Environment Clearance for Proposed Inland Water Transport along East Coast of Mumbai.

Similar documents
CRZ Clearance for Proposed construction of Ghodbundar Jetty, Thane by MMB

CRZ Clearance for Proposed Construction of RO RO Jetties at Narangi-Kharawadashri, Tal. & Dist. palghar by MMB

SEIAA-AGENDA

Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai Date:June 1, 2018

Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai Date:September 18, 2018

Environment Clearance for Mumbai Pune Expressway Missing Link from Khopoli Exit on YCEW to Sinhagad Institute in Lonavala inn Pune District

Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai Date:November 6, 2018

Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai Date:February 16, 2018


Environment Clearance for ATLANTIS PROPOSED DEVELOPMENT SCHEME ATPlot bearing c.t.s no. 320, t.p.s no 1, panchpakhadi, thane (w)

Environment Clearance for Proposed ESW Mass housing Scheme S. No. 86,95,133 Shirdhon, Taluka Kalyan (Phase I)

Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai Date:May 12, 2017

Environment Clearance for Category of 5(f) B, Synthetic organic chemicals industry

Environment Clearance for Amendment and Expansion in Residential cum Commercial project

SEAC-2016/C.R.424/TC-1

Subject: Sir, Proposed Slum Rehabilitation Scheme Private m/s. Sahyog Homes Limited M/s. Enviro Analysts And Engineers Pvt Ltd. SRA Scheme.

Harman Finochem Limited Private Mr. Bhupinder Singh Manhas sd engineering services pvt. ltd. Others

Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai Date:May 12, 2017

Environment Clearance for Expansion of SRA Scheme :Shivanjali Co. Op. Hsg. Soc. Ltd.

Subject: Sir, Environment Clearance for Hotel and Beach Resort Project

Subject: Sir, New project. Not applicable

Environment Clearance for Establishment of Synthetic Organic Chemical API Manufacturing facility by

Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai Date:January 15, 2019

Environment Clearance for Amendment in Environmental Clearance for AMRUT MANTHAN + SHREE MAHALAXMI & PRIMUS RESIDENCES at Santacruz, Mumbai.

SEAC-AGENDA

SEAC-AGENDA

SEAC-AGENDA

SEAC-AGENDA

To, M/s. Larsen & Toubro Realty Ltd. at CTS. Nos. 117A, 117A/1, & 117B & 117C Village Tungwa, Saki Vihar Road, Powai, Mumbai

SEAC-AGENDA

Consolidated Statement on various Environmental Aspects for Construction Project

SEAC-AGENDA

SEAC-AGENDA

SEAC-AGENDA

SEAC-AGENDA

Max. building height (m)

Sr. No. 1 Name of the project M/S Shivsamarth Stone Crusher Name : M/S Shivsamarth Stone Crusher Address : Village- Vajrachounde

Check list for construction Project of EC [Category 8(a)]:

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

SEAC-AGENDA

Environment Impact Assessment (EIA) The proposed project falls in category 8 (a) B2 as per schedule of EIA Notification, 2006.

SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS

Report on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan

SEAC-AGENDA

Shri Gurudatt Sugars Ltd., Gat No. 61/A, Akiwat - Takaliwadi Road, Takaliwadi , Taluka - Shirol, Dist Kolhapur, Maharashtra

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors

SEAC-AGENDA

SEAC-AGENDA

SEAC-AGENDA

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

Rajasthan State Pollution Control Board

CONECPTUAL PLAN. w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire. M/s Kalpataru Limited December, 2016

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell)

COMPLIANCE STATUS REPORT

Health and safety norms of CPWD should be followed during construction.

SEAC-AGENDA

20/09/2016. ,held on 25/04/2017

GENERAL CONDITIONS. 7. The Applicant will adopt the prescribed norms, and standards provided in the national Building Code of India 2005.

SEAC-AGENDA

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF OCTOBER TO MARCH-2017

SEAC-AGENDA

SEAC-AGENDA

Ref: Environment Department, MS, SEIAA Letter SEAC 2010/CR.824/TC-2 Dated 2 nd Nov 2011

SEAC-AGENDA

Pre-Feasibility Report For

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

Consent For Operation (CFO-Air,Water)

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD.

SIA/PB/NCP/53462/2016)

Details of the proposed project as presented before the committee are tabulated below:

TATA STEEL LIMITED. Environment Compliance Report (Oct 2017 to Mar 2018)

CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT

2. Member Secretary, Maharashtra Pollution Control Board, Sion, Mumbai

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan

Consent For Operation (CFO-Air,Water)

BRIEF SUMMARY OF THE PROJECT

2. The expected cost of the project is Rs.50 crores.

COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated

No. SEIAA/2018/329 REGISTERED Dated:

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB Ministry of Environment and Forests, Government of India. Registered

Indicative Checklist for construction projects of EC [Category 8(a)]:

Environment Compliance Report (Apr 2017 to Sep 2017)

meeting held on meeting held on The SEAC observed that:

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Rajasthan State Pollution Control Board

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

The SEAC has examined the proposal in the light of amended Notification dated

PROPOSED TERMS OF REFERENCE

This project does not attract EIA Notification and provisions in CRZ Notification [Clause no. 4.2 (i) (b)] also exempt preparation of EIA report.

For TOR New Projects. Mo. no. : Contact no. and ID of the Applicant

Amrut Manthan + Shree Mahalaxmi & Primus Residences by M/s Gurukrupa Developers ENVIRONMENTAL MANAGEMENT PLAN Introduction M/s Gurukrupa Developers pr

Dated: 23 rd June, To MIs Godrej Redevelopers (Mumbai) Pvt. Ltd., Godrej Bhawan, 4th Floor, 4A Home Street, Fort, Mumbai

Department of Ecology and Environment Room No.709, 7 th Floor, IV-Gate, M.S. Building, Bangalore ,

Pre- feasibility Report. For. At Plot No. 242, 241, 238/2, 239, 237/1, 238/1, 247/1 of Village Sondapar, Tehsil :HingnaDistrict- Nagpur, Maharashtra.

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

Prefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC

No. SEIAA: 71: CON: 2011 STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, KARNATAKA (Constituted by Ministry of Environment & Forests, Government

Transcription:

To, Maharashtra Maritime Board at Ferry Wharf (Bhaucha Dhakka), Nerul and Mandwa Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:April 10, 2017 Subject: Sir, Environment Clearance for Proposed Inland Water Transport along East Coast of Mumbai. This has reference to your communication on the above mentioned subject. The proposal was considered as per the EIA ification - 2006, by the State Level Expert Appraisal Committee-I, Maharashtra in its th meeting and recommend the project for prior environmental clearance to SEIAA. Information submitted by you has been considered by State Level Environment Impact Assessment Authority in its SEIAA meeting no 108th meetings. 2. It is noted that the proposal is considered by SEAC-I under screening category as per EIA ification 2006. Brief Information of the project submitted by you is as below :- 1.Name of Project 2.Type of institution 3.Name of Project Proponent 4.Name of Consultant 5.Type of project 6.New project/expansion in existing project/modernization/diversification in existing project 7.If expansion/diversification, whether environmental clearance has been obtained for existing project 8.Location of the project 9.Taluka 10.Village 11.Area of the project 12.IOD/IOA/Concession/Plan Approval 13.e on the initiated work (If ) 14.LOI / NOC / IOD from MHADA/ Other approvals (If ) Proposed Inland Water Transport along East Coast of Mumbai. Government Maharashtra Maritime Board ultratech Proposed Inland Water Transport New. Amendment in EC Ferry Wharf (Bhaucha Dhakka), Nerul and Mandwa Mumbai, Thane and Alibag Mumbai City, Nerul and Mandwa Mayor Municipal Corporation of Greater Mumbai Head Quarter, Mumbai CST, 400001,Mayor Navi Mumbai Municipal Corporation Plot No. 1, Sector- 15A, Palm Beach Junction, Belapur, Navi Mumbai, Pin: 400614,Sarpanch Sasawane Group Village Panchayat Sasawane, Mandwa Pin: 402201 Mayor Municipal Corporation of Greater Mumbai Head Quarter, Mumbai CST, 400001 IOD/IOA/Concession/Plan Approval : Mayor Municipal Corporation of Greater Mumbai Head Quarter, Mumbai CST, 400001 Approved Built-up Area: 1130 NO 15.Total Plot Area (sq. m.) 1600 16.Deductions Applicable SEIAA-EC-0000000015 Page 1 of 10

17.Net Plot area 1600 18 (a).proposed Built-up Area (FSI & Non-FSI) 18 (b).approved Built up area as per DCR 19.Total ground coverage (m2) 20.Ground-coverage Percentage (%) (e: Percentage of plot not open to sky) FSI area (sq. m.): Non FSI area (sq. m.): Total BUA area (sq. m.): Approved FSI area (sq. m.): Approved Non FSI area (sq. m.): Date of Approval: 21.Estimated cost of the project 631500000 SEIAA-EC-0000000015 Page 2 of 10

Serial 22.Production Details Product Existing (MT/M) Proposed (MT/M) Total (MT/M) 1 Dry season: Wet season: Details of Swimming pool (If any) Source of water 23.Total Water Requirement Fresh water (CMD): 10 Recycled water - Flushing (CMD): Recycled water - Gardening (CMD): Swimming pool make up (Cum): Total Water Requirement (CMD) : Fire fighting - Underground water tank(cmd): Fire fighting - Overhead water tank(cmd): Excess treated water 0 Source of water Local body 8 10 23 Fresh water (CMD): 10 Recycled water - Flushing (CMD): Recycled water - Gardening (CMD): Swimming pool make up (Cum): Total Water Requirement (CMD) : Fire fighting - Underground water tank(cmd): Fire fighting - Overhead water tank(cmd): Excess treated water 0 Local body 8 0 18 SEIAA-EC-0000000015 Page 3 of 10

Particula rs Water Require ment Domestic 24.Details of Total water consumed Consumption (CMD) Loss (CMD) Effluent (CMD) Existing Proposed Total Existing Proposed Total Existing Proposed Total 25.Rain Water Harvesting (RWH) Level of the Ground water table: Size and no of RWH tank(s) and Quantity: Location of the RWH tank(s): Quantity of recharge pits: Size of recharge pits : (Capital cost) : (O & M cost) : Details of UGT tanks if any : 26.Storm water drainage Natural water drainage pattern: Quantity of storm water: Size of SWD: 27.Sewage and Waste water Sewage generation in KLD: STP technology: Capacity of STP (CMD): Location & area of the STP: (Capital cost): (O & M cost): 20 septic 25 10 5 1 SEIAA-EC-0000000015 Page 4 of 10

Waste generation in the Pre Construction and Construction phase: Waste generation in the operation Phase: Mode of Disposal of waste: Area requirement: (Capital cost and O&M cost): 28.Solid waste Management Waste generation: 25 Disposal of the construction waste debris: Dry waste: 20 Wet waste: 10 Hazardous waste: Biomedical waste (If ): STP Sludge (Dry sludge): Others if any: Dry waste: Wet waste: Hazardous waste: Biomedical waste (If ): STP Sludge (Dry sludge): Others if any: Location(s): Area for the storage of waste & other material: Area for machinery: Capital cost: O & M cost: filling Negligible NA 5 NA sent to local body sent to local body sent to local body used as manure SEIAA-EC-0000000015 Page 5 of 10

Serial Parameters 1 Amount of effluent generation (CMD): Capacity of the ETP: Amount of treated effluent recycled : Amount of water send to the CETP: Membership of CETP (if require): e on ETP technology to be used Disposal of the ETP sludge 29.Effluent Charecterestics Unit Inlet Effluent Charecterestics Outlet Effluent Charecterestics Effluent discharge standards (MPCB) SEIAA-EC-0000000015 Page 6 of 10

Serial 30.Hazardous Waste Details Description Cat UOM Existing Proposed Total Method of Disposal 1 Serial Section & units 31.Stacks emission Details Fuel Used with Quantity 1 Serial Stack No. Height from ground level (m) 32.Details of Fuel to be used Internal diameter (m) Type of Fuel Existing Proposed Total Temp. of Exhaust Gases 1 33.Source of Fuel 34.Mode of Transportation of fuel to site Power requirement: Serial Source of power supply : During Construction Phase: (Demand Load) DG set as Power back-up during construction phase During Operation phase (Connected load): During Operation phase (Demand load): Transformer: DG set as Power back-up during operation phase: Fuel used: Details of high tension line passing through the plot if any: 35.Energy MSEDCL 10KVA 20KVA 160KVA 100KVA HSD Energy saving by non-conventional method: 36.Detail calculations & % of saving: Energy Conservation Measures Saving % 1 SEIAA-EC-0000000015 Page 7 of 10

37.Details of pollution control Systems Source Existing pollution control system Proposed to be installed (Capital cost and O&M cost): Serial Capital cost: O & M cost: 38.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Attributes Parameter Total Cost per annum (Rs. In Lacs) 1 Air Environment Water For Dust Suppression Air & Noise monitoring 2 Water Environment Water monitoring 0.6 3 Serial 1 2 3 Socio- Economic Environment Component Sewage Treatment Plant Regular Maintenance of Vesssles Green Belt & Horticulture Disinfection- Pest Control First Aid Facilities Health Check Up Creche for children Personal protective equipment b) Operation Phase (with Break-up): Description Capital cost Rs. In Lacs 0.8 7.65 STP Operational and Maintenance cost (Rs. in Lacs/yr) waste water 25 2.5 Regular Maintenance of Vesssles Green Belt & Horticulture 4 Housekeeping Housekeeping 0.50 39.Storage of chemicals (inflamable/explosive/hazardous/toxic substances) Description Status Location No Information Available Storage Capacity in MT 3.0 2.0 Maximum Quantity of Storage at any point of time in MT 40.Any Other Information Consumption / Month in MT Source of Supply Means of transportation SEIAA-EC-0000000015 Page 8 of 10

CRZ/ RRZ clearance obtain, if any: Distance from Protected Areas / Critically Polluted areas / Eco-sensitive areas/ inter-state boundaries Category as per schedule of EIA ification sheet Court cases pending if any Other Relevant Informations Have you previously submitted Application online on MOEF Website. Date of online submission Applied for CRZ clerance No - 3. The proposal has been considered by SEIAA in its SEIAA meeting no 108th meeting & decided to accord environmental clearance to the said project under the provisions of Environment Impact Assessment ification, 2006 subject to implementation of the following terms and conditions: Specific Conditions: I PP informed that no mangroves will be affected by project activity General Conditions: SEIAA-EC-0000000015 Page 9 of 10

4. The environmental clearance is being issued without prejudice to the action initiated under EP Act or any court case pending in the court of law and it does not mean that project proponent has not violated any environmental laws in the past and whatever decision under EP Act or of the Hon ble court will be binding on the project proponent. Hence this clearance does not give immunity to the project proponent in the case filed against him, if any or action initiated under EP Act. 5. In case of submission of false document and non-compliance of stipulated conditions, Authority/ Environment Department will revoke or suspend the Environment clearance without any intimation and initiate appropriate legal action under Environmental Protection Act, 1986. 6. The Environment department reserves the right to add any stringent condition or to revoke the clearance if conditions stipulated are not implemented to the satisfaction of the department or for that matter, for any other administrative reason. 7. Validity of Environment Clearance: The environmental clearance accorded shall be valid as per EIA ification, 2006, and amendments by MoEF&CC ification dated 29th April, 2015. 8. In case of any deviation or alteration in the project proposed from those submitted to this department for clearance, a fresh reference should be made to the department to assess the adequacy of the condition(s) imposed and to incorporate additional environmental protection measures required, if any. 9. The above stipulations would be enforced among others under the Water (Prevention and Control of Pollution) Act, 1974, the Air (Prevention and Control of Pollution) Act, 1981, the Environment (Protection) Act, 1986 and rules there under, Hazardous Wastes (Management and Handling) Rules, 1989 and its amendments, the public Liability Insurance Act, 1991 and its amendments. 10. Any appeal against this Environment clearance shall lie with the National Green Tribunal (Western Zone Bench, Pune),New Administrative Building, 1stFloor, D-, Wing, Opposite Council Hall, Pune, if preferred, within 30 days as prescribed under Section 16 of the National Green Tribunal Act, 2010. Copy to: 1. SHRI ANAND. B. KULKARNI, CHAIRMAN-SEIAA 2. SECRETARY MOEF & CC 3. IA- DIVISION MOEF & CC 4. MEMBER SECRETARY MAHARASHTRA POLLUTION CONTROL BOARD MUMBAI 5. REGIONAL OFFICE MOEF & CC NAGPUR 6. MUNICIPAL COMMISSIONER MUMBAI 7. MUNICIPAL COMMISSIONER NAVI MUMBAI 8. REGIONAL OFFICE MPCB RAIGAD 9. REGIONAL OFFICE MIDC RAIGAD 10. COLLECTOR OFFICE RAIGAD SEIAA-EC-0000000015 Page 10 of 10