Department of Defense Industrial, Landscaping, and Agricultural (ILA) Water Use Guidance

Similar documents
Federal Net Zero Design-Energy, Water, and Waste. Net Zero Water. Kate McMordie Stoughton Pacific Northwest National Laboratory August 16, 2017

Water Auditing 101. William D. Chvala, Jr., CEM. Greg Sullivan, PE, CEM. Pacific Northwest National Laboratory. Pacific Northwest National Laboratory

Green Codes & Standards: Impact on Landscape Irrigation

ARIZONA CONSERVATION REQUIREMENTS. Management Plans MUNICIPAL CONSERVATION REQUIREMENTS

Water Management Energy and Sustainability Sub Group November Meeting. Brian Boyd, Kate McMordie Stoughton, and Jordan Henderson November 20, 2013

National Water Demand Management Policy

ORDINANCE NO NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF GARLAND, TEXAS: SECTION 1

APPENDIX B. LOWER COLORADO RIVER AUTHORITY DROUGHT CONTINGENCY PLAN RULES FOR WATER SALE CONTRACTS December 2013 TABLE OF CONTENTS

Principles of Water Conservation and

UWMP Standardized Tables. King City District Urban Water Management Plan Appendix H

Water Conservation Plan

Appendix E. UC Sustainable Water Systems Policy

DRAFT MEMORANDUM OF UNDERSTANDING BETWEEN THE SAN FRANCISCO PUBLIC UTILITIES COMMISSION AND THE SAN FRANCISCO RECREATION AND PARK DEPARTMENT

LEED Credits. How FieldTurf Can Contribute To Obtaining

Mauritius Green Building Handbook. Water. Introduction. Water and buildings. Llewellyn van Wyk Principal Researcher Built Environment CSIR

UWMP Standardized Tables. Livermore District Urban Water Management Plan Appendix H

ORDINANCE NO. Adopted by the [AGENCY] [DATE] ADOPTING A WATER CONSERVATION PROGRAM

Global Lessons on Water Reuse for Industrial Applications in Alberta. Dr. Stephen Stanley, Ph.D., P.Eng., Senior Vice President, EPCOR Water Services

UWMP Standardized Tables. City of Hawthorne District Urban Water Management Plan Appendix H

Districtwide Water Conservation Efforts

Regulation No. 15 Water Conservation Water Shortage Contingency Plan

UWMP Standardized Tables. Los Altos Suburban District Urban Water Management Plan Appendix H

UWMP Standardized Tables. Salinas District Urban Water Management Plan Appendix H

UWMP Standardized Tables. Palos Verdes District Urban Water Management Plan Appendix H

UWMP Standardized Tables. Dominguez District Urban Water Management Plan Appendix H

Water Balance and Roadmap Update Pacific Northwest National Laboratory Kate McMordie and Brian Boyd

Water 202: Turning Audits and CEWWEs into Successful Projects

Table of Contents Part Title Page

Infrastructure Element

Gwinnett County Department of Water Resources Reclaimed Water Transport/Application Training Program

Graywater Use by the Army Is it Time Yet?

CHAPTER 11 CONSERVATION

Oklahoma Department of Environmental Quality Water Quality Division. Patty S. Thompson, P.E. Southwest AWWA Conference October 14, 2014

OPERATING POLICY MANUAL

Impacts From Development

DoD Sustainability Strategy The Latest. Mr. Dave Asiello DUSD(I&E)/CMRM

EMERGING TRENDS IN WATER TREATMENT

DROUGHT MANAGEMENT AND WATER CONSERVATION IN CHARLOTTESVILLE AND ALBEMARLE COUNTY

Progress and Barriers to Becoming Net Zero

PURPOSE PROCESS PAYOFF

Lawrence Berkeley National Laboratory Lawrence Berkeley National Laboratory

REGULATIONS GOVERNING WATER SERVICE TO CUSTOMERS OF THE EAST BAY MUNICIPAL UTILITY DISTRICT SECTION 30 NONPOTABLE WATER SERVICE

Army Water Reuse Policy A Decision Document

Water Recycling and Reuse

CITY OF LAGRANGE, GEORGIA UTILITY DEPARTMENT WATER CONSERVATION AND DROUGHT CONTINGENCY PLANS

INFRASTRUCTURE ELEMENT Goal, Objectives and Policies

Greywater Recycle System. Optimising the re-use and recycling of waste water

SECTION (SECTION 02810) PLANTING IRRIGATION SPECIFIER NOTE:

WATER USE EFFICIENCY PROGRAM

ckly STAFF REPORT Meeting Date: February 06, 2018 To:

CONSERVATION PLAN April 2009

A History of Water Reuse in Colorado

NOTICE OF PROPOSED WATER SHORTAGE CONTINGENCY PLAN WITH STAGED MANDATORY REDUCTIONS AND DROUGHT SURCHARGES AND PUBLIC MEETING

Rusty Osborne October 1, 2010 Sustain This!

CHAPTER 5.03: WATER CONSERVATION AND WATER SUPPLY SHORTAGE PROGRAM Section Title Findings Declaration of purpose and

Residential Recycled Water Household Guide

Chapter NONPOTABLE WATER DISTRIBUTION SYSTEM

UNIFIED FACILITIES CRITERIA (UFC)

WE Credit NRDC 158 NRDC. 159 Zentox Corporation. 160 Cahill Associates. 161 ZGF Partnership. 162 [none] 163 Keen Engineering Inc.

DEPARTMENT OF GEOGRAPHY POST GRADUATE GOVT. COLLEGE FOR GIRLS.SECTOR-11 CHANDIGARH CLASS-B.A.II PAPER-A RESOURCES AND ENVIRONMENT: WORLD PATTERNS

2013/SCSC/WKSP1/007 Sustainability of Water - Water Reclamation and Reuse

PREPARING FOR AN UNCERTAIN WATER FUTURE: CONSERVATION, DEMAND

2013 UPS Corporate Sustainability Report: Supplemental Data

Lawrence Berkeley National Laboratory

DROUGHT CONTINGENCY PLAN

Stormwater Harvesting in the Bronx 2013 SESWA Annual Conference Charlotte, NC October 24, 2013

INDUSTRIAL WATER & SEWER USE SURVEY. 3. Operator (If different from the Owner, the name of the person, or firm, legally the operating the facility):

Drought Legislation Implementation Information Guide

Austin Water Conservation Commercial / Multifamily Rebates AAFAME Luncheon November 14, 2017

City of Wimberley. Public Hearing January 8, Proposed Central Wastewater Project Modifications

City of Millbrae 2016 CALIFORNIA GREEN BUILDING CODE CHECKLIST FOR NEW NONRESIDENTIAL BUILDINGS

10:00 a.m. Public Hearing #1

1 of 6 9/8/2012 3:47 PM

ORDINANCE NO WHEREAS, on January 17, 2014, Governor Edmund G. Brown, Jr. declared a drought state of emergency; and

17. WATER SUPPLY. TABLE 17.1 Average Daily Potable Water Demand

ORDINANCE NO

Introduction. 1 Module 1.5 Risk Mitigation For Small Holder Agricultural Production In The Caribbean

HALL COUNTY DEPT OF PUBLIC WORKS & UTILITIES Page 1 of 8 Reuse Water End User Application

APPENDIX L MODEL WATER CONSERVATION PLANS FOR MUNICIPAL AND NON MUNICIPAL USE

Supporting Information for Rainwater Catchment Rebate:

SECTION STORMWATER POLLUTION PREVENTION

Water Supply Availability & Deficiency Report

WATER USE PERMIT APPLICATION

City of Dallas Water Utilities Drought Management Update. September 20, 2006

Executive Directive #5 Issue Date: October 14, 2014 Subject: Emergency Drought Response Creating a Water Wise City Introduction Los Angeles and

Industrial, Commercial and Institutional Facility Water Conservation Incentive Programs

Comprehensive Plan Update - Sanitary Sewer Section Planning Commission Workshop: November 10, 2014

Water 2. Compliance 5

DRAFT KERN GROUNDWATER AUTHORITY COORDINATION AGREEMENT COMPONENTS WHITE PAPER SERIES. Item D Total Water Use

WATER USE PERMIT APPLICATION

Wastewater Management - Kenyan Policy perspective and business perspective.

WATER CONSERVATION, REUSE and AUGMENTATION SUMMARY

What are WSSC s conservation objectives? How is conservation linked to WSSC s environmental protection, resource management, sustainability goals?

NEW HAMPSHIRE CODE OF ADMINISTRATIVE RULES. CHAPTER Env-Wq 2100 WATER CONSERVATION; USE REGISTRATION AND REPORTING

REQUEST FOR COUNCIL ACTION

Building A State of Conservation

Water reuse and water quality aspects in Europe

CALGREEN NON-RESIDENTIAL BUILDING Checklist

Tempering the Thirst Of America s Driest City

Oklahoma Department of Environmental Quality Water Quality Division. Carl Parrott, P.E.

Transcription:

Department of Defense Industrial, Landscaping, and Agricultural (ILA) Water Use Guidance Office of the Assistant Secretary of Defense (Energy, Installations, and Environment) December 2015

Contents Purpose... 1 Background on Requirement... 1 Guidance on ILA Water... 1 Definitions... 1 ILA Water Reporting... 3 Reporting Responsibilities... 3 Baseline Development... 4 Determining ILA Water Usage... 4 Recommended Methods for Estimating Water Uses... 5 Industrial Applications... 5 Landscaping Applications... 5 Other Estimation Techniques... 6 References... 7

Purpose The Department of Defense (DoD) has long made it a priority to protect the environment on our installations, not only to preserve resources for future generations, but to ensure that we have the land, water, and airspace needed to sustain military readiness. The Department must better understand water use across the DoD as the risk of water scarcity continues to grow, as evidenced by the current drought in California. Measurement, conservation and management are the steps DoD is taking to reduce the risks affecting the water supply. The purpose of the DoD Industrial, Landscaping, and Agricultural (ILA) Water Use Guidance is to provide a starting point for determining ILA water use. This guidance specifically defines ILA water and provides instructions on baseline development and annual reporting by providing standard measurement and estimation techniques for water applications particularly when metering equipment is unavailable. Over the course of gaining a better understanding of ILA water applications throughout DoD, this guidance may be updated to reflect a more accurate and efficient process towards better water management. Background on Requirement On March 25, 2015, President Obama signed Executive Order (EO) 13693 Planning for Federal Sustainability in the Next Decade. EO 13693 include provisions to require Federal agencies to improve water use efficiency and management of ILA water. The EO requires federal agencies to reduce ILA water consumption 2 percent annually through fiscal year 2025. EO 13693 supersedes EO 13514, however the EO 13514 Implementation of Water Efficiency and Management Provisions instructions are still current. Reporting on reductions in ILA water use will be included in the agency s annual Strategic Sustainability Performance Plans. Guidance on ILA Water Definitions The terms defined in this section are of central importance to complying with this guidance. Examples are provided to further clarify these terms. Agricultural water Alternative Water used for irrigation and other uses related to a Federal agency testing and development of agricultural products including foods and goods ultimately used in farming and forestry and uses related to research associated with animal livestock operations. Common forms of agricultural water use include: Horticulture Greenhouse operations Aquaculture, and animal support operations, e.g., livestock water) Water not obtained from a surface or ground water source or purchased 1

water Facility Freshwater sources ILA Water Industrial Water Landscaping water reclaimed water from a third party. Alternative water can include: rainwater harvested on-site, sump pump water harvesting, gray water, air cooling condensate, reject water from water purification systems, water reclaimed on-site, or water derived from other water reuse strategies. Any building, installation, structure, land, or other property owned or operated by, or constructed or manufactured and leased to, the Federal Government. This includes a group of facilities at a single or multiple location(s) managed as an integrated operation, as well as governmentowned contractor-operated facilities. Surface or ground water sources, such as lakes, rivers, streams, on-site storm water/retention ponds, springs, creeks, and wells, that have a total dissolved solids concentration of less than 1,000 milligrams per liter (1,000 ppm). Water consumed for industrial, landscaping, or agricultural purposes. Water used to aid in industrial processes such as cooling, washing, and manufacturing. Common forms of industrial water use include: Process steam production Dust suppression Process water for industrial Make-up water for cooling manufacturing process towers Construction water Non-potable use for space Waste water treatment plant uses cooling facilitiesvehicle wash Central plant, e.g., facilities heating/cooling plant Water used for the controlled application of water to outdoor spaces to supplement water demand not satisfied by natural precipitation. Common forms of landscaping water use include: Golf courses Dog park Cemeteries Building landscaping Irrigation of turf or landscaped beds Recreational/athletic fields Ornamental ponds and fountains Nonconsumptive water use Non-potable water Water that is diverted from its freshwater source and is returned to the point of diversion in the same quantity and quality as the original diversion. Common forms of non-consumptive water use include: Hydroelectric power Water quality improvement Navigation Fish propagation Once-through cooling Water obtained from a freshwater source that is not of sufficient quality for human consumption and has not been properly treated or has not been permitted and approved for human consumption. 2

Potable water Purchased reclaimed/ recycled water Treated water Water that is of sufficient quality for human consumption and is obtained from public water systems or from freshwater sources such as lakes or streams. Wastewater-treatment plant effluent purchased from a third party that has been diverted for beneficial uses such as irrigation, industry, or thermoelectric cooling instead of being released to a natural waterway or aquifer. Freshwater treated at a water treatment plant that is non-potable. This can either be purchased or produced on-site. ILA Water Reporting The following flow chart captures which sources should be reported under the ILA water use goal in units of millions of gallons (mgals): Reporting Responsibilities DoD Components are responsible for reporting ILA water use at: Owned facilities, installations, and buildings Leased spaces where the component pays for the utility 3

Facilities located on Federal lands or military installations that are privately leased, such as restaurants, privatized family houses, farmland/agricultural leases, and where the tenant does NOT pay utilities separately ILA water consumed by DoD and Federal tenants shall be reported by the host unless there is a mutual agreement between the host and DoD tenant that the tenant will report consumption. The host and tenant shall ensure that water consumption is not double-counted. Baseline Development All components are required to establish a baseline of ILA water use. FY 2016 has been selected as the baseline year for DoD. 1 Components should collect and track each water category so that they have separate accounting of industrial, landscaping, and agricultural water use. They should report separate consumption figures both metered and estimated for these three use types in mgals along with associated cost such as including sewage fees incurred directly from ILA water consumption in thousands of dollars. Determining ILA Water Usage All metered and unmetered ILA water use meeting the criteria of this guidance should be included in the baseline and subsequent annual reports. Where facilities have multiple meters, it is important to use consistent units when combining data. If permanent metering is not available, then temporary flow meters are another solution. Temporary ultra-sonic meters can be installed to the outside of a pipe and do not require disruption of the flow. Care must be taken to install the meters so that the water flow is representative of conditions that can be used to establish an annual value for consumption. Components should document assumptions and methods by which these representative conditions were created. If the water source is from an on-site well, then the pumping records, if reliable, can be used to estimate the water use. This is done by multiplying the pump flow rate at the given well depth by the annual runtime. If these metering options are not practical or applicable, then an engineering estimate should be used to approximate annual water use. Each component should determine the best method for accurately performing such estimations. As a first step, facilities can inventory all unmetered ILA applications. Based on the inventory, components can develop a strategy for determining how various applications should be accurately estimated. It is important for there to be consistency in how these data are collected. Components should establish procedures to document the assumptions and techniques used so they can be repeated in the future. 1 EO 13514 originally established FY 2010 as the baseline year. Given the difficulty of estimating ILA water use in previous years, DoD will use FY 2016 as its baseline year to ensure completeness and accuracy of its reporting. 4

Recommended Methods for Estimating Water Uses This section provides recommendations suggested by Federal Energy Management Program (FEMP) for calculating unmetered water use for industrial and landscaping applications. No specific recommendations are made for agricultural applications, but general estimation techniques are provided that may apply to some applications. Industrial Applications Components should conduct a process audit or develop a water balance for the significant waterusing processes in their facilities. This analysis may include a measurement of the water used in each step of a process or a calculation of water inputs and outputs of a system as a whole. If batching is used within a process, water can be estimated based on the number of units produced and the amount of water used per unit. Additional adjustments should be made if water is recycled or reclaimed during the process. In addition to the evaluation of industrial processes, components should analyze the water use in mechanical systems, such as evaporative cooling systems, steam heating systems, and washing applications as part of their baseline to ensure that all significant water uses are included. Department of Energy has published Guidelines for Estimating Unmetered Industrial Water Use 2 to offer standard estimation techniques for the more typical industrial water applications, e.g., evaporative cooling systems, steam heating system, washing applications, and batch process/manufacturing usages, and vehicle wash stations. Components should refer to this guide when developing methods for these applications. Landscaping Applications There are two recommended approaches to producing an engineering estimate for unmetered sources of landscaping water use: irrigation audit and evapotranspiration. The irrigation audit method is a more in-depth process, and therefore provides a more accurate estimation of water use. It consists of performing physical measurement of water applied to landscaped areas through irrigation equipment. Irrigation audits require knowledge on how to perform an audit and the purchase of some minor equipment. Where feasible, components should either use or transition to performing irrigation audits because they offer a method for spot measuring actual landscape water use. General instructions on this method can also be found in FEMP s Guidelines for Estimating Unmetered Landscaping Water. 3 The evapotranspiration (ET) method is a relatively easy way for components to develop an estimate of annual landscape water use. However, it relies on several general assumptions and therefore is less accurate than the irrigation audit method. ET estimates the amount of water needed to maintain a healthy turf or landscaped area for a given 2 https://www1.eere.energy.gov/femp/pdfs/est_unmetered_industrial_wtr.pdf 3 http://energy.gov/eere/femp/downloads/guidelines-estimating-unmetered-landscaping-water-use 5

location based on the water requirements of the plant types, specific site conditions, precipitation levels by the site, and the amount of water transpired and evaporated from the plants. No special training or purchase of equipment is needed, but some basic knowledge of the landscape and the use of specific calculations are required. When using this method, components should refer to FEMP s Guidelines for Estimating Unmetered Landscaping Water Use 3. Other Estimation Techniques Components should consider using the batch or discharge procedure when appropriate. In all cases, careful record keeping is necessary for accurate estimates. Batch, discharge and open channel procedures can be used to estimate irrigation, landscape, or agriculture applications. The batch procedure can be used when water is transported in a tank truck or container for application. Multiply the volume of the tank or container by the number of times it is filled from the distribution system to yield the total amount of water delivered. The discharge procedure is useful when water is applied directly from a pipe (e.g., sprinkler system). Multiply the rate of water discharge by the total time during which it flows to get the total volume of water delivered. The calculation must account for variations in the discharge rate as well as the length and frequency of the application period. The open channel flow procedure is useful for estimating flow rates of water that is discharging freely from an open channel when only the cross sectional area of the channel and discharge distance of the water is known. This procedure uses the Manning equation and various design charts and is a simple and useful procedure for approximating open channel flow rates, both full and partial, in pipes and channels of various cross sections. 6

References Association, American Water Works. (1999). Water Audits and Leak Detection. Stoughton, KL McMordie, Boyd, BK, & Loper, SA (2014). Army Industrial, Landscaping, and Agricultural Water Use. Deputy Assistant of the Army for Energy and Sustainability. Council on Environmental Quality.(2013). Implementing Instruction: Federal Agency Implementation of Water Efficiency and Management Provisions of EO 13514. Guidelines for Estimating Unmetered Industrial Water Use. Federal Energy Management Program (2010). Guidelines for Estimating Unmetered Landscaping Water Use. Federal Energy Management Program (2010). 7