Special Provision No. 911F04 March 1997

Similar documents
Special Provision No. 911S07 October Coating the Ends of New Steel Girders with the Epoxy-Zinc/Epoxy/Polyurethane System

Special Provision No. 911F06 October 2000

COATING NEW STRUCTURAL STEEL SIGN SUPPORT STRUCTURES - Item No. Special Provision No. 911S09 November 2006

Section 716. SHOP CLEANING AND COATING STRUCTURAL STEEL

CONSTRUCTION SPECIFICATION FOR COATING STRUCTURAL STEEL SYSTEMS

CONSTRUCTION SPECIFICATION FOR COATING STRUCTURAL STEEL SYSTEMS

CONSTRUCTION SPECIFICATION FOR COATING STRUCTURAL STEEL SYSTEMS

SECTION High Performance Coatings Field Applied Acrylic Urethanes (Solid Color, Pearl and Metallic Finishes)

SECTION 2 DIVISION 05 METALS

.2 Section Waste Management and Disposal.

Corrosion Protection Specifications Liquid Paint System Performance Level 113 [FC-L113 ]

Tested in accordance with ISO , high expected durability in corrosivity category C5-I. Property Test/Standard Description

METAL FABRICATION..1 General Conditions and Division 1 shall govern Work of this section.

MATERIAL SPECIFICATION FOR PAINT COATING SYSTEMS FOR STRUCTURAL STEEL

Property Test/Standard Description. US EPA method 24 (tested) (CARB(SCM)2007, SCAQMD rule 1113, Hong Kong)

Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method 1

SECTION STRUCTURAL STEEL

Special Provision No. 599F01 May 2004 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS

SECTION 15 STRUCTURAL STEEL

.4 Submit proof of qualifications and authorization in writing to the Contract Administrator, four (4) weeks prior to commencement of Work.

1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces.

CONSTRUCTION SPECIFICATION FOR METAL TRAFFIC BARRIERS AND METAL RAILINGS FOR STRUCTURES

DIVISION 5 METALS SECTION STRUCTURAL STEEL

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011.

B. Shop Drawings: Include plans, elevations, sections, details, and attachments.

PRODUCT GUIDE: ZINC-RICH COATINGS. Version:

METALS Commissioning of Metals Structural Steel Framing Steel Studs... 2

STRUCTURAL STEEL FRAMING

SECTION METAL FLOOR PLATE STAIRS

B. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work.

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

SECTION STRUCTURAL STEEL FRAMING

Property Test/Standard Description. calculated US EPA method 24 (tested) (CARB(SCM)2007, SCAQMD rule 1113, Hong Kong)

COMMERCIAL ITEM DESCRIPTION ELECTROCOATING PRIMER

Pre-qualification testing in accordance with NORSOK M-501, Rev. 3, System 7, suitable for splash zone. Property Test/Standard Description

CONSTRUCTION SPECIFICATION FOR EXPANDED METAL ANTI-GLARE SCREEN

CONSTRUCTION SPECIFICATION FOR METAL TRAFFIC BARRIERS AND METAL RAILINGS FOR STRUCTURES

National Master Specification (NMS) Section Publisher: Spex.ca Page 1. Approved: RELATED REQUIREMENTS.1 [ ].

Tested in accordance with ISO , high expected durability in corrosivity category C5-I. Property Test/Standard Description

SECTION METAL STAIRS

STRUCTURAL STEEL FRAMING Section

Special Provision No. 799F01 March 2012 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS

Property Test/Standard Description. US EPA method 24 (tested) (CARB(SCM)2007, SCAQMD rule 1113, Hong Kong)

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL

Product Guide Specification DIVISION SPECIALTIES MANUFACTURERS OF PROTECTIVE COVERS

Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method 1 32 C VOC-USA / VOC Hong Kong EPA Method 24

Property Test/Standard Description. 53± 2 % matt (0-35) Flash point ISO 3679 Method 1 25 C calculated IED (2010/75/EU) (theoretical)

Property Test/Standard Description. US EPA method 24 (tested) (CARB(SCM)2007, SCAQMD rule 1113, Hong Kong)

Special Provision No. 915S03 December References, Materials, Construction, and Quality Assurance for Sign Support Structures

MATERIAL SPECIFICATION FOR SECTIONAL STEEL HIGH MAST LIGHTING POLES

Property Test/Standard Description

SECTION STEEL JOIST FRAMING

Pre-qualification testing in accordance with NORSOK M-501, Rev. 5, System 1, suitable for exterior exposure in offshore environment, below 120 C.

Insulating Cellular Concrete Steel Joists Painting. A. America Society for Testing and Materials (ASTM):

TS 24 SOUTH AUSTRALIAN WATER CORPORATION

Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method 1 30 C calculated VOC-USA / VOC Hong Kong EPA Method 24

Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method 1 28 C

Property Test/Standard Description

DIVISION 5 METALS Metal Fabrication

Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method F (28 C) VOC-USA / VOC Hong Kong EPA Method 24

MATERIAL SPECIFICATION FOR FRAMES, GRATES, COVERS, AND GRATINGS

SECTION FABRICATED ENGINEERED STRUCTURES. A. Pre-engineered, shop-fabricated structural steel building with formed purlin framing.

SECTION 1045 PAINT FOR STRUCTURAL STEEL

SECTION METAL PLATE CONNECTED WOOD TRUSSES PART 1 - GENERAL 1.01 RELATED DOCUMENTS

Rust-Oleum Industrial Brands Specification

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns.

Property Test/Standard Description. calculated US EPA method 24 (tested) (CARB(SCM)2007, SCAQMD rule 1113, Hong Kong)

Elastocoat Protective Coatings APPLICATION GUIDE

SECTION STRUCTURE MOUNT RAILING SYSTEM

7. New railings for existing buildings shall be designed to match any existing railings unless there is a compelling reason for change.

Table of Contents. List of Drawings

SECTION STRUCTURAL STEEL

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method F (29 C) calculated VOC-US/Hong Kong

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases.

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method F (29 C) calculated VOC-US/Hong Kong

Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method 1

Property Test/Standard Description STANDARD GRADE

Preassembled steel stairs with concrete-filled treads.

CONSTRUCTION SPECIFICATION FOR GUIDE RAIL END TREATMENT - EXTRUDER TERMINAL SYSTEM

NAVSEA REVIEWED ASTM F-718. Interline 783 Finish, Ultra High Solids Two-Pack Fast Cure Solvent-Free Coating

Keuka Studios May 2008 SECTION {05720} CABLE RAILING SYSTEM {CABLE RAILING SYSTEM} Display hidden text for Specifier Notes.

Exterior pipes, Fences, screens, grills and gates, Metallic Structures, Structural elements (column, trusses, etc.)

Tnemec 394 Proprietary Long Form Coatings Schedule

SIGMAZINC 160. Revision of March 2007 DESCRIPTION. two component moisture curing inorganic zinc (ethyl) silicate primer PRINCIPAL CHARACTERISTICS

AMBICO Limited Section and BLAST RESISTANT STEEL WINDOW FRAME ASSEMBLIES Page 1

General: Primarily designed for maintenance and repair. Only aluminium containing versions to be used in immersed environments.

1.1 This Section includes surface preparation and the application of base coats, intermediate and topcoats.

Section FLUSHING HYDRANTS

DURASHIELD JARS APPLICATION SPECIFICATION SHEET FIELD-APPLIED JOINT & REPAIR SYSTEM (JARS) EFFECTIVE: 6/2/15

SIGMACAP MASTIC GF. September surface tolerant coating for lower grade of steel preparation

In accordance with documents prepared by: The Worcester Housing Authority.

UFGS (July 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

1.4 kg/l (11.4 lb/us gal) Maximum 295 g/kg (Directive 1999/13/EC, SED) Maximum 420 g/l (3.5 lb/gal) 50 to 63 μm (2.0 to 2.

TS 82 TECHNICAL STANDARD SURFACE PREPARATION AND PROTECTION OF STEELWORK USING INORGANIC ZINC SILICATE AND ACRYLIC LATEX COATING SYSTEM

Property Test/Standard Description

05030 METAL FINISHES/09800 SPECIAL COATINGS ZRC COLD GALVANIZING COMPOUND

SECTION METAL STAIRS

Property Test/Standard Description Solids by volume. ISO 3233 Gloss level (60 ) ISO 2813

Transcription:

COATING STEEL RAILING SYSTEM(S) - Item No. Special Provision No. 911F04 March 1997 Definitions, Elimination of Pre-Start Material Sample, Material Requirements, Operational Constraints, Time Between Surface Preparation and Prime Coat Application, Surface Preparation and Coating Application, and Measurement and Testing of Coating Materials 911.03 DEFINITIONS Section 911.03 of OPSS 911, November 1990, is amended by the addition of the following: Interim Surface Preparation - Any method of treating a surface in preparation for coating that does not meet the requirements for the final surface preparation standard. Final Surface Preparation - The surface preparation standard(s) (eg: SSPC-SP5, SSPC-SP6, SSPC-SP10, SSPC-SP11) specified in the contract documents. To the term "Structural Steel", the phrase "structural steel piles", is added. 911.04 SUBMISSION AND DESIGN REQUIREMENTS 911.04.01.01 Written Notices, Drawings, Certificates and Product Data Sheets Clause 911.04.01.01 of OPSS 911 is amended by the addition of the following: The product data sheets shall also indicate the minimum acceptable re-coat time period for -10 C and - 20 C. 911.04.03 Pre-Start Material Sample Subsection 911.04.03 of OPSS 911 is deleted. 911.05 MATERIAL 911.05.01 Coating Systems - Except Hot Dip Galvanizing and Metallizing Subsection 911.05.01 of OPSS 911 is deleted and replaced by the following: All coating systems shall conform to OPSS 1704, November 1990, amended as follows: 1704.02 REFERENCES Section 1704.02 of OPSS 1704 is amended by the addition of the following under "American Society for Testing and Materials": ASTM D3960-93 - Standard Practice for Determining Volatile Organic Compound Content of Paint and Related Coatings March 1997 Pg. 1 of 5 SSP911F04

1704.05.01 General Subsection 1704.05.01 of OPSS 1704 is amended by the addition of the following: c) To qualify as a low volatile organic compound (VOC) coating, a product shall contain not more than 350 grams per litre of VOC's as defined in ASTM D3960-93. Table 1 in OPSS 1704 is amended by the addition of the following: VOC Content CGSB 1-GP-71 Method ASTM SSPC Tolerances n.a. D3960-93 n.a. ï10% but total not to exceed 350 g/l Material shall be delivered to the job site or the fabrication shop in the manufacturer's sealed containers bearing the manufacturer's labels conforming to OPSS 1704. 1704.05.02 Colour Subsection 1704.05.02 of OPSS 1704 is amended by deleting the second paragraph and replacing it with the following: Successive coats shall be formulated to show distinct colour difference. With the exception of coal tar epoxies, the colour of the finish coat shall be 504-217 brown (1-GP-12C) for ACR steel and 501-107 grey (1-GP-12C) for all other steel. Table 1 of OPSS 1704 is amended by the deletion of the tolerances for gloss: CGSB 1-GP-71 Method Physical Tests Gloss 13.1 911.07 CONSTRUCTION 911.07.01.01 Surface Preparation Clause 911.07.01.01 of OPSS 911 is amended by the addition of the following: Steel handrails shall be cleaned to the requirements of SSPC-SP8-82 (Pickling). Steel posts, caps, and panel anchorages shall be cleaned to the requirements of SSPC-SP5-89 (White Metal Blast Cleaning) *1. Steel panel anchorages, on concrete posts, shall be cleaned to the requirements of SSPC-SP10-89 (Near- White Blast Cleaning) *2. March 1997 Pg. 2 of 5 SSP911F04

911.07.01.01.04 Operational Constraints Clause 911.07.01.01.04 of OPSS 911 is amended by deleting the first paragraph and replacing it with the following: The final surface preparation operations shall not be carried out in the following conditions as detailed in SSPC-PA1: - Clause 6.1, "Temperature" - Clause 6.2, "Moisture" The limitations do not apply to interim surface preparation. 911.07.01.02 Application of Coating Clauses 911.07.01.01 and 911.07.01.02 of OPSS 911 are amended by the addition of the following: The area of structural steel in the handrail panels to be cleaned and hot dip galvanized is estimated to be: *3. The area of structural steel in the posts, caps, and panel anchorages to be cleaned, metallized and seal coated is estimated to be: *1 and *3. The area of structural steel in the steel panel anchorages, on concrete posts, to be cleaned and coated with the epoxy-zinc/epoxy/polyurethane system is estimated to be: *2 and *3. The coatings previously applied to the steel railing system are: *4. Clause 911.07.01.02.01 of OPSS 911 is amended by deleting the fourth paragraph and replacing it with the following: Except for the bolts, nuts and washers in clause 911.07.03.02.02, all rivets, bolts, nuts and washers shall be prime coated and finish coated by brush. When the inorganic zinc primer is specified, brushing shall be carried out with the epoxy-zinc primer from the low volatile organic compound system after the spray application. The finish coat shall be brush applied prior to spray application. The finish coat shall be brush applied prior to spray application. Clauses 911.07.01.02.02 to 911.07.01.02.05 of OPSS 911 are deleted. Clause 911.07.01.02.01, "General", is amended by the addition of the following Low Volatile Organic Compound (VOC) Coating Systems: Epoxy-Zinc/Epoxy/Polyurethane System The epoxy-zinc/epoxy/polyurethane system consists of three coats and shall conform to Table A. March 1997 Pg. 3 of 5 SSP911F04

TABLE A Amercoat Canada Corrosion Service Co. Ltd. Coat Dry Film Thickness Dry Film Thickness Prime 75 µm minimum 75 µm minimum Second 100 µm minimum 75 µm minimum Third 50 µm minimum 75 µm minimum 911.07.01.02.09 Seal Coating of Metallized Surfaces Clause 911.07.01.02.09 of OPSS 911 is deleted and replaced with the following: All metallized surfaces shall be coated with epoxy mid-coat from one of the low volatile organic compound (VOC) systems. The minimum dry film thickness shall be 50 µm. The colour of the seal coat shall be a semi-gloss equivalent of 501-107 grey (1-GP-12C). 911.07.01.02.10 Touch-Up Clause 911.07.01.02.10 of OPSS 911 is deleted and replaced with the following: Damaged areas of coated surfaces shall be cleaned of all rust and other contaminants and recoated with the same materials except for inorganic zinc primers which shall be recoated with an epoxy zinc primer from the low VOC systems. The minimum dry film thickness shall be 75 µm. The damaged areas of hot dip galvanized and metallized surfaces shall be cleaned of all rust and other contaminants and shall be recoated with two coats of zinc-rich coating. Each coat shall be 75 µm minimum dry film thickness. Where metallized surfaces have been seal coated, the seal coat shall be applied over the zinc-rich coating to a minimum dry film thickness of 50 µm. The zinc-rich coating used to touch-up the metallic coatings shall be from the zinc-rich touch-up systems. 911.07.02.02 Time Between Surface Preparation and Prime Coat Application Clause 911.07.02.02 of OPSS 911 is deleted and replaced with the following: Except for metallizing and hot dip galvanizing, the maximum time between final surface preparation and prime coat application shall be 10 hours. 911.08 QUALITY ASSURANCE 911.08.01 Inspection Subsection 911.08.01 of OPSS 911 is deleted and replaced by the following: Each phase of work will require inspection by the Contract Administrator before proceeding to the next phase. Acceptance of the surface preparation will be based on the applicable SSPC surface preparation specifications and pictorial standards given in SSPC-Vis1 and SSPC-Vis3. March 1997 Pg. 4 of 5 SSP911F04

911.08.02 Measurement of Surface Profile Subsection 911.08.02 of OPSS 911 is deleted and replaced by the following: Surface profile measurements will be made on a random basis by use of a spring micrometer and extra coarse, pressure sensitive replica tape. 911.08.03 Measurement of Coating Thickness Subsection 911.08.03 of OPSS 911 is amended by the addition of the following: The Contractor shall submit two copies to the Contract Administrator of the Galvanizer's dry film readings prior to the component's installation on the structure. 911.08.06 Testing of Coating Materials Subsection 911.08.06 of OPSS 911 is deleted and replaced by the following: Each batch of coating material shall be field sampled at the request and in the presence of the Contract Administrator. Sample containers will be supplied by the Contract Administrator. March 1997 Pg. 5 of 5 SSP911F04