Update on Switching Programme and Q&A

Similar documents
BSC Panel March 2017

02/03/17 Appendix A Reqts Traceability Matrix v3.0 DCC Public. requirements.

DCC Business Case for DCC activities during the Transitional Phase of the Switching Programme. Design Baseline 2 Update

DCC Business Case for DCC activities during the Transitional Phase of the Switching Programme

Ofgem Switching Programme Consequential Change. DSG Update 20 th November 2018

By to: Rachel Clark Programme Director, Switching Programme Ofgem 9 Millbank London SW1P 3GE.

Market-wide Half-Hourly Settlement

Market-wide Half-Hourly Settlement

Transition Business Rules. for. Project Nexus. submitted to Project Nexus Workgroup. Copyright 2014 Xoserve Ltd. Transition Business Rules

UNC 0630R: Review of the consequential changes required in UNC as a result of the Ofgem Switching Programme. UNC Request Workgroup Report

P302 Improving the Change of Supplier Meter read process for smart Meters

Switching Programme: development of the REC and SCR process. UNC Panel update 20 Sept 2018

Faster Switching. - Consultation Response -

Transition Business Rules. for. Project Nexus

Smart meters, regulation and market development

UK Link Programme Business Transition Process Approach

Business Principles. For. Invoicing. Xoserve Project Nexus

Business Requirement Principles. Supply Point Register. Xoserve Project Nexus

Revisions to the internal DCC Business Case for the Switching Programme up to May 2019 Switching Programme - Smart DCC

Address Data Quality cross-code report to Ofgem

Market-wide Half-Hourly Settlement

MARKET OPENING PROGRAMME

Improving the information given to Shippers when there is a requested disconnection

igt Agency Services The relevant extract from GT UNC TPD V6.5 is shown in appendix 1. Final version December 2013 igt Agency Services industry report

Portfolio Plan Overview

Xoserve Project Nexus

ELECTRALINK S VISION GOVERNANCE OF THE RETAIL ENERGY CODE

2019 Business Plan Principles and Approach Consultation Customer Feedback Report Publication Date: 16 th July 2018

Data Protection Strategy

UK Link Shipper Engagement Day Agenda

UNC 0651: Replacement of the Retrospective Data Update provisions. UNC Modification

Gas Smart Change of Supply Read Project Report v doc. Gas Smart Change of Supply Read Project. Interim Report. Date: 9 th July 2014

Project Nexus Treatment of Unidentified Gas in Settlement. Presented at AUG Methodology Walkthrough February 2017

PUBLIC ELEXON Version February 2016

Facilitating Whole Electricity System Outcomes

NG Gas Portfolio Plan Overview

Initial Enrolment Project Feasibility Draft Report Consultation Document

Rachel Clark Switching Programme Director Consumers & Markets Ofgem 10 South Colonnade Canary Wharf London E14 4PU 31 st July 2018

DCC OPERATIONS UPDATE

Identification of Supply Meter Point pressure tier

Joint European Stakeholder Group. Tuesday 9 January 2018 Meeting 28 WebEx

Targeted Charging Review SCR, Regulating the Future Energy System and the Charging Futures Forum. 11 October 2017

UK LINK Committee Minutes Thursday 09 September 2010 via teleconference

DCC Operations update. Industry Event 15 th December Dave Broady Operations Director, Smart DCC. DCC Public

The Procedure for Agreement of Change of Supplier Readings and Resolution of Disputed Change of Supplier Readings

Replacement of the Retrospective Data Update provisions

Gas Charging Review. NTSCMF 5 April 2017 Final slide pack Update provided on 3 April All slides added or updated are marked with a blue star

Oxfordshire Clinical Commissioning Group Board Meeting. Date of Meeting: 26 May 2016 Paper No: 16/37

Risk Management Strategy. Version: V3.0

Engage Consulting Briefing Note: Smart Metering Implementation Programme: Prospectus

Unidentified Gas. Solution Options Overview. 22 nd November 2017

Change Control Process for the Co-Ordinated Retail Electricity Markets

Transmission Charging Methodologies Forum. 8 th of December 2016

Meter Technical Details for Smart Meters (CP1388) Education Session. Adam Lattimore 20 June 2013

UNC 0651: Changes to the Retrospective Data Update provisions. UNC Modification

Demand Side Balancing Reserve Workshop. Peter Bingham EMR Team David Preston Senior Account Manager

Government Procurement: challenges and need for new approach Sheffield Hallam FM Conference

Data Cleansing Workgroup. 24 th November 2014

Target Operating Model Design Principles. 1. Purpose of the Design Principles

SO incentives from February 2012

PROJECT BOARD TERMS OF REFERENCE. Roles and Responsibilities

UK Link Committee Meeting. Xoserve Report Pack. Meeting Date: 11 th December 2014 Reporting Month: November 2014

UNC 0658 (Urgent): CDSP to identify and develop improvements to LDZ settlement processes. UNC Modification

AUGE responses to issues raised by British Gas during the consultation period for the 2014 first draft AUGS for 2015/16, 27 June 2014

This proposal will outline a solution that will enable suppliers to be compliant with the EU three week switching directive.

Energy and Climate Change Committee Enquiry Progress on Smart Meter Roll Out

Market-wide Half-Hourly Settlement

Nelson Hospital Redevelopment. Proposed Approach to Business Case Development

Nexus Requirements Clarification Log - Open Requirements

Unidentified Gas. Executive Summary

igt Shipper Work Group Meeting Monday 15 th December 2014 at 10.30am

UIG Task Force Progress Report. ChMC 12 th September 2018

Mandate monthly read submission for Smart and AMR sites from 01 February 2017

Smart Metering Implementation Programme. Consultation on New Smart Energy Code Content

IGT117: Introduction of winter read/consumption reports and associated obligations. Modification

Gas Network Innovation Strategy

CCG Organisation Improvement Plan November 2017 Exceptions Report

277/06 - PRELIMINARY TERRE (P344) IMPLEMENTATION IN ADVANCE OF OFGEM DECISION

Electricity Market Reform Capacity Market Implementation Plan

Technical Assurance of Performance Assurance Parties

UNIVERSITY OF CAMBRIDGE INFORMATION SERVICES COMMITTEE PROJECT AND PROGRAMME GOVERNANCE: DOCUMENTATION GUIDE: STAGE GATES

Joint European Stakeholder Group. Thursday 21 September 2017 Meeting 24 WebEx

Data Enquiry Service. Background & Project Progress. Sat Kalsi

Electricity Market Reform (EMR) Contingency Products. Peter Bingham EMR Team

ENERGY AND CARBON MANAGEMENT PLAN

European Update. 2nd July 2015

Power Responsive Flexibility Forum 11 th January 2018 Summary

1. How can Ofgem ensure that sharper Cash Out incentives from the Significant Code Review:

UK Link Committee Meeting. xoserve Report Pack SEPTEMBER 2009

Victorian AMI Program Stephen Thomson, AMI Program Director Principal Consultant Marchment Hill Consulting

Agency Charging Statement. Applies from 9 May 17 February 2014

OFFICIAL. Scottish Police Authority Board. Meeting. Case: Paper by Interim Chief Officer and Accountable Officer Reference B 08.

UNC 0641S: Amendments to Modification Shipper/Transporter - Meter Point Portfolio Reconciliation rules and obligations. UNC Workgroup Report

Plymouth Hospitals NHS Trust Business Case for replacement Managed Equipment Service

I-SEM Programme Project Office Programme Change Control Procedure

Energy Networks Association

A Guide to the Non-Domestic Gas and Electricity Retail Markets

Summary: Intervention and Options

Smart Meter Technical Details Consultation Collated Responses

Demand Side Balancing Reserve & Supplemental Balancing Reserve Update

Transcription:

Update on Switching Programme and Q&A

Purpose Background on the strategic outline case (SOC) Explain the three reform packages Review key impacts for suppliers Review Ofgem s request for information Detailed Level Specification Phase 2

The strategic outline case A strategic business case using HM Treasury five case model Published on 19 Jan 2017 Developed with stakeholder input Sets out three reform packages We are now requesting information to assess packages Aim to consult on a preferred option in Aug 17 with decision end 17 To support the RFI, the SOC provides the following key elements: Economic Case (Chapter 3 and 4) Reform packages (Appendix 1) Business Process Modelling (Appendix 2) Data architecture (Appendix 3) Reform package spreadsheet (Appendix 4a) 3

Draft reform packages DO NOTHING No system or process changes No improvement to reliable switching 21 day switch OPTIMISE EXISTING Use existing systems Address matching to improve reliability Key process changes (harmonised where possible) to deliver 3 to 7 day switch MAJOR REFORM New central switching service (core data) Enduring reliability improvement to MPxN/address data Harmonised and simplified next day switching process FULL REFORM New central switching and market intelligence services Enduring reliability improvements, and improved access to broader range of switching data Harmonised and simplified next day switching process Potential consumer benefits Scale of challenge

Key elements of reform packages Optimise existing RP1 Major Reform RP2 Full Reform RP3 Objections window reduced to 1WD Gas confirmation window reduced to 1WD All packages Supply point nomination data accessed from Xoserve via API Suppliers support equivalent terms for cooling off returns MPxNs matched to GB address list MPRS modified to handle: Related MPANs; import/export; dom/nondom MAP ID maintained in UKLink and MPRS (and MAPs notified at switch) API access to enquiry services (for RP1 and 2 this is ECOES & DES) MAM unbundled to MOP and MAP Harmonisation of advance registration and standstill periods As for RP1, apart from New Centralised Switching Service (CSS) MPRS and UKLink modified to interface with CSS and to remove switching functionality Supplier led gas switching Losing suppliers respond instantly to objection requests MPxNs linked via GB address register Shipper and agent IDs recorded in CSS - (MOP, DA, DC, MAM, MCP, MAP) CSS notifies supplier and agents of confirmed and executed switch. Used for agent appointment Calendar day switching (CSS, supplier objections 24x7) As for RP2, plus New Market Intelligence Service (MIS) all switching, meter point, settlement and meter asset data (incl. smart) accessed via MIS ECOES and most of DES are withdrawn MPRS modified to handle MTDs MIS available 24x7 5

Variations on policy positions to be tested in the RFI Cooling off (all) Variation 1: No requirement for Supplier A to offer equivalent terms Objections (RP2) Variation 1: For RP2, CSS manages central objections database Variation 2: Compressed window of 5 hours Variation 3: Longer switch period for non-domestic End of next day switching (RP2) Variation 1: Longer objection period Variation 2: Longer period between gate closure and switch Calendar days vs working days (RP1) Variation 1: Operate on calendar day basis Enquiry service (RP3) Variation 1: MIS developed and operated by Gemserv/Xoserve Quick wins Variation 1: implement 1 day objections and cooling off changes in Nov 18 6

Request for information Issued to suppliers on 19 Jan alongside SOC Large suppliers received a mandated request. Mid-tier supplier suppliers received a request which mandated certain elements. Other suppliers received a voluntary request Response requested by 2 March RFI focuses on the following impact areas for suppliers Contracting and preparatory work prior to switching request Interaction with switching service Other activity around the switch Post switch activity Delivery Additional questions 7

Supporting your RFI responses We want your responses! This is an important opportunity for us to understand and respond to the impacts of our proposals on your businesses We have contacted suppliers to understand likely response rate We asked for any clarification questions to be sent to us by 10 February and will summarise and publish responses (we will add any relevant points from today s Q&A session as well) If you have any other questions on the RFI not covered today, please contact: Andrew Wallace (andrew.wallace@ofgem.gov.uk, tel: 020 7901 7067) Pooja Darbar (pooja.darbar@ofgem.gov.uk, tel: 020 7901 7499) 8

Context - Programme phases PHASE 1 PHASE 2 PHASE 3 PHASE 4 Blueprint Detailed Level Specification Enactment, Build and Test PHASE 5 ACTIVITY ACTIVITY ACTIVITY ACTIVITY Define new market arrangements in a Target Operating Model (TOM) including Delivery Strategy Define in detail how reforms will work Draft modifications to codes and licences Changes made to codes and licences Central Registration Service procured Systems designed, built and tested. Transition scheme executed Consultation and Decision (with IA) on preferred outcome Consultation and Decision (with IA) on SCR Direction and licence mods Monitor and Evaluate ROLES Workgroups led by Ofgem Industry and consumer reps to support workgroup option analysis Industry to provide data for IA ROLES Industry Code Administrators and Ofgem led workgroups Industry and consumer reps continue to support workgroups Industry to provide data for IA ROLES Industry raise code mods and Ofgem approve Ofgem make licence modifications DCC procure a central registration service ROLES DCC and Industry implement reforms DCC undertake market assurance DCC execute Transition Scheme Ofgem monitor and take go-live decision 9

DLS products (for illustration only) 4 Baseline 4* 1. Ofgem owned, Ofgem led no substantive DCC involvement e.g. regulatory products 2. Ofgem owned, Ofgem led, substantive DCC contribution. 3. Ofgem owned, DCC led. 4.1 E2E Switching Arrangements 4.2 CRS * 4.3 Overall Delivery Plan* 4.4 Regulation * 4. DCC owned, DCC led e.g. procurement products 4.1.1 DLS Assumptions 4.2.1 CRS Detailed 4.3.1 & Build Plan 4.4.1 E2E Regulation Structure & Standard * indicates a wrapper product for the sub-products listed 4.1.2 Detailed Models 4.2.2. CRS Non- Functional Requirements 4.3.2 Integration Plan 4.4.2 Transitional Regulation Requirements 4.1.3 E2E Data Architecture & Data Governance 4.2.3 CRS Service Management Requirements 4.3.3 Testing Plan 4.4.3 REC Shell / Structure 4.1.4 E2E Switching Arrangements NFR 4.2.4 CRS Delivery Plans 4.3.4 Transition Plan 4.4.4 Approach to REC Body Selection / Procurement 4.1.5 Solution Architecture 4.2.5 Security Section of tender pack(s) 4.3.5 Post- Implementation Plan 4.4.5 Specification of REC Body / Administrator 4.1.6 Operational Choreography 4.3.6 Data Migration Plan 4.4.6 Approach to Legal Drafting Procurement 4.1.7 Technology & Comms. Standards 4.1.10 Security & Privacy * 4.3.7 SI Procurement Specification 4.4.7 Specification for legal support / procurement 4.1.8 Policy Detailed 4.1.10.1 E2E Security Architecture 4.4.8 Programme Board paper with procurement recommendation 4.1.9 E2E Switching Arrangements Service Management 4.1.10.2 Security Requirements 4.1.10.3 Privacy Requirements

Programme governance Ofgem Senior Management Team Delegated authority and budget Major escalated issues Switching Programme Steering Group Switching Programme Delivery Group Report & Inform Report SRO, advised by Ofgem Programme Board Programme Management & PMO Technical Authority Alignment (TDA & DIAT) EDAG Blueprint only Monitor product delivery Management & Co-ordination Alignment & Approval Ofgem and Impact Assessment Team Commercial Continued commercial development/monitoring work (separate from DLS) Detailed Switching Arrangements Team Product specific user fora Teams CRS Product specific user fora Switching Delivery Team Product specific user fora Switching Regulation Team Product specific user fora

Q&A Welcome any questions on the SOC, RFI, DLS Phase or next steps 12