: Livingston, Macomb, Monroe, Oakland, St. Clair, Washtenaw, and Wayne U.P.: Schoolcraft County (tentative) 120 day letter Final Implementation Rule 33

Designated Areas Not Attaining Ozone Standard Non-Attainment NSR Permitting Emission reduction Offsets LAER Alternative site analysis Sources in compliance Public involvement Challenges Standard very low Background impacts Transport Offsets 34

Dispersion Modeling

Policy and Procedure AQD-022 Effective March 3, 1015 Dispersion modeling Options to meet Stack Height Requirements Allowable emission rate of new or modified emission units Challenges Ongoing Reductions in emissions (net benefit) not recognized Qualitative option Short-term standards 36

Appendix W to 40 CFR Part 51 Guideline on Air Quality Models Revisions finalized October 20, 2016 Federal Register January 17, 2017 Effective date deferred to May 22, 2017 37

Secondary Formation Ozone: NO x and VOC Secondary PM 2.5 : NO x and SO 2 Two-tiered demonstration approach (New Appendix W) Tier 1: Use of relationships between emissions and ambient impacts (from existing models) Tier 2: Sophisticated case-specific Chemical Transport Modeling 38

Secondary Formation Challenges Tier 1: MERPs : Modeled Emission Rates for Precursors Guidance from EPA is still DRAFT Marquette, Montcalm, and Macomb EPA suggests use of SIL as Critical Air Quality Threshold Primary PM 2.5 may exceed the SIL without considering secondary formation of PM 2.5 Ozone precursor thresholds Approved Modeling Protocol for PSD Projects 39

Regulatory Horizon

Regulatory Horizon in Air Quality Modeling Guidance Ozone Nonattainment Designations CSAPR Clean Power Plan NSPS Subpart TTTT 41

Future Changes/Modifications Peakers not a Listed Source Category New Sources have 250 tpy (PSD) Aggregation Consideration Changes to Major Sources A2A Analysis for Applicability Actual-to-Projected Actual Past Actuals may be Low Future Projected Emissions based on Business Plan THANK YOU 42