Fillmore Center. Largest LEED EB certified project for multifamily housing known in US. LEED Certification Progress Report. Fillmore Center July 2009

Similar documents
Prerequisite. prerequisite.

National EPA SUSTAINABLE COMMUNITIES CONFERENCE March 2009

THE ECONOMICS OF LEED FOR EXISTING BUILDINGS FOR INDIVIDUAL BUILDINGS 2008 EDITION A WHITE PAPER APRIL 21, 2008

FOR ADDITIONS and REMODELS Before filling out this application, read Green Building & Green Points Guideline Booklet for more in-depth information.

2016 LEED Equivalency Analysis for Stanford Campus

LEED for Existing Buildings:

Construction Specifications Canada Conference May 23, BOMA BESt

10 LEED STRATEGIES FACILITY MANAGERS CAN USE

LEED EB:OM Credit Catagories

Summary of Greening of State Government Executive Orders

SUSTAINABILITY An Energy & Emissions Case Study

CIMS-Green Building: Elevate Your Green Cleaning and Prepare for LEED

Sustainable Building Operations & Upgrades

Presenters: Dominick Balletta Managing Director Jacob Burns Film Center

LEED & INCENTIVES. Alison Y. Rivenburgh, LEED AP

What s New in LEED O+M v4: Get Ready for the Future! A Presentation by The Sustainability Experts Leonardo Academy At NFMT Las Vegas

GOLD LEVEL AWARD WINNER. The City of Daly City Sustainability Best Practices Activities

The USGBC booklet, LEED for Existing Buildings: Operations

OVERVIEW. The goal of this LEED-EB effort was to manage and operate the building in an as environmentally sensitive a way as possible.

LEED for Operations and Maintenance

500 WEST PUTNAM AVENUE GREENWICH, CT

LEED Application Guide for Multiple Buildings and On-Campus Building Projects

Genentech Building 20 Office LEED-CI Gold XL CONSTRUCTION

LEED Application Guide for Multiple Buildings and On Campus Building Projects

Beyond Code Building Programs. What They are, and What They can Mean to Your Community

LEED 2009 for Commercial Interiors. Presented by: Colleen McCafferty LEED AP Roselia Harris LEED AP

California State University, Sacramento February 24, 2010

Welcome ESC Educational Webinar Green Performance Contracting

L E E D S C O R E C A R D ( B U I L D I N G D E S I G N & C O N S T R U C T I O N )

Energy Efficiency Solutions for Multifamily Housing. Clark Energy Group LLC

ILLINOIS ENERGY NOW Energy Efficiency Incentives for State Facilities. December 2016

LEED-EB Checklist. Sustainable Sites - 14 points 3/9/ Documentation Required. Not Pursued Key Party. Purchase Record. Targeted.

2017 Sustainability Report

State of Illinois Programs & Grants Energy Efficiency Portfolio. Low Income Grant Programs Renewable Energy American Reinvestment and

LEED for Commercial Interiors

Executive Summary of the 2015 Resource Management Plan Results:

Mind the Gaps: Post-Occupancy Discoveries from Design to Operation

USGBC's Vision. Buildings and communities will regenerate and sustain the health and vitality of all life within a generation.

Green Building and Operating Practices and Guidelines

Chapter 13C GREEN BUILDING REQUIREMENTS

LEED-CI ANALYSIS 115 STEVENS AVENUE VALHALLA, NY

LEED -Existing Buildings. Crescent Ridge Corporate Center I

LEED BD+C Integrative Process. Lori A. Brown, LEED AP BD+C Power Jam Study! Lorisweb.com 1

PLATINUM LEVEL AWARD WINNER. City of Chula Vista Sustainability Best Practices Activities

City Facilities and Operations

Sustainable Building Code City of Ketchum

6/4/2014. LEED Projects are

Crawford House Office Building

Exploring Clean Energy Professional Development and Training Opportunities. Rebecca Hughes, NYSERDA Project Manager

Mumbai Existing Building Operation & Maintenance

How to Interpret this Report

Decatur Fire Station No. 2

Energy Upgrade California

McCollum Hall Classroom Renovation Project Profile LEED-CI Gold, August 2007

Green Building Standards

Sustainable Design A DIVISION OF SHIVE-HATTERY

Benchmarking EPA Portfolio Manager and Energy Star Certification

26% 13% reduction in lighting power density 83% 19% 44%

Annual Sustainability Performance Report Card

Environmental, Social and Governance Objectives and Initiatives

LEED-EB: How to achieve certification and reduce operating costs. Ed Iczkowski, Managing Member EFI Commissioning Services, LLC

Sustainability at UCSB Campus. Perrin Pellegrin Campus Sustainability Manager Facilities Management, UCSB April 25, 2006

Green Assistance Program Orientation Meeting March 22, August 5, 2010

STRATEGY 1 Increase composting by county employees to achieve 85% waste diversion; continue education about including soiled paper in compost stream

Lessons Learned from Continuous Commissioning of a LEED Gold Building in Texas

Receive a no-cost detailed water audit to learn about your building s water use and how you can save water and money.

Casey Neurock, LEED A.P. NeuGreen, LLC

1050 WALNUT STREET BOULDER, COLORADO

Sustainability in Existing Buildings: How to use LEED and The Triple Bottom Line to Green Your Facility

Completed energy audits on 20 percent of the city s buildings with the remaining buildings to be completed within four years.

A PRACTICAL GUIDE TO SAN FRANCISCO'S GREEN BUILDING ORDINANCE

INFRASTRUCTURE ONTARIO

What is Green Building?

Energy Savings Audit

RECOLOGY 2017 RATE APPLICATION TECHNICAL WORKSHOP. February 2017

LEED CAMPUS CASE STUDY. July 2018

Winchester High School

Green Campus & Sustainability Program

LEED Rated Government Buildings. Government Sector Construction. CPWD Construction Work Load

BUILDING A MORE SUSTAINABLE WORLD

Appendix C: Greenhouse Gas Reduction Calculations

Environment by Design:

Energy Efficiency and Reduction. Tribal Lands and Environment Forum August 15, 2016

Green Campus & Sustainability Program. Los Rios Community College District

ANAHEIM CONVENTION CENTER GREEN PROGRAM

The Duke Endowment. Duke Facilities Fall Campus Sustainability Summit. Facilities Discussion. September 14, Management

LEED. Leadership in Energy and Environmental Design

Benefits of Green Buildings. Government Finance Officers Association of Texas April 2014

Guidance for Retro-Commissioning

GREEN OPTIONS SUSTAINABILITY REPORT. Grocery Focused. RETAILER Centered.

05/14/2012 THE CRIME OF IMPROPER ENERGY MANAGEMENT AGENDA

Strive for Continuous Improvement. Drive Facility Efficiency & Sustainability with Technology

Energy Retrofit Loan Program

BGSU Construction Standards Office of Design & Construction Bowling Green State University

2015 Sustainability Accomplishments

Overall Sustainable Design

North Carolina ENERGY STAR Conference Saving the World One House at a Time November 15, Energy Efficient Homes Top Ten List: Myth vs.

IFMA Central Pennsylvania Chapter August 20, 2014

Case Study for Fortune 500 Telecom: Retrofitting Pneumatic Controls for Energy Efficiency

LEED-CI ANALYSIS 140 GRAND STREET WHITE PLAINS, NY

Transcription:

LEED Certification Progress Report Fillmore Center July 2009 Fillmore Center Largest LEED EB certified project for multifamily housing known in US. 2

Major Outstanding Projects Air handlers audit Retro-commissioning Recycling Compactor Occupant Surveys Improved Pest Management Phase out program for CFC-based HVAC units 3 Performance Period July September 2009 7/13/09 Air handlers audit 7/13/09 Retrocommissioning (RCx) 7/22/09 Improved Pest Management 8/1/09 Install New Recycling Compactor 8/1/09 Install New boilers 8/15/09 Occupant Surveys 8/21/09 Custodial Effectiveness Survey Phase out Program for CFC based 8/31/09 HVAC 4

Replace Boilers Replace three boilers in: One in each tower: T1, T2, & T3 Existing boilers: Less than 70% efficiency New boilers: ModCon Munchkin 94% efficiency 5 ModCon 94% efficiency Modulating Stackable frame Requires special air intake & exhaust All boiler rooms were inspected and will comply with requirements Equipment cost: $8,600 - $13,100 depending on size Some extra installation costs Rebate of $700 - $1,200 per unit depending on size 6

Boiler Savings Move from less than 70% efficiency to 94%. Approx. savings of $11,500 per year replacing 3 boilers At $1.20 per therm 7 Waste Stream Reduction Composting Program Landscaping Waste & Residents Placed posters in all trash rooms Batteries and hazardous light bulbs E-waste (TVs, PCs, phones, etc.) To install New Compactor 8

9 Plaque in Lobby 10

Savings from New Compactor Incentive: % Diverted = % Savings Annual Savings: 40% Diversion Approx. $72,000 810 cubic yards diverted from landfill Annual Savings: 60% Diversion Approx. $114,000 1,460 cubic yards diverted from landfill Equivalent to 10 semi truck trailers 11 Waste Stream Savings Note: This is an approximation and the actual bill amount will vary. 12

Tenant Education Week Explanation of Fillmore Greening to tenants Distributed compost bins Distributed 500 CFLS 23.5 kw load reduction Bike to Work Week Great response from tenants! Video Sample 13 Staff Education Week July 27-31 Personal training for completed Plans & Policies: Hardscape Management Plan Integrated Pest Management Plan Purchasing Policy Waste Stream Policy Performed my SEP and Fillmore head staff The goal is to clarify & streamline processes to improve efficiencies, minimize mistakes, and increase consistency. 14

Air Handler Audit Required by LEED to meet ASHRAE standards Clark Seif Clark, Inc. Project Scope Certified Industrial Hygienist / Certified Indoor Environmentalist Develop comprehensive catalog of all air handling equipment Assess condition of all air handling units Identify inefficiencies / recommend upgrades Determine indoor air flow and indoor air quality 15 Occupant Surveys 15 possible LEED points Transportation Survey Residents who commute in a single occupied car vs. other forms of commuting Occupancy Comfort Survey Satisfaction with appliances, thermal comfort, air quality, lighting levels, and building cleanliness 16

Integrated Pest Management (IPM) Site Assessment Complete Terminix fine-tuned IPM plan Fewer chemicals used Prevention over termination Example: Alter landscaping procedures to prevent nests rather than exterminate pests 17 Other Projects Underway Custodial Effectiveness Assessment Survey Replacing light bulbs during unit turnover with high efficient CFLs Replacing fountain lights with high efficient lighting Replacing dog runs with new synthetic turf Using recycled content Scheduled for August 18

Solar PV & Thermal Power Purchase Agreement Solar System Design Solar PV Offsets 7% of electricity System Size: 135 kw Solar Thermal Offset 6% of natural gas System Size: 3,136 Sq. Ft.

Solar Opportunity Great solar access Minimal shading San Francisco climate Full solar analysis completed Solar Layout F1 Blue modules are PV Black modules are thermal

Solar Layout S2 & F2 Solar Layout S3 & F3

LEED Cost List Replace three boilers $78,000 Retro commissioning $24,600 Low mercury light bulbs $12,600 New compactor $45,099 Air handler Audit $8,500 Occupant Surveys $10,000 Custodial Effectiveness Assessment $4,500 Sustainable Cleaning Supplies $10,000 TOTAL $193,299 25 Current Point Status Category Points Sustainable Sites 5 Water Efficiency 3 Energy Efficiency 14 Materials & Resources 6 Air Quality 8 Innovation in Operations 5 Total 41 Certification 34 points Silver 43 points Gold 51 points Platinum 68 points 26

Joe O Connor Sustainable Energy Partners, LLC 2588 Mission Street Suite 210 San Francisco, CA 94110 www.separtners.com 415.648.1299 office 847.628.1299 Fax 27