INTERACTIVE HIGHWAY SAFETY DESIGN MODEL (IHSDM)

Similar documents
Interactive Highway Safety Design Model (IHSDM) AASHTO Subcommittee on Design July 21, 2009

Interactive Highway Safety Design Model (IHSDM) Traffic Records Forum Biloxi, MS October 28,

NCHRP Report 687 Guidelines for Ramp and Interchange Spacing

INTERCHANGE MODIFICATION REPORT

INTERCHANGE SAFETY. Steve Allen. Houston Daugherty. Director, Strategic Transportation Investments Division (TDOT)

WELCOME IL 47. Community Advisory Group Meeting #4 Waubonsee Community College Tuesday, November 15, 2016

NCHRP 3-88 Guidelines for Ramp and Interchange Spacing

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS

Interchange Design. Nick Hoernke, Bill Roth and Eric Sorensen

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

TRANSPORTATION PROJECT REPORT DRAFT CONCEPTUAL ACCESS MODIFICATION PROPOSAL OCTOBER 2002

CHAPTER 5 PARALLEL PARKWAY CORRIDOR IMPROVEMENTS

THE HIGHWAY SAFETY MANUAL

APPENDIX A TIER 1 ANALYSIS

Nashville Regional Freight & Goods Movement Study Phase III

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

Appendix B Highway 407 Interchange Review - Cochrane Street Area

Evaluating Design Alternatives using Crash Prediction Methods from the Highway Safety Manual

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges

Status of Highway Safety Manual Implementation. October 2015

Interchange Justification Report (IJR) I-75 at Bethlehem Road Henry County

An Introduction to the. Safety Manual

8.0 Chapter 8 Alternatives Analysis

I-35/80 Operations Study: Douglas Avenue to NW 86 th Street FOR

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

Data-Driven Safety Analysis (DDSA) Implementing Safety Innovations Every Day Counts 3

I-10 CORRIDOR IMPROVEMENTS STAGE 0 FEASIBILITY STUDY STATE PROJECT NUMBER H FEDERAL AID PROJECT NUMBER H004100

On behalf of the Carolina Crossroads project team we thank you for taking the time to attend this meeting.

Route 7 Connector Ramp MODIF IE D I N T ER C H A N G E M OD IFICATIO N R E PO RT TRA N S F O R M I : I N S ID E THE BE LTWAY

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence.

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0

LOCATION AND DESIGN DIVISION

FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison

APPENDIX B. Excerpts from the October 2002 Conceptual Alternatives Report

The sections below include examples of HSM implementation activities undertaken by various transportation agencies.

I-95 Corridor Study Phase II Highway Element

500 Interchange Design

TRAFFIC SAFETY EVALUATION. Using the Highway Safety Manual and the Interactive Highway Safety Design Model. I 15 Dry Lakes Design Exception

DEVELOPMENT, ANALYSIS, AND DESIGN OF A NEW PARKWAY AT GRADE INTERSECTION (PAGI)

ACTION TRANSMITTAL

MOBILITY AND ALTERNATIVES ANALYSIS

Updating Virginia s Statewide Functional. Brad Shelton, VDOT Chris Detmer, VDOT Ben Mannell, VDOT

Exit 73 I-29 Interchange Modification Justification Study

NW La Center Road/I-5 Interchange Improvement Project (MP 16.80)

Interstate 10 (SR 8)/ SR 200 (US 301) Interchange Interchange Modification Report. APPENDIX E Interchange Concepts Considered

Diverging Diamond Interchanges in Michigan

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

500 Interchange Design

Final Recommendations Identification of Improvements, Strategies, and Solutions

Updating Virginia s Statewide Functional Classification System. Briefing to MPOs, PDCs, and Local Governments

Central Phoenix Transportation Framework Study

Geometric Design: Past, Present, and Future

Project History Interchange Innovation Existing Conditions Proposed Design Approval Process Final Details PRESENTATION FOCUS

Chapter GRADE SEPARATIONS & INTERCHANGES

BILLINGS BYPASS UPDATE

Appendix D Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

C-TEP is pleased to present a short course; Innovative Intersections & Interchanges, March 14-16, 2016 in Calgary, Alberta.

Beltline Interchange Range of Alternatives Screening Summary Memo

HSM APPLICATION USING IHSDM (I-12 TO BUSH) April Renard, P.E. LADOTD Highway Safety

DDI s Can Move More Than Cars. Alex Ariniello. Presentation for the ITE Western District Annual Meeting. July, 2016 in Albuquerque, New Mexico

SHRP II R-11 Strategic Approaches at the Corridor and Network Levels to Minimize Disruptions From the Renewal Process. June 10, 2014 Webinar

Performance Based Practical Design (PBPD)

Military Highway Interchange

Informational Brochure. Proposed Interchange. Interstate Route 295 (I-295) AT Greenville Avenue (State Route 5) Town of Johnston, Rhode Island

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement

I 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION TRAFFIC OPERATIONS AND SAFETY ANALYSIS REPORT

PROJECT STUDY REPORT. Cal Poly Pomona Senior Project

CLA /10.54, PID Project Description:

I-10 KENDALL EXTENSION. Open House

Operational Analysis of Dulles Toll Road Ramps to Tysons. Board Transportation Committee Meeting September 17, 2013

Overall project. The $288 million Phase 2 DesignBuild project starts construction. this spring, with completion by December 31, 2016

FINAL REPORT ATTACHMENT 1 Detailed Phase II Data Tables

Project Prioritization for Urban and Rural Projects TEAM CONFERENCE March 7, 2018

Environmental Consequences and Mitigation

Consideration of a Diverging Diamond Interchange in Saskatchewan. Paul H. A. Steel, Project Manager, M. Eng., P.Eng., Tetra Tech EBA Inc.

Vicinity Map. Interstate 605 (I-605) and State Route 91 (SR-91) in Los Angeles County

NORTHWEST CORRIDOR PROJECT. NOISE TECHNICAL REPORT 2015 Addendum Phase IV

3 INTERSTATES. The Carolina Crossroads Project Team Welcomes You

New Analytical Tools for Safety Management of Urban and Suburban Arterials. Douglas W. Harwood Midwest Research Institute Kansas City, MO

Bow Concord I-93 Improvements City of Concord Transportation Policy Advisory Committee

Highway Safety Analysis Tools for Engineers

on Access Management Howard Preston CH2M HILL 7 th Annual Conference

Interchange Improvements at the Queen Elizabeth Way and Glendale Avenue

AASHTO s Highway Safety Manual and Performance Measures / Targets

What is the Dakota County Principal Arterial Study?

Existing vs. Proposed Ramp Noise Sensitivity Analysis Austin Boulevard Interchange

SPAGHETTI BOWL. RTC Workshop April 20, 2018

Geni Bahar, P.E. Describe key concepts and applications

SR 60 Grade Separation over CSX Railroad Traffic Technical Memorandum

Statewide Roundabout Guidance

I-270 NORTH EA PERFORMANCE MEASURES IN NEPA

Process to Identify High Priority Corridors for Access Management Near Large Urban Areas in Iowa

RECOMMENDED RAMP DESIGN PROCEDURES FOR FACILITIES WITHOUT FRONTAGE ROADS

CHAPTER 8: I-71 ACCESS IMPROVEMNETS

I-95 Corridor Study Phase II Highway Element

Performance Based Practical Design. March 30 th, 2016 ITS Georgia

CHAPTER 2 - TRAVEL DEMAND MODEL DEVELOPMENT

CHAPTER 5. City of Greensburg Comprehensive Plan. Introduction. Transportation Goals & Objectives

Principal Arterial Intersection Conversion Study

Transcription:

INTERACTIVE HIGHWAY SAFETY DESIGN MODEL (IHSDM) TSITE 2016 Winter Meeting Nashville, TN February 25, 2016

AGENDA Project History IHSDM: Background & Overview IHSDM: Interstate 24 Model IHSDM: Interstate 24 Results & Analysis Conclusion

PROJECT HISTORY

SITE LOCATION IAR Regional Location The proposed project is located in Nashville, Tennessee off Interstate 24 Serves as a connector between Illinois, Kentucky, Tennessee, and Georgia Project History

WHERE WE ARE TODAY! SITE LOCATION IAR Regional Location For reference: approx. 15 miles away from our meeting today Serves as a connector between Nashville, Murfreesboro, and Chattanooga Project History

IAR Local Location Originally designed & built in 1980s Update designed in mid-1990s Redesign and approve for implementation in 2016 Project History

IAR Site Location Current site: interchange only accesses the north Average AADT Interstate 128,000 veh/day Average AADT Ramps: 5,000 veh/day Project History

IAR Site Location Proposed site: 65,324 additional veh/day 2,552,500 s.f. of commerical and residential space 1 new roadway / 1 extended route Project History

Project History Timeline Consensus Mid 1990s: Interchange update first designed Spring 2013: The property adjacent to interchange was purchased for development Fall 2014: Initial meeting with state DOT Initial meeting with Metro Nashville Traffic Summer 2015: Traffic study finalized / First IAR submitted to FHWA Required additional clarifications related to safety analysis Specifically, the 2014 published Highway Safety Manual supplement Interactive Highway Safety Design Model (IHSDM) v. 10.1 released October 1, 2015 Project History

IHSDM: BACKGROUND & OVERVIEW

What is IHSDM? IHSDM: Interactive Highway Safety Design Model A suite of software tools that support project-level geometric design decisions by providing quantitative information on the expected safety and operational performance. Simply put, it helps planners, designers, and reviewers justify and defend geometric decisions. IHSDM: Background & Overview

The Modules Contains 6 separate evaluation modules ; all based on Highway Safety Manual (HSM) New version contained updates to Crash Prediction module; specifically, interchange-level evaluation Module Crash Prediction Policy Review Design Consistency Traffic Analysis Intersection Review Driver/Vehicle Relationship to HSM Implementation of HSM, Part C (Predictive Method) Evaluates nominal safety; use in conjunction with (not in place of) HSM, Part C methods Diagnostic tools to that can further support HSM, Part C evaluations IHSDM: Background & Overview

Software Capabilities Available Facility Types: Two-lane rural highways Multilane rural highways Urban & suburban arterials Freeway segments Freeway ramps / interchanges IHSDM: Background & Overview

Input Requirements Requirements vary based on module. IHSDM: Background & Overview

Output Reports Report types vary based on module. For Crash Prediction Module: Highway Data Evaluation Report Crash Frequency and Rates Crash type distribution Graphs IHSDM: Background & Overview

IHSDM: INTERSTATE 24 MODEL

Alternative #1: Existing Condition No build scenario: Theoretical Alternative (null) Assumes no modifications before 2020 Prop. development would not have direct access to either Interstate 24 or Hickory Hollow Parkway IHSDM: Interstate 24 Model

Alternative #2: Proposed Diverging Diamond Interchange (DDI): 3 thru lanes in each direction 2 new signalized intersections Exit ramps will diverge with thru lanes Entrance ramps will merge with through lanes IHSDM: Interstate 24 Model

Alternative #3: Proposed Tight Urban Diamond Interchange (TUDI): Retains partial cloverleaf (parclo) in SE quadrant Existing ramps modified to allow traffic in north & south direction Also to improve existing sight distance issues on ramps 2 new signalized intersections Bridge widening IHSDM: Interstate 24 Model

IHSDM: INTERSTATE 24 ANALYSIS & RESULTS

Projected Crashes for Network Total Crashes 2012-2015 Actual 2020 Alt. #1 (A) 2020 Alt. #2 2020 Alt. #3 Total Eastbound at Exit 59 42.86/year 34.94/year 29.14/year 29.14/year Total Eastbound at Exit 60 2.28/year 3.07/year 7.20/year 13.09/year Total Eastbound at Exit 62 20.00/year 26.68/year 27.30/year 27.30/year Total Westbound at Exit 62 29.14/year 24.34/year 24.70/year 24.70/year Total Westbound at Exit 60 3.43/year 2.22/year 5.11/year 9.29/year Total Westbound at Exit 59 19.43/year 27.10/year 23.96/year 23.96/year Total Segments and Ramps 117.14/year 118.35/year 117.41/year 127.48/year Remaining Conflict Points Within Area of Influence Remaining SR 254 Corridor 87.13/year 87.13/year 74.06/year 74.06/year HH Pkwy at Crossings Blvd 8.29/year 8.29/year 12.13/year 12.13/year Total Remaining Areas 95.42/year 95.42/year 86.19/year 86.19/year Total in Influence Area 212.56/year 213.77/year 203.06/year 213.67/year IHSDM: Interstate 24 Analysis & Results

Final Analysis Alternative #2 (DDI): Will reduce the total crashes within the area of influence by 5% (almost 11 crashes per year). Alternative #3 (TUDI): Can accommodate the 2020 site traffic, as well as the diverted traffic while keeping total crashes constant. In January of 2016, FHWA found design alternatives in the proposal to be both engineering and operationally acceptable and were both conceptually approved. IHSDM: Interstate 24 Analysis & Results

CONCLUSION This is why safety is important QUESTIONS?

CONCLUSION For more IHSDM information: Barge Waggoner Sumner & Cannon, Inc. Lauren Gaines Lauren.Gaines@bwsc.net 615.254.4243 For more project information: TDOT Strategic Transporation Investments Division Shaun Armstrong Shaun.Armstrong@tn.gov 615.253.5327