Planning and Placing Concrete

Similar documents
Planning, Laying Out, and Tooling Concrete Block

General Brick Installation Instructions

Installation Instructions - Dry Method

Stepping Stone. Name: Date:

Identifying Basic Areas of Agricultural Mechanization

Examining Reforestation Practices

SECTION RIGID PAVEMENT

OBJECTIVE SHEET HAND TOOLS: SPECIAL TOOLS

Epoxy & Pebblestone Fax: We ship all over the USA U.V.

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS. A. Formwork complete with shoring, bracing and anchorage.

GENERAL SHALE NATURAL THIN ROCK VENEER Installation Guide. GeneralShale.com

Lesson B3 2. Measuring Trees. Pathway Strand: Power, Structural and Technical Systems

OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. RobinsonBrick.com

CAST-IN-PLACE CONCRETE SLOTTED FLOORS FOR SWINE

Pembroke Hopkins Park Construction Outreach Program E S. Rd., Pembroke Township, IL Tel: (815) Fax: (815)

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

Guide to Using Top-Cast Surface Retarder

Underground Exhaust System

SECTION CURB RAMPS AND OTHER MINOR CONCRETE FACILITIES. Part 1 - General Work Included Related Requirements...

Guide to Using Top-Cast Surface Retarder

SECTION MISCELLANEOUS CAST-IN-PLACE CONCRETE

Measuring Timber Stands

PPC Cement TUTORIAL. how to screed a floor

Working with Concrete

Concrete Framing: Slab on Grade

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

McKinnon Materials, Inc th Commerce Park Blvd. Tampa FL, Phone: (813) Fax: (813)

Water for the World. 7 y

SECTION CONCRETE PAVING FOR PEDESTRIAN AREAS. A. This Section includes exterior cement concrete pavement for the following:

MOUNTAIN STONE Products

Determining Livestock Facility Needs

Calculating Soil Loss

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990

ROAD MAINTENANCE METHODS. By B. C. Tiney, Maintenance Engineer, Michigan State Highway Department.

Paragraph Description Page No General Materials Concrete Masonry Work Altitude Valve Vault Cover 25-4

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

Identifying Water Sources and Quality Standards

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

Installation Guidelines

EASY GARDEN WALKWAYS Home Gardeners School March Presented by Robert W. Bellek Owner

HOW TO INSTALL PATIOS AND WALKWAYS STEP 2 STEP 1. For all Patios and Walkways. The base is the most important step in your patio and walkway projects.

Hardscaping Installation Manual

Section CONCRETE SIDEWALKS. 1. Payment for concrete sidewalks is on square foot basis.

Resin Bound Installation Guide

Lesson B3 4. Finding a Job. Pathway Strand: Employability and Career Development

Pot and Bothered. Tools. Materials: Peat moss Sand Portland cement Water

SECTION 30 - CONCRETE STRUCTURES TABLE OF CONTENTS

1 Exam Prep Guide to Shotcrete Questions

SECTION CAST IN PLACE CONCRETE PART 1 GENERAL 1.01 RELATED DOCUMENTS

CONCRETE. Composition of concrete mix. Classification and uses. Mix proportions and quantities CHAPTER 7. Plain Concrete. Reinforced Concrete

Application Instructions for Keystone Kool Deck on Existing Concrete

Slab on Grade. Introduction CHAPTER 10

1. Payment for concrete sidewalks is on square foot basis. a. Limits for measurement for trench excavation as follows:

A-9,250 Parking Structure Resurfacing Cement Look

1. Manufacturer certified according to NRMCA's "Certification of Ready Mixed Concrete Production Facilities."

HOW TO INSTALL PATIOS AND WALKWAYS STEP 2 STEP 1. For all Patios and Walkways. The base is the most important step in your patio and walkway projects.

SECTION SITE CONCRETE

DIVISION 3 HEAVY DUTY CONCRETE FLOOR TOPPING SECTION 03340

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3

SOLAR GREENHOUSES Calling a greenhouse solar is somewhat redundant, since all greenhouses are solar heated to some extent. The greenhouse itself

SECTION RIGHT-OF-WAY DAMAGE REPAIRS PART 1 - GENERAL PART 2 - MATERIALS AND METHODS

DETERMINING THE WATER REPELLANCY AND DEPTH OF PENETRATION OF PENETRATING CONCRETE TREATMENTS

CONCRETE WORK CONCRETE WORK. Underground Electric Distribution Standards I. SCOPE APPLICABLE STANDARDS

PPC PRODUCT BROCHURE PPC prod brochure portrait 2017_1.indd /04/11 3:09:48 PM

SECTION MINOR CONCRETE

Exploring Natural Resources

Concrete. Chapter 10 Properties of Fresh Concrete. Materials of Construction-Concrete 1. Wikipedia.org

.1 Concrete mix shall be in accordance with the following:.1 The average of all tests shall exceed 25 MPa.

REINFORCED CONCRETE MASONRY SECTION

Below-grade pours (such as foundations) can be done out of the chute of the concrete truck or conveyer, however using a pump is best.

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

B. All work of the section shall comply with the conditions of the contract, the drawings and any special conditions forming a part of the contract.

Selecting a Marketing Approach

Content Domain. NCCER Progress Blvd. Alachua, FL

Installation Instructions

Managing Livestock Waste

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 03 - CONCRETE

Mix and lay concrete tutor notes

Module 11: Plastered walls

CELCORE CELLULAR INSULATING CONCRETE SPECIFICATION FOR RETROFIT PLACEMENT OVER EXISTING ROOF MEMBRANES

Installation Manual. Foundations. Version 2

Exploring Careers in Agricultural Mechanics and Technology Systems

Project Specifications

Recognizing the Impact of Technological Advances in Agricultural Mechanics

Building Construction 14. Dr Nabil El-Sawalhi Associate professor Engineering Projects Management

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK

SECTION BRICK MASONRY ASSEMBLIES

indicated on the Drawings include exterior curbing and walkways necessary for the repairs or of this portion of the Work and who shall be thoroughly

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items:

SECTION CAST IN PLACE CONCRETE FOR FLOOR SLABS ON GRADE THAT WILL RECEIVE SEMI-PERMEABLE OR IMPERMEABLE FLOOR FINISHES

SITE WORK II: Footings, Cisterns

ITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING

SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL

Which way up? There seems to be some confusion about the way you lay natural stone. Please see the diagram as detailed below

ITEM NO. 307 CONCRETE STRUCTURES

Retaining Wall Installation Instructions PART 1 RETAINING WALL GENERAL

SECTION CONCRETE PAVING

1. Rapid Set Cement. 2. Methods of preparation. 3. How to stage a job site. 4. Installation Mix, place, finish. 5. Coloring the TRU.

LITHOCRETE ARCHITECTURAL CONCRETE PAVING

Transcription:

Lesson A3 5 Planning and Placing Concrete Unit A. Mechanical Systems and Technology Problem Area 3. Construction Systems Lesson 5. Planning and Placing Concrete New Mexico Content Standard: Pathway Strand: Power, Structural and Technical Systems Standard: VIII: Plan, implement, manage, and/or provide support services to facility design and construction; equipment design, manufacture, repair, and service; and agricultural technology. Benchmark: VIII-B: Follow architectural and mechanical plans to construct building and facilities. Performance Standard: 1. Identify and select appropriate building materials. 9. Construct with concrete, stone, and brick. Student Learning Objectives. Instruction in this lesson should result in students achieving the following objectives: 1. Describe how to plan the job. 2. Discuss preparation for the concrete pour. 3. Explain placing, finishing, and curing concrete. Unit A. Problem Area 3. Lesson 5. Page 1.

List of Resources. The following resources may be useful in teaching this lesson: Recommended Resources. One of the following resources should be selected to accompany the lesson: Herren, Ray V. and Elmer L. Cooper. Agricultural Mechanics Fundamentals & Applications. Albany, New York: Delmar Publishers, 2002. (Text, Lab Manual, and teacher s Manual Unit 38) Johnson, Donald M., et al. Mechanical Technology in Agriculture. Danville, Illinois: Interstate Publishers, Inc., 1998. (Textbook, Chapter 18) Phipps, Lloyd J., et al. Introduction to Agricultural Mechanics, Second Edition. Upper Saddle River, New Jersey: Prentice Hall Interstate, 2004. (Textbook, Chapter 14) List of Equipment, Tools, Supplies, and Facilities Writing surface Overhead projector Transparencies from attached masters Copies of student lab sheets Concrete tools Ingredients to pour concrete Terms. The following terms are presented in this lesson (shown in bold italics): Bag mix Broom finish Bull float Calcium chloride Coarse aggregate Concrete Concrete drag Concrete edger Concrete form Concrete jointer Curing Darby Earthen form Fine aggregate Float finish Floating Form nails Gallon mix Magnesium or wooden hand float Unit A. Problem Area 3. Lesson 5. Page 2.

Portland cement Power trowel Reinforcing bars Reinforcing wire Steel hand concrete finishing trowel Striking off Troweled finish Interest Approach. Use an interest approach that will prepare the students for the lesson. Teachers often develop approaches for their unique class and student situations. A possible approach is included here. Ask the students if anyone has poured and finished concrete. Talk about the advantages of using concrete. It is moldable, fire-safe, strong, resists abrasion, insect and rodent proof, storm resistant, permanent, watertight, and economical. Talk about where concrete is used (floors, footings, patios, etc.). Ask if they would like to know how to set forms, pour, and finish concrete. Summary of Content and Teaching Strategies Objective 1: Describe how to plan the job. Anticipated Problem: What do you need to know before pouring concrete? I. Concrete is a mixture of coarse aggregate, fine aggregate, portland cement, and water. Coarse aggregate is gravel. Fine aggregate is coarse sand. Portland cement is a cement that is made from burning lime, silica, iron oxide, and alumina together. Gypsum is then added. It acts as a glue that holds everything together. A. Concrete needed for the job is figured and sold by the cubic yard. We commonly drop the word cubic and refer to purchasing concrete by the yard. To calculate the amount needed convert the length, width, and thickness into feet, multiply them together, and divide by 27. One cubic yard is 27 cubic feet. For example a concrete driveway 18 foot 30 foot poured six inches thick would be 10 cubic yards (18 30.5 27 = 10 cubic yards). B. Select quality materials to be mixed. If soil is present in the sand or gravel, the result will be weak concrete. C. Mix ingredients in the correct proportions. Driveways, walks, floors, and watertight foundations should be a six gallon mix, while foundation walls, footing, and mass concrete can be a seven gallon mix. The term gallon mix refers to the number of gallons of water used with a bag of cement. In general less water means stronger concrete. The term bag mix refers to the number of bags or sacks of cement used per cubic yard of concrete. A six bag mix would have, for example, six bags of cement per cubic yard. The Unit A. Problem Area 3. Lesson 5. Page 3.

correct proportions for a six bag mix would be one part cement to 2¼ parts fine aggregate to 3 parts coarse aggregate. D. An important part of planning is purchasing material to build concrete forms and assembling tools needed for digging, building and setting forms, installing reinforcement, pouring concrete, and finishing concrete. Learn the terms and definitions in this section. Either of the recommended texts should be helpful to students in accomplishing this. Have them read the suggested chapters in either reference. Use TM: A3 5A and LS: A3 5A to practice figuring the amount of materials needed to complete a concrete job. Objective 2: Discuss preparation for the concrete pour. Anticipated Problem: What do I need to do before the concrete arrives? II. Concrete may be mixed in a wheelbarrow using a shovel or the ingredients may be shoveled into a small electric or gasoline powered mixer. Most people purchase ready-mixed concrete from a local supplier. A. In many cases the area where concrete is to be poured or placed must be dug out. For example, driveways and sidewalks are generally one inch above the ground level when finished. Small areas may be dug with a shovel but larger areas need a backhoe, grader blade, or loader bucket to speed up the job. In some cases, like a floor, the concrete should be level while in other situations, like a driveway, the concrete should slope away from the house. B. A concrete form is a frame or mold that holds new concrete in shape until it has set or hardened. The forms must be strong and rigid to prevent sagging, bulging, and spreading. Freshly poured concrete exerts great pressure. A trench dug in the ground with solid walls is an earthen form that is used for concrete footing. When wooden forms are used they must be tight to prevent the escape of the water-cement paste. A tightly stretched nylon line is useful to set the forms in a straight line. Wooden stakes are used to hold the form boards in position. For small jobs, a four foot level on top of the form can be used to either set the forms level or sloping. A surveying level is needed to set larger jobs. Form nails, also called scaffold nails, are a double-headed nail used to fasten the boards to the stakes. Coating forms with used motor oil or diesel fuel and using form nails make form removal much easier. C. Once the forms are set, fill sand or rock should be added if the area is too deep. A drag board can be used as fill is added so that the recommended thickness of concrete will be poured. The fill, especially sand, should be packed or tamped down so that it is solid. Do not use soil as fill because it will settle later leaving a void or hole under the concrete. D. Consider placing a sheet of plastic on top of the fill if the weather is very warm and you would like to slow down drying and curing time. Also concrete floors with plastic under them are less likely to be damp. E. Areas where heavy equipment will drive over concrete or where freezing and thawing are a problem, should be reinforced. Reinforcing bars are steel bars with ridges that bond Unit A. Problem Area 3. Lesson 5. Page 4.

with the concrete. They are commonly seen in the construction of highways and bridge decks. Reinforcing wire comes in rolls with wire rectangles or squares approximately 6 inches on center. It is used in lighter construction such as patios and sidewalks. F. In hot weather consider spraying the area to be poured with water when the concrete arrives. G. Whether you mix your own or buy ready-mixed concrete be sure there are no dry clumps and the concrete is thoroughly mixed. The water content is very important. Extra water will result in weak concrete but concrete that is too dry is very difficult to pour and level off. Watch experienced concrete finishers or hire one to help the first time you pour concrete. H. Fiberglass fibers may be added to the concrete as it is mixed at the ready-mix plant as a way to reinforce it. I. If concrete is poured in cold weather calcium chloride is added to prevent the concrete from freezing as it cures. Building paper or straw can be used to cover the concrete after it is finished and while it is curing. Visit a site where forms are being set in preparation for pouring concrete. Visit the local ready-mix plant or use a concrete finisher as a guest speaker. Before visiting the sites, use the recommended texts to provide students with more information. Look for an opportunity in the school or community to set forms for a concrete pour. Use LS: A3 5B to make the forms for pouring stepping stones. Objective 3: Explain placing, finishing, and curing concrete. Anticipated Problem: How is concrete placed, finished, and cured? III. Placing and finishing concrete should not be attempted without having plenty of labor. Once concrete is mixed the drying and curing process begins and you are working against the clock. Be sure all the placing and finishing tools you need are on hand. A. When pouring concrete, common tools such as shovels, spades, rakes, and concrete drags are needed to move and spread the material. Since concrete is so heavy, it is best to move it downhill with a chute. The closer the concrete chute is to where the concrete is needed, the less work is required. In areas where the chute cannot reach use a wheelbarrow. The concrete should be pushed, pulled, or lowered rather than lifted. A concrete drag is a solid blade with a handle used to push or drag concrete into low spots. Striking off concrete is using a drag board that is usually a 2 4 or a 2 6 that is used to saw back and forth to level the concrete. One person is needed at each end of the drag board and a third person with rubber boots and a concrete drag in the middle of the concrete make a good team for placing concrete. Other workers are needed to operate the wheelbarrows and shovels. A drag board vibrator can be clamped to two drag boards. One person with the drag board vibrator can do the same work as two people without it. The concrete should be dragged twice before going on to the next step. B. Use a hammer to tap the form boards or a spade jabbing up and down inside the form board to vibrate the fine material next to the form board. Unit A. Problem Area 3. Lesson 5. Page 5.

C. The next step, floating, pushes the rocks down and brings the sand-cement paste to the surface and begins the smoothing process. A magnesium or wooden hand float is used to smooth the area near the edge of the work area. A darby is a two handed float usually 18 long that is also used near the edge. A bull float is a 36 or 42 inch float with a long round handle used to reach the areas away from the edge. D. A concrete edger is used to push the rocks down near the form board to round the edge prevents a chipping or breaking when the form board is removed. E. A concrete jointer is used to put grooves across concrete areas like sidewalks. The joint helps the appearance and provides a relief area making cracks in concrete less noticeable. After floating, edging, and jointing, it is time to finish the concrete. F. A float finish leaves a rough finish that is acceptable for a livestock feeding floor or footing. A troweled finish is a very smooth finish used for basement and garage floors. A steel hand concrete finishing trowel is used for small jobs and near the edge on large jobs. A power trowel is a gasoline powered trowel with three or four blades used to finish large areas. A broom finish is made by using a coarse bristle concrete broom or floor broom either after floating or after troweling. The broom finish is often used on driveways and sidewalks for added traction. G. Curing is the process of concrete drying and hardening. The slower the moisture leaves, the stronger the concrete will be. Spraying the concrete with water every day of the first week and covering the concrete with plastic or a tarp is helpful. Allow the concrete to cure for at least 7 days prior to driving vehicles on it. The recommended textbooks do a good job of walking students through the content of this objective. Have them read the appropriate chapters. Show the tools needed to place and finish concrete. Use TM: A3 5B to help students identify concrete tools. Look for an opportunity in the school or community to pour and finish concrete. Use LS: A3 5B to pour and finish concrete stepping stones. Review/Summary. Have each student pick up a concrete tool to identify and tell the class how that particular tool would be used. Review the process of selecting the right bag mix and calculating the quantity needed. Have a student volunteer place the steps involved in pouring and finishing in order on the chalk board (striking off, floating, edging, jointing, troweling). Review the types of finish and situation where each is recommended. Application. Use the lab sheets to calculate the amount of concrete needed, build concrete forms, pour concrete, and finish concrete. Evaluation. Give the written test and evaluate the skill displayed through the use of the lab work. Unit A. Problem Area 3. Lesson 5. Page 6.

Answers to Sample Test: Part One: Matching 1=c,2=a,3=d,4=e,5=f,6=b,7=g,8=h Part Two: Completion 1. Concrete 2. coarse sand 3. gravel 4. oil, diesel fuel 5. 27 6. less 7. curing 8. bars, wire Part Three: Short Answer 1. Float finish is the roughest, followed by the broom finish, with the trowel finish the smoothest. 2. Six bags of cement/cubic yard of concrete. 3. Seven gallons of water used per bag of cement. 4. Cement is one of the ingredients in concrete. Unit A. Problem Area 3. Lesson 5. Page 7.

Sample Test Name Test Lesson A3 5: Planning and Placing Concrete Part One: Matching Instructions. Match the term with the correct response. Write the letter of the term by the definition. a. bull float d. edger g. striking off b. concrete drag e. hand trowel h. vibrator c. darby f. jointer 1. A two-handed concrete float. 2. A concrete float that is usually 42 inches long with a magnesium pole handle. 3. Used to round the concrete next to the form board. 4. Used near the edge of the concrete to do the final smoothing. 5. Used to put a groove across a concrete sidewalk every three or four feet. 6. Used to remove excess concrete near the drag board. 7. The process of leveling using a drag board. 8. Can be attached to a drag board to help level the concrete. Part Two: Completion Instructions. Provide the word or words to complete the following statements. 1. is a mixture of coarse aggregate, fine aggregate, cement, and water. 2. Fine aggregate is actually. 3. Coarse aggregate is actually. 4. Form boards will be easier to remove if they have been coated with or before the concrete is poured. 5. There are cubic feet in one cubic yard. 6. In general the water used the stronger the concrete. 7. The process where concrete dries out and hardens is called. 8. Concrete can be strengthened by using reinforcing or reinforcing. Unit A. Problem Area 3. Lesson 5. Page 8.

Part Three: Short Answer Instructions. Provide information to answer the following questions. 1. Compare the float, broom, and trowel finish: 2. What is meant by a 6-bag mix? 3. What is meant by a 7-gallon mix? 4. How are concrete and cement different? Unit A. Problem Area 3. Lesson 5. Page 9.

TM: A3 5A CONCRETE MIXTURE RECOMMENDATIONS Foundation Footing and Walls 1:2¾:4 7 Parts (cu ft) of Cement Parts (cu ft) of Sand Parts (cu ft) of Aggregate Gallons of Water Water-tight Floors and Foundations 1:2¼:3 6 Parts (cu ft) of Cement Parts (cu ft) of Sand Parts (cu ft) of Aggregate Gallons of Water Unit A. Problem Area 3. Lesson 5. Page 10.

TM: A3 5B CONCRETE PLACING AND FINISHING TOOLS Concrete Hand Float Concrete Edger Hand Trowel Concrete Jointer Concrete Hand Finishing Trowel Power Trowel Portable Concrete Mixer (Courtesy, Interstate Publishers, Inc.) Unit A. Problem Area 3. Lesson 5. Page 11.

LS: A3 5A Name Lab Sheet Calculating Concrete Needed 1. How much concrete would you order for a 30 foot 40 foot shop floor 4 inches thick? 2. How much concrete would you order for an 18 foot 30 foot driveway 5 inches thick? 3. Given information: 10 cubic yard of a 6-bag 7-gallon mix a. How many bags of cement would be needed? b. How many gallons of water would be needed? c. How many pounds of sand are needed? (14 cu. ft./cu. yd. and 91 pounds/cu. ft) d. How many pounds of gravel are needed? (19 cu. ft./cu. yd. and 100 pounds /cu. ft.) Unit A. Problem Area 3. Lesson 5. Page 12.

LS: A3 5B Name Lab Sheet Making Concrete Stepping Stones 1. Determine the size and style of stepping stones you want to make. 2. Make a top view drawing, cutting list, and bill of materials. The most common sizes are 12 inch and 18 inch square. 3. Build forms. Use 1 4 or 2 4 screwed together. 4. Coat the inside of the forms with used motor oil so they can easily be removed after the concrete cures. 5. Mix a 1:2:3 mixture in a wheelbarrow. 6. Pour the concrete into the form. Strike off the concrete with a piece of 2 4. 7. Use a trowel to jab down along the inside of form to push the rocks away and bring the cement paste to the edge. Also tap the outside of the form with a hammer. 8. Use a concrete edger to round the edge of the concrete. 9. Float the surface leaving a slightly rough surface. Color pigment add can be floated into the surface if desired. 10. For an aggregate finish add a layer of pea gravel or landscape rocks and float it into the concrete surface so that half of the pebbles are embedded in the concrete. Use water and a stiff brush to clean the concrete coating off of the pebble surfaces as the concrete hardens. 11. After the concrete has cured one day, take out the screws and remove the forms. Unit A. Problem Area 3. Lesson 5. Page 13.

LS KEY: A3 5A Name Lab Sheet Key Calculating Concrete Needed 1. (30 40 4/12) / 27 = 14.8 cubic yards 2. (18 30 5/12) / 27 = 8.3 cubic yards 3. a. 6 bags/yd 10 cu. yds = 60 bags b. 60 bags 7 gal/bag = 420 gallons of water c. 10 cu. yds. 14 cu. ft./cu. yd. = 140 cu. ft. 140 cu. ft. 91 pounds/cu. ft. = 12,740 pounds d. 10 cu. yds 19 cu. ft/cu. yd. = 190 cu. ft. 190 cu. ft. 100 pounds/cu. ft. = 19,000 pounds Unit A. Problem Area 3. Lesson 5. Page 14.