Fundamentals of Transmission Operations

Similar documents
Telecommunications. Generator Data Requirements. PJM State & Member Training Dept. PJM /27/2015

Fundamentals of Transmission Operations

Manual 01 Revision 36

Communications & PJM All-Call Overview. Interconnection Training Program Module FC

Fundamentals of Transmission Operations

edart Tickets PJM State & Member Training Dept. PJM /27/2016

Transmission ITP. Data Exchange Requirements. PJM State & Member Training Dept. PJM /10/2018

PJM TO/TOP Matrix of Shared or Assigned Tasks

Control Center Requirements

PJM TO/TOP Matrix of Shared or Assigned Tasks

Transmission System Outage Scheduling Process. Interconnection Training Program PJM State & Member Training Dept.

Job Descriptions. Title & Job Functions: Transmission Function Employees

Operating Procedure PURPOSE... 1

Generator Operational Requirements

Summary of M-13 Rev. 66 Changes

Updated October 2, 2014 TITLE: System Operator Transmission - Senior DEPARTMENT: System Operations

Managing Director Transmission Operations

Control Center and Data Exchange Requirements

PSE&G Assumptions Overview. November 2018

Capacity Shortages RE Module. Interconnection Training Program PJM State & Member Training Dept.

East Kentucky Power Cooperative (EKPC) Transmission System Planning Criteria

Transmission ITP. Introduction. PJM State & Member Training Dept. PJM /10/2018

Dispatch Signal & Locational Marginal Pricing (LMP)

NERC Reliability Functional Model

RCR-35 Reliability Coordinator Reliability Plan for the SaskPower Subregion of the Midwest Reliability Organization

Peak Reliability IRO Webinar

POTOMAC ELECTRIC POWER COMPANY

M14B Annual Review. Jonathan Kern Transmission Planning Planning Committee March 8 th, PJM 2018

Document Updated: 12/5/2018

Outage Coordination Training MISO Training

Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position AA1-038

Training and Certification Compliance

RELIABILITY PLAN for the SERC Southeastern Subregion Reliability Coordinator July 14, 2016

International ejournals

MIDWEST ISO UPDATE. Sherman Elliott Manager State Regulatory Affairs

Transmission Interconnection Requirements. Table of Contents

Generation Dispatch. PJM State & Member Training Dept. PJM /13/2017

Project Revisions to TOP and IRO Reliability Standards Mapping Document Updated December 2014

AMERICAN RENEWABLES GAINESVILLE REGIONAL UTILITIES GAINESVILLE RENEWABLE ENERGY CENTER

REVENUE METERING REQUIREMENTS MANUAL (REDLINE VERSION)

Incremental Black Start RFP Response Template & General Information

LEER/TLR 5 Drill Procedure General Coordination Procedures and Drill Scenario

AMERICAN RENEWABLES GAINESVILLE REGIONAL UTILITIES GAINESVILLE RENEWABLE ENERGY CENTER

5.4 Post Contingency Local Load Relief Warning

Generation Interconnection Feasibility Study Report. For. PJM Generation Interconnection Request Queue Position AA1-038

Operating Procedure PURPOSE... 1

Reading, Understanding, and Following NERC Standards

Outage Scheduling Manual

PJM System Operator Certification & Training Requirements PJM State & Member Training Dept.

Facility Interconnection Requirements

Dispatch Signal & Locational Marginal Pricing (LMP)

OUTAGE COORDINATION PROCESS

OUTAGE COORDINATION PROCESS

Austin Energy s New GMS and Integration with Market Systems

Standard Development Timeline

Transmission Constraint Relaxation Parameter Revision ISO Straw Proposal

FRCC 2007 SYSTEM OPERATOR TRAINING SEMINARS. Reliability Coordinator Processes and Tools

Certification and Training Requirements

Generator Assessment & Roles During A Restoration

Demand Response Data Task Force Draft Report Outline and Work Plan

Educating System Operators in the New Millennium! Background. Course Level. Target Audience. NERC Continuing Education Hours

Certification and Training Requirements

EIPC Interconnection-wide Webinar and Stakeholder Discussion. November 17, 2015

Operating Procedure PURPOSE... 1

NERC Transmission Operator (TOP) Hetch Hetchy Water and Power (HHWP) (NCR05182)

Operating Procedure PURPOSE... 1

Glossary of Terms Used in Reliability Standards. Preliminary Draft Version 0 Reliability Standards September 1, 2004

MARKET EFFICIENCY STUDY PROCESS AND PROJECT EVALUATION TRAINING

Procedure No. Operating Version No. Procedure Effective Date System Emergency Notice Templates Distribution Restriction: None 1.

PJM Manual 37: Reliability Coordination Revision: 14 Effective Date: April 1, Prepared by Systems Operation Division

CALIFORNIA INDEPENDENT SYSTEM OPERATOR ANCILLARY SERVICES REQUIREMENTS PROTOCOL

Reference Document. Interconnected Operations Services

Addressing System Restoration Issues for the ISO New England System. Michael I. Henderson ISO New England Inc. PES General Meeting July 2015

SPP at a Glance. Located in Little Rock. Approximately 600 employees

PJM Manual M36 System Restoration. A.1 Critical Black Start Criteria

Year Assessment Preliminary Study Design

PJM Manual 12: Balancing Operations. Revision: 31 Effective Date: August 21, Prepared by Chris Pilong Dispatch PJM 2014 PJM 2014

SPP REPORT ON MAY 26, 2000 TLR EVENT

FRCC - PROC - RC - EOP-004. FRCC Disturbance Reporting Procedure

Reactive Reserve Check

PJM Black Start Replacement Process RTO Wide Black Start RFP Review Plan

Power System Operation Procedure Glossary Of Terms

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions June 25, Electric Grid Operations

Network Outage. Member Impacting Project Overview - Network Outage

TRANSMISSION PLANNING ASSESSMENT METHODOLOGY AND CRITERIA

Reliability Coordinator Data Request and Specifications for Data Provision

Proposed Service Level Agreement For Medium SaaS Projects

Outage Types and Entering Tickets PJM State & Member Training Dept.

Performance Management System

Project Real-time Monitoring and Analysis Capabilities: Meeting Notes

PJM Compliance Bulletin

Reliability Coordinator Outage Coordination Methodology

ASSOCIATED NERC STANDARD(S): TPL (referred to as TPL-001 in this document) IMPLEMENTATION: In effect when approved.

Approved by Standing Committees Approved by Board of Trustees

PJM Manual 10: Pre-Scheduling Operations Revision: 36 Effective Date: December 22, Prepared by Operations Planning Division

PJM Manual 03: Transmission Operations

Two Settlement PJM /06/2016

Eligible Intermittent Resource Dispatch Operating Target EIR DOT

EXELON UTILITIES TRANSMISSION FACILITY INTERCONNECTION REQUIREMENTS

Transcription:

Fundamentals of Transmission Operations Telecommunications PJM State & Member Training Dept. PJM 2014 9/10/2013

Objectives The student will be able to: Explain the back-up satellite phone testing requirements Explain how to coordinate outages of telemetry and communication equipment with PJM (RTUs, datalinks, etc.) Identify the requirements of Member companies to have a plan for loss of Control Center Functionality PJM 2014 2 9/10/2013

Satellite Phone Testing Process PJM 2014 9/10/2013

Satellite Phone Review Tests are conducted to verify that all equipment is working correctly and proper communication protocols are being used Two tests are conducted including the use of the Push-to-Talk (PTT) and Twoway Point-to-Point systems PJM 2014 4 9/10/2013

Satellite Phone Review When Does Testing Take Place? Test are normally conducted on weekly basis Tests may need to take place more frequently depending on current security level Satellite phones are also tested during a PJM sponsored emergency procedures drills PJM 2014 5 9/10/2013

Satellite Phone Review Who Participates In The Testing? All Member Companies with satellite phone systems participate in the tests Transmission Owners must have satellite phones at both their primary and back-up facilities Generation Operator (GO) Control Centers must have satellite phones when one or more units total 500 MW or greater PJM 2014 6 9/10/2013

Satellite Phone Review What Are The Main Purposes of Testing? The testing ensures proper functionality and reliability of the satellite phone system at both PJM & Member Company locations Allows the opportunity to test readiness level of Operators Operators have the opportunity to become familiar with the satellite phone equipment PJM 2014 7 9/10/2013

Satellite Phone Review Communication Protocols & Testing Testing ensures proper communication protocols are being followed when using the satellite phone system Speak clearly, slowly and be mindful of pronunciations Use proper code words when communicating Over when message/statement complete Out when terminating transmissions (Initiator) Always identify your company and your name PJM 2014 8 9/10/2013

Coordinating Telemetry and Equipment Outages PJM 2014 9/10/2013

Data Outages Miscellaneous Reportable Outages Email coordination notice 24 business hours in advance of significant system changes that could affect ICCP data link communications or the data exchange with PJM Data Set Switches (this does not include database updates, editing data exchange lists, etc. unless they include an outage) Significant Software Enhancements Communication line outages Backup center testing Failovers to alternate sites ICCP server failovers Network and Firewall maintenance RTU outages or changes to RTU data sent to PJM for RTUs connected to EHV (345kv and above) facilities 1 day notice required PJM 2014 10 9/10/2013

Data Outages Miscellaneous Reportable Outages The PJM EMS Networking group will coordinate any technical details, additional support, etc. with the member company Members providing notification should send it to the following email address (outage@pjm.com ). In an emergency, call the PJM Support Center at 610-666-8886 or the Dispatch Supervisor at 610-666-8806 The notification should include: The action being taken by the member company Planned length and expected time of the outage Potential impact to PJM Member contact information Member Company System Operator should coordinate final outage with the PJM Dispatch Supervisor 15 minutes prior to the event PJM 2014 11 9/10/2013

Data Outages Scheduling Data Outages PJM staff has the authority to: Reschedule or cancel a member company scheduled planned outage based on system conditions Reschedule or cancel a member company scheduled planned outage based on existing ICCP data link outages Deny a request for a member company planned outage if requested time has been previously scheduled PJM 2014 12 9/10/2013

Data Outages Scheduling Data Outages (cont.) During Peak Load Operations, to the extent possible, emergency changes should occur: During Summer operations - prior to 11:00 EPT During Winter operations - between 10:30 14:30 EPT Weekly routine maintenance should be canceled or rescheduled to days when emergency procedures are not anticipated PJM 2014 13 9/10/2013

Data Outages Unscheduled Data Outages Considerations / actions: MOC or Generator Owner/Operator Contact PJM Dispatch to report/discuss problem Recognize prior SCED approved base-point is stale while ICCP problems exist Resolve communications issue (support staff) Manually dispatch directions to plants verbally if problem is not resolved within 10 minutes Log manual dispatch directions Provide a contact person to PJM Dispatch to enhance operations during reliability issues PJM 2014 14 9/10/2013

Data Outages Unscheduled Data Outages Considerations / actions: TO or Merchant Transmission Contact PJM Dispatch to report/discuss problem Resolve communications issue (support staff) Contact PJM Dispatch regarding transmission constraints Verbally communicate critical data to PJM Dispatch as needed Provide a contact person to PJM Dispatch to enhance operations during reliability issues PJM 2014 15 9/10/2013

Data Outages Unscheduled Data Outages (cont.) Considerations / actions: PJM Actions Contact MOC/TO to discuss communication issues Resolve communication issue Recognize prior SCED approved base-point as stale while ICCP link is down Communicate zonal cost if communication issues are not resolved within 10 minutes Communicate targeted generation dispatch if transmission constraints arise Log manual dispatch/reassign regulation as necessary Communicate impact on ability to monitor transmission system Elevate communication to Shift Supervisor if reliability issues arise PJM 2014 16 9/10/2013

RTU Outages RTU Outages All outages that affect PJM s ability to receive telemetered data must be reported In the case of RTU s for 345 kv and above, personnel at the station will have to relay critical data to the TO and PJM Data to be kept manually updated includes: MW line flows for 500 kv and higher line and all tie lines Bus voltages for all 500 kv and higher stations Affected data must be updated: After loss of major generator or transmission line When value has a change of 100 MW or more for 500 kv and above, 50 MW for 345 kv and below At least every 30 minutes PJM 2014 17 9/10/2013

Loss of Control Center Functionality Requirements PJM 2014 9/10/2013

Member Back-Up Control Center Requirements PJM Members are required to construct and man Control Centers that are subject to the criteria outlined in Manual 01 Member Control Center Requirements In addition, Manual 01 specifies that each Member TO must have a plan for loss of control center functionality that includes procedures and responsibilities for providing annual training to ensure that operating personnel are able to implement the plans PJM 2014 19 9/10/2013

Member Back-Up Control Center Requirements All PJM Members shall develop a backup recovery plan to cover various contingencies, including maintaining an off-site storage location for updated copies of all software and data files necessary to restore control center functions The backup recovery plan is subject to review by PJM PJM 2014 20 9/10/2013

Summary Satellite phones must be tested periodically to ensure operation and familiarity Data outages also have an impact on system operations and need to be coordinated with PJM Members need to have plans and procedures in place for loss of control room functionality PJM 2014 21 9/10/2013

Questions? PJM 2014 9/10/2013

Disclaimer: PJM has made all efforts possible to accurately document all information in this presentation. The information seen here does not supersede the PJM Operating Agreement or the PJM Tariff both of which can be found by accessing: http://www.pjm.com/documents/agreements/pjmagreements.aspx For additional detailed information on any of the topics discussed, please refer to the appropriate PJM manual which can be found by accessing: http://www.pjm.com/documents/manuals.aspx PJM 2014 23 9/10/2013

Resources and References PJM. (2012). PJM Manual 1: Control Center & Data Exchange Requirements (Rev 21). Retrieved from http://www.pjm.com/~/media/documents/manuals/m01.ashx NERC. (2007). Standard Com-002-2 Communications and Coordination. Retrieved from http://www.nerc.com/files/com-002-2.pdf NERC. (2012). Standard TOP-001-2 Transmission Operations. Retrieved from http://www.nerc.com/files/top-001-2.pdf PJM 2014 24 9/10/2013