BA 3653: Assignment #1 (Due: Oct. 20, 2015) I. General Instructions

Similar documents
PRACTICE PROBLEM SET Topic 1: Basic Process Analysis

Lecture - 44 Supply Chain

OPERATİONS & LOGİSTİCS MANAGEMENT İN AİR TRANSPORTATİON

ACCT323, Cost Analysis & Control H Guy Williams, 2005

Outline. Push-Pull Systems Global Company Profile: Toyota Motor Corporation Just-in-Time, the Toyota Production System, and Lean Operations

ANCHOR ISO9001:2008 RPR-007 MARINE SERVICES ADDITIONAL PROCEDURE PRODUCT REALISATION

Littlefield Technologies: Overview

IT 470a Six Sigma Chapter X

Integrated Quality Systems

Chapter two. Product and Process design

Justifying Advanced Finite Capacity Planning and Scheduling

SIMUL8-PLANNER FOR COMPOSITES MANUFACTURING

Chapter Eight. Learning Objectives

Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras

ENM 102 Introduction to Industrial Engineering. Chapter 4 Facilities Location and Layout

Using Demand Solutions APS for Effective Scheduling in the Food Process Industry

Manufacturing Resource Planning

Tim Gutowski, July 8, 2002

Business Marketing part

PRECISION-MACHINED COMPONENTS FOR MEDICAL APPLICATIONS. Case Studies

OTOMES. MES for Steel Industry. Production Management Intelligence. Steel

Finished goods available to meet Takt time when variations in customer demand exist.

JUST IN TIME. Manuel Rincón, M.Sc. October 22nd, 2004

KillTest *KIJGT 3WCNKV[ $GVVGT 5GTXKEG Q&A NZZV ]]] QORRZKYZ IUS =K ULLKX LXKK [VJGZK YKX\OIK LUX UTK _KGX

Management of Inventory Systems Prof. Pradip Kumar Ray Department of Industrial and Systems Engineering Indian Institute of Technology, Kharagpur

Managerial Accounting Prof. Dr. Varadraj Bapat Department of School of Management Indian Institute of Technology, Bombay

Tri-Star Manufacturing:

19 Process: Cost systems

JIT and Lean Operations. JIT/Lean Operations

Operations as a Competitive Weapon

Full file at

PLUS VALUE STREAM MAPPING

IIA-CIA-Part3 IIA. Certified Internal Auditor - Part 3, Business Analysis and Information Technology

Visibility in the Inbound Supply Chain Finding a Clear Competitive Advantage as Complexity Grows

CAD/CAM CHAPTER ONE INTRODUCTION. Dr. Ibrahim Naimi

Drum Buffer-Rope. Based on : R. Holt, Ph.D., PE

Operations Management

Drum Buffer-Rope. Skorkovský. Based on : R. Holt, Ph.D., PE

7/8/2017 CAD/CAM. Dr. Ibrahim Al-Naimi. Chapter one. Introduction

Just-In-Time (JIT) Manufacturing. Overview

Chapter 8 Producing Quality Goods and Services

Using BellHawk Construction to Track the Making of Custom Kitchen Cabinets

Littlefield Labs: Overview

COST COST OBJECT. Cost centre. Profit centre. Investment centre

Producing Quality Goods and Services

Final Project: Patient Transporter Facility

The Cost of Poor Quality (COPQ) Speaking the Language of Money

Copyright Infor. All Rights Reserved.

2012 MPS Qualify Exam

Production & operations management. Chapter 6 Process Planning & design

TYPES OF COST CLASSIFICATIONS CLASSIFICATION BY BEHAVIOR

MIT Manufacturing Systems Analysis Lecture 1: Overview

MM 323 MANUFACTURING SYSTEMS PRODUCTION AND LAYOUT TYPES

Managerial Accounting Prof. Dr. Varadraj Bapat Department of School of Management Indian Institute of Technology, Bombay

2

Chapter 5 Location and Layout Strategies

Manufacturing Functionlity in Microsoft Dynamics GP. Gain complete control over your inventory, production and orders.

The Case For Ripping Hardwood Lumber

Exemplar for Internal Achievement Standard. Accounting Level 3

CONTROL. Chapter 3-7. Cost of Quality Institute of Industrial Engineers 3-7-1

Table of Contents Aerospace Manufacturing Compensation and Benefits Survey i

Production Management and Scheduling

Planning manufacturing systems

MAM5C/ OPERATIONS MANAGEMENT UNIT I -V

Job Manager for Professional Service Organizations

Differential Analysis: Relevant Costs the Key to Decision Making

Manufacturing Information Systems. deden08m.com 1

5 Strategies to make Money in Your Warehouse!

Chapter 2 Cost Terms, Concepts, and Classifications

Manufacturing Systems Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras

3 October 2017 Page 1 of 5 BellHawk Systems Corporation

Manage Your Own Company Business Game LIUC Cattaneo University

Chapter 1 The Manufacturing Plant as a Business System

Volume 18 Number 11 - November 2018 ADVANCED, FAST, AND TRUSTED SOLUTION

8 Tools to Over Manage the Bottleneck

Process Flow Design and Trial Production Demo Exercise (FDDx ) 1

Productivity Improvement Techniques in Apparel Manufacturing Industry

The Five Focusing Steps

Work System Design Dr. Inderdeep Singh Department of Mechanical and Industrial Engineering Indian Institute of Technology Roorkee

PRODUCTIVITY IMPROVEMENT IN APPLIANCE MANUFACTURING

SUPPLIER QUALITY ASSESSMENT

TABLE OF CONTENTS. Question Paper. Answer 1. Answer 2. Answer 3. Answer 4. Soft Copy

REVISION: MANUFACTURING 12 SEPTEMBER 2013

Connecting S&OP to the Shop Floor: Here s How!

Process Costing. Chapter 17 ACCT Fall Jay K. Baker, MSFS, MBA, CPA, CFP

OM (Fall 2016) Outline

This appendix includes the title and reference number for every best

Chapter 02 - Cost Concepts and Cost Allocation

Chapter 02 - Cost Concepts and Cost Allocation

5 Metrics You Should Know to Understand Your Engineering Efficiency

Learning Objectives. Facility Layout. Layout. Strategic Importance of Layout. Layout Strategy Concerns. Importance of Layout Decisions

INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe

INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe

Product Realization. Ameritube LLC 1000 N. Hwy 77, Hillsboro TX Revision Level: Procedure No. A

SCM 302 OPERATIONS MANAGEMENT JIT

Operations Management and Quality

Job Manager for Job Shops

An accounting perspective: Business insight

This article is on Facility Layout and Types of Layouts. It contains concepts like -

Transcription:

BA 3653: Assignment #1 (Due: Oct. 20, 2015) I. General Instructions 1. Each group (or team) consists of 3~4 students (maximum 5 students) enrolled in the same section. The right table shows the deduction percentage for other than 3~4 students in a group. All the group members will get the same grade. You may use Discussions to find your partners in the Blackboard. 2. Please read carefully the syllabus to find the detailed information about group formation. 3. Please refer to the right figure for the desirable cover page. 4. A late assignment will not be accepted in any excuse. The answers for assignment & quiz will be either posted on the D2L or handed out in the class. However, the answers for the case study will not be posted. Instead, it will be discussed in the class. # in group Deduction 1 25 % 2 15 % 5 15% BA3653: HW # 1 (Due: Oct. 20, 2015) Q1. (a) (b) Alex Tender 321234 x02f3@unb.ca Chris Soft 332111 f52r3@unb.ca Troy Mania 214567 r329t@unb.ca (Give 1 space here for grading) II. Questions [Total 100 points] (Please use your educational guess for incomplete information.) Q1 (10 points): For the Alton Bridge video (https://youtu.be/yidjesfbtwi), answer the followings: (a) [3] Draw the process diagram. (b) [5] What kind of problems happened to delay the construction? For each problem, describe how many days delayed and how they solved it. (c) [2] What were the reasons for successful or failed operations? Find at least three reasons. Q2 (12 points): Watch the BMW video (http://youtu.be/o7xxmbvsfr0). (a) [2] What would be the ultimate goal in their operation? (b) [3] What do they provide to customers? Find at least five benefits from the video. How do these services relate to customers expectation (that is, explain them with Price, Quality, Time & Variety)? (c) [3] Draw the flow (or process) chart for a car service (based on the manager s explanation). (d) [2] What do they do to customers and technicians, if the repair work is not satisfactory? (e) [2] What would be the result from their excellent operations? Q3 (13 points): Read the case of CUSTOM MOLDS, INC. (see page 4-5 in this document). (a) [3] What are the major issues facing Tom and Mason Miller? (b) [5] Identify the individual processes on a flow diagram. What are the competitive priorities for these processes and the changing nature of the industry? (c) [5] What alternatives might the Millers pursue? What key factors should they consider as they evaluate these alternatives? Q4 (10 points): Watch the King Soopers video (http://youtu.be/nobvu-_jfqg). (a) [5] Fill up the blanks below. (BA 3653 HW #1) (Page 1 of 5)

Process (by Classification 2) Equipments (describe in detail) Easiness to changing capacity Skill level of workers Variety of product Capacity or volume mentioned Breads Pastry Line Custom decorated Cakes (b) [3] Draw the process diagram (or flow chart) for Pastry Line. (c) [2] Why does King Soopers Bakery use three different processes? Q5 (20 points): The layout of a three-stage process consists of three welding machines in parallel (W 1, W 2 and W 3 ) at stage 1, a single drill machine (D 1 ) at stage 2 and two grind machines in parallel (G 1 and G 2 ) at stage 3. The processing times are (where unit is minute): W 1 : 4, W 2 : 6, W 3 : 6, D 1 : 2, G 1 : 3 and G 2 : 5. Buffer B 1 is between stages 1 and 2 and Buffer B 2 is between stages 2 and 3. (a) [2] Draw a neat process flow diagram. (It should have the input arrow and output arrow.) (b) [2] What is the minimum MLT? (c) [2] Calculate hourly capacities of each stage. (d) [2] What is the overall capacity of the process? (e) [6] Jobs are numbered 1, 2, 3, 4 and so on (at least draw 9 jobs). These jobs are released to W 1, W 2 and W 3, whenever it s necessary. Plot a Gantt chart using the diagram below to maximize productivity and to minimize the WIP. ( is more important than.) Job 1 is already plotted for you. (You may copy or cut & paste the diagram to your answer). 4 W1 1 1 1 1 6 W2 6 W3 (B1) 2 D1 1 1 (B2) 3 G1 1 1 1 5 G2 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Parts (f) to (i) are based on schedule described in the above Gantt chart of part (e). Assume that the system becomes stable after six jobs. (f) [1] Say the finished time for Job 1 ~ 6. (g) [1] From your Gantt chart, what will be the average MLT? (h) [2] What are the contributions to WIP for resources? (i) [2] Verify little s formula. Q6 (10 points): (a) [4] Canada Revenue Agency completes 400 projects per year, on average. In October 2015, it was reported that the number of projects currently on their plate (i.e. pending at various stages) is 90. The Agency head claims that the average time to complete a project is less than three months. Is the estimate of average time to complete a project realistic? Justify your answer. (BA 3653 HW #1) (Page 2 of 5)

(b) [3] Inventory Turnover is defined as the number of times that a company s inventory cycles or turns over per year. Suppose the inventory turnover for HP Computer was 20 and the average inventory of the company was $100 million (based on purchase price). How much annual profit would the company make if they make on an average 2 % profit on each item sold? (c) [3] A bank finds that the average number of people waiting in queue during lunch hour is 15. On average, during this period 3 people per minute leave the bank after receiving service. How long do people spend on average in the bank? Q7 (25 points): Read the Shouldice Hospital in the Course materials. (a) [2] Describe its products or services. (b) [4] Analyze all the costs incurred by customers and compare them with other competitors in the following table. Assume the value of time lost to employer ranged between $50 ~ 300 per day. Shouldice Other Hospitals 1. Cost of typical operation 2. Transportation 3. Value of time lost to employer (at hospital & while recovering) 4. Subtotal before allowance for recurrence 5. Expected cost of recurrence 6. Total cost (c) [3] Research about the profitability of the operations in Shouldice. Let s assume that they performed 7,000 operations in 50 weeks in 1983. (If you use some assumptions, please specify them.) [Note: Use the following table.] Revenue Cost Profit Clinic Hospital (d) [3] What are the competitive advantages in Shouldice? List at least four competitive edges. (e) [2] Why is the ratio of nurse to patient low, compared to other hospitals? Find at least three reasons. (f) [3] Show your neat diagram for admission process before arriving to the hospital. (g) [3] Analyze Shouldice s process on the quality factors. (on slide #6 @ Topic 2) (h) [5] What kinds of facilities do they have? For each facility, show the capacity and utilization. Let s assume that they performed 7,000 operations in 50 weeks in 1982. [Hint: Facilities are exam room, admitting personnel, number of beds, which related to process the patients.] (sample) Key Resources Capacity Utilization 1. Exam room 6 rooms * [60/17.5] patient/hr * 2 hrs/day 140/206 = 68% <6>15~20min * 5 days/wk = 206 patients/wk 2. Admit. Proc. (BA 3653 HW #1) (Page 3 of 5)

[CUSTOM MOLDS, INC.] Custom Molds, Inc., manufactures custom-designed molds for plastic parts and produces custom-made plastic connectors for the electronics industry. Located in Tucson, Arizona, Custom Molds was founded by the father and son team of Tom and Mason Miller in 1975. Tom Miller, a mechanical engineer, had more than 20 years of experience in the connector industry with AMP, Inc., a large multinational producer of electronic connectors. Mason Miller had graduated from the University of Arizona in 1974 with joint degrees in chemistry and chemical engineering. The company was originally formed to provide manufacturers of electronic connectors with a source of high quality, custom-designed molds for producing plastic parts. The market consisted mainly of the product design and development divisions of those manufacturers. Custom Molds worked closely with each customer to design and develop molds to be used in the customer s product development processes. Thus, virtually every mold had to meet exacting standards and was somewhat unique. Orders for multiple molds would arrive when customers moved from the design and pilot-run stage of development to large-scale production of newly designed parts. As the years went by, Custom Molds reputation grew as a designer and fabricator of precision molds. Building on this reputation, the Millers decided to expand into the limited manufacture of plastic parts. Ingredient-mixing facilities and injection-molding equipment were added, and by the mid-1980s Custom Molds developed its reputation to include being a supplier of high-quality plastic parts. Because of limited capacity, the company concentrated its sales efforts on supplying parts that were used in limited quantities for research and development efforts and in preproduction pilot runs. PRODUCTION PROCESSES By 1985, operations at Custom Molds involved two distinct processes: one for fabricating molds and one for producing plastic parts. Although different, in many instances these two processes were linked, as when a customer would have Custom Molds both fabricate a mold and produce the necessary parts to support the customer s R&D efforts. All fabrication and production operations were housed in a single facility. The layout was characteristic of a typical job shop, with like processes and similar equipment grouped in various places in the plant. Figure C2.1 shows a schematic of the plant floor. Multiple pieces of various types of high-precision machinery, including milling, turning, cutting, and drilling equipment, were located in the mold-fabrication area. Fabricating molds is a skill-oriented, craftsman-driven process. When an order is received, a design team, comprising a design engineer and one of 13 master machinists, reviews the design specifications. Working closely with the customer, the team establishes the final specifications for the mold and gives them to the master machinist for fabrication. It is always the same machinist who was assigned to the design team. At the same time, the purchasing department is given a copy of the design specifications, from which it orders the appropriate raw materials and special tooling. The time needed to receive the ordered materials is usually three to four weeks. When the materials are received for a particular mold, the plant master scheduler reviews the workload of the assigned master machinist and schedules the mold for fabrication. Fabricating a mold takes from two to four weeks, depending on the amount of work the machinist already has scheduled. The fabrication process itself takes only three to five days. Upon completion, the mold is sent to the testing and inspection area, where it is used to produce a small number of parts on one of the injection molding machines. If the parts meet the design specifications established by the design team, the mold is passed on to be cleaned and polished. It is then packed and shipped to the customer. One day is spent inspecting and testing the mold and a second day cleaning, polishing, packing, and shipping it to the customer. If the parts made by the mold do not meet design specifications, the mold is returned to the master machinist for retooling and the process starts over. Currently, Custom Molds has a published lead time of nine weeks for delivery of custom-fabricated molds. Dock Receiving raw materials inventory Dry mix Wet mix Assembly Offices Lunch room Cut and trim FIGURE C2.1 Plant Layout Dock Packing and shipping finished goods inventory Testing and inspection Injection machines Mold fabrication The manufacturing process for plastic parts is somewhat different from that for mold fabrication. An order for parts may be received in conjunction with an order for a mold to be fabricated. In instances where Custom Molds has previously fabricated the mold and maintains it in inventory, an order may be just for parts. If the mold is already available, the order is reviewed by a design engineer, who verifies the part and raw material specifications. If the design engineer has any questions concerning the specifications, the customer is contacted and any revisions to specifications are mutually worked out and agreed upon. Upon acceptance of the part and raw material specifications, raw material orders are placed and (BA 3653 HW #1) (Page 4 of 5)

production is scheduled for the order. Chemicals and compounds that support plastic-parts manufacturing are typically ordered and received within one week. Upon receipt, the compounds are first dry-mixed and blended to achieve the correct composition. Then the mixture is wetmixed to the desired consistency (called slurry) for injection into molding machines. When ready, the slurry is transferred to the injection molding area by an overhead pipeline and deposited in holding tanks adjacent to the injection machines. The entire mixing process takes only one day. When the slurry is staged and ready, the proper molds are secured from inventory or from the clean and polish operation if new molds were fabricated for the order and the parts are manufactured. Although different parts require different temperature and pressure settings, the time to produce a part is relatively constant. Custom Molds has the capacity to produce 5,000 parts per day in the injection-molding department; historically, however, the lead time for handling orders in this department has averaged one week. Upon completion of molding, the parts are taken to the cut and trim operation, where they are disconnected and leftover flashing is removed. After being inspected, the parts may be taken to assembly or transferred to the packing and shipping area for shipment to the customer. If assembly of the final parts is not required, the parts can be on their way to the customer two days after being molded. Sometimes the final product requires some assembly. Typically, this entails attaching metal leads to plastic connectors. If assembly is necessary, an additional three days is needed before the order can be shipped. Custom Molds is currently quoting a three-week lead time for parts not requiring fabricated molds. THE CHANGING ENVIRONMENT In early 1991, Tom and Mason Miller began to realize that the electronics industry they supplied, along with their own business, was changing. Electronics manufacturers had traditionally used vertical integration into component parts manufacturing to reduce costs and ensure a timely supply of parts. By the late 1980s, this trend had changed. Manufacturers were developing strategic partnerships with parts suppliers to ensure the timely delivery of high quality, cost-effective parts. This approach allowed funds to be diverted to other uses that could provide a larger return on investment. The impact on Custom Molds could be seen in sales figures over the past three years. The sales mix was changing. Although the number of orders per year for mold fabrication remained virtually constant, orders for multiple molds were declining, as shown in the following table: NUMBER OF ORDERS ORDER Molds Molds Molds SIZE 1988 1989 1990 1 80 74 72 2 60 70 75 3 40 51 55 4 5 6 5 5 3 5 4 6 4 8 5 7 2 0 1 8 10 6 4 9 11 8 5 10 15 10 5 Total orders 230 238 231 The reverse was true for plastic parts, for which the number of orders per year had declined but for which the order sizes were becoming larger, as illustrated in the following table: NUMBER OF ORDERS ORDER Parts Parts Parts SIZE 1988 1989 1990 50 100 93 70 100 70 72 65 150 40 30 35 200 36 34 38 250 25 27 25 500 10 12 14 750 1 3 5 1,000 2 2 8 3,000 1 4 9 5,000 1 3 8 Total orders 286 280 277 During this same period Custom Molds began having delivery problems. Customers were complaining that parts orders were taking four to five weeks instead of the stated three weeks and that the delays were disrupting production schedules. When asked about the situation, the master scheduler said that determining when a particular order could be promised for delivery was very difficult. Bottlenecks were occurring during the production process, but where or when they would occur could not be predicted. They always seemed to be moving from one operation to another. Tom Miller thought that he had excess labor capacity in the mold-fabrication area. So, to help push through those orders that were behind schedule, he assigned one of the master machinists the job of identifying and expediting those late orders. However, that tactic did not seem to help much. Complaints about late deliveries were still being received. To add to the problems, two orders had been returned recently because of the number of defective parts. The Millers knew that something had to be done. The question was What? (Source: This case was prepared by Dr. Brooke Saladin, Wake Forest University, as a basis for classroom discussion.) (BA 3653 HW #1) (Page 5 of 5)