ESMAP MANAGEMENT RESPONSE TO THE EXTERNAL EVALUATION REPORT

Similar documents
Capacity Building for the WAVES Global Partnership

Terms of Reference of CGIAR s Independent Science for Development Council (ISDC)

Evaluation and Learning Special Initiative FY17 Annual Report and FY18 Work Plan (SUMMARY)

Item 16 of the Provisional Agenda SEVENTH SESSION OF THE GOVERNING BODY. Kigali, Rwanda, 30 October - 3 November 2017

ARRANGEMENTS FOR JOINT OECD- UNDP SUPPORT TO THE GLOBAL PARTNERSHIP FOR EFFECTIVE DEVELOPMENT CO- OPERATION

PROGRESS REPORT ON THE GENDER EQUALITY ACTION PLAN

United Nations Framework Convention on Climate Change (UNFCCC) Subsidiary Body for Implementation (SBI)

GEF-7 REPLENISHMENT DRAFT GEF-7 POLICY RECOMMENDATIONS (PREPARED BY THE SECRETARIAT)

GGGI EVALUATION RULES

Global Environment Facility

Governing Body Geneva, November 2002 PFA. ILO evaluation framework. Evaluation within a strategic budgeting context TENTH ITEM ON THE AGENDA

Evaluation of the Contribution of UNDP to Environmental Management for Poverty Reduction ( :The Poverty and Environment Nexus)

Partnerships. Framework

Guidelines for the Diagnostic Trade Integration Study (DTIS) and DTIS Update (DTISU) under EIF Phase Two

Draft Proposal for the Establishment of a PMR Results Framework. May 13, 2013 draft Note PA

MAINSTREAMING GENDER IN ENERGY SECTOR PRACTICE AND POLICY

An Agenda for Cash. Part of CaLP s 100 days of cash initiative May Background and introduction

Work plan for enhancing the management and administration of UNCTAD

STRATEGIC FRAMEWORK FOR MAINSTREAMING CITIZEN ENGAGEMENT IN WORLD BANK GROUP OPERATIONS

Framework of Global Partnership on Waste Management Note by the Secretariat

CERF Risk Action Plan Annual Update, March 2016

New York, November 14 th 2015

CERF Risk Action Plan Annual Update, April 2015

JOB DESCRIPTION Environment & Climate Officer, Local recruitment (*re-advertisement), Dakar, WCA, ECD Division (1 position)

Africa Renewable Energy and Access Program (AFREA)

Summary AMF Strategy Framework

Indicative Marrakech Partnership work programme for 2019

FAO RESPONSE ON THE FINAL VERSION OF THE CGIAR OPTIONS PAPER ON GOVERNANCE STRUCTURES AND DECISION MAKING - APRIL

MANAGEMENT RESPONSE TO THE SEMI-ANNUAL EVALUATION REPORT OF

1. Gender Dimensions in Natural Resources Management Roles, Responsibilities, Practices and Knowledge

Monitoring, Evaluation and Learning Strategy Irene Karani

Science Strategy

Management response to the external evaluation of UNCTAD subprogramme 4: Technology and logistics

ANNEX I - TERMS OF REFERENCE

2014 TRIENNIAL SURVEILLANCE REVIEW MANAGING DIRECTOR S ACTION PLAN FOR STRENGTHENING SURVEILLANCE

IFAD s updated Social, Environmental and Climate Assessment Procedures. Managing risks to create opportunities

Strategic Partnerships

Society of American Foresters Strategic Plan

Sixtieth session of the Trade and Development Board Geneva, 24 September 2013

Harnessing the potential for SAIs to contribute to the success of the Sustainable Development Goals

PARTNERSHIP FOR MARKET READINESS (PMR) IMPLICATIONS OF THE PARIS AGREEMENT ON PMR ACTIVITIES Workshop Summary Monday 25 April, 2016 Lima, Peru

Why the private sector matters for development effectiveness

Management response to the evaluation of UNDP contribution to environmental management for poverty reduction: the povertyenvironment

DIVERSITY & INCLUSION STRATEGIC PLAN,

Harmonizing Gender in the Three Rio Conventions and the GEF

Voluntary Guidelines for Securing Sustainable Small-Scale Fisheries in the Context of Food Security and Poverty Eradication

CAPACITY BUILDING COMMITTEE (CBC) / GOAL 2

"FICHE CONTRADICTOIRE" Evaluation of the European Union's support to Private Sector Development in Third Countries ( )

UNITED NATIONS DEVELOPMENT PROGRAMME Junior Professional Officer (JPO) JOB DESCRIPTION. I. Position Information

FSC SOCIAL STRATEGY: BUILDING AND IMPLEMENTING A SOCIAL AGENDA VERSION 2.1. Section C: FSC Social Strategy

REPORT ON THE STRATEGY FOR TECHNICAL AND VOCATIONAL EDUCATION AND TRAINING (TVET) AND DIRECTIONS FOR FOLLOW-UP BEYOND 2015 SUMMARY

TECHNICAL AND VOCATIONAL EDUCATION AND TRAINING (TVET): REPORT ON THE FULL MID-TERM REVIEW OF THE IMPLEMENTATION OF THE STRATEGY FOR TVET.

Global Infrastructure Facility

The Transition to Programmatic Approaches and Programming Principles & Project Standards

Concept Note Support to the World Bank s Energy Sector Management Assistance Programme (ESMAP)

Job pack: Monitoring Evaluation and Learning Manager

Hundred and Twenty-fifth Session. Rome, November 2018

OVERARCHING FRAMEWORK UNEP GLOBAL MERCURY PARTNERSHIP

United Nations Development Programme (September 2014)

HEALTH PURCHASING VICTORIA

GW Human Resources Strategic Plan

Social impact assessment. Introduction STAKEHOLDER - AGE

ENHANCED INTEGRATED FRAMEWORK. Concept Note. Sustainability of EIF Tier 1 projects to support National Implementation Arrangements (NIAs)

CONTRACT FOR STAKEHOLDER ENGAGEMENT AND COMMUNICATIONS SUPPORT FOR THE INTEGRATED URBAN DEVELOPMENT FRAMEWORK (IUDF)

Volunteering Development

Governing Body 323rd Session, Geneva, March 2015

Management Systems. Linkage. 26 March Text #ICANN49

EUROPEAN COMMISSION Job Description Form. Job description version7 (Active) Job no in DEVCO.C.4 Valid from 19/03/2018 until

Enhancing synergies towards climate action and sustainable development on the ground

World Heritage Leadership A new capacity building programme of ICCROM and IUCN

Trade-Related Assistance: What Do Recent Evaluations Tell Us?

International tio Good Practice Principles for Country-Led Division of Labour and Complementarity n. Working Party on Aid Effectiveness

OUTREACH STRATEGY FOR THE CARTAGENA PROTOCOL ON BIOSAFETY ( ) Note by the Executive Secretary

ACU strategy

Grade 2, salary from 55,056 up to 68,510 plus benefits

Monitoring and Evaluation Policy

WASH LEAD. Locations - Freetown, with frequent travel to the field. Yes, to be confirmed. Shaping a stronger Oxfam for people living in poverty

P EN. POVERTY ERADICATION NETWORK Strengthening Citizens Participation STRATEGIC PLAN

A. Proposals for the integration of climate-change activities within the programmes of work of the Convention

President s report on a proposed grant under the global/regional grants window to a non- CGIAR-supported international centre

COMMUNICATION STRATEGY. Table of Contents

Building on the recently adopted CEB Common Principles, the 2030 Agenda requires the UN Development System (UNDS) to:

Republic of Liberia National Elections Commission (NEC) MONITORING & EVALUATION POLICY

UNESCO CREATIVE CITIES NETWORK (UCCN) BUILDING A COLLECTIVE VISION FOR THE FUTURE STRATEGIC FRAMEWORK

Capital Regional District Public Participation Framework

CONCLUSIONS AND RECOMMENDATIONS

PROGRAMME OFFICER: EXTRACTIVE INDUSTRIES

Forest Carbon Partnership Facility (FCPF)

FAO actions to implement the IASC Transformative Agenda (December 2012)

DECISION ADOPTED BY THE CONFERENCE OF THE PARTIES TO THE CONVENTION ON BIOLOGICAL DIVERSITY AT ITS NINTH MEETING

5.1 SIXTIETH SESSION OF THE COUNCIL OF THE INTERNATIONAL BUREAU OF EDUCATION. Geneva, January 2011 DRAFT

UNITED NATIONS DEVELOPMENT PROGRAMME SPECIALIST DEVELOPMENT PROGRAMME (SDP) JOB DESCRIPTION

July 26, 2018 HIGHLIGHTS OF THE COUNCIL S DISCUSSIONS 54 TH GEF COUNCIL MEETING JUNE 24-26, 2018, DA NANG, VIET NAM

Information and communication technologies for development: Progress in the implementation of General Assembly resolution 57/295

Linkages between the Africa Governance Inventory (AGI) and the African Peer Review Mechanism (APRM)

Official Summary by the President of the Economic and Social Council 2012 ECOSOC DEVELOPMENT COOPERATION FORUM. New York, 5-6 July

ESMAP Strategic Business Plan ( ) & The Renewable Energy Agenda

Central London or Edinburgh Grade 3 salary depending upon experience from 45,361 up to 56,405 (for exceptional candidates)

Terms of Reference (TOR) and Evaluation Criteria

Information for Development Program ICT FOR DEVELOPMENT: LINKING KNOWLEDGE AND ACTION

Transcription:

ESMAP MANAGEMENT RESPONSE TO THE EXTERNAL EVALUATION REPORT We very much welcome and appreciate many valuable insights and useful recommendations in the external evaluation report. This evaluation has also afforded ESMAP management and staff with a chance to take stock and a broader perspective about ESMAP s mission and objectives, and how best to achieve them. The report has helped us identify areas where ESMAP s operations and program management may need to be strengthened. This Management Response is structured around the report s key recommendations along the five categories of evaluation. A separate note addressing specific issues/questions in the report will be prepared and shared with the Consultant, the CG, and TAG. We welcome the opportunity to discuss this further at the CG Meeting, and to benefit from the CG s guidance on recommendations going forward. GENERAL COMMENTS The report appears to conflate ESMAP s overarching goal of reducing poverty with one of the three thematic objectives of the program: reducing energy poverty. We would like to note that each of the three objectives energy security, energy access, energy poverty are inter-related and both energy security and access have important direct and indirect linkages to reducing poverty. Increased energy security helps reduce poverty in the long run, although it is difficult to identify the linkages upfront. Similarly, efforts to promote energy access contribute to reduced energy poverty. ESMAP has launched a program to address energy poverty issues head-on, through improved energy access, which has the potential to impact on both energy poverty and energy security at the same time. Fulfillment of ESMAP s strategic role. In this regard, the report states that ESMAP s operational leveraging role has shown more impacts than its knowledge clearinghouse function, attributing this mainly to the annual block grant (ABG) program and inadequate dissemination. While we agree with the recommendation to enhance our outreach and dissemination work, it is important to recognize that a large chunk of the ABGs focus on intermediating knowledge. The report places significant emphasis on the lending leveraging effect of ESMAP resources. While leveraging is an important facet of our work, it is important also to note that this is but one facet, perhaps the most easily measurable one. In the broader development context, leveraging includes not just World Bank lending, but also leveraging of policy and institutional change, which are harder to attribute and measure. We acknowledge the difficulty of measuring the policy or capacity building/knowledge transfer impacts of our work, but will continue to seek improvements in portfolio monitoring and evaluation in this area. Below is ESMAP s Management Response to the 11 specific recommendations discussed in the report.

I. RELEVANCE 1. While continuing to adapt to changing global and regional concerns (e.g., steady high oil prices, new opportunities offered by natural gas, gender issues), ESMAP should maintain a clear and well delineated area of concentration in order to avoid an over-extension of resources, including funding and expertise. ESMAP should reinforce its position in those areas with greatest gain relative to need and its comparative advantage, such as with global crosssectoral work and well-targeted innovative tools and models. ESMAP RESPONSE: Agreed. 2. In order to keep a stronger orientation on strategic level focus, ESMAP program objectives should be more clearly and systematically referred to in project planning documents and products/outputs. Clarity and consistency is especially important to integrating new programs into the business plan, in particular through relevant wording in the names of the new programs and well-identified positioning within the program and results framework. ESMAP RESPONSE: Agreed. Since 2010, all new ESMAP activities are required to have statements of outcomes that are linked to program objectives as well as indicators to measure results. 3. ESMAP should pursue and reinforce efforts to mainstream gender and social aspects into project planning and implementation, e.g., by integrating social and gender issues in project templates and implementing the follow-on recommendations from the workshop(s) under the Gender & Energy Development Strategies Program. M&E reporting should include gender disaggregated and social indicators at project level, in order to monitor actual results. ESMAP Response: ESMAP management concurs with the recommendation to further mainstream gender and social aspects into ESMAP activities. These recommendations appear to be based on a 2008 Gender and Energy Horizon Scanning and Planning Workshop Report. We should like to note that the workshop s recommendations were the foundation for ESMAP's Gender and Energy Development Strategies (GEDS) Program developed in 2008 and further detailed in the Project Concept Note (PCN) for the on-going AFREA Gender and Program. The components of the Gender and Energy Program just in time assistance, developing a SWAT team of gender and energy experts, integrating gender into M&E, project planning and implementation are all part of the recommendations coming from the 2008 workshop report. These activities have been supporting the mainstreaming of gender into energy operations through a "learn-by-doing approach" by providing World Bank energy teams and governments just in time technical assistance targeted at developing project components, activities and actions that can be integrated into existing and future operations and programs. Based on these efforts in 5 countries (Mali, Senegal, Benin, Tanzania, and Kenya), toolkits, case studies and knowledge materials are being developed to support the energy sector in further mainstreaming gender. As the Bank acts on the 2012 World Development Report on Gender and Development, ESMAP is wellpositioned to support the energy practice based on the knowledge, activities, and team of experts it has recently mobilized. ESMAP RESPONSE TO THE EXTERNAL EVALUATION REPORT P a g e 2

II. EFFECTIVENESS 4. ESMAP continues to need a comprehensive communications and knowledge management plan and dissemination protocol for papers, reports and other activities. Implementation of such a plan will not only improve visibility but it will also advance the reach of outputs and outcomes by engaging a wider audience. ESMAP RESPONSE: ESMAP management recognizes that, as its portfolio grows and demand increases for its resources and knowledge products, it faces substantially greater needs for communication and dissemination support. In FY12, ESMAP hired a Communications Officer, developed new communication and publication strategies, and put in place an integrated communication, publication, and online team as part of the core ESMAP unit. During this period, ESMAP management has already addressed some of the specific issues relating to communications and dissemination raised in the evaluation, including: (i) development of a comprehensive communications plan and a new plan for production of knowledge products; (ii) putting in place a new dissemination protocol; (iii) better defining ESMAP s role, scope and objectives for external audiences; (iv) ensuring ESMAP branding is on all knowledge reports produced by the Bank regions through increased cooperation between the ESMAP communications team and regional ESMAP coordinators; and (v) establishing a new budget mechanism for funding dissemination of knowledge products to begin in FY13. 5. In order to account for and track progress along key ESMAP high-level objectives, management must either devote further resources to identifying a standard methodology for assessing the quality and potential of upstream activities and products, or increase the depth and frequency of impact-assessments of follow-on results long after project closing, or both. ESMAP RESPONSE: Agreed. While noting the inherent difficulty of attributing the policy and investment impacts to ESMAP s analytical and advisory activities, ESMAP continues to strengthen its monitoring and evaluation system, through an annual portfolio review that systematically assesses outcomes along high-level objectives and the introduction of a results-based, on-line monitoring system. Seeking out experiences from other international programs is a key part of the effort to improve M&E systems. Furthermore, ESMAP plans to update its existing logframe and incorporate more details on specific indicators to better reflect impacts (or goals) at a global level. An early draft logframe is currently under development and will be presented to the CG in the context of the next business plan for ESMAP. III. EFFICIENCY 6. In order to collect and assess meaningful results on efficiency of ESMAP operations and management, ESMAP should improve project-level reporting on outputs, costs, and outcomes and link this improved reporting to expected and actual cost data. ESMAP RESPONSE: We agree with evaluation team s emphasis on tracking value for money indicators, but would seek further elaboration from the evaluation team on where further improvements in project level reporting are recommended. Institutional systems already provide for project level reporting on outputs, costs, and outcomes. ESMAP's M&E system establishes linkages between the cost of activities ESMAP RESPONSE TO THE EXTERNAL EVALUATION REPORT P a g e 3

and outcomes. Furthermore, the new M&E portal, recently introduced by ESMAP, will help to improve tracking and reporting of outputs, measurement of outcomes, cost allocation, and actual expenses. IV. INSTITUTIONAL ARRANGEMENTS AND MANAGEMENT 7. Building on the work that has already been done over the current Business Plan period to streamline and ensure a more coordinated approach to business and work planning, the CG meeting structure and agenda should be adjusted. It should accommodate the need for more donor interaction to discuss strategic issues amongst donors themselves as a first step during meetings, and to allow for a consolidated discussion of such issues with ESMAP management as a second step. 8. ESMAP should expand the representation on its CG, not only to emerging donors, but also integrate recipient country representation This would ensure their views are directly carried into the strategic level discussions and decisions on the future of the program and into an enhanced North-South dialogue framework. Furthermore, it urges ESMAP to consider the need to continue to integrate recipient country perspectives from different categories of stakeholders directly in TAG assessments and provide the TAG with the resources required to ensure this. 9. The evaluation team echoes concerns already expressed by the TAG in 2011 and recommends that a more predictable pledging and contribution system by donors under a multiyear framework be instituted. It would go a long way in making human resources, business, and activity planning more in line with evolving and emerging needs in the Energy sector. ESMAP RESPONSE: We welcome the recommendations related to the CG meeting structure, TAG s engagement with stakeholders, and predictability of the pledging and contribution system. With respect to expanding representation on the CG, we look forward to the feedback from the CG, particularly on the role of the Knowledge Exchange Forum in providing recipient country representatives and donors an opportunity to share views on the program, as well as on the need to ensure efficiency in decisionmaking. V. SUSTAINABILITY 10. ESMAP should strengthen its process of risk identification and management through its new M&E system. ESMAP RESPONSE: Agreed. We would also note that ESMAP s results framework and supporting M&E system incorporate potential risks and mitigation measures. The new results-based monitoring system will strengthen the assessment of activities at-risk by flagging them for management action. 11. Two key areas are identified for broadening the beneficiary group. One is to increase and improve on the dissemination and knowledge sharing activities of ESMAP at country and regional levels, and secondly to improve the knowledge sharing with the donor group. Improvements can be made by ESMAP through making more information publicly available, through translations into local languages, through South-South exchange, through extending the reach of dissemination workshops and, finally, by promoting ESMAP s website. Knowledge ESMAP RESPONSE TO THE EXTERNAL EVALUATION REPORT P a g e 4

sharing with the donors could include regular workshops and advice provision to provide more dynamism to the donor knowledge sharing platform. ESMAP RESPONSE: Agreed. We further note that efforts are already underway to streamline and strengthen ESMAP s communications and knowledge dissemination activities at both country and regional levels, to reach donors, clients, partners, and other stakeholders (academia, service providers, private sector, etc.). More specifically, ESMAP is currently working on addressing issues raised in the evaluation, such as: (i) promoting more South-South exchanges and knowledge exchange with clients by proposing an expansion of its Knowledge Exchange Forum to include greater participation of clients and reserving funds for the dissemination of flagship knowledge products; (ii) building greater awareness of ESMAP work outside of specific country contexts; (iii) increased funding for wide distribution of regionally-produced publications with global implications; (iv) expanded support for regional and crossregional knowledge forums through ESMAP initiatives such as SIDS-DOCK and EECI. During FY12, ESMAP has proactively sought to include donors to ESMAP workshops, especially those taking place in donor and client countries, and to promote knowledge partnership with appropriate donors on ESMAP activities. ESMAP RESPONSE TO THE EXTERNAL EVALUATION REPORT P a g e 5