An Evaluation of the Impact of Electronic Marshalling on a Process Safety Project Execution Process

Similar documents
Emerson Digital Twin: A Key Technology for Digital Transformation

DeltaV Enclosures. DeltaV Whitepaper. January 2013 Page 1

Dynamic Core with Mimic

Deliver your next project on time and within budget. Integrated Projects

Performance Learning Platform

Business Case for Dynamic Simulation

Emerson Process Management s Human Centered Design Philosophy: Conquering Complexity

DeltaV Distributed Control System October PAT and Batch Recipe Execution

Emerson Process Management s Human Centered Design Philosophy: Conquering Complexity

It s Time to Look at Projects Differently. Strategies for Integrated Project Execution

DeltaV InSight. Introduction. Benefits. Gain new process insight from embedded process learning. Easily identify underperforming control loops

Enhance your terminal operations and performance.

DeltaV OTS Express: A New Approach to Operator Training

DeltaV Engineering Seat Software Suite

Mimic Simulation Software Overview

Advanced Continuous Historian

DeltaV Control Module Execution

RECENT INNOVATIONS IN CONTROL SYSTEMS TECHNOLOGIES FOR AGILE PROJECT EXECUTION

Wall Mount DeltaV Cabinet

XLReporter for DeltaV Analyze

ProfessionalPLUS Station Software Suite

DeltaV InSight. DeltaV InSight. Introduction. DeltaV Product Data Sheet. Gain new process insight from embedded process learning

AMS Device Manager with the DeltaV System

Improve Process Performance by Validating Systems and Preparing Operations

DeltaV Continuous Historian

Reduce Risks and Increase Flexibility by maintaining project quality and accommodating late freezing of project data

DeltaV Continuous Historian

Online Interfaces and Optional Features

Embedded Enterprise Historian

Guardian Support for Syncade Smart Operations Management Suite

Application Station Software Suite

Blake Biernacki. Brian Bailey. Chad Sessions

Yokogawa Ends 2014 with a Bang: New CENTUM Release with Network-IO

5 Things to Consider Before Implementing Your Next Automation System Project

Satnam Bhogal and Joe Bastone 27 Oct 2016 LEAP FOR EPCS

Guardian Support and Guardian Support + Repair for Portable Analyzers and Online Systems

Fiscal Measurement and Remote Automation. Oil & Gas SCADA Services and Solutions

DeltaV InSight. DeltaV InSight. Introduction. DeltaV Product Data Sheet. Gain new process insight from embedded process learning

New Solutions for Optimizing Delivery of Automation Projects

Savannah River Section. DCS Migration: Overview of Practical Approach to Mitigating Risk

Pneumatic Valve Islands. Fieldbus & Multipol

Base Station. Base Station. Introduction. DeltaV Product Data Sheet. Adaptable work environment. Scalable to suit your needs. Dedicated functional use

Oil & Gas Industry. Smart Remote Automation. An Extension of PlantWeb Digital Architecture. PlantWeb

Eliminate the risks involved in executing complex analytical systems projects.

Easy. devices is just the start. Your control system should easily accept and adapt to all the many types of I/O in today s modern plants.

Guardian Support for AMS Suite

SureService Program. Benefits. Introduction. Service Data Sheet November Best-in-class system reliability. Preventive maintenance package

Session Nine: Functional Safety Gap Analysis and Filling the Gaps

Guardian Support and Guardian Support + Repair for Portable Analyzers and Online Systems

Integration of Data in the Supply Chain

Certified Training Centre Bareld Bruining

OPTIMIZING METERING PERFORMANCE

Optimal Control Systems Company Profile

Implementing Safety Instrumented Burner Management Systems: Challenges and Opportunities

BUSINESS CASE FOR USE OF FOUNDATION FIELDBUS

University of Michigan: Central Plant Distributed Control System Upgrades

Guardian Support for AMS Device Manager

2012 Honeywell Users Group EMEA Erik de Groot Safety Manager and Universal Safety update

Partner Up Greg Hallauer, Yokogawa Corporation of America

Symmetricom Global Services

Design and Milestone Review Report

IS AN OPEN SOURCE BUSINESS PROCESS MANAGEMENT SOLUTION RIGHT FOR YOU?

Unified control system in power plant TCE approach for implementation in Indian context

High Density Temperature Transmitters in Gasification Pilot. Patrick Bishop Chemical Engineer Keith Bentley Measurement Consultant

SBX 1000 In Situ Oxygen Transmitter

MATERIAL VISIBILITY. for Owners/Operators: The Importance of A CASE STUDY

Quality Policy. Vision

Regulatory Compliance Health Check

How Reliability Impacts Shareholder Value by Bruce Hawkins, CMRP

Tecnomatix Plant Simulation

PROJECT CERTAINTY. Reduce Complexity. Complexity among suppliers. and technologies drags down. progress. But by eliminating

Roxar Weight Loss Coupon Holder and Coupons 1 Retractable System

HID SAFE Enterprise. Enterprise Class Physical Identity and Access Management Solution

Reduce paper-based errors

Using Assessments to Improve System Availability

Strategy Roadmap. CA s Mainframe 2.0 Strategy Roadmap

Electronic Batch Records

Nothing s Complex. B to Y Solution Company. Control System Engineering Services

Aspen Economic Evaluation Family

Address system-on-chip development challenges with enterprise verification management.

A NEW TEMPLATE. Bringing together process design and plant automation WATER CHALLENGES ICHEME AWARDS HOW TO PROCESS GRAPHICS SAFETY OPERATOR TRAINING

Results of the IEC Functional Safety Assessment

NECTOR M Power System Building and Luminaire Power

2012 Honeywell Users Group EMEA. Sustain.Ability. John Schofield, Honeywell Improved Reliability, Safety and Compliance with Management of Change

Managed Business Services for Smart Metering

CASE STUDY: SAFETY INSTRUMENTED BURNER MANAGEMENT SYSTEM (SI-BMS)

City of San Mateo Clean Water Program Programmable Logic Controller (PLC) and Human Machine Interface (HMI) Programming Services

Performance Challenges Business Impact Areas Improvement Opportunities. Increased Production Costs. Brand Repeatability. Reduced Plant Availability

MIE TALK - January 2017

Mechatronics Solution for the Automotive Industry. Solution brief. automotive. Siemens PLM Software

Capabilities and Services

Siemens PLM Software. PLM solutions for the aerospace industry. When you only have one chance to get it right. siemens.com/plm

AN ADVERTISING SUPPLEMENT TO MARCH Project Execution:

Daniel Orifice Fittings and Meter Tubes

Migration Use Cases with the Migration Manager IBM Redbooks Solution Guide

ON TIME, WITHIN BUDGET

WHITE PAPER. The Foundation of a Successful ITAM Program - In 5 Not So Easy Steps

Ovation GE LM6000 Control System Retrofit

IBM System Storage. IBM Information Archive: The next-generation information retention solution

Transcription:

DeltaV SIS Process Safety System DeltaV SIS Whitepaper An Evaluation of the Impact of Electronic Marshalling on a Process Safety Project Execution Process This paper assesses the technical and commercial Impact of change on projects using traditional marshalling methods versus a DeltaV SIS with Electronic Marshalling technology. It will attempt to identify and quantify the impact and changes to work processes along with the cost and schedule benefits available to EPC contractors and end users.

Introduction Project schedules today rarely allow for the exploration of alternative solutions or for the consideration of unique approaches. Traditional technology and work processes have constrained the ability to incorporate design changes during the engineering lifecycle which has led in many cases to rework, cost escalation, schedule extension and conflict amongst contracting partners. With the growing recognition of the importance of early integration of the process safety systems provider being crucial to successful project execution, the traditional contractor and supplier roles have changed. System suppliers have now become solution providers under the guise of a Main Automation Contractor (MAC), where they are responsible not only for the Integrated Control and Safety System (ICSS), but also the incorporation of a number of disparate systems and packages from various suppliers. This early integration presents opportunities to investigate new technologies that provide the best solution to meet client and project requirements, such as Emerson s DeltaV SIS with Electronic Marshalling. The introduction of Electronic Marshalling technology for DeltaV SIS provides a modern flexible and innovative approach to project implementation that will provide significant benefits such as: Reduced costs Cost and schedule certainty Increased project efficiency Technical consistency Elimination of duplicate engineering activities Improved change control management This technology has the potential to significantly reduce the system footprint by removing the requirement for marshalling cabinets in traditional wired safety systems. More importantly it will have an effect on system design and configuration with the potential to improve change control management, reducing the cost of design changes throughout the project lifecycle. The flexibility offered by Electronic Marshalling technology allows the project team to make provision early in the execution for any future changes. The intent of this study is for Emerson to capture, document, and present the comparison between traditional safety hardware configurations, engineering processes, and the technological benefits of DeltaV SIS with Electronic Marshalling, when applied to a process safety project with traditional engineering. DeltaV SIS with Electronic Marshalling Technology Overview Since its inception, DeltaV SIS has been at the forefront of technological innovation and the release of Electronic Marshalling continues this trend. Whilst retaining the innovative functionality and features of previous releases, this technology addresses the following common issues encountered on projects: Late design changes or incomplete data Late cable information Late HAZOP and SRS completion Late mechanical package information Marshalling cabinet wiring changes Additional I/O Logic solver I/O allocation Changing I/O type Late design freeze and Factory Acceptance Test (FAT) FAT complexity Efficient and effective project execution. 2

Electronic Marshalling Project Impact DeltaV SIS with Electronic Marshalling provides the most differentiating element that will enable reduction of CAPEX (installation & commissioning efforts, cabling, footprint etc.) and project risk, as well as allowing a more flexible planning of design, installation, testing, and commissioning program. The use of this new product in the execution of the project will allow late release of I/O allocation to safety instrumented functions and enable easy implementation of late design changes and late cabling information, affecting the system marshalling cabinets. This capability has a significant impact on change management on the project and brings flexibility in the scheduling of Design Freeze milestones and hardware design activities. Figure 1 Engineering tasks impacted by Electronic Marshalling The DeltaV SIS Electronic Marshalling system is a revolutionary solution that takes away the pains of cross-wiring designs and having to set early milestones for hardware design freeze related to the I/O and cabling information. As shown in Figure 2, it optimizes the marshalling cabinet space as this is done electronically, simplifying the overall cabinet designs and providing a footprint which is less susceptible to the impact of change as I/O and cabling design becomes more defined. 3

Figure 2 Conventional Cabinets (Left) versus Electronic Marshalling (Right) The I/O backplane can be installed within a cabinet or directly in a field junction box and has integral terminals for landing the multi-core and field cables. This provides cost savings and schedule certainty. Figure 3 The DeltaV SIS CHARMs Smart Logic Solver (CSLS) and CHARM design 4

Project Impact during Execution By applying the Electronic Marshalling technology to an SIS project, we are able to assess the impact of new technology. It should be recognized that implementation of Electronic Marshalling will require fundamental changes to existing engineering work processes. These work process changes will enable the benefits of embedded within DeltaV SIS Electronic Marshalling to be realized to their fullest extent. These work process changes are summarized below. What Would the Implications of DeltaV SIS with Electronic Marshalling be to a Project? The potential cost escalation on a project is in two main areas, namely: Physical hardware, cabinet and wiring plus associated software change and testing Associated time, resources and personnel required to implement change using traditional processes With Electronic Marshaling technology, the CHARMS hardware is in essence an enabler within the project execution process, allowing more time in the design phases and later freeze dates. Therefore, the major impact on the project will occur in the execution work processes and the time needed for their completion. Process Safety project execution is a bit different than BPCS design and scheduling. The design and engineer phase of the project still exists, but much of that design is based on the results or the Process Hazard Analysis (HAZOP and LOPA) and resulting generation of the Safety Requirements Specification (SRS). The SRS defines the number, type and allocation of Safety Instrumented Functions (SIF) required to deliver the level of safety required for the process. Once completed, detailed engineering can be accomplished. The core process for the contractor when using traditional I/O technology is shown in figure 4. The P&ID s are developed and from there the Instrument Database containing details required by the system vendor such as tag lists and cabling information, enabling the start of their own engineering design process activities is generated. Figure 4 Contractor Core Processes for Conventional I/O Systems 5

The P&ID s and instrument database continue to be developed during the project until close out. Therefore the scope and information required by Emerson is not fully defined and subject to change. Emerson will use preliminary cable data for system engineering in order to meet the system engineering and schedule milestones. Figure 5 shows the actual processes used during execution. This shows that much of the work for Emerson relied on having the final cabling data, which was not available until much later in the project execution. The resultant change and rework related to this issue is usually the source of cost escalation and schedule extension. Figure 5 Emerson Project Process for Conventional I/O 6

The Application of Electronic Marshalling Technology to Core Processes For the EPC contractor, Electronic Marshalling technology has a significant impact in that Emerson does not require the final cabling data until much later in the project. Emerson only needs to have an indication of the anticipated size of the system in terms of I/O and the preliminary cable information. The contractor and Emerson can make an allowance for unknown or late preliminary design data at the very start of the project with little or no impact on future changes and cost escalation. This is illustrated in Figure 6. Figure 6 Contractor Process with Electronic Marshalling For Emerson, the execution process becomes far less reliant on receiving final cabling information. Using the calculated system size, the cabinets are built and shipped to site when final cabling data is available. The addition of further I/O is a relatively simple task and has no major cost implication over and above any new system hardware. The site installation contractor can install and land multi-core cables. The CHARMS can be installed on site when final cabling details have been established and loop checking and a Site Acceptance Test (SAT) performed as shown in Figure 7. 7

Figure 7 Emerson Core Process for I/O on Demand Electronic Marshalling In comparing figures 5 and 7, we can see that the execution work processes are significantly simplified for Emerson mitigating the potential for change, engineering rework and cost escalation. For the contractor the risk on moving forward with preliminary design data and understanding that design development will not unduly impact the execution and schedule is a major benefit. It also provides a significantly higher level of cost certainty, engineering consistency, improved management of any potential change and an optimal system architecture. Cost Implications of DeltaV SIS with Electronic Marshalling Although most projects incorporate a number of different systems into the overall solution, Electronic Marshaling technology is applicable to the DeltaV SIS portion only. Potential cost savings can be generated in areas such as physical hardware, engineering processes and the associated resources. Let s look at an example of the level of cost savings one can expect by using Electronic Marshalling technology for implementation in a safety system. Consider a project comprised a total of 1536 safety I/O of various types as detailed in the following table, and this configuration is the base case against which other alternatives have been evaluated. A second, more significant case assumes the use of Electronic Marshalling with CHARMS installed in the field in standard enclosures. As such, the 1536 I/O are assumed to be implemented as follows: 8

Table 1: Electronic Marshalling with CHARMS in the field In this Total Installed Cost (TIC) analysis, cost savings come from significantly reduced cabling infrastructure (Ethernet cable from junction boxes rather than using conventional multi-core signal cables), elimination of marshalling cabinets, associated engineering and installation activity, and can significantly reduce overall engineering and design effort. It should be noted that even more savings could be realized if the system included thermocouples, RTDs, and high current devices, or intrinsically safe signals. When compared to traditional wired signal infrastructure, the installed cost saving per loop can be significant as shown in Figure 8. Figure 8 DeltaV SIS Electronic Marshalling benefits in a traditional wired marshalling execution 9

DeltaV SIS Process Safety System DeltaV SIS Whitepaper Conclusion It has been clearly demonstrated that if DeltaV SIS with Electronic Marshalling technology is applied, a project will produce many benefits and improve the change management process for both Emerson and the contractor when compared with using traditional hard-wired SIS I/O and marshalling. Emerson Process Management Asia Pacific: 65.6777.8211 Europe, Middle East: 41.41.768.6111 North America, Latin America: +1 800.833.8314 or +1 512.832.3774 www.deltavsis.com Emerson Process Management 2013. All rights reserved. Emerson is a trademark of Emerson Electric Co. The DeltaV SIS logo is a mark of one of Emerson Process Management family of companies. All other marks are property of their respective owners. The contents of this publication are presented for informational purposes only, and while every effort has been made to ensure their accuracy, they are not to be construed as warranties or guarantees, express or implied, regarding the products or services described herein or their use or applicability. All sales are governed by our terms and conditions, which are available on request. We reserve the right to modify or improve the design or specification of such products at any time without notice.