PANCHESHWAR MULTIPURPOSE PROJECT

Similar documents
KYNSHI-I HEP (270 MW), MEGHALAYA

The baseline studies shall consist of three season field data i.e. Pre-Monsoon, Monsoon and winter (lean) Season covering one calendar year.

Table-1: Scoping Matrix adopted for CEIA study for Shivasamudram Run of the river power project, Karnataka

The EIA report would cover the following aspects. Page 1 of 10

ANNEXURE-VII TERMS OF REFERENCE FOR CONDUCTING COMPREHENSIVE EIA STUDY FOR KURUNG HYDRO ELECTRIC PROJECT (330 MW), ARUNACHAL PRADESH

STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR RIVER VALLEY PROJECTS.

Proposed Terms of Reference for EIA studies

APPENDIX I PROPOSED TERMS OF REFERENCE

ANNEXURE- II Proposed TOR

Environmental Impact Assessment of Hydroelectric Power Plant LEEZA MALIK (2013CEP2080) TUSHAR SINGLA (2011MT50623)

V: PROJECT SCOPING & METHODOLOGY

PROPOSED TERMS OF REFERENCE (TOR) FOR

ENVIRONMENT MANAGEMENT PLAN OF JELAM TAMAK H.E. PROJECT, UTTARAKHAND

2) A copy of the document in support of the fact that the Proponent is the rightful lessee of the mine should be given.

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

CONSTRUCTION OF 6 LANE KUNDLI MANESAR PALWAL EXPRESSWAY IN THE STATE OF HARYANA

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any;

HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES

1.0 The Need for EIA. (a) the project proponent; (b) the regulatory agencies; and, (c) all stakeholders and interest groups.

PROPOSED TERM OF REFERENCE

TECHNICAL SPECIFICATIONS NTPC LIMITED

TERMS OF REFERENCE. Notes for NEPA for Generic Terms of Reference

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P

ENVIRONMENTAL IMPACT ASSESSMENT IN INDIAN SCENARIO

Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd STANDARD TERMS OF REFERENCE

BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e)

Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous

CATCHMENT AREA TREATMENT PLAN

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

PROPOSED TERMS OF REFERENCE

DRAFT TERMS OF REFERENCE FOR EIA STUDY

A. Proposed TOR. April Vedanta Limited- Cairn Oil & Gas

PROPOSED TERMS OF REFERENCE FOR EIA STUDY

LIST OF TABLES NUMBE R CHAPTER 1- ENVIRONMENT AND ENVIRONMENT DEGRADATION

A. Proposed TOR. April Vedanta Limited- Cairn Oil & Gas

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

PROPOSED TERMS OF REFERENCE

Notes for NEPA for Generic Terms of Reference

ENVIRONMENT MANAGEMENT PLAN

Terms of Reference. As Required by the Environment Act For Preparation of an Environmental Assessment Report

CMPDI. 4.6 Mine Closure Plan


Hind Energy & Coal Beneficiation (India) Ltd.

Introduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and

STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE

REMOTE SENSING AND GIS FOR INTEGRATED LAND MANAGEMENT: CASE OF INDIA

ELECTRICAL TRANSMISSION LINES & SUBSTATIONS

INSTITUTE OF AERONAUTICAL ENGINEERING

Standard TOR for Onshore Oil & Gas Exploration, Development & Production

PROPOSED TERMS OF REFERENCE

Deatiled Project Report Vamanapuram IWMP 1

ENVIRONMENTAL SCIENCES

5.4 Initial Environmental Examination

MATERIALS AND METHODS:

LAKE RESTORATION, ISSUES & APPLICATION THE CASE OF BANGALORE

State. 2. Location: Madhya Pradesh. Total period for which the forest land is proposed to be diverted (in year). 3. Detail of user agency

MECON LIMITED RANCHI , INDIA

CONTENTS CHAPTER : ONE. 1-9 CHAPTER : TWO.10-16

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999

Hind Energy & Coal Beneficiation (India) Ltd.

MECON LIMITED RANCHI , INDIA

SLAUGHTERHOUSES AND ABATTOIRS

STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE

Environmental Impact Assessment

COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated

PROPOSED TERMS OF REFERENCES. Standard Terms of Reference for Pesticides Industry and pesticide specific intermediates (excluding formulations) 5(b):

STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE

Environmental and Social Impact Assessment for Rogun Hydro Power Plant

UNIT I ENVIRONMENT, ECOSYSTEMS AND BIODIVERSITY

Mangaluru Integrated Gas Project

ISSUES PROPOSED INTERVENTIONS. Water Scarcity and Pollution. Inadequate Legislation. Overexploitation. Human Settlements and Migration

COMMENTS ON THE RELEASE OF LAND FOR DEVELOPMENT ACTIVITIES AND RESETTLEMENT WITHIN THE DISTRICT OF MANNAR 21/07/2017

Annexure A. A. Proposed TOR

STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala

CNL(10)51. NASCO Guidelines for the Protection, Restoration and Enhancement of Atlantic salmon Habitat

ROADS: OPERATION AND MAINTENANCE

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify)

Annex F Scoping Checklist

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT

ENVIRONMENTAL IMPACT ASSESSMENT

THE LOWER INDUS RIVER: BALANCING DEVELOPMENT AND MAINTENANCE OF WETLAND ECOSYSTEMS AND DEPENDENT LIVELIHOODS

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India

Newmont Mining Corporation Water Management Standard

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

TOPICS (Environment Issues-I)

12 TH WORLD LAKE CONFERENCE

FINAL TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR TOWN OF CANMORE S PROPOSED COUGAR CREEK DEBRIS FLOOD RETENTION STRUCTURE PROJECT

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA

VALLIAMMAI ENGINEERING COLLEGE

No.J-11011/132/2010-IA II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

Technical Review of Pak Beng Hydropower Project Water Quality, Aquatic Ecology and Fisheries

Madagascar: Makira REDD+

MA (P) Environmental Education Syllabus

PROPOSED TERMS OF REFERENCE (TOR)

Wood Canyon Emergent Wetland Project. City of Aliso Viejo 12 Journey, Suite 100 Aliso Viejo, CA 92656

Transcription:

ANNEXURE-VIII PROPOSED TERMS OF REFERENCE FOR CONDUCTING CEIA STUDY FOR PANCHESWAR MULTI-PURPOSE PROJECT 1. GENERAL The Environmental Impact Assessment of the proposed Pancheswar Multi-purpose project shall examine the project s potential negative and positive environmental impacts and shall recommend measures required to prevent, minimize, mitigate or compensate for adverse impacts and improve environmental performance of the scheme. The Ministry of Environment and Forests (MoEF), Government of India (GoI) has issued a notification called EIA Notification 2006 on September, 14, 2006. The project requires Environmental Clearance from Ministry of Environment and Forests (MoEF). An EIA study is a pre-requisite for obtaining Environmental Clearance. The Study Area for the EIA study shall comprise of the following: Submergence area (Indian Portion) of main dam and reregulating dam Area within 10 km of various project appurtenances including i.e. canal network, submergence area, etc. Gross Command Area Catchment area in Indian Portion intercepted at the site of main dam and reregulating dam EIA Study will be carried out with an objective to : Establish and Assess Baseline Environmental-Social ground truth within 10 km. radius and catchment of the project area. Identify and Evaluate Environmental-Social Impacts of Proposed project. Prepare Environmental Monitoring & Management Plan Identification of the project affected people and prepare rehabilitation and resettlement plan, and 2. DATA COLLECTION/GENERATION The details of baseline data/ information that would be collected are as follows: 1. Geological and Geophysical Aspects Geography & physiography of the project area Design discharge & its RI ( Recurrence interval) Regional Geology and structure of the catchment Seismicity, tectonics and history of past earthquakes in the area Critical review of the geological features around the project area Impact of project on geological environment Justification for location & execution of the project in relation to structural components. Detailed geological mapping of the proposed project site including relevant details as available in the DPR 34

Seismo-tectonics Study of Design Earthquake Parameters A site specific study of earth quake parameters shall be conducted. The results of the site specific earth quake design parameters will be sent for approval of the NCSDP (National Committee of Seismic Design Parameters, Central Water Commission, New Delhi. 2. Hydrology of the basin Hydro-meteorology, drainage systems Water availability for the project and the aquatic fauna Design discharge and its recurrence interval 3. Biological Resources Flora Forests and forest types Water body inundating forest area Vegetation profile, no. of species in the project area, etc. Community Structure through Vegetation mapping Species Diversity Index (Shanon-Weiner) of the biodiversity in the project area as well as plant fossil & phytoplankton Documentation of economically important plants, medicinal as well as timber, fuel wood etc. Endemic, endangered and threatened species Impact of impoundment and construction activities on the vegetation Location of any Biosphere Reserve, National Park or Sanctuary in the vicinity of the project, if any Cropping and Horticulture pattern and practices in the study area. Fauna Inventorisation of terrestrial wildlife including reptiles, herpetofauna, butterflies and amphibians, alongwith their present status in the project area Zoogeographic distribution/affinities, Endemic, threatened and endangered species. Avifauna - Status, Resident/Migratory/Passage migrants, Impact of project on threatened/endangered taxa, if any RET faunal species are to be classified as per IUCN Red Data list or as per different schedule of Indian Wilde Life Protection Act, 1972. Effect on fish migration and habitat degradation due to project. Existence of National Park, Sanctuary, Biosphere, Reserve Forest etc. in the study area if any, would be detailed Aquatic Ecology Aqua-fauna like macro-invertebrates, zooplankton, phytoplanktons, benthos, water dependent avifauna etc and Assessment of biotic resources primary productivity. Conservation Status 35

Fish and Fisheries Migratory fish species, if any and their breeding grounds Impact of barrage building on fish migration and habitat degradation Overall ecological impact upto 10 km d/s from the dam site and the impact of untreated and waste water in to the river shall be assessed. Conservation areas and status of threatened/endangered taxa Biotic Pressures Management plan for conservation areas and threatened/endangered taxa Remote Sensing & GIS studies and various maps Delineation of critically degraded areas in the catchment area intercepted at the dam site upto the upstream project on the basis of Silt Yield Index as per the methodology of AISLUS Land use and land cover mapping Drainage pattern/map Detailed map showing soil classification of the command area & map showing land irrigability classification of the command area Sampling location map for all the parameters at least in 1:50,000 scale; along with FCC a pie diagram to show proportions of different land use/land cover patterns in the project area Socio-economic aspects Land details Demographic profile Economic structure Development profile Agricultural practices Infrastructure facilities: education, health and hygiene, communication network, etc. Impact on socio-cultural aspects due to the proposed project. Other Details Irrigation planning for the project. Command Area Development Plan for the project. Soil classification of the command area Land irrigability classification of the command area Various sampling locations shall be shown on a map. Plan for covering 10% of the area under pressurized irrigation including its cost. 36

5. Collection of data pertaining to water (physico-chemical and biological parameters), air and noise environment and likely impact during construction and post construction periods. Air Environment Baseline Information on ambient air quality in the project area covering aspects like Particulate Matter less than 10 microns (PM10), SO2, NO2 Noise Environment Construction Methodology and Schedule 6. PRIMARY DATA COLLECTION The details of primary data to be collected are given in Table-1. TABLE 1 Details of primary data generation Description No. of Frequency of Sampling locations Ambient Air Quality 10 Ambient air quality monitoring (24 hourly samples), twice a week for 2 weeks post-monsoon ands winter) Parameters : RPM, SO2, NO2 River Water Quality Samples to be collected from various 20 representative locations on rivers Kali, monsoon and winter) Sarju, Panar and Ramganga in and around project site Parameters : Temperature, ph, Electrical Conductivity, Total Dissolved Solids, Alkalinity, Total Hardness, Chlorides, Sulphates, Fluorides, Phosphates, Calcium, Magnesium, Sodium, Potassium, Iron, Chromium, Lead, Cadmium, Mercury, Zinc, DO, BOD, COD, Total Coliform GROUND WATER Samples to be collected from various 49(@ one representative locations in the command sample per monsoon and winter) area 5000 ha) Parameters : Temperature, ph, Electrical Conductivity, Total Dissolved Solids, Total Hardness, Chlorides, Sulphates, Fluorides, Phosphates, Calcium, Magnesium, Sodium, Potassium, Iron,, DO, BOD, COD SOILS Sampling in the command area 49(@ one Parameters : ph, N,P,K, organic matter, sample per monsoon and winter) 37

Description soil texture, Electrical Conductivity, Water Holding Capacity, Field Capacity, Wilting Point, Calcium, Magnesium, Sodium, Potassium NOISE Hourly readings taken for 24 hours (Leq.) TERRESTRIAL ECOLOGY Parameters : Density, Diversity and abundance of various floral species. Estimation of diversity indices Presence of various faunal species as observed during the ecological survey shall also be recorded and studied AQUATIC ECOLOGY Parameters: Density, diversity and abundance of various phytoplanktons and zooplanktons, periphytons, macroinvertebrates species, primary productivity, fish species 7. No. of locations 5000 ha) Frequency of Sampling 10 monsoon and winter) 15 monsoon and winter) 20 monsoon and winter) PREDICTION OF IMPACTS 7.1 Construction Phase The following impacts of the project should be assessed (a) Air Changes in ambient levels and ground level concentrations due to total emissions from point, line and area sources Effects on soils, material, vegetation, and human health Impact of emissions DG sets used for construction power if any, on air environment. (b) Noise Changes in ambient levels due to noise generated from equipment, blasting operations and movement of vehicles Effect on fauna and human health (c) Water Impact of sewage disposal (d) Land Changes in land quality including effects of waste disposal (e) Biological Impacts due to incrreased human interfernces (f) Socio-economic Aspects Impact on the local community including demographic changes 38

7.2.2 Impact on economic status Impact on human health Impact on increased traffic Operation Phase Land Environment Impact on land use pattern due to increase in cropping intensity. Increased irrigation intensity in the command area. Impacts on soil quality due to increased and continued use of agro-chemicals. Increased potential for water logging and soil salinization in the command area. Impacts due to acquisition of land for various project appurtenances including ownership status. Water Environment Changes in land use and drainage pattern Riverbank and their stability Impact due to submergence Impacts on reservoir water quality. Changes in quality Sedimentation of reservoir Impact on fish fauna Disposal of effluents containing agro-chemicals including pesticides from surface and sub-surface drainage system. Increased use of agro-chemicals in the command can lead to water pollution. Ecology Deforestation and shrinkage of animal habitat Impact on fauna and flora (including aquatic species if any) due to decreased flow of water Impact on rare and endangered species, endemic species, and migratory path/route of animals, if any Impact on breeding and nesting grounds, if any Impact on animal distribution, migration routes (if any), habitat fragmentation and destruction due to dam building activity Impacts on the bio-diversity as a result of introduction of irrigation in the command area. Impacts due to acquisition of forest land and impacts on flora and fauna. Impacts on ecologically sensitive sites like national park, wildlife sanctuary, etc. of any. Impacts on rare, endangered and threatened species. Impacts on medicinally important and other economically important species if any. Impacts on migratory routes of wildlife. Increased potential for farm and tank fisheries in the command area. 39

Socio-Economic Environment: Acquisition of private lands for construction of various project appurtenances namely construction of road network joining the quarry sites and the construction sites, canal and drainage network in the command area. Social Impact Assessment of PAFs Improvement in employment potential as a result of increase in irrigation intensity. Improvement in quality of life as result of higher agricultural production, and improvement in income levels. Impacts on livestock. Increased incidence of vector- borne diseases. Impacts on incidence of water-borne diseases Improvement in public health, educational status, etc. as a result of economic development. Improvement in the status of livestock as a result of greater water availability and fodder from agricultural residues. Impetus to urbanization and industrialization as a result of improved water availability. Impact on Holy Places and Tourism Other Aspects Downstream impact on water, land & human environment due to drying up of the river at least 10 km downstream of the dam. Positive as well as negative impacts likely to be accrued due to the project are to be listed. Positive impacts like benefits from carbon trading. 8. ENVIRONMENTAL MANAGEMENT PLAN Feasible and cost effective measures to prevent or reduce significant negative impacts to the acceptable levels are to be developed, including the estimate of the impacts and cost of these measures, and of the institutional and training requirements to implement them. When impacts cannot be mitigated, compensation to affected parties shall be considered. The management measures proposed to be suggested for the following aspects: Measures to control water pollution due to various effluents to be discharged during construction phase. Measures to control air pollution during construction phase. Measures to contain noise pollution and mitigate adverse impact on construction staff and habitat in the study area. Reclamation of areas disturbed during construction including quarry stabilization and construction waste disposal sites Development of public health management plan Maintenance of water quality during project operation phase. Compensatory Afforestation Plan in lieu of forest land to be acquired for the project Biodiversity conservation plan Greenbelt development along periphery of reservoir, colonies, approach road, canals etc. 40

Health Delivery system. Air Pollution Control. Noise Control measures. Sustenance and enhancement of fisheries potential. Infrastructure development for agriculture. Measures to control water logging in Command area including conjunctive use of ground Management of water-borne and vector-borne diseases Control of Aquatic Weeds Detailed plan for covering 10% of the area command area under pressurized/drip irrigation, including its cost. 9. RESETTLEMENT AND REHABILITATION PLAN The project envisages acquisition of private land for various project appurtenances. The families losing land and, homestead on account of acquisition of land for various project appurtenances shall be identified. The information on other infrastructure facilities and community properties likely to be affected as a result of the project shall also be collected. A Resettlement & Rehabilitation (R&R) Master Plan highlighting the guidelines of land acquisition and provisions for rehabilitation measures shall be formulated. The Resettlement and Rehabilitations Plan shall be formulated as per the norms of Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013. 10. CATCHMENT AREA TREATMENT A Catchment area Treatment Plan for catchment area in India intercepted at diversion site of main dam and reregulating dam will be prepared as a part of the Comprehensive EIA study. The procedure for preparation of CAT plan for each watershed area to be covered is given as below: Catchment area Treatment Plan to be prepared using SYI method. Delineation of sub-watersheds in the catchment area. Landuse pattern using satellite data, slope map using Survey of India toposheets, etc. will be prepared. Mapping of critically degraded areas based on Integration of Remote Sensing technique, GIS methodology and Silt Yield Index method and prioritization Watershed treatment Preparation of phase wise Catchment Area Treatment (CAT) Plan for subwatersheds with very high and high erosion intensity. Estimation of cost required for implementation of CAT plan. 11. DAM BREAK ANALYSIS STUDY A dam break analysis shall be conducted to simulate hypothetical failure of dam including preparation of inundation maps. The dam break shall be conducted for scenario considering simultaneous failure of main dam and reregulating dam. The study shall be conducted using HECRAS model. A Disaster Management Plan (DMP shall be prepared for dealing with emergency situation. It shall include emergency preparedness plan, surveillance plan, evacuation plan etc including communication system. 41

12. LOCAL AREA DEVELOPMENT PLAN As a part of the CEIA, a Local Area Development Plan (LADP) shall be formulated for implementation in study area villages. An amount of 0.5% of the project cost shall be earmarked for implementation of Local Area Development Plan 13. ENVIRONMENTAL MONITORING PROGRAMME The Environmental Impact Assessment is basically an evaluation of future events. It is necessary to continue monitoring certain parameters identified as critical by relevant authorities under an Environmental Monitoring Programme. This would anticipate any environmental problem so as to take effective mitigation measures. An Environmental Monitoring Programme will be formulated for implementation during project construction and operation phases. The cost estimates and equipment necessary for the implementation of various measures suggested as a part of Environmental Monitoring Programme shall also be covered as a part of the EIA Study. 14. COST ESTIMATES Cost Estimate covering following aspects shall be prepared: Cost of implementing Environment Management Plans Cost of implementing Environment Monitoring Programme Cost of Catchment Area Treatment Plan Cost of Rehabilitation & Resettlement Plan Cost for Local Area Development Plan Cost of all other compensation, mitigation and management measures 42