Water Quality Management Plan

Similar documents
Water Resources Management Plan

Sizing Calculations and Design Considerations for LID Treatment Measures

June 2017 C.3 Workshop Sizing Example. Section II.B Sizing Volume-Based Treatment Measures based on the Adapted CASQA Stormwater BMP Handbook Approach

Stormwater Treatment Measure Sizing and Design Considerations SMCWPPP C.3 Workshop June 21, 2017

CENTRALIZED BMPS TYPICALLY PUBLICLY OWNED & MAINTAINED BMPS, TREATING A LARGE (>20 ACRES) URBAN DRAINAGE WITH MULTIPLE LAND

Design Handbook. Low Impact Development Best Management Practices

Design Example Residential Subdivision

Example 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond)

APPENDIX J-3. Orcem Stormwater Management and Treatment Facilities Design Summary

Water Resources Management Plan Appendix B

PRELIMINARY DRAINAGE REPORT NEWCASTLE FIRE STATION OLD STATE HIGHWAY

PRELIMINARY DRAINAGE STUDY

Pollutant Sources/Source Controls Checklist A-7

Stormwater Treatment Practice (STP) Calculator Instructions

Hydrology Study. For Bella Terrazza Portion of Lot 1, Block 39, Subdivision of S Tract, Rancho El Cajon El Cajon, CA 92021

EXAMPLE Stormwater Management Plans w/ CSS BMP Sizing Calculator (v2.1)

Worksheets from Orange County Technical Guidance Document ( )

Modeling Green Infrastructure Compared with Large-Scale Monitoring at Kansas City, MO

THE SAN DIEGO AND IMPERIAL COUNTIES CHAPTER OF THE AMERICAN PUBLIC WORKS ASSOCIATION (APWA) ANNOUNCE A SEMINAR DEMONSTRATING The BMP Sizing

IBS Site Drainage: Senior Design Project

Concurrent Session B: LID Design Specifications (Chapter 4 in Draft Manual)

100-yr Design Runoff (cfs) Basin ID 103b A a B B C Totals

Appendix A. Compliance Calculator Guidance

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Treatment Volume: Curve Numbers. Composite CN or Not? Treatment Volume: Curve Numbers. Treatment Volume: Calculation. Treatment Volume: Calculation

RETENTION BASIN EXAMPLE

Chatham Park Stormwater Manual

Hydrology for Drainage Design. Design Considerations Use appropriate design tools for the job at hand:

January 20, Nate Hatleback Project Manager, City of Thornton Development Engineering 9500 Civic Center Drive Thornton, CO (303)

Sizing Criteria Worksheets and Examples

Appendix A. Stormwater Pollutant Sources/Source Controls Checklist

Permeable Pavement: A New Chapter

ORDINANCE APPENDIX F STORMWATER MANAGEMENT DESIGN CRITERIA

HYDROLOGIC CONSIDERATIONS. 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY

Tips for Preparing/Reviewing Storm Water Control Plans (SWCP)

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff

LAKE COUNTY HYDROLOGY DESIGN STANDARDS

Appendix 10-A. Optional Recharge Volume Approach

County of Los Angeles - Department of Public Works

FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 1.0 Overview

NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP)

10/16/2013. The Big Picture of LID and Green Infrastructure. Learning Objectives

Module 10b: Gutter and Inlet Designs and Multiple Design Objectives

Extended Detention Basin Design

Municipal Stormwater Ordinances Summary Table

Rational Method Hydrological Calculations with Excel COURSE CONTENT

Practices that capture and temporarily store the WQ v before allowing it to infiltrate into the soil.

Conservation Design Approach for New Development

November 21, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

SIZING. MWS Linear. Hybrid Stormwater Filtration System. P.O. Box 869 P Oceanside, CA F

Design of Stormwater Wetlands

STORMWATER QUALITY CONTROL PLAN (SWQCP)

DESIGN DEVELOPMENT HYDROLOGY REPORT & LOW IMPACT DEVELOPMENT PLAN (LID PLAN)

Environment, Energy, Security & Sustainability (E2S2)

Stormwater Bio-Infiltration Pilot Project Concept Proposal Submitted by

1. Review Column 1 and identify which of these potential sources of stormwater pollutants apply to your site. Check each box that applies.

Pre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015

2011 Guidance Manual for Development Stormwater Quality Control Measures

the 2001 season. Allison brought high winds and street flooding to Houston, after

4.12. Detention Basins

City of Beverly Hills Low Impact Development (LID) Fact Sheet

15A NCAC 02H.1005 STORMWATER REQUIREMENTS: COASTAL COUNTIES

Introduction to Storm Sewer Design

SFPUC Wastewater Enterprise URBAN WATERSHED MANAGEMENT PROGRAM

SFPUC Wastewater Enterprise URBAN WATERSHED MANAGEMENT PROGRAM

Engineering Division 701 Laurel Street Menlo Park, CA Phone: (650) Fax: (650)

Learn how to design inlet grates, detention basins, channels, and riprap using the FHWA Hydraulic Toolbox and WMS

OHIO S NPDES STORMWATER GENERAL PERMIT FOR CONSTRUCTION ACTIVITIES OHC Justin Reinhart, PE Division of Surface Water

APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY)

Stormwater Control Plan Report

City of Santa Clarita Project-Specific Urban Stormwater Mitigation Plan

Hydrologic Study Report for Single Lot Detention Basin Analysis

TECHNICAL GUIDANCE DOCUMENT APPENDICES

G. HYDROLOGY Existing Conditions

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

Latest MWELO Updates + Storm Water Requirements Kliffs Notes New Storm Water Permit and BMP Design Manual: Impacts on Future Development Presented

3.2 INFILTRATION TRENCH

Municipal Regional Stormwater Permit Provision C.3 Model Conditions of Approval

Dry Swale Wet Swale Grass Channel Dry Well Permeable Pavement Bioretention DESIGN ELEMENTS

Shirley E. Clark, Ph.D., P.E. October 5, /30/2012

City of Charlottesville Water Resources Protection Program

Stormwater Quality Review Checklist - General

Philadelphia Water Department. Stormwater Regulations Update. BIA & Fox Rothschild LLP

MS4 Programs: Quality, the Other Stormwater Q. Dan Bounds, PE, D.WRE IAFSM March 9, 2017

Applying the Water Quality Volume

CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management

New Draft Model BMP Design Manual for San Diego Region

Project Priority List scoring worksheet - stormwater Guidance document

Appendix B. Storm Drain System Data

Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts

Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts

3.11 Sand Filter Basin

Hydrology Study. Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated)

Module 3 and Module 4 Watershed Analysis and RUSLE Calculation. Noboru Togawa. Presented to: Dr. Pitt Construction Site Erosion Control

4.8. Subsurface Infiltration

A Case for the Design and Modeling of BMP Infiltration and LID Techniques. By: Bob Murdock

SUPPORTING DOCUMENT STORMWATER BEST MANAGEMENT PRACTICE (BMP) INFEASIBILITY WORKSHEET FOR ON-SITE STORMWATER MANAGEMENT

Decatur, Georgia Stormwater Management Policy Guidelines. DRAFT November 5, 2014

Transcription:

Water Quality Management Plan For El Centro Aquatic Center Park Avenue between 4 th Street and 6 th Street August 5, 216 Prepared by Arsalan Dadkhah, Ph.D., PE (RCE 4156) D-MAX Engineering, Inc. 722 Trade Street, Suite 119 San Diego, CA 92121 858.586.66

Table of Contents 1 Project Information... 1 1.1 Hydromodification Applicability... 1 1.2 Eligibility for Reduced BMP Sizing or Alternative BMPs... 1 2 Drainage Management Areas... 2 3 Site Design BMPs... 2 4 Low Impact Development and Treatment BMPs... 3 5 Flow Control BMPs... 5 5.1 Flow Control BMPs for Hydromodification Projects... 5 5.2 Flood Control Requirements... 5 6 Source Control BMPs... 5 7 Operation and Maintenance... 5 Tables Table 1. Project Summary... 1 Table 2. Hydromodification Management Requirements Applicability... 1 Table 3. Applicability of Special BMP Sizing or Selection Standards... 1 Table 4. DMA Summary... 2 Table 5. Site Design BMP Volume Reduction Summary by DMA... 3 Table 6. DMA Runoff Summary by DMA... 4 Table 7. Use of BMPs Other than Bioretention... 4 Appendices A. Vicinity Map B. Runoff Calculations for Storm Water BMP Design C. Project Drainage Management Area and BMP Map D. State Calculator Spreadsheet Site Design BMP Volume Reduction Calculations E. LID and Treatment BMP Sizing Calculations and Design Characteristics F. Calculations for Hydromodification Management Flow Control and Flood Control Storage G. Source Control BMPs Proposed and Plan Sheet References H. Operation and Maintenance Plan for Permanent BMPs Page i

1 Project Information Table 1 summarizes basic project information. Appendix A includes a vicinity map of the project. Table 1. Project Summary Project Name Address Total Size (acres or square feet) Project Description El Centro Aquatic Center Park Avenue between 4 th Street and 6 th Street 3.2 acres Construct an aquatic center, including swimming pools and supporting buildings and parking areas, in the area bounded by Park Avenue, Adams Avenue, 4 th Street, and 6 th Street. This property is an existing park that is predominantly pervious, with a few existing small structures and paved pads for dumpsters and ancillary structures. Grass in the park has not been watered for some time due to the drought and is in poor condition. The segment of 5 th Street between Park and Adams will be demolished and incorporated into the Aquatic Center footprint. Pavement work at the intersection of 5 th Street and Park will be done to allow drainage to flow to the east across this intersection; in the existing condition it flows to the north. 1.1 Hydromodification Applicability Hydromodification projects must meet additional flow control requirements. Table 2 indicates whether the project is a hydromodification project. Table 2. Hydromodification Management Requirements Applicability Hydromodification Project (Y/N): at least 1 acre and resulting in an increase in impervious area compared to the existing condition of the property Y 1.2 Eligibility for Reduced BMP Sizing or Alternative BMPs Eligibility for reduced BMP sizing or using alternative BMPs is summarized in Table 3. Any items marked Y must be explained briefly below the table. Table 3. Applicability of Special BMP Sizing or Selection Standards Redevelopment qualifying for reduced BMP sizing due to 5% rule (Y/N): results in increase of less than 5% of the impervious surface when compared to the existing condition of the property Road or Linear Underground/Overhead Project (LUP) qualifying for special BMP sizing and selection (Y/N): most roads and LUPs qualify. See details in Section 4.3.2.2 of the El Centro Post-Construction Storm Water Standards Manual Downtown project eligible for alternative BMP selection (Y/N): project creating/replacing less than 1 acre of impervious area, with at least 85% of entire project site covered by permanent structures, and located in the area bounded by State, Broadway, 4 th, and 8 th. See Section 4.3.4.4 of the El Centro Post-Construction Storm Water Standards Manual. N N N Page 1

BMP receiving runoff only from existing impervious area eligible for alternative BMP selection (Y/N): See Section 4.3.4.4 of the of the El Centro Post-Construction Storm Water Standards Manual for details. Historic project eligible for alternative BMP selection (Y/N): Historic sites, structures or landscapes that cannot alter their original configuration in order to maintain their historic integrity. See Section 4.3.4.4 of the El Centro Post-Construction Storm Water Standards Manual. N N 2 Drainage Management Areas Table 4 below summarizes the project s Drainage Management Areas (DMA). Runoff calculations for the Storm Water Design Volume (SDV) are included in Appendix B. Table 4. DMA Summary DMA ID Total DMA Area (sf) Rooftop Impervious Area (sf) Other, Non- Rooftop Impervious Area (sf) Hydrologic Soil Group* Storm Water Design Volume, SDV (cf) West 57,886 42,241 D 1,945 East 57,896 6,928 28,638 D 1,559 South 13,234 8,163 D 358 Park Ave, North 4,13 4,13 D 232 Park Ave, South 4,645 4,645 D 269 * Note: while USDA NRCS maps suggest the soil is type C, the geotechnical report found soil with high clay content and low infiltration rate that is more consistent with type D. Appendix C includes a map of the site showing following: Delineated DMA areas, along with a DMA ID (i.e., a name or ID number) for each DMA Location and size, as applicable, of all o Site design BMPs o Source control BMPs o LID measures or other treatment BMPs o If applicable, additional controls for hydromodification (applicable only to hydromodification projects; see Table 2 above and El Centro Post-Construction Storm Water Standards Manual Section 4.4). Cross sections as necessary to demonstrate compliance with BMP sizing standards. 3 Site Design BMPs Site Design BMPs are techniques to reduce runoff from the project site. Site Design BMPs reduce the volume of storm water to be treated by Low Impact Development (LID) or treatment BMPs. The amount of runoff reduced by Site Design BMPs (V SD ) is calculated using the State Water Resources Control Board Page 2

Post-Construction BMP Calculator spreadsheet (State Calculator Spreadsheet). A version of this spreadsheet set up with El Centro inputs is available for download on the City s website. The site design BMP volume reductions for each DMA are summarized in Table 5 below. Supporting calculations from the State Calculator Spreadsheet are included in Appendix D. A map of the locations of trees planted and supporting information for soil quality improvement calculations are also included in Appendix D. Table 5. Site Design BMP Volume Reduction Summary by DMA DMA ID Porous Pavement Tree Planting Volume Reduction from Site Design BMPs (cubic feet) Downspout Disconnection Impervious Area Disconnection Vegetated Swales Rain Barrels/ Cisterns Soil Quality Total Volume Reduction (V SD ) West 34 314 348 East 15 196 211 South 2 68 7 Park Ave, North Park Ave, South Note -Volume reduction for each Site Design BMP is determined using the State Water Board Post-Construction BMP Calculator spreadsheet. A completed version of the State spreadsheet is attached as an appendix to document the values shown in the summary table above. 4 Low Impact Development and Treatment BMPs The amount runoff to be treated by Low Impact Development (LID) or treatment BMPs is calculated as follows: SDV V SD = V R SDV: Storm Water Design Volume (see Table 4) V SD : volume of runoff reduced by site design BMPs (see Table 5) V R : remaining volume Low Impact Development and Treatment BMPs of runoff to be treated Table 6 summarizes these values by DMA. The type LID or treatment BMP used is also shown in Table 6. Page 3

Table 6. DMA Runoff Summary by DMA Storm Water Design Volume, SDV (cf) Runoff Reduction from Site Design, V SD (cf) Remaining Runoff to be Treated, V R (cf) DMA ID LID or Treatment BMP Used Permavoid (retention and reuse for irrigation) in West 1,945 348 1,597 landscaping in West DMA Permavoid (retention and reuse for irrigation) in East 1,559 211 1,348 landscaping in East DMA South 358 7 288 Permavoid (retention and reuse for irrigation) in Park Ave, landscaping along N side of North 232 232 Park Ave Park Ave, South 269 269 Permavoid (retention and reuse for irrigation) in landscaping along S side of Park Ave The rationale for using a BMP other than bioretention, if applicable, is described in Table 7. Table 7. Use of BMPs Other than Bioretention If BMPs other than bioretention were used, explain why they are as effective as bioretention. The proposed Permavoid underground retention system captures water that is then used by plants in landscaped areas above the Permavoid system. Water is removed via passive wicking; no pump or moving parts are used, and plant roots do not extend into the Permavoid chambers. Since water captured in the water quality layer of Permavoids is 1% prevented from discharging, none of the pollutants in the captured water should leave the site, making it even more effective than a typical bioretention design, which filters water through an engineered soil media and then releases it. Note that additional Permavoid storage under the water quality layer is provided for flood control purposes only; it releases water via an orifice rather than capturing and reusing it. The volume of those Permavoid units is not included in the water quality calculations in Appendix E. Calculations for the proposed LID or treatment BMPs demonstrating the following are included in Appendix E. The BMPs proposed provide sufficient capacity for V R. No standing water will be present above ground 72 hours after a storm. Permavoids proposed for water quality have an impervious liner around them to allow captured water to be retained and reused. There is no underdrain in the water quality layer of Permavoids. Overflow from the water quality layer of Permavoids goes into the detention/flood control layer of Permavoids and then released to the storm drain system. The Permavoid systems have initial sediment removal Page 4

structures to pretreat water before it enters the the Permavoid underground storage areas, as shown on the grading plans (Appendix C). No impervious cutoff walls are proposed. 5 Flow Control BMPs 5.1 Flow Control BMPs for Hydromodification Projects Hydromodification projects, as identified in Section 1.2, must meet the following standard: Post-project runoff for Hydromodification Projects shall not exceed estimated pre-project peak flow rate for the 1-year, 24-hour storm. For the El Centro area, the 1-year, 24-hour storm is approximately 1.95 inches. Appendix F includes hydrologic analyses that show the 1-year, 24-hour flow rate for the pre-project (existing) condition and for the post-project (proposed) condition. The calculations demonstrate that the combination of BMPs implemented for the project is sufficient to meet the performance standard described above. 5.2 Flood Control Requirements Projects must also meet all City of El Centro standards for flood control and applicable flood control standards from IID and Caltrans, as applicable. Calculations and narrative demonstrating that the project meets the applicable flood control standards are included in Appendix F. 6 Source Control BMPs Source control BMPs must be implemented, where applicable and feasible. Appendix G provides a list of the City of El Centro s requires source control BMPs, along with whether each will be implemented at the proposed project. Source control BMPs marked as not applicable include an explanation of why they are not applicable. Source control BMPs that will be implemented include a reference to their location on plan sheets, except for BMPs that are operational only (e.g., pesticide application management) and cannot be shown on plan sheets. 7 Operation and Maintenance An operation and maintenance plan for proposed BMPs is included in Appendix H. Because this is a City project and the City will own the completed BMPs, a property owner maintenance agreement recorded against the property prior to project completion is not necessary. Page 5

Appendix A. Vicinity Map

Vicinity Map Project Area

Appendix B. Runoff Calculations for Storm Water BMP Design

Storm Water Design Volume Calculations Using WEF Method Step 1: Calculate DMA-Specific Runoff Coefficient for BMP Sizing DMA ID: West East South Park Ave, North Park Ave, South Total DMA Area, A 57,886 57,896 13,234 4,13 4,645 sf Rooftop area (impervious) 6,928 sf Other, non-rooftop impervious area (parking lots, paved sidewalks and pathways, etc.)* 42,241 28,638 8,163 4,13 4,645 sf Impervious fraction, i.73.61.62 1. 1. (unitless) Runoff coefficient for BMP sizing, C**.5.4.4.86.86 (unitless) * Unpaved parking lots, pathways, and similar surfaces (gravel, DG, porous concrete, etc.) should not be counted. ** This runoff coefficient is for treatment BMP sizing only. It is calibrated for smaller storms and is usually smaller than the runoff coefficients used for flood control calculations based on larger storms (e.g., 5-year or 1-year storms). DO NOT use this runoff coefficient for flood control calculations.

Step 2: Calculate DMA-Specific Unit Storm Water Volume Park DMA ID: West East South Park Ave, North Ave, South Regression constant, a (based on 48-hr drawdown) 1.963 1.963 1.963 1.963 1.963 (unitless) Mean annual runoff-producing rainfall depth, P 6 (85th percentile storm).41.41.41.41.41 in Unit storm water volume, P.43.323.325.694.694 in Step 3: Calculate DMA-Specific Storm Water Design Volume (SDV) DMA ID: West East South Park Ave, North Park Ave, South Storm water design volume, SDV 1945 1559 358 232 269 cf

Appendix C. Project Drainage Management Area and BMP Map

t MATCHLINE - SEE SHEET C-22 STORM DRAIN CONSTRUCTION NOTES NORTH C-21

t MATCHLINE - SEE SHEET C-21 STORM DRAIN CONSTRUCTION NOTES NORTH C-22

NORTH

Appendix D. State Calculator Spreadsheet Site Design BMP Volume Reduction Calculations

Post-Construction Water Balance Calculator Instructions Fill in values for blue cells (i.e., the color of the cell to the right). (Step 1a) If you know the 85th percentile storm event for your location enter it in the box below (Step 1b) If you can not answer 1a then select the county where the project is located (click on the cell to the right for drop-down): This will determine the average 85th percentile 24 hr. storm event for your site, which will appear under precipitation to left. IMPERIAL Cells in green are calculated for you based on the inputs to blue cells-- do not directly edit the green cells..41 (Step 1c) If you would like a more percise value select the location closest to your site. If you do not recgonize any of these locations, leave this drop-down menu at location. The average value for the County will be used. EL CENTRO 2 SSW Project Information Runoff Calculations Project Name: El Centro Aquatic Center (Step 2) Indicate the Soil Type (dropdown menu to right): Group D Soils Very low infiltration. Clay loam, silty clay loam, sandy clay, silty clay, or clay. Infiltration rate to.5 inch/hr when wet. Waste Discharge Identification (WDID): [Only applicable if project is subject to State Construction General Permit] (Step 3) Indicate the existing dominant non-built land Use Type (dropdown menu to right): Open Space: grass cover 5% to 75% Date: [Insert Date this spreadsheet was completed] (Step 4) Indicate the proposed dominant non-built land Use Type (dropdown menu to right): A mix of lawn, grass, pasture and tress covering 5-75% of the open space Drainage Management Area (DMA) ID (from map): Runoff Curve Numbers West Complete Either Sq Ft Acres Acres Existing Runoff Curve Number 84 (Step 5) Total Project Site Area: 137674 3.16 Proposed Development Runoff Curve Number 94 (Step 6) DMA Area: 57886 1.33 Based on the County you indicated above, we have included the 85 percentile average 24 hr event - P85 (in)^ for your area. The Amount of rainfall needed for runoff to occur (Existing runoff curve number -P from existing RCN (in)^) P used for calculations (in) (the greater of the above two criteria) ^Available at www.cabmphandbooks.com Design Storm.41.38.41 in In In Percent of total project : (Step 7) DMA Conditions DMA Area (acres) Existing Rooftop Impervious Coverage Existing Non-Rooftop Impervious Coverage (Paved areas) 42% Complete Either Sq Ft Acres Calculated Acres 1.33.. Proposed Rooftop Impervious Coverage Proposed Non-Rooftop Impervious Coverage (Paved areas) 42241..97 (Step 8) Impervious Area Reduction Credits Porous Pavement Tree Planting Acres..11 Volume (cubic feet) 34 Pre-Project Runoff Volume (cu ft) 2 Cu.Ft. Downspout Disconnection. Project-Related Runoff Volume Increase w/o credits (cu ft) 414 Cu.Ft. Impervious Area Disconnection Total Post-Project Runoff Volume 416 Cu.Ft. Green Roof Stream Buffer... Vegetated Swales. Project-Related Volume Increase with Credits (cu ft) 66 Cu.Ft. Subtotal.11 34 Subtotal Runoff Volume Reduction Credit 34 Cu. Ft. (Step 9) Impervious Volume Reduction Credits Rain Barrels/Cisterns Soil Quality Subtotal Runoff Volume Reduction Total Runoff Volume Reduction Credit Volume (cubic feet) Cu. Ft. 314 Cu. Ft. 314 Cu. Ft. 348 Cu. Ft.

Tree Planting Credit Worksheet For the PROPOSED condition within DMA ID: West Tree Canopy Credit Criteria Number of proposed evergreen trees to be planted (credit = number of trees x.5)* Number of proposed deciduous trees to be planted (credit = number of trees x.25)* Square feet under an existing tree canopy, that will remain on the property, with an average diameter at 4.5 ft above grade (i.e., diameter at breast height or DBH) is LESS than 12 in diameter. Square feet under an existing tree canopy that will remain on the property, with an average diameter at 4.5 ft above grade (i.e., diameter at breast height or DBH) is 12 in diameter or GREATER. Number of Trees Planted Area Credit (acres). 43.11 Square feet Under Canopy.. Please describe below how the project will ensure that these trees will be maintained. City maintenance staff will regularly maintain the trees. * credit amount based on credits from Stormwater Quality Design Manual for the Sacramento and South Placer Regions Return to Calculator

Soil Quality Credit Worksheet For the PROPOSED condition within DMA ID: West Response Will the soils used for landscaping meet the ideal bulk densities listed in Table 1 below? 1 Yes No If you answered yes to the question above, and you know the area-weighted bulk density within the top 12 inches for soils used for landscaping (in g/cm 3 )*, fill in the cell to the right and skip to cell G11. If not select from the drop-down menu in cell G1. If you answered yes to the question above, but you do not know the exact bulk density, which of the soil types in the drop down menu to the right best describes the top 12 inches for soils used for landscaping (in g/cm 3 ). What is the average depth of your landscaped soil media meeting the above criteria (inches)? Silts, silt loams 3 What is the total area of the landscaped areas meeting the above criteria (in square feet)? Return to Calculator Table 1 Sands, loamy sands <1.6 Credit (cu ft) 314.4 Sandy loams, loams <1.4 Sandy clay loams, loams, clay <1.4 Silts, silt loams <1.3 Silt loams, silty clay loams <1.1 Sandy clays, silty clays, some clay loams (35-45% clay) <1.1 Clays (>45% clay) <1.1 1 USDA NRCS. "Soil Quality Urban Technical Note No.2-Urban Soil Compaction". March 2. http://soils.usda.gov/sqi/management/files/sq_utn_2.pdf * To determine how to calculate density see: http://www.globe.gov/tctg/bulkden.pdf?sectionid=94 786

Post-Construction Water Balance Calculator Instructions Fill in values for blue cells (i.e., the color of the cell to the right). (Step 1a) If you know the 85th percentile storm event for your location enter it in the box below (Step 1b) If you can not answer 1a then select the county where the project is located (click on the cell to the right for drop-down): This will determine the average 85th percentile 24 hr. storm event for your site, which will appear under precipitation to left. IMPERIAL Cells in green are calculated for you based on the inputs to blue cells-- do not directly edit the green cells..41 (Step 1c) If you would like a more percise value select the location closest to your site. If you do not recgonize any of these locations, leave this drop-down menu at location. The average value for the County will be used. EL CENTRO 2 SSW Project Information Runoff Calculations Project Name: El Centro Aquatic Center (Step 2) Indicate the Soil Type (dropdown menu to right): Group D Soils Very low infiltration. Clay loam, silty clay loam, sandy clay, silty clay, or clay. Infiltration rate to.5 inch/hr when wet. Waste Discharge Identification (WDID): [Only applicable if project is subject to State Construction General Permit] (Step 3) Indicate the existing dominant non-built land Use Type (dropdown menu to right): Open Space: grass cover 5% to 75% Date: [Insert Date this spreadsheet was completed] (Step 4) Indicate the proposed dominant non-built land Use Type (dropdown menu to right): A mix of lawn, grass, pasture and tress covering 5-75% of the open space Drainage Management Area (DMA) ID (from map): Runoff Curve Numbers East Complete Either Sq Ft Acres Acres Existing Runoff Curve Number 84 (Step 5) Total Project Site Area: 137674 3.16 Proposed Development Runoff Curve Number 92 (Step 6) DMA Area: 57896 1.33 Based on the County you indicated above, we have included the 85 percentile average 24 hr event - P85 (in)^ for your area. The Amount of rainfall needed for runoff to occur (Existing runoff curve number -P from existing RCN (in)^) P used for calculations (in) (the greater of the above two criteria) ^Available at www.cabmphandbooks.com Design Storm.41.38.41 in In In Percent of total project : (Step 7) DMA Conditions DMA Area (acres) Existing Rooftop Impervious Coverage Existing Non-Rooftop Impervious Coverage (Paved areas) 42% Complete Either Sq Ft Acres Calculated Acres 1.33.. Proposed Rooftop Impervious Coverage Proposed Non-Rooftop Impervious Coverage (Paved areas) 6928 28638.16.66 (Step 8) Impervious Area Reduction Credits Porous Pavement Tree Planting Acres..8 Volume (cubic feet) 15 Pre-Project Runoff Volume (cu ft) 2 Cu.Ft. Downspout Disconnection. Project-Related Runoff Volume Increase w/o credits (cu ft) 241 Cu.Ft. Impervious Area Disconnection Total Post-Project Runoff Volume 243 Cu.Ft. Green Roof Stream Buffer... Vegetated Swales. Project-Related Volume Increase with Credits (cu ft) 3 Cu.Ft. Subtotal.8 15 Subtotal Runoff Volume Reduction Credit 15 Cu. Ft. (Step 9) Impervious Volume Reduction Credits Rain Barrels/Cisterns Soil Quality Subtotal Runoff Volume Reduction Total Runoff Volume Reduction Credit Volume (cubic feet) Cu. Ft. 196 Cu. Ft. 196 Cu. Ft. 211 Cu. Ft.

Tree Planting Credit Worksheet For the PROPOSED condition within DMA ID: East Tree Canopy Credit Criteria Number of proposed evergreen trees to be planted (credit = number of trees x.5)* Number of proposed deciduous trees to be planted (credit = number of trees x.25)* Square feet under an existing tree canopy, that will remain on the property, with an average diameter at 4.5 ft above grade (i.e., diameter at breast height or DBH) is LESS than 12 in diameter. Square feet under an existing tree canopy that will remain on the property, with an average diameter at 4.5 ft above grade (i.e., diameter at breast height or DBH) is 12 in diameter or GREATER. Number of Trees Planted Area Credit (acres). 3.8 Square feet Under Canopy.. Please describe below how the project will ensure that these trees will be maintained. City Public Works staff will regularly maintain the trees as part of their overall maintenance of the Aquatic Center. * credit amount based on credits from Stormwater Quality Design Manual for the Sacramento and South Placer Regions Return to Calculator

Soil Quality Credit Worksheet For the PROPOSED condition within DMA ID: East Response Will the soils used for landscaping meet the ideal bulk densities listed in Table 1 below? 1 Yes No If you answered yes to the question above, and you know the area-weighted bulk density within the top 12 inches for soils used for landscaping (in g/cm 3 )*, fill in the cell to the right and skip to cell G11. If not select from the drop-down menu in cell G1. If you answered yes to the question above, but you do not know the exact bulk density, which of the soil types in the drop down menu to the right best describes the top 12 inches for soils used for landscaping (in g/cm 3 ). What is the average depth of your landscaped soil media meeting the above criteria (inches)? Silts, silt loams 3 What is the total area of the landscaped areas meeting the above criteria (in square feet)? Return to Calculator Table 1 Sands, loamy sands <1.6 Credit (cu ft) 196.4 Sandy loams, loams <1.4 Sandy clay loams, loams, clay <1.4 Silts, silt loams <1.3 Silt loams, silty clay loams <1.1 Sandy clays, silty clays, some clay loams (35-45% clay) <1.1 Clays (>45% clay) <1.1 1 USDA NRCS. "Soil Quality Urban Technical Note No.2-Urban Soil Compaction". March 2. http://soils.usda.gov/sqi/management/files/sq_utn_2.pdf * To determine how to calculate density see: http://www.globe.gov/tctg/bulkden.pdf?sectionid=94 491

Post-Construction Water Balance Calculator Instructions Fill in values for blue cells (i.e., the color of the cell to the right). (Step 1a) If you know the 85th percentile storm event for your location enter it in the box below (Step 1b) If you can not answer 1a then select the county where the project is located (click on the cell to the right for drop-down): This will determine the average 85th percentile 24 hr. storm event for your site, which will appear under precipitation to left. IMPERIAL Cells in green are calculated for you based on the inputs to blue cells-- do not directly edit the green cells..41 (Step 1c) If you would like a more percise value select the location closest to your site. If you do not recgonize any of these locations, leave this drop-down menu at location. The average value for the County will be used. EL CENTRO 2 SSW Project Information Runoff Calculations Project Name: El Centro Aquatic Center (Step 2) Indicate the Soil Type (dropdown menu to right): Group D Soils Very low infiltration. Clay loam, silty clay loam, sandy clay, silty clay, or clay. Infiltration rate to.5 inch/hr when wet. Waste Discharge Identification (WDID): [Only applicable if project is subject to State Construction General Permit] (Step 3) Indicate the existing dominant non-built land Use Type (dropdown menu to right): Open Space: grass cover 5% to 75% Date: [Insert Date this spreadsheet was completed] (Step 4) Indicate the proposed dominant non-built land Use Type (dropdown menu to right): A mix of lawn, grass, pasture and tress covering 5-75% of the open space Drainage Management Area (DMA) ID (from map): Runoff Curve Numbers South Complete Either Sq Ft Acres Acres Existing Runoff Curve Number 84 (Step 5) Total Project Site Area: 137674 3.16 Proposed Development Runoff Curve Number 92 (Step 6) DMA Area: 13234.3 Based on the County you indicated above, we have included the 85 percentile average 24 hr event - P85 (in)^ for your area. The Amount of rainfall needed for runoff to occur (Existing runoff curve number -P from existing RCN (in)^) P used for calculations (in) (the greater of the above two criteria) ^Available at www.cabmphandbooks.com Design Storm.41.38.41 in In In Percent of total project : (Step 7) DMA Conditions DMA Area (acres) Existing Rooftop Impervious Coverage Existing Non-Rooftop Impervious Coverage (Paved areas) Complete Either Sq Ft Acres 9% Calculated Acres.3.. Proposed Rooftop Impervious Coverage Proposed Non-Rooftop Impervious Coverage (Paved areas) 8163..19 (Step 8) Impervious Area Reduction Credits Porous Pavement Tree Planting Acres..1 Volume (cubic feet) 2 Pre-Project Runoff Volume (cu ft) 1 Cu.Ft. Downspout Disconnection. Project-Related Runoff Volume Increase w/o credits (cu ft) 54 Cu.Ft. Impervious Area Disconnection Total Post-Project Runoff Volume 55 Cu.Ft. Green Roof Stream Buffer... Vegetated Swales. Project-Related Volume Increase with Credits (cu ft) Cu.Ft. Subtotal.1 2 Subtotal Runoff Volume Reduction Credit 2 Cu. Ft. (Step 9) Impervious Volume Reduction Credits Volume (cubic feet) Rain Barrels/Cisterns Soil Quality Cu. Ft. 68 Cu. Ft. Subtotal Runoff Volume Reduction 68 Cu. Ft. Total Runoff Volume Reduction Credit 7 Cu. Ft.

ECAC Soil Amendment Quantities Row Labels Soil Amendment Volume in CuFt Sum of CYAN 1 Sum of GREEN 1 Sum of GREEN 2 Sum of GREEN 4 Sum of GREEN 3 Sum of GREEN 5 Sum of Total Quantity Soil Amend Volume 1 gal.63 14 128 23 28 37 33 263 165.69 24"box 1.7 16 7 16 1 4 428 36"box 28.96 23 2 5 4 34 984.64 48"box 64.4 4 4 257.6 5 gal 3 28 232 79 34 168 52 593 1779 Grand Total 46 399 111 62 226 9 934 3614.93 Trees 4 39 9 21 5 Shrubs 42 36 12 62 25 85 Soil Amend Volume 35.42 1613.92 384.31 119.64 843.31 33.33 W W E S E S Trees Vol (cf) Ave depth (in) Area (sf) Trees Notes West 43 1964 3 786 43 (Cyan 1 + Green 1) East 3 1228 3 491 3 (Green 2 + Green 3) South 5 423 3 169 5 (Green 4 + Green 5)

NORTH

Appendix E. LID and Treatment BMP Sizing Calculations and Design Characteristics

Treatment will be provided using Permavoid units or approved equal. Each Permavoid unit is approximately 95% void space and stores about 11.45 cubic feet of water. Permavoid will be used for two purposes at the proposed project. An upper layer of Permavoid units will directly underlie landscaping, and water trapped in the Permavoid will be used for passive landscape irrigation. Captured water is wicked up from the Permavoid storage to the soil immediately above the Permavoid, where plant roots can take it up. These Permavoid units will be protected with an impervious liner and an elevated outlet/overflow structure to ensure the required volume is captured in the Permavoids. Water in excess of the water quality design volume will exit the water quality Permavoids. In the East and West drainage areas, this excess water will go into another, deeper layer of Permavoids that are used for detention only (due to being too deep to allow the stored water to be wicked up to the soil above the underground storage) or to an above ground detention basin. Only the volume of Permavoids designed for water quality (retention and reuse via passive irrigation) are counted in the calculations below. See the grading plan sheets for additional details on Permavoid installation configuration and dimensions. Retention/Reuse Area Sizing DMA(s) Remaining Runoff to be Treated (V R ) Number of Permavoid Units Total Storage Volume (cf) 1 Total Volume Sufficient? 2 West 1,597 143 1,637 Yes East 1,348 119 1,363 Yes South; Park Ave, North 52 66 756 Yes Park Ave, South 269 24 275 Yes Notes -Blue cells will be automatically calculated based on the inputs in other cells. -DMA ID and V R are taken from Table 3. 1. Based on % void. E.g. a 5 sf x 2' deep gravel filled area (4% void) has 4 cf of storage. 2. To be "sufficient", Total Volume must be greater than or equal to V R for the DMA.

Appendix F. Calculations for Hydromodification Management Flow Control and Flood Control Storage

A. Hydromodification Calculations To demonstrate compliance with hydromodification management requirements, the post-project 1- year peak flows must not exceed the pre-project 1-year peak flow rates. Runoff calculations were performed for peak flows for the 1-year storm using the rational method. The equation for peak flow calculations is as follows: Q = CIA, where Pre-Project Conditions Q Peak flow rate (cfs) C Runoff coefficient (dimensionless) I Intensity (in/hr) A Area (acres) Drainage areas were delineated based on existing topography (Map F-1). Runoff coefficients for pervious and impervious areas were assigned based on the standard runoff coefficient ranges in the Caltrans Highway Design Manual, and a weighted average runoff coefficient was calculated based on the relative amounts of pervious and impervious area in each drainage area. The East Central drainage area has a higher runoff coefficient because the eastern half of 5 th Street comprises about half of the drainage area. Table F-1. Existing Condition Runoff Coefficients Existing Drainage Area Drains to Area (acres) Impervious (acres) % Impervious C (Pervious) C (Impervious) Weighted Average C West West Central East Central East Inlet at SE side of 6th & Adams.51.33 6%.17.9.22 Inlet at SW side of 5th & Adams 1.83.154 8%.17.9.23 Inlet at SE side of 5th & Adams.2.97 48%.17.9.52 Inlet at NW side of 4th & Park.62 %.17.9.17 Note: C is the runoff coefficient Intensity is calculated based on local rainfall data and time of concentration. For all drainage areas, the travel path includes sheet flow over grass/dirt areas in the existing park, which then reaches the curb gutter of adjacent streets and becomes concentrated flow in the curb gutter. Sheet flow duration was calculated using the following formula, which is provided in the Caltrans Highway Design Manual: F-1

where, T t Travel time (min) L Flow path length (ft) n Manning s roughness coefficient for sheet flow P 2 2-year, 24-hour rainfall depth (1.1 in per NOAA Atlas 14) s Longitudinal slope along flow path In the existing condition grass cover at the project site is sparse, so a Manning s n between the values for fallow (.5) and short grass prairie (.15) was used. Curb gutter flow travel time was estimated by calculating a curb gutter velocity and applying that to the length of flow in the gutter. The following equation was used to calculate curb gutter velocity: For both sheet flow and gutter flow, the travel path length and longitudinal slope are based on measurements from existing topography maps. The road pavement cross slope was set at.3, the gutter Manning s n was set at.12, and the width of flow was estimated at 8 feet. The total time of concentration was calculated based on the sum of sheet flow travel time and curb gutter travel time, as summarized in the table below. Table F-2. Existing Condition Times of Concentration Sheet Flow Travel Time Curb Gutter Travel Time Existing Drainage Area L (ft) n s T c, Sheet Flow (min) L s v (fps) T c, Curb Gutter (min) Total T c (min) West 8.8.5 15.4 25.5 2.5 1.7 17. West Central 9.8.5 16.9 61.5 2.5 4. 2.9 East Central 4.8.5 8.8 175.5 2.5 1.2 1. East 9.8.5 16.9 36.5 2.5 2.4 19.3 F-2

Intensity (in/hr) To calculate intensity, an intensity duration frequency (IDF) curve was developed by importing NOAA Atlas 14 precipitation data 1 for the El Centro rain gauge (EL CENTRO 2 SSW) into HydroCAD software, which then developed an IDF table and curve. The IDF table from HydroCAD was plotted in Excel, and a power equation was developed to calculate the intensity based on the time of concentration (duration). The IDF curve and equation are shown in Figure F-1 below. 3.5 1-Yr Intensity Duration Frequency 3 2.5 2 1.5 1 y = 7.7847x -.552 R² =.9958 1-Yr Intensity Duration Frequency Power (1-Yr Intensity Duration Frequency).5 2 4 6 8 1 12 Duration (min) Figure F-1. 1-Year Storm IDF Curve Based on the IDF curve and equation above, the intensity for each drainage area was calculated, and the intensity was used to calculate the 1-year existing condition peak flows. Table F-3. Existing Condition 1-Year Storm Peak Flows Existing Drainage Area Total T c (min) 1-yr I (in/hr) Weighted Average C Area (acres) Q 1 (cfs) West 17. 1.57.22.51.18 West Central 2.9 1.4.23 1.83.59 East Central 1. 2.1.52.2.22 East 19.3 1.46.17.62.15 1 NOAA Atlas 14 Precipitation Data Frequency Server, http://hdsc.nws.noaa.gov/hdsc/pfds/ F-3

Post-Project Conditions Post-project drainage areas are shown on the drainage management area (DMA) map in Appendix C. The East and West DMAs drain to detention basins. The South DMA drains to Park Avenue, where it enters the storm drain system at the same point as the discharge from the East DMA detention basin. The Park Ave, North and Park Ave, South DMAs are not considered in the hydromodification calculations since these areas are roads with the same footprint and impervious area in the pre- and post-project conditions, so there should not be any change in the 1-year storm runoff as a result of pavement replacement in these areas. The post-project peak flow for the South DMA, which does not drain to a detention basin, was calculated using the same methodology as the existing condition peak flows. Table F-4. Post-Project Condition South DMA Runoff Coefficient DMA Area (Ac) Impervious (Ac) % Impervious C (Pervious) C (Impervious) Weighted Average C South.3.26 87%.17.9.81 Table F-5. Post-Project Condition South DMA Time of Concentration Sheet Flow Travel Time Curb Gutter Travel Time T c, Sheet Flow T c, Curb Gutter Total T c DMA L (ft) n s (min) L s v (fps) (min) (min) South 25.15.5 1. 55.5 2.5 3.6 13.7 Table F-6. Proposed Condition South DMA 1-Year Storm Peak Flow Total T c 1-yr I Weighted Area Q 1 DMA (min) (in/hr) Average C (acres) (cfs) South 13.7 1.77.81.3.44 The peak flow from the DMAs draining to detention basins was calculated based on applying the orifice equation to determine the maximum flow from the detention basins. The orifice size was set such that the total post-project flow to a given discharge point would not exceed the pre-project flow for the 1- year storm, as summarized in Table F-7. F-4

Table F-7. Target Basin Outlet Flow Rates Post-Project Discharge Point Existing Drainage Areas Draining to Post- Project Discharge Point Proposed DMA(s) 1-yr Peak Flow, Existing Condition (cfs) Proposed Condition Flow not Directed to Basin (cfs) Maximum Basin Outlet Flow (cfs) Storm drain at SE side of 6th & Adams West West.18.18 Storm drain at NW side of 4th & Park West Central, East Central, East East, South.96.44.52 Runoff volumes were calculated using the following formula: V = CPA, where V Runoff volume (cf) C Runoff coefficient (dimensionless) P Precipitation depth (ft) A Area (ft 2 ) Table F-8. Post-Project Condition 1-Year Runoff Volumes for East and West DMAs Runoff Coefficient (C), Based on Comparable Land Use 1-Year, 24- Hour Storm Volume (cf) DMA Area (Ac) % Impervious West 1.33 73%.68 6,396 East 1.33 61%.57 5,363 Note: the 1-year, 24-hour storm is 1.95 per NOAA Atlas 14. At the 1-year storm volumes above, the water surface elevation in the detention basins will not exceed 6 feet for the West Basin and 6.2 feet for the East Basin (theses elevations correspond to the basins being full, and their capacities hold a 3 inch storm). The West Basin orifice size is set at 1.5 inches, and the East Basin orifice size is set at 2.5 inches. At these orifice sizes, the maximum discharge rates from the basins will not exceed the maximum values shown in Table F-7, as shown below in Table F-9. Table F-9. Orifice Flow Rate Calculations for the East and West Basins West Basin (Max outflow =.18 cfs) East Basin (Max outflow =.52 cfs) C v.6.6.6.6.6.6 Water Ponding above Outlet (feet) 6 4.5 1 6.2 3.2 1 Orifice Pipe Diameter (in) 1.5 1.5 1.5 2.5 2.5 2.5 Velocity from Orifice (ft/s) 11.79 1.21 4.81 11.99 8.61 4.81 Flow from Orifice (cfs).14.13.6.41.29.16 As shown in Table F-1 below, the post-project 1-year peak flows are less than the pre-project 1-year peak flows, so the hydromodification management requirements have been met. F-5

Table F-1. 1-Year Peak Flow Summary Existing Drainage Areas Draining to Post-Project Discharge Point 1-yr Peak Flow, Existing Condition (cfs) 1-yr Peak Flow, Post- Project Condition (cfs) Post-Project Discharge Point Proposed DMA(s) Storm drain at SE side of 6th & Adams West West.18.14* Yes Storm drain at NW side of 4th & Park West Central, East Central, East Hydromodification Requirements Met East, South.96.85** Yes Notes: To meet hydromodification requirements, the post-project peak flow must be less than or equal to the pre-project peak flow for each discharge point. * Maximum outflow from West Basin ** Maximum outflow from East Basin plus post-project 1-yr peak flow from South Basin. B. Flood Control Storage Calculations Flood control storage calculations are based on a 3 inch storm per City of El Centro policy. The Park Ave, North and Park Ave, South DMAs are not included in the calculations since the existing and proposed condition of these areas will be the same (paved road). Therefore, there will be no additional runoff from those areas in the post-project condition and no need for additional storage to mitigate flooding impacts. Runoff from the South DMA is also not included because at.3 acres, it is a comparatively small portion of the site and it is less than the size of the existing impervious road segment (5 th Street between Adams Avenue and Park Avenue, which is about.46 acre) part of the site that does not have any detention storage in the existing condition. Runoff volumes for a 3 inch storm for the West and East DMAs are shown in Table F-11. Table F-12 illustrates how above and below ground basins have been designed to store at least this amount of water and shows that total basin drawdown time is less than 72 hours, which is necessary to meet vector control requirements. Table F-11. Three Inch Storm Runoff Volume Summary Runoff Coefficient (C), Based on Comparable Land Use 1-Year Storm Runoff Coefficient* 3" Storm Runoff Volume Drainage Area Area (Ac) % Impervious West 1.33 73%.68.85 12,31 East 1.33 61%.57.71 1,277 Note: * As dictated by the procedure in the Caltrans Highway Design Manual, the 1-year storm runoff coefficient is 1.25 times the initial runoff coefficient determined by comparison to comparable land use. F-6

Intensity (in/hr) Table F-12. Provided Basin Storage Note: DMA Provided Above Ground Storage (cf) Permavoid Units Proposed Underground Storage (cf) Total Storage Provided (cf) Basin Drawdown Time (hr)* West 3,575 762 8,726 12,31 56.9 East 6,541 327 3,744 1,285 17.8 * Per vector control requirements, must be less than 72 hours. C. 25-Year and 1-Year Storm Calculations for Caltrans The peak flows in the pre- and post-project conditions associated with the 25-year, 6-hour and 1-year, 6-hour storms were compared using the same methodology described in Section A above for the comparison of 1-year peak flows, except that different IDF curves were used to calculate the intensities and C values were increased per the procedure in the Caltrans Highway Design Manual. The 25-year and 1-year IDF curves in Figures F-2 and F-3, respectively, were developed based on NOAA Atlas 14 data using the same methodology used to develop the 1-year IDF curve described in Section A. 5 4.5 4 3.5 25-Yr Intensity Duration Frequency 3 2.5 2 1.5 1 y = 1.821x -.562 R² =.9949 25-Yr Intensity Duration Frequency Power (25-Yr Intensity Duration Frequency).5 2 4 6 8 1 12 Duration (min) Figure F-2. 25-Year Storm IDF Curve F-7

Intensity (in/hr) 1-Yr Intensity Duration Frequency 7 6 5 4 3 2 y = 16.224x -.574 R² =.992 1-Yr Intensity Duration Frequency Power (1-Yr Intensity Duration Frequency) 1 2 4 6 8 1 12 Duration (min) Figure F-3. 1-Year Storm IDF Curve Calculations for the 25-year and 1-year peak flows are summarized in the following tables. Table F-13. Existing Condition 25-Year Storm Peak Flows Existing Drainage Area Total T c (min) 25-Yr I (in/hr) 25-Yr C* Area (acres) Q 1 (cfs) West 17. 2.2.24.51.27 West Central 2.9 1.96.25 1.83.91 East Central 1. 2.97.57.2.34 East 19.3 2.5.19.62.24 * Per the methodology described in the Caltrans Highway Design Manual, the 25-yr C value is 1.1 times the initial C value as determined via the process described in Section A of this report or.95, whichever is less. F-8

Table F-14. Existing Condition 1-Year Storm Peak Flows Existing Drainage Area Total T c (min) 1-Yr I (in/hr) 1-Yr C* Area (acres) Q 1 (cfs) West 17. 3.19.28.51.45 West Central 2.9 2.83.29 1.83 1.49 East Central 1. 4.33.65.2.57 East 19.3 2.97.21.62.39 * Per the methodology described in the Caltrans Highway Design Manual, the 25-yr C value is 1.25 times the initial C value as determined via the process described in Section A of this report or.95, whichever is less. Table F-15. Proposed Condition South DMA 1-Year Storm Peak Flow Total T c 25-Yr I Area Q 1 DMA (min) (in/hr) 25-Yr C* (acres) (cfs) South 13.7 2.49.89.3.67 * Per the methodology described in the Caltrans Highway Design Manual, the 25-yr C value is 1.1 times the initial C value as determined via the process described in Section A of this report or.95, whichever is less. Table F-16. Proposed Condition South DMA 1-Year Storm Peak Flow Total T c 1-Yr I Area Q 1 DMA (min) (in/hr) 1-Yr C* (acres) (cfs) South 13.7 3.62.95.3 1.4 * Per the methodology described in the Caltrans Highway Design Manual, the 25-yr C value is 1.25 times the initial C value as determined via the process described in Section A of this report or.95, whichever is less. As described in Section B, the East and West basins have the capacity to hold runoff from a 3 inch storm. Per NOAA Atlas 14, the 1-year, 6-hour storm is 2.5 inches. Therefore, the proposed basins have the capacity to capture all runoff from the 25-year and 1-year storms. This means the peak outflow from these basins in the post-project condition can be calculated based on the orifice equation, as done in Section A for the 1-year peak flow. The calculations in Table F-9 are based on the basins being completely full (head values of 6 feet and 6.2 feet). Therefore, the flow rates as calculated for these head values using the orifice equation are conservative estimates of the outflows from the basins during 25-year and 1-year storms. Tables F-17 and F-18 summarize the results of the calculations, which show that the post-project peak flows are less than the existing condition peak flows. F-9

Table F-17. 25-Year Peak Flow Summary Existing Drainage Areas Draining to Post-Project Discharge Point 25-yr Peak Flow, Existing Condition (cfs) 25-yr Peak Flow, Post- Project Condition (cfs) Post-Project Peak Flow Less Than Existing Condition Peak Flow? Post-Project Discharge Point Proposed DMA(s) Storm drain at SE side of 6th & Adams West West.27.14* Yes Storm drain at NW side of 4th & Park West Central, East Central, East East, South 1.49 1.8** Yes Notes: * Maximum outflow from West Basin ** Maximum outflow from East Basin (see Table F-9) plus post-project 25-yr peak flow from South Basin. Table F-17. 1-Year Peak Flow Summary Existing Drainage Areas Draining to Post-Project Discharge Point 1-yr Peak Flow, Existing Condition (cfs) 1-yr Peak Flow, Post- Project Condition (cfs) Post-Project Peak Flow Less Than Existing Condition Peak Flow? Post-Project Discharge Point Proposed DMA(s) Storm drain at SE side of 6th & Adams West West.45.14* Yes Storm drain at NW side of 4th & Park West Central, East Central, East East, South 2.45 1.45** Yes Notes: * Maximum outflow from West Basin ** Maximum outflow from East Basin(see Table F-9) plus post-project 1-yr peak flow from South Basin. F-1

Map F-1. Existing Condition Drainage Areas F-

Appendix G. Source Control BMPs Proposed and Plan Sheet References

Source Control BMPs Proposed and Plan Sheet References Source Control BMP Description CASQA Reference 1 Proposed? (Y/N/NA) Plan Sheet Reference If NA or Not Shown on Plans, Explain Why Accidental spills or leaks Keep a spill kit or other means of responding to spills onsite. Liquid storage containers kept outdoors must be equipped with secondary containment unless the liquid stored contains no pollutants (e.g., purified water). Secondary containment design and spill response materials available onsite may also need to meet the requirements of other standards (e.g., hazardous materials, fire department). -- Y NA Will be inside buildings. Mops or rags will be onsite to clean up food and drink spills. Materials to clean up chemicals associated with pools will also be present as applicable. Interior floor drains Parking/storage areas and maintenance Indoor and structural pest control Landscape/ outdoor pesticide use Plumb indoor floor drains to the sanitary sewer system. Pretreatment is required where necessary to comply with City wastewater regulations. Design parking areas to drain to landscaping or LID features where feasible. Complete regular sweeping or other cleaning of parking areas as necessary to remove accumulated trash, sediment, and other pollutants. Use integrated pest management to avoid or minimize pesticide use where feasible, and use pesticides only in accordance with manufacturer s instructions. See BMP A- 1 in Table 1 of the El Centro BMP Manual. Use integrated pest management to avoid or minimize pesticide use where feasible, and use pesticides only in accordance with manufacturer s instructions. See BMP A- 1 in Table 1 of the El Centro BMP Manual. Also use native plants or other plants that require minimal pesticide use as feasible. -- Y NA -- Y Grading sheets Flood drains are not shown on grading plans -- Y NA Nonstructural BMP -- Y NA Nonstructural BMP

Source Control BMPs Proposed and Plan Sheet References Source Control BMP Description CASQA Reference 1 Proposed? (Y/N/NA) Plan Sheet Reference If NA or Not Shown on Plans, Explain Why Pools, spas, ponds, decorative fountains, and other water features Discharges from water features to the municipal separate storm sewer system (MS4) are only allowed in certain cases. See BMP A-5 in Table 1 of the El Centro BMP Manual for pool and spa discharge regulations. Discharges from ponds, decorative fountains, and other water features to the MS4 are typically not allowed. -- Y NA Primarily nonstructural/ operational BMP Restaurants, grocery stores, and other food service operations Provide a covered, contained storage area for used cooking oil. This requirement may be satisfied by storing used cooking oil inside a building (ensure health regulations and fire department regulations are met) or in a refuse area designed to meet the requirements described below. -- Y Building/ Architectural Plans Same location as refuse area Refuse areas Equip the refuse area with a structural overhead canopy and a four-sided enclosure. Site drainage should be directed away from the refuse area to prevent run-on. No storm drains are allowed within refuse areas. SD-32 Y Building/ Architectural Plans Industrial processes Design facilities such that industrial processes are located indoors or in covered areas protected from run-on to the extent feasible. Where applicable, industrial processes must be designed to comply with State of California Industrial General Permit requirements. SD-31, SD- 35 NA Will not occur at proposed project