SPACE TYPE: ENHANCED OFFICE

Similar documents
SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM)

SPACE TYPE: COURTROOM

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

TABLE OF CONTENTS Public Safety Building

Budget Estimate Basic Tenant Improvement

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

PHASE I ACADEMIC BUILDING CORE RENOVATIONS RCNJ Project No C

OFFICE Space STANDARD SPECS Page 1

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

SANDTOWN CROSSING PROFESSIONAL OFFICE PARK Atlanta, GA

MODULAR BUILDING SPECIFICATIONS

Technical Data Sheet Signature 842

ADDENDUM 2 - JULY 14, 2015

Watercrest - Sand Hill - Columbia, SC TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS

By YR Communities.

SANDTOWN CROSSING PROFESSIONAL OFFICE PARK Atlanta, GA

Sewer, Water, Gas, Electric and Cable

Whitley Shower Locker Toilet Facilities

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

ALL DIMENSIONS FROM FINISHED FACE OF PARTITION TO FINISHED FACE OF PARTITION UNLESS OTHERWISE NOTED.

Gerald Desmond Bridge Replacement

Interior construction includes interior partitions, interior doors, and fittings.

Total Building Area: 1964 Construction 30,140 square feet 1976 Construction 36,787 square feet 66,927 square feet

TENANT CRITERIA MANUAL INSERT PHOTO HERE

DESIGN DESCRIPTIONS MANUAL

VOLUME 4 DIVISION SPECIFICATIONS

A. All tackboards shall be mechanically fastened to walls; gluing shall not be allowed.

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

PUBLIC RESTROOMS, DESIGN INTENT Los Angeles World Airports

Melhart Music Center Modular Music Practice Rooms - E3 Ready Specifications Section 13034

Carter's Oshkosh (SIS) # The Center at Pearland Parkway - Pearland, TX Scope Of Work / Bid Qualifications

10155 Toilet Compartments

Tenant Fit-Out for PLCB / Waynesboro Mall

Bureau of Indian Affairs

Interior construction includes interior partitions, interior doors, and fittings.

1-5'0" X 4'0" Opens into 0

SHELL & CORE: COURTHOUSE

DESIGN AND CONSTRUCTION STANDARDS. Section 2: Standards for Specific Categories of Work. Laboratory Standards

G Garza+McLain NOT FOR CONSTRUCTION SITE PLAN - EXISTING SCALE: 1" = 50'-0" SHEET NOTES GENERAL NOTES KIPP JOURNEY MODULAR CAMPUS

FRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6

Deficiency ID Qty UoM Priority. Concrete Walks Are Damaged And Require Replacement ,000 SF 3

CHARTRES COURT Washington Avenue Houston, Texas ChartresCourtHouston.com CHARTRES COURT LLC

Construction Standards PAGE

Kelly Village Apartments 3118 Green Houston, Texas 77020

PROJECT MANUAL FOR: HUMPHREYS CO. SHERRILL BUILDING RENOVATIONS: NEW URGENT CARE CLINIC & EXTENSION SERVICE OFFICE

RECAPP Facility Evaluation Report

The parking lot is in varying condition depending upon location. The vehicular and pedestrian traffic flow is generally good.

AGILITAS Property Development

ACCESSIBLE REST ROOM Code Requirements

Estimate Form for Bathroom Design and Installation

COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION

Newberry. Foundation Framing

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project

Asset Overview Report By Asset Name

CHAPTER 6 INTERIOR CONSTRUCTION

THE RESTORE LOUISIANA REIMBURSEMENT ESTIMATE

SECTION MEDICATION CABINET. 1.1 SUMMARY A. Section Includes: 1. Medication cabinets with self-contained refrigerator and fixtures.

Smokey Ridge, Christiansburg, Virginia

SECTION ACCORDION FOLDING PARTITIONS

OPERABLE PARTITIONS. Signature

Wall Plan (01011 Design Requirements, Section ) First Floor, Building 5111

CM ASSIGNMENT OF TEMPORARY FACILITIES see included IU Project Site Requirements

Bedrooms. Baths. 2 Bdr. 2 Bdr. 2 Bdr. 2 + Den. 2 + Den. $298,800 Prairie. 2 + Den. 3 + Loft Loft 2.5. $318,800 Prairie 2.5.

Division 00 Procurement and Contracting Requirements

Minneapolis Community and Technical College T-Building Floor 2 Student Affairs Cost Estimating Form Templates - Exhibit C

INC Pre-Assembled Structures

Timberglen Recreation Center Summary

COOL AMENITIES for Modern Living

Priced from $1,525,000

Columbia County Health Care Center Added Amenities

Residential Outline Specifications

Exhibit A Library Shell Construction

HC Homes at Tehaleh. Framing

SECTION OUTLET, PULL, AND JUNCTION BOXES

Moveable. Demountable. Reconfigurable. Architectural Walls

Schedule D. RTM Finished Home Specifications

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington

K.B. Polk Recreation Center Summary

STUART-HOBSON MIDDLE SCHOOL

FRV AE SOLAR PROJECT, WEBBERVILLE, TX SPECIFICATION FOR THE TURNKEY, DESIGN AND BUILD OF THE OPERATIONS & MAINTENANCE (O&M) BUILDINGS

Décor Design Construction llc

Wellington Manor Series

Facilities Management Service and Support Function Needs

PLANNING FOUNDATION FRAMING

Delta Gamma Sorority Renovation Budget Scope 3/7/2018

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Hillcrest PS (Barrie), 9205

Bath Project General Services GC/PS Worksheet

SPECIFICATION FOR THE DEVELOPMENT OF LPA CLEAN ROOM INFRASTRUCTURE Description of work

STANDARD PLAN RELEASE SUMMARY(SPR) Physical Facilities Department

Facility Condition Assessment: Final Report. University of Delaware Newark Main Campus McKinly Lab Newark, DE 19716

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist

Accessible Toilet and Bathing Rooms

Gold Package Inclusion List

Date: Kitchen Project General Services GC/PS Worksheet

Transcription:

SPACE TYPE: ENHANCED OFFICE Construction Criteria The unit costs for Enhanced Office space types are based on the construction quality and design features in the following table. This information has been generally organized under Uniformat headings. Items marked with a have a space-related cost impact on the building shell and core. Interior Construction Partitions and Robing, and Trial Jury Suite Perimeter and Demising Partitions, Jury Assembly Area s, Private Toilets, Equipment Storage, Closets, Service Units, and Coat Rack s Doors ½ GWB on metal studs at 16 OC Raised floor to ceiling grid Structural slab-to-slab One hr fire rated 55 STC Two layers ½ GWB both sides on metal studs 16 OC Acoustical insulation filling the wall cavity Structural slab-to-slab One hr fire rated 40 STC One layer 5 / 8 GWB both sides on metal studs 24 OC Acoustical insulation filling the wall cavity Match construction of primary space to maintain complete acoustical envelope ½ GWB on metal studs at 16 OC when not part of the primary acoustical envelope Solid core 1¾ hardwood veneer doors 3-0 (w) by 7-0 (h) Door frames to be minimum 14 gauge construction Hardware to be latch sets with levers Enhanced Office 2-1

Suite Entrance and Secondary Exits Fire rated solid core hardwood veneer doors 3-0 (w) by 7-0 (h) Door frames will be a minimum 14 gauge metal frame construction Frame sound gasketing and threshold gasket Hardware to be locksets with levers Key locks Automatic closer and Robing, Trial Jury, and Jury Soundlock Doors Solid core 1¾ hardwood veneer doors 3-0 (w) by 7-0 (h) Door frames to be solid hardwood, stained, and sealed Frame and threshold sound gasket Hardware to be locksets with levers Key locks and conduit for fail-safe electric locks connected to the fire alarm system; electronic security equipment and cabling provided by tenant Automatic closers s, Grand Jury Witness s, s, Equipment or Video Storage, Closets, Service Units, and Coat Rack s Specialties Toilet Accessories Solid core 1¾ hardwood veneer doors 3-0 (w) by 7-0 (h) Door frames to be solid hardwood, stained, and sealed Hardware to be locksets with levers Key locks Stainless Steel ceiling hung partitions Toilet paper holder Feminine napkin disposal (female toilets only) Feminine napkin dispenser (female toilets only) Paper towel dispenser combination waste receptacle Soap dispenser Mirror ADAAG compliant grab bars Signage Suite Entrance Signage System identification signage to be raised brass letters mounted beside the door with ADAAG compliant tactile Braille signage modules Signage for life safety, public convenience (toilets) within the functional areas of the tenant will be included in the unit costs and will be building standard modular vinyl lettering on plastic laminate signage frame system with ADAAG compliant tactile Braille vinyl signage modules Signage requirements within the tenant demised space related to their function will be provided by the tenant 2-2 Enhanced Office

Window Treatment Horizontal 1 louver blinds Cord free operation Anti-static painted aluminum louvers Concealed valance free head Raised Floor Raised floor provided as part of building shell and core provisions; Raised floor provided in all non-core areas and core electrical, telephone and computer LAN closets Interior Finishes Walls Jury Trial Soundlock, Judge s Conference and Robing, Jury Trial Jury Assembly Area s s Equipment or Video Storage, Closets, Service Units, and Coat Rack s Wall surface to have hardwood base with painted wall surface Wall surface to have Type II vinyl wall covering with hardwood base Wall surface to have hardwood base with 2 thick acoustical insulated fabric covered panels above and painted wainscot Wall surface to have hardwood base with painted walls 3 / 8 textured porcelain tile base and wainscot with Type II vinyl wall covering above Low VOC semi-gloss paint with vinyl cove base Floors Carpet tile above raised floor area 42 ounces per square yard face weight Yarn dyed color Fourth generation nylon yarn Bonded construction with cushioned back Enhanced Office 2-3

and Judge s Robing, Jury Assembly Area, Jury Trial, Jury Soundlock, and Attorney Conference/ Witness Waiting s Service Units and Coat Closets Broadloom carpet above raised floor area 42 ounces per square yard face weight Yarn dyed color Fourth generation nylon yarn Bonded construction with cushioned back 3 / 8 textured porcelain tile Vinyl composition tile Ceiling, and Service Units Suspended 24 by 24 acoustical tile ceiling included in building shell and core provisions GWB painted ceiling Soffit over counter areas Plumbing Service Units Porcelain sink inset in counter Hot and cold water supply Lever gooseneck faucet Drinking Fountains Wall mounted fountain Porcelain sink inset in counter Hot and cold water supply Lever faucet Porcelain floor mounted flush-valve water closet HVAC Air Distribution System 2-4 Enhanced Office

Air Handling Unit AHUs are part of the building shell and core provisions; no additional cooling capacity is assumed to be required as part of the Tenant Improvements for this space type New air filters to be provided at time of Tenant Improvement Jury facilities and ancillary spaces located on court floors should be served by the same AHU serving the court set Separate zones for Jury Assembly and Jury Trial rooms Air Supply Pressurized raised floor air supply with ceiling plenum return air is part of the building shell and core provisions Acoustical transfer ducts at all acoustically rated partitions at Jury Trial rooms, Chief/Head offices, Conference rooms, and tenant demising partitions Exhaust Air Thermostat Controls Service units and private toilets direct 100% exhaust Conferences provide separate control Provide setback thermostat even in areas of 24 hour operation with override by BAS Fire Protection Fire Suppression Sprinkler system is part of the building shell and core provisions; assume that Tenant Improvements for this space type require relocation of 10% sprinkler heads Fire and smoke dampers to be provided in rated walls Fire and Smoke Detection Fire Alarms One smoke and heat detection device in each enclosed occupiable space (not including video and equipment storage rooms or coat racks) One fire alarm pull station by each egress point Audible and visible (strobe) alarm in each occupiable space (not including video and equipment storage rooms or coat racks) Electrical Electrical Outlets Raised Floor Areas Raised floor wireway distribution with modular cable, distribution boxes and conduit every 12-0 Flush floor receptacles with four duplex receptacles for every 100 SF Wall mounted duplex outlets every 50-0 OC Judge s Robing Two duplex outlets Two wall mounted duplex outlets One recessed raised floor mounted duplex outlet One duplex outlet Enhanced Office 2-5

Jury Trial Four wall mounted duplex outlet, one with dedicated line One recessed raised floor mounted duplex outlet Service Unit Jury Assembly Two quadplex ground fault interrupter counter splash-mounted electrical outlets One duplex wall outlet inside cabinet for refrigerator Two duplex outlets at dais, one with dedicated line One recessed wall mounted outlet above the dais for the clock Convenience outlets at every 200 SF Ground fault electrical duplex outlet Lighting lighting provided as part of the building standard shell and core provisions with a minimum of one 24 (w) by 48 (l) recessed parabolic fluorescent fixture with two T-8 lamps and electronic ballasts per room and additional fixtures per every 80 SF (or T-5 equivalent) Independent switch control for each suite with 3 way switches at each entrance and for each enclosed space, including offices, work rooms, file rooms, and closets s Judge s Robing, s, and Jury Trial s Recessed down lamps with compact fluorescent lamps in addition to building shell and core ambient lighting Dimmable light controls located on the wall at the entrance; dimmable lighting, and special accent or decorative lighting are part of the Tenant Improvements Dimmable light controls located on the wall at the entrance; dimmable lighting, and special accent or decorative lighting are part of the Tenant Improvements Telephone and Communication Outlets Conduit and pathways for services from the core to the tenant demised space provided as part of the building shell and core provisions; conduit and boxes within the tenant suite are part of the Tenant Improvement unit costs Conduit and boxes for telephone systems and data LAN system; wiring and equipment provided by tenant Floor cut-out and flush floor receptacles to accommodate data and communication connections for every 100 SF; cabling and equipment provided by tenant Conduit and boxes for one ceiling mounted PA speaker every 1,000 SF; cabling and equipment provided by tenant Conduit and boxes for one telephone line, cabling and equipment provided by other 2-6 Enhanced Office

Jury Assembly Conduit and boxes for sound reinforcement system; equipment and wiring provided by tenant Conduit and boxes for one microphone on dais; equipment and wiring provided by tenant Conduit and boxes for PA loudspeaker system consisting of recessed ceiling mounted speakers; equipment and wiring provided by tenant Conduit and boxes for one infrared assisted listening device transmitter mounted at ceiling height; equipment and wiring provided by tenant Conduit and boxes for one MATV (master antenna/cable TV) connection; equipment and wiring provided by tenant Security Systems and Duress Alarms Judge s Robing, and Judge s Conference Conduit and boxes for one wall mounted duress alarm; equipment and cabling provided by tenant Furnishings Casework Judge s Robing Service Unit Storage s, Coat Closets All millwork to be AWI custom grade hardwood veneer panels and plastic laminate tops with solid hardwood dimensional lumber AWI custom grade hardwood veneer lockers, 1-0 (w) by 1-0 (d) by 6-0 (h), with concealed hinges, locks, brass hooks and hanger rod One mirror 8-0 (h) by 3-0 (w) AWI custom grade hardwood veneer base cabinet and counter with concealed hinge doors and brass pulls AWI custom grade hardwood veneer base cabinet, upper cabinet, and counter with concealed hinge doors and brass pulls AWI custom grade hardwood veneer shelving Enhanced Office 2-7