PAGASA and its Flood Early Warning Services. HydroMeteorology Division (HMD)

Similar documents
2011/9/ Principal rivers (421 river basins) 18 major river basins (with drainage area greater. 72 lakes Extensive groundwater aquifers

WATER-RELATED HAZARDS AND DISASTER RISK IN CAGAYAN RIVER BASIN, PHILIPPINES

Understanding and Addressing the New Normal - The Philippine Experience

The Pampanga River Basin Flood Forecasting & Warning System (PRFFWC) the pilot FFW System in the Philippines

Water Resources. Inland freshwater (rivers, lakes, and groundwater) Marine (bay, coastal, and oceanic waters) Rainwater

Appendix C Historical Records of Flood Damage

Flood and Sediment Management in the Philippines, in view of Cooperation. Minoru Kamoto. Version 2009.Nov.6

Grecile Christopher R. Damo

Developing Resilience to Climate Change and Flooding: The DOST 7 Integrated Storm Water Management (ISWM) Project in Cebu. by Rene Burt Llanto 1

WATER RESOURCES IN THE PHILIPPINES: Status, Challenges and Opportunities

Application of Rainfall-runoffinundation. Pampanga River Basin

What we are looking for through utilizing the global earth observation. 14 January 2012 Japan International Cooperation Agency (JICA) Yusuke AMANO

Project Title : A FLOOD FORECASTING DEVICE IN QUEZON CITY, PHILIPPINES: A SOUND PRACTICE FOR FLOOD DISASTERS REDUCTION MEASURE

Annex C. Hydrological Investigation

THE STUDY ON FLOOD CONTROL PROJECT IMPLEMENTATION SYSTEM FOR PRINCIPAL RIVERS IN THE PHILIPPINES

Ex-Ante Evaluation (for Japanese ODA Loan)

Inter-Agency Task Force on the Harmonization of National Government Performance Monitoring, Information and Reporting Systems

ARANGKADA PHILIPPINES 2010: A BUSINESS PERSPECTIVE. Infrastructure: Water

Inter-Agency Task Force on the Harmonization of National Government Performance Monitoring, Information and Reporting Systems

STATE UNIVERSITIES AND COLLEGES PC requirement identified by MITHI

Indices and Early Warning Systems in the Philippines

Broadening the Scope of the Proportional System of Representation

Impacts of Drought in the e Philippines

DPWH STRATEGIC INFRASTRUCTURE PROGRAMS AND POLICIES

Managing Disasters in the Philippines

Implementation Status & Results Philippines National Program Support for Environment and Natural Resources Management Project (P096174)

Perspective. EMIL K. SADAIN, CESO I Undersecretary for UPMO Operations and Technical Services

List of Agencies Eligible for FY 2015 PBB

Implementation Status & Results Philippines National Program Support for Environment and Natural Resources Management Project (P096174)

CBFFWS. October 2007 PAGASA, Philippines

Workshop Proceedings

Japanese ODA Loan Ex-ante Evaluation

ENGINEERING AND DEVELOPMENT CORPORATION OF THE PHILIPPINES

OPTIMIZATION OF DAM OPERATION FOR.

BASIC STUDY FOR NON- STRUCTURAL DISASTER PREVENTION MEASURES

Prior Investment. Disaster Risk Reduction

DPWH STRATEGIC INFRASTRUCTURE PROGRAMS AND POLICIES

Susan P. Abano Engineer IV Policy and Program Division

96.47 million inhabitants km2 322 inhabitants/km % mm/year million m3 /year m3 /inhabitant 17 %

Water Related Challenges in Asia - A Tale Of Three Cities -

JICA s International Cooperation on Climate Change and Water Resources Management

Proposal Report. Flood Hazard Mapping Project. City of San Fernando (P)

THE STUDY ON FLOOD CONTROL PROJECT IMPLEMENTATION SYSTEM FOR PRINCIPAL RIVERS IN THE PHILIPPINES

Chronic Food Insecurity Situation Overview in 71 provinces of the Philippines

Compendium of Case Studies Guidance Notes. Camiguin Province, Island of Mindanao. Date: Natural hazard risk reduction

Outline of Presentation

Philippine Presentation

Disaster Risk Reduction and Climate Change Agenda of the Department of Science and Technology

CHAPTER 5 WATER LEVEL FLUCTUATION IN LAGUNA LAKE DURING FLOOD IN PASIG-MARIKINA RIVER

Institutional Challenges, Scientific Opportunities

Climate Change Impact Assessment and Adaptation in the Philippines

ICELANDIC RIVER / WASHOW BAY CREEK INTEGRATED WATERSHED MANAGEMENT PLAN STATE OF THE WATERSHED REPORT CONTRIBUTION SURFACE WATER HYDROLOGY REPORT

John Louie FABILA, Ma. Rosario Concepcion ANG, and Girlie DAVID, Philippines. Key words: flood hazard, risk management, climate change SUMMARY

Angat Water Transmission Improvement Project

MS. MARINA SALDANA. Tagaytay City Roadshow 25 February

Climate Change Impacts to the Water Environment and Adaptation Options in the Philippines¹. by: Lourdes V. Tibig 2

2014/ATCWG/013 Analysis and Mapping of Impacts under Climate Change for Adaptation and Food Security (AMICAF) Activities in the Philippines

IWRM Conflict Management The Laguna de Bay Experience Dolora N. Nepomuceno

Japan - Philippines Joint Statement On Bilateral Cooperation for the Next Five Years

Proposal Report. Flood Hazard Mapping Project in. Singhaburee Municipal, Singhaburee province Thailand. Prepared By. Mr. Phadungsak PHACHAROEN

Roadmap toward Effective Flood Hazard Map in Lampang Thailand. JICA region-focused training course on flood hazard mapping JFY 2005

REGIONAL FLOOD FREQUENCY ANALYSIS FOR PHILIPPINE RIVERS

JOURNAL OF APPLIED SCIENCES RESEARCH

JICA S COOPERATION IN THE PHILIPPINES. November 2016

About the RCCs The RCCs are tasked to: Regularly measure local competitiveness indicators Formulate programs to improve competitiveness Engage in inve

Hydrologic forecasting for flood risk management Predicting flows and inundation in data-limited catchments

For which applications/questions will the IDSS be used?

SOUTH ASIA HYDROMET FORUM SESSION 5: LINKING COMMUNITIES TO WEATHER AND CLIMATE SERVICE

ACTION PLAN TOWARD EFFECTIVE FLOOD HAZARD MAPPING IN CAMBODIA

The Report of the East Asian Seas Congress in Manila, Philippines -Partnerships At Work : Local Implementation and Good Practices

Main Moderator: Cuong Hung Pham, Senior Operations Officer, World Bank Vietnam Country Office

Achieving Natural Disaster Business Success by Developing Clients and Community: Lessons from Local Leading Companies in Nagaoka City, Niigata, Japan

DR.FRANSISCA MULYANTARI

Climate uncertainties and RP positions in the UN Framework Convention on Climate Change

River Administration in Japan

4. Present Activities and Roles

Metro Manila Flood Control Project (II)

DPWH PROGRAMS AND PROJECTS ON DISASTER RESILIENCY

THE WALLACE REPORT NOT A DROP TO DRINK: RP S WATER CRISIS PETER WALLACE

PLANNING AND DESIGNING FOR CLIMATE ADAPTIVE AND RESILIENT TRANSPORT: EXPERIENCE FROM PHILIPPINES

Risk management of urban rain events in a coastal city. The case of Marseille

Level of Urbanization

Latest tools and methodologies for flood modeling

Lessons learned and improved technologies for real-time Flood Forecasting and Warning

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Hydrology and Water Management. Dr. Mujahid Khan, UET Peshawar

Decision Support Tools for Climate Resilient Agriculture in the Bicol Region

Transport Infrastructure Framework for the Philippines

TABLE OF CONTENTS. Preface. Abbreviations and Acronyms. Executive Summary. Water Quality Hot Spots. Philippines Water Quality at a Glance v

Water Solution. PSI Incontrol Sdn Bhd

Management of Water Control Systems

LAGUNA LAKE DEVELOPMENT AUTHORITY. Introduction to

Impacts of Rainfall Event Pattern and Land-Use Change on River Basin Hydrological Response: a Case in Malaysia

FISHER RIVER INTEGRATED WATERSHED MANAGEMENT PLAN STATE OF THE WATERSHED REPORT CONTRIBUTION SURFACE WATER HYDROLOGY REPORT

Preparing Water Services for Climate Risks: Experience from the Philippines

Organizational Report Department of Water Resources Management, MoNRE Vietnam

GMS: Flood and Drought Risk Management and Mitigation Project

Remote Sensing Applications for Flood Management in ADB TA8074-REG

Title Action Plan toward Effective Flood Hazard Mapping in My Country

Foreword. Von Hernandez Executive Director Greenpeace Southeast Asia. Impacts and Vulnerabilities in the Philippines

Transcription:

and its Flood Early Warning Services HydroMeteorology Division (HMD)

HYDROMETEOROLOGY DIVISION ( HMD) (Formerly Flood Forecasting Branch, FFB)

WATER-RELATED DISASTER MITIGATION MEASURES MEASURES STRUCTURAL MEASURES NON-STRUCTURAL MEASURES Dams & Reservoirs Upstream rain gauge network Retarding Basins Bypass, floodway Channel enlargement Embankment/Dike Reduce upstream runoff Hydrological stations, Telemetering network. Flood monitoring and early warning system (EWS) Evacuation and mitigation operation Hazard mapping Zoning MOVE THE WATER AWAY FROM The Weather and Climate THE Authority PEOPLE!! MOVE THE PEOPLE AWAY FROM THE WATER!!

AS THE MAIN ADVOCATE OF NON-STRUCTURAL MEASURE IN THE COUNTRY Flood Early Warning System Mechanisms: 1. Basin Operation for Telemetered major river basins 2. Dam Operation for major reservoirs (in Luzon, so far) 3. Basin Operation for Non-telemetered/ Ungauged/ Poorly-gauged ) River Basins (mostly Principal River Basins) 4. Operate under River Basin Approach

MAJOR RIVER BASINS IN THE PHILIPPINES (D.A.=> 1400 SQ. KM.) Name of River Basin Drainage Area River Length (km) 1. Cagayan 27,280 505 2. Mindanao 23,169 373 3. Agusan 10,621 350 4. Pampanga 9,759 260 5. Agno 5,952 206 6. Abra 5,125 181 7. Pasig-Marikina-Laguna Bay 4,678 78 8. Bicol 3,771 136 9. Abulog 3,372 175 10. Tagum-Libuganon 3,064 89 11. Ilog-Hilabangan 1,945 178 12. Panay 1,843 152 13. Tagoloan 1,704 106 14. Agus 1,645 36 15. Davao 1,623 150 16. Cagayan De Oro 1,521 90 17. Jalaur 1,503 123 18. Buayan-Malungon 1,434 64 Source: Rivers in the Philippines, DPWH-JICA Publication, March 1997

MAJOR RIVER BASINS (1) ABULUG (3,372 sq. km.) (2) ABRA (5,125) (3) CAGAYAN (27,280) (4) AGNO (5,952) (5) PAMPANGA (9,759) (6) BICOL (3,771) (7) PASIG-MARIKINA (4,678)

(8) PANAY (1,843 sq. km.) (9) JALAUR (1,503 sq. km.) (10) ILOG-HILABANGAN (1,945 sq. km.)

(11) AGUSAN (10,621 sq. km) (12) TAGOLOAN (1,704 sq. km) (13) CAGAYAN De ORO (1,521 sq. km) (14) AGUS (1,645 sq. km) (15)TAGUM-LIBUGANON (3,064 sq. km) (16) DAVAO (1,623 sq. km) (17) MINDANAO/COTABATO (23,169 sq. km) (18) BUAYAN-MALUNGON (1,434 sq. km) Outlet of the major river basins

RIVER BASIN APPROACH:

(1) For Telemetered River Basins Operation: FLOOD FORECASTING & WARNING SYSTEMS (FFWS) * PABC (Pampanga-Agno-Bicol-Cagayan RB) * Pasig-Marikina RB Telemetered River Basins: Pampanga RB 1973, rehabilitated in 2009 Agno, Bicol & Cagayan RBs 1983 (Agno system was rehabilitated 2011.) Pasig-Marikina 1993, 2004 Major Dams: Angat & Pantabangan 1986 Binga, Ambuklao & Magat 1992 San Roque 2001 In 2009-2012, implemented the JICA Technical Cooperation Project for the Strengthening of Flood Forecasting and Warning System for Dam Operation

Existing facilities for Flood Early Warning System (For River basins and dams): Rainfall station Flood Forecasting and Warning- Main Operation Center Telemetry Equipment Communication tower Water level gauge River Center and its Operation Room Rain gauge and solar panel Fixed and mobile warning facilities

(2) For Dam Operation & Management: FLOOD FORECASTING & WARNING SYSTEMS FOR DAM OPERATION (FFWSDO) - Collaborative undertaking between the and the dam offices, (National Power Corporation and National Irrigation Administration), DPWH, OCD and NWRB - Convene as a Committee (JOMC, Joint Operation and Management Committee) National Flood Forecasting and Warning Center - provides the meteorological condition for the effective operation of the spillway during inclement weather condition Dam authorities in their respective areas of jurisdiction - NPC (Ambuklao, Binga, San Roque, Angat, CBK) - NIA (Magat, Pantabangan) Monitoring agencies

(3) For Non-telemetered/ Ungauged/ Poorlygauged ) River Basins: Issuance of General Flood Advisories (GFAs) Cascaded to Local Government units through the OCD COMMUNITY BASED FLOOD EARLY WARNING SYSTEM (CBFEWS)

Flood Forecast Products 1. Hydrological Forecast is a general information/condition of the river basins which are being monitored by. It is prepared daily during non-flood watch period/ during low flow periods or when the expected streamflow is generally normal. Hydrological Forecasts are prepared and uploaded in the website by the Duty Hydrologist. Time of issuance: 8:00 AM daily, with 24-hours validity period Contents/Information: present weather system affecting the basin, observed and forecast rainfall, forecast average stages/discharge of rivers/lakes/swamps, relevant additional information/comments

Flood Forecast Products 2. Basin Bulletin for Pampanga, Agno, Bicol and Cagayan (PABC) River Basins Basin Flood Bulletins are flood forecasts in the form of warning, which are prepared twice daily during flood watch. In the event that there is a significant rise in the water level, an intermediate basin flood bulletin is issued at 10:00 AM and 10:00 PM. This is being issued by the respective river centers of Pampanga, Agno, Bicol and Cagayan river basin. Time of issuance: Twice daily at 4:00 AM and 4:00 PM Contents/Information: Date and time of issuance, validity period of the bulletin, average basin rainfall (cumulative), forecast rainfall for the next 24 hours, expected hydrological response of the basin and its tributaries, advice to the concerned agencies to take appropriate measures.

Flood Bulletin

Flood Forecast Products 3. General Flood Advisory (GFA) is a flood bulletin in general or simple form. It is a hydrological information for the concerned public to be aware or prepare for the expected flood or high streamflow. It is issued to non-pabc river systems (with or without CBFEWS) where the proximity of the available real-time or near-real-time rainfall (synoptic, etc.) and/or water level data can serve as inputs. It is being issued if there is a forecast of significant rainfall based on the meteorological/numerical models and others, even if the past/observed rainfall over the concerned area is considered nil. Time of issuance: Once daily or as the need arises Contents/Information: present weather, observed rainfall from the nearest synoptic station, forecast rainfall, watercourses that are likely to be affected expected hydrological response of the river system, advice to the concerned agencies to take appropriate measures.

General Flood Advisory For Non Telemetered River Basins Forecast Rainfall Category 1. Light rains 2. Light to moderate 3. Moderate to Heavy Required Actions: 1. To take precautionary measures e.g. close monitoring 2. To be alert for possible flashflood and landslides 3. To take appropriate actions

. Other Products 4. Dam Updates, summary of the current level of the major dams being monitored. It shall be prepared and uploaded daily on the s website by the Duty Hydrologist. It is issued during nonflood watch. Time of issuance: Once daily at 6:00 AM Period of validity: 24-hours NOTE: during Flood Watch, dam updates are carried-out every 2 hours, especially in the event of an increase in the reservoir elevation, increase in gate opening/discharge from the dam Contents/Information: previous & current elevation (at 6:00 AM), deviation from the Normal High Water and Rule Curve elevations, gate opening (if any)

5. Dam Hydrological Situationer, an information about the current hydrological status of the major dams being monitored. It is prepared and uploaded daily on the website by the Duty Hydrologist. It is issued during non-flood watch. Time of issuance: Once daily at 9:00 AM (based on the latest available reservoir water level elevation which is usually at 6:00 A.M.) Period of validity: 24-hours Contents/Information: present weather system, observed and forecast rainfall, expected hydrological response of the reservoir/dam, relevant additional information

6. Dam Discharge Warning, an information about the impending release of water from the monitored dams/reservoir. Time of issuance: opening of gates) As the need arises (at least 5 hours before the Period of validity: Updated on the event that there is an increase in the gate opening/discharge from the dam/reservoir. Any new information regarding the spillway operation shall also be reflected in the Dam Updates. Contents/Information: weather synopsis, basin rainfall (cumulative), forecast rainfall, time & number of gate opening, expected hydrological response Aside from Dam Discharge Warning, the NPA/NIA dam offices will also activate their fixed warning sirens and patrol cars to forewarn the people living in the target areas of an impending release of water from the dam. All information are disseminated to the concerned LGUs thru telephone/fax.

STATUS OF MAJOR DAMS IN THE COUNTRY (posted on website)

COMMUNICATION SCHEME ALL information starts here: Large scale systems like typhoon and monsoon Weather Forecasting Center Concerned Regional Services Division (PRSD) ALL information starts here in case of local/small scale system like TSTM, including rainfall warning Office of Civil Defense Operation Center Alert Level READY Alarm Level GET SET Critical Level GO Office of Civil Defense Concerned Regional Office Disaster Operation Center Located at the Municipal Hall, operated and maintained by the respective MDRRMO Warning dissemination adapted or inherent within the community Bandillo, Mega Phone, Text Blast, Church Bell, Purok Leaders Office of Provincial Disaster Risk Reduction and Management Office (PDRRMO) Target Community

A Non-Structural flood disaster mitigation and management program that is based on the capability of the Barangay/community operating it. Manual/Standard Rain Gauge Automatic Rain Gauge Staff Gauge Alert, Alarm & Critical levels

Activities in the establishment of CBFEWS 1. Consultation meeting with Local Government Units (LGUs) 2. Site survey and ocular inspection 5. Seminar on data observation/ operationalization/retraining 6. Special IEC and flood drill/dry run 3. Installation of monitoring facilities, flood signages and hydrographic surveys 4. On-site training of observers and volunteers 7. Turn over of CBFEWS to LGUs

OTHER FLOOD EWS INITIATIVES

Features/Components: 1.Monitoring system 7 rainfall stations 10 water level stations 2.Warning system 9 Warning posts 3.Telecommunication system 2 Relay/repeater stations 4.Flood gates @Rosario Master Control station 5.Hydraulic Structure @ Napindan 6.Monitoring Centers @ Rosario (MMDA), & DPWH

(2) KOICA 1 Project (for the Provinces of Aurora & Iloilo, and Agus River Basin) Early Warning, Monitoring & Response System for Disaster Mitigation in 3 selected areas of the Philippines Implemented in 2007-2008

(3) KOICA 2 Project (for Pasig-Marikina River Basins and some Metro Manila Areas) Implemented after Typhoon Ondoy in 2009 Funded by the Korean International Cooperation Agency (KOICA) Installation of monitoring stations (Automatic Weather Stations, RR and WL) and warning facilities (siren and voice) backed by Korean technology Hydrological Model for flood early waning activities Computer screenshots of the KOICA FEWS Main Features/Components: 1. Monitoring system - 6 rainfall stations - 10 water level stations - 4 automatic weather stations (AWS) 2. Data processing system - rainfall-runoff model 3. Warning system - 19 warning posts along Marikina, Pasig, San Juan and Nangka rivers 4. Main Operation Center Warning control system of KOICA FEWS

(4) READY Project for GMMA (Greater Metro Manila Area: Bulacan/Cavite/Laguna/Rizal)

(5) FLASHFLOOD ALERT SYSTEM FOR CAGAYAN DE ORO RIVER BASIN Implemented due to the aftermath of Typhoon Sendong in 2011 Supported by National Disaster Management Institute (NDMI) of Korea (6) DEWS PROJECT (Deployment of Early Warning Systems).. (2014-2017) For selected principal river basins nationwide In cooperation with ASTI-DOST Similar equipment installed under Project NOAH (7) KOICA 3 PROJECT (For Tullahan River Basin) - will cover the installation of monitoring equipment (rainfall, water level, watch camera at the forecasting points and warning posts along Tullahan River and installation of additional monitoring stations for Pasig-Marikina)

(8) FLOOD FORECASTING & WARNING SYSTEMS (FFWS) for: ABRA RB (Ilocos Sur, Abra, Benguet) competed center ILOG-HILABANGAN RB (Negros Occidental & Oriental) PANAY RB (Capiz) on-going installation of gauging stations To follow: ABULOG RB (encompassing the provinces of Cagayan and Kalinga) and MINDANAO RB (encompassing provinces of North & South Cotabato, Bukidnon and Maguindanao) Davao, Agusan, Tagum-Libuganon and Buayan-Malungon River Basins (Completed center), on-going installation of rainfall/water level monitoring stations Components in the development of FFWS for major river basins - Installation of telemetered/automatic rainfall & water level stations and sturdy/ communication system - Construction of River Center (Office Building) - Deployment of personnel who will man/undertake the flood operational activities the stations Newly-constructed center for Abra River Basin in Vigan, Ilocos Sur

For additional information: Email add: hmd.ffws@gmail.com Telephone numbers: 9294065, 9282754, 9204052, 9266970