CIC Guidelines Construction Administration and Observation

Similar documents
CIC Guidelines Procurement

CIC Guidelines Detailed Design

CIC Guidelines Preliminary Design

Architectural Design and Build Process. A Client Guide

Version 1.0 / August CIC Guidelines Preface, Preamble and Glossary

STRUCTURAL ENGINEER S SERVICES SCOPE

COSCSMO15 SQA Unit Code H99L 04 Control projects in construction management

SENIOR PROJECT MANAGER

MECHANICAL & ELECTRICAL ENGINEER S SERVICES SCOPE

Structural Engineering & Civils Scope of Services

Owner's Representative Scope Matrix - D/B Rev 10/28/2013

Level 6 NVQ Diploma in Construction Site Management (Construction)

PLANNING AND EVALUATION PRELIMINARY DESIGN

BUILDING CONTROL (AMENDMENT) REGULATIONS 2013

REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility. RFP Components

JK 1. RIBA stages JK START OF MAIN CONTRACT WORKS 1. DEFINITION 2. PURPOSE 3. PROCEDURE 3.1 PROJECT MANAGEMENT TEAM ROLE

CLEAN WATER SERVICES AND CAROLLO ENGINEERS, INC. RECITALS. 1. District and Consultant previously entered into the Master Contract.

Project monitor services

Level 6 NVQ Diploma in Construction Contracting Operations Management

QUALIFICATION MATRIX ADDENDUM:

Level 6 NVQ Diploma in Construction Site Management (Construction)

Township of Severn REQUEST FOR PROPOSAL. Architectural & Professional Services Fire Station Replacement

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

PROJECT DESIGN GUIDE A00.1 COMPETENCE STATEMENT AND ASSESSMENT

Structural. Professional Engineers Ontario

RIBA Small Project Plan of Work

CASE STUDY: Ara Institute of Canterbury Kahukura Block

CONSTRUCTION MANAGEMENT CORE COMPETENCIES

QSS 0 Products and Services without Bespoke Contracts.

This is EXHIBIT A, consisting of [ ] pages, referred to in and part of the Task Order dated [ ]. Engineer's Services for Task Order

ISSUE CERTIFICATE OF PRACTICAL COMPLETION AND INITIATE HANDOVER TO UNIVERSITY

Document B Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition

Apprenticeship Standard for High Speed Rail and Infrastructure (HSRI) Advanced Technician

CONSTRUCTION MANAGEMENT. By GREEN PLANET SERVICES Lesley Padayachee Cell:

Document B252TM 2007

Health, Safety and Wellbeing Policy

Member level the optimum standard is given against each activity statement

BULLETIN 34: BUILDING ENVELOPE SERVICES APPROPRIATE PROFESSIONAL PRACTICE

CONSTRUCTION MANAGER

600 - Phase C Intermediate Review Checklist for the Architect- Engineer

Auckland Transport HS08-01 Safety In Design

Overview COSCSMO14. Manage project processes in construction management. Manage project processes in construction management

ATTACHMENT D SCOPE OF SERVICES

QUALITY ASSURANCE PROTOCOL (QAP)

Coal Pensions ARM Headquarters. Kier Construction Eastern, Exemplar BIM Project

VILLAGE OF VERNON HILLS REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER AT RISK SERVICES. Part I: Proposal Information

Coordination of Consultants

Level 3 NVQ Diploma in Construction Contracting Operations

Level 3 NVQ Diploma in Controlling Lifting Operations Supervising Lifts (Construction)

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

Professional Engineers Using Software-Based Engineering Tools

San Antonio Water System Standard Specifications for Construction

ANNEXURE A SCOPE OF WORK FOR PROFESSIONAL SERVICES: RESTORATION OF NON PAREILLE BUILDINGS. Principal Agent and Professional Architectural Services

45. Feedlot construction delivery

SCOPE OF WORK FOR PROFESSIONAL SERVICES: HET POSTHUYS ELECTRICAL UPGRADE

RURAL ELECTRIFICATION AGENCY ENERGY FOR RURAL TRANSFORMATION PHASE III. Credit No.: 5653, Project ID.: P133312

Procedure. Work Health and Safety Contractor Management. Document number: PRO Rev no. Description Process Owner Approved for issue

APPENDIX T.2 SACPCMP The South African Council for the Project and Construction Management Professions

East Central College

Chapter 2 Parties to the Contract

JOB DESCRIPTION. To provide technical expertise and project support across the full range of Hanover s asset management projects.

Insurance Policy. Major Damage - 10 years. Ingress of water - 5 years. Defects in chimneys/flues - 5 years. Building Regulations defects 5 years

Commercial Planning Core Competencies PLANNING CORE COMPETENCIES 2018

Capital Projects Group Mechanical Work Commissioning Specification

21/01/2019 RIAI Advice Note - Types of Information 1

Construction Activity Descriptions April, 2018

PROJECT DESIGN GUIDE D02 COMMUNICATION PLAN

Code of Practice. for Inspecting and Certifying Buildings and Works. Building Control Regulations 1997 to 2015

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

EXHIBIT 6 Preconstruction Work

Florida Cleanroom Systems

This part of the Works Information sets out the obligations of the Contractor with regards to:

Job Title Quantity Surveyor/Estimator (Capital Programme) Job Grade This post is graded at Grade 9 Reports to Head of Development Direct Reports

Performance Standards for Self-insurers

Project Management Rail Safety Worker Competence

2016 National Tribal Transportation Conference

Roles and Responsibilities

Estimating specialism core competencies

External Supplier Control Obligations

Derlin Construction Limited QUALITY POLICY MANUAL ISO 9001:2008

Local Rule: Engaging External Service Providers

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS

Job Description May 27, 2014

Work Health and Safety Management Systems and Auditing Guidelines

Chapter 3 Other Stakeholders Duties

1. This Section includes administrative and procedural requirements for contract closeout including, but not limited to, the following:

BIDDING FOR BIM. CIF Bidding for BIM. September

SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES

Retail and Office Design and Fit out June 2018

SCHEDULE 3 OF BYLAW 7900 CITY OF KELOWNA QUALITY CONTROL AND ASSURANCE

Management Excluded Job Description

AIA Contract Documents

TERMS OF REFERENCE FOR CONSULTING SERVICES FOR ENGINEERING AND CONSTRUCTION SUPERVISION CONSULTANT

Change of Coordinating Registered Professional (CRP) or Registered Professional (RP)

Owner s Representative SCOPE OF SERVICES

1.4 USE OF EXISTING ELEVATORS FOR CONSTRUCTION PURPOSES (NO ELEVATOR CONTRACTOR IS CONTRACTED FOR THE PROJECT)

REQUEST FOR PROPOSAL

Level 5 NVQ Diploma in Controlling Lifting Operations Planning Lifts (Construction)

CONTRACT SERVICES PHASE 1: PRE-CONSTRUCTION

SPECIFICATION FOR THE ERECTION AND MAINTENANCE OF TRAFFIC SIGNS, CHEVRONS, MARKERS AND SIGHT RAILS

Transcription:

Version 1.0 / August 2016 Construction Administration Stage 7 of 8

Approval: To commence post-contract award activities. Documentation: From previous stage that forms the basis of the ongoing design. Approval: Of for construction documentation and associated tags. Two clicks: Deliverable required and party(ies) responsible. Approvals and Inputs One click: Party(ies) required to input, assist, and coordinate. Health and Safety Health and Safety at Work Design (HSD): Update report to reasonably address Health and Safety issues during occupation, use, maintenance, construction, demolition or disposal. Include Subcontractor design. Health and Safety at Work Construction (HSW): Update report to reasonably address Health and Safety issues during construction. Health and Safety at Work: Workshop and H&S report with team. Existing Conditions/Materials: existing and new risks, assess and mitigate, advise, monitor. Existing Conditions/Materials: Verify and advise risks closed out. Welfare Facilities: Implement adequate welfare facilities for the construction personal and site visitors. Monitor what provisions are provided. Public Safety: Monitor plan to reasonably manage risk to the public during construction. Contract Work Programme: Monitor plan of Health and Safety in construction risks. Issue s: To separate/nominated/(sub)contractors. (specify) Spec 2 of 7

Comply: Proactively with H&S Plan, Project Execution Plan, BIM Management Plan, and others as required. Update plan to reflect agreed contract processes. Quality Assurance: Update project-specific QA plan. Undertake work in accordance with. Contractor Quality Assurance: Contractor to provide and update as necessary after review and comment by team. Attend: To correspondence and at meetings. Resources: Align internal resources with programme requirements, update design programme if required. Documentation Register: Prepare and progressively update. Seismic Design: Design and Coordination of seismic restraints; include for all elements across relevant disciplines. Construction methodology: Review ongoing construction methodology. Buildability: Highlight significant or unusual buildability identified in Subcontractor design. Buildability: Highlight significant or unusual buildability identified in Subcontractor design. s' work: Prepare, and implement requirements. Supplementary Construction documentation: Issue under instruction as required, keep records. Samples: Undertake review(s) and record comment/approvals. Integrate design: across trades. Substitutions: Demonstrate equality with original documentation, determine/note requirement for revised building consent, seek and achieve approval to change, engage consultants, manage consent variation, pay all related charges and fees?? Supplementary Construction documentation: Prepare and issue, keep records. Contractor/subcontractor design: Review progressively. Shop ings: Review progressively. Observation: Undertake as per project requirements, clarify and communicate matters arising. Provide supplementary input/information as required. Sectional Completion: Undertake Sectional Completion inspections and issue defects s. Practical Completion: Undertake Practical Completion inspections and issue defects s. As Built ings: Progressively update drawings, review and comment on documents by others, issue at completion. Warranties: Review and comment, include any defects in defects. Operation and Maintenance Manuals: Review and comment, include any omissions in defects. Compliance: Provide statements/certificates. : Content and timing per PEP H&S, programme, progress, cost, risk, non-conformances, etc. Collate: As built information from all disciplines and issue at agreed milestones. (specify) General / / Spec Spec/ / / Spec Certify 3 of 7

BIM Execution Plan (BEP): Review Construction phase BEP aligned with Design BEP. Technology and systems: Validate, establish connection to CDE, confirm communications protocols. CDE: Implement for information and model sharing. Maintain CDE and communication protocols in line with BEP BIM meetings: Chair. Modelling/Shop ings: Prepare in line with BEP. Coordination: Manage and confirm in accordance with BEP. /integrate: Input to models with team. Contractor BIM: Review to meet BIM outcomes. Construction phase BIM: Audit of information, models and s required for hand over. (specify) BIM: Develop and agree strategies and objectives. Environmentally Sustainable Design (ESD) ESD: Brief and monitor Contractor input. ESD: Building user guides and operation and maintenance manuals prepared and agreed. (specify) Compliance Compliance: Progressively check construction against resource consent including conditions. Compliance: Progressively observe construction compliance with NZ Building Code and relevant standards and Codes of Practice and approved building consent conditions. QA: Undertaken QA in accordance with agreed strategy. Consent conditions: Review all to ensure these can be met at CCC (e.g. survey certificates and producer statements). CCC as-built ings: Collate for drainage, sprinklers, backflow devices, etc. CCC testing and commissioning Certificates: Collate all. CCC energy works Certificates: Collate all. CCC s: Collate all QA, photographic records, etc. for council record. Producer statements: Obtain and review. Certificate of Public Use: Collate documentation and make application. Code Compliance Certificate: Collate and make application, provide supplementary information as required. (specify) 4 of 7

Health and Safety: Monitor H&S plan/register incorporating both HSD and HSAW matters. Update to Include construction H&S matters. Project Programme: Review progress and update relative to construction programme. Track supplied items. Construction Programme: Monitor against programme and liaise with Contractor on matters arising. Project Execution Plan: Implement plan, track performance of team, including completion matters arising. Team: Review Construction team including designers undertaking Design Build. Novation: Manage novation of consultants. Check consultants' obligations. Consultant Engagement Construction: Engage for site observation role per consent conditions. Peer Reviews and Producer Statements: Track inputs and align with programme. Commissioning: Develop detailed commissioning plan., undertake and document commissioning in line with plan. Insurances: Review and agree required project insurances (PI, PL, construction, etc.) Consultant Payments: Review and certify claims. Supplementary Construction documentation: Issue under instruction as required/keep records. ESD Application: Assemble all information and prepare application. ESD Certification: Receive (design) certification and distribute. PCG/ Meetings: Facilitate, chair, minute, notate, attend. Design Meetings: Facilitate, chair, minute, notate, attend. Stakeholders and User Groups: construction with Base Build and mitigate effects on programme and scope. Tenants: base build works with tenant requirements. Construction Meetings: Establish, facilitate, chair, minute, notate, attend. Risk: Update. Apply risk/opportunities management principles. Budget: Manage the cost consultant to provide reports. Value Management: Value initiatives arising from procurement - facilitate, chair, issue notes, minute, attend. Authorities: Liaise with and inputs for inspections and compliance. Contract Administration: Agree and establish processes for contract correspondence including claims, contract Instructions, variations claims and advice, etc. Update PEP to reflect. Contract Correspondence: Arrange, and progressively audit, communications per PEP (RFIs etc.) Payment Claims: Receive, distribute for comment, certify. Variation Claims: Seek advice from QS. Variation Claims: Assess and approve. Extensions of Time Claims: Assess time component, approve. Disputes: Proactively seek to resolve per contract, attend/manage mediation if required. Commissioning: Identify and report all commissioning requirements and activities including need for independent commissioning. Completion: Identify and report all Completion requirements and activities. Sectional Completion: Assess Sectional Completion and issue certificate(s) with defects s. Management Certify 5 of 7

Practical Completion: Assess Practical Completion and issue certificate(s) with defects s. Completion: Oversee transfer/discharge insurances, retentions, bonds etc. Final Account: Receive and distribute, comments, certify. Code Compliance/Certificate of Public Use: Identify and report all Code compliance requirements and activities. Provisional and Prime Cost Sums, Contingency: Manage expenditure. (specify) Management (continued) Certify Design Accessibility and facilities for people with disabilities: Monitor construction. Building Maintenance: specialist installation with structure. (specify) Cost Financial : Progressively update and report against agreed contract sum. Prepare progress claims. Variation Claims: Assess costs and incorporate into the financial report. (specify) /Geotechnical Brief: Document importance levels, seismic requirements, design loads and building movements, geotechnical issues, etc. Proprietary Design: Review of Contractor design of systems (e.g. flooring); detailed coordination with other trades, site conditions, erection requirements and shop details. Design Review: Review shop drawings, technical specifications and construction method statement submission for consistency with detailed design/specification. Erection/construction: Review Contractor construction methodology. (specify) /spec 6 of 7

Load: Confirm/review capacities, sizes based on equipment selection of all trades. Design: Complete documentation for services, including selections, plans, elevations and sections. Shop ings: Production of d larger scale detailed including mounting details, supports, seismic bracing and restraints, provisions for access and maintenance. Plant/control rooms: Detail space/location requirements, and physical requirements including access and maintenance, plinths, bracing, isolation Plant/control: Wiring diagrams, points schedules system programming. Utilities/Connections: Observe utility connections. Equipment: Review selections and technical submissions. Fabrication details: Ductwork, pipework, switchboards, etc. Distribution: Detail sizes for services distribution and containment networks (ducts, cables, pipes, cable trays) including mounting, access and maintenance, including all supports and seismic restraints. Intake/discharge: Produce fabrication and installation documents. (specify) Note: Activities in this section may apply to all services disciplines Building Services / /, / 7 of 7