This part of the Works Information sets out the obligations of the Contractor with regards to:

Similar documents
DELIVERY. Management Plan Volume 2 Central Section Delivery. Document Number: CR-XRL-O4-GPG-CR

TECHNICAL DIRECTORATE. Technical Assurance Plan

QUALITY ASSURANCE REQUIREMENTS

QSS 0 Products and Services without Bespoke Contracts.

Learning Legacy Document

CORPORATE STANDARD ROUTINE MAJOR WORKS DEVELOPERS AND ACCREDITED SUPPLIERS VERSION: 1.0

Achieve CRL s vision and values, including the delivery of a world class affordable railway;

RISQS Audit Protocol. Safe Work planning. Document no.: RISQS-AP-003. Safe Work Planning

CORPORATE STANDARD ROUTINE MINOR WORKS DEVELOPERS AND ACCREDITED SUPPLIERS

Railway Interface Planning Scheme Rules (RIPS Rules)

Building Control (Amendment) Regulations MBCA Guidance Document

TÜV SÜD BABT Production Quality Certification Scheme

General Accreditation Criteria Equipment assurance, in-house calibration and equipment verification

Design Management Plan

BHG Operational Awareness Program May 8, 1998 Configuration Management Revision 0 Page 1 of 11 CONFIGURATION MANAGEMENT

INS QA Programme Requirements

CONTRACTOR WHS SYSTEM STANDARD SAFETY IN DESIGN EXTERNAL USE ONLY

Derlin Construction Limited QUALITY POLICY MANUAL ISO 9001:2008

PROBUILD GUIDE SUBCONTRACTOR QUALITY MANAGEMENT. Section Two Project Specific Quality Management Plans. Version No 1.

ENGINEERING STANDARDS DEVELOPMENT PROCEDURE

RISQS Audit Protocol. Plant Operations Scheme. Document no.: RISQS-AP-004. Plant Operations Scheme

ISO 9001:2015 QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES

Project Management Rail Safety Worker Competence

Procedure. Work Health and Safety Contractor Management. Document number: PRO Rev no. Description Process Owner Approved for issue

Services for professional procurement. Be better informed, make better decisions. RISQS Audit Questions Network Rail On-Track Plant Operations

CMI Guidance Document

GE/GN8640. Risk Evaluation and Assessment. Guidance on Planning an Application of the Common Safety Method on. Rail Industry Guidance Note

Urzgan Rural Access Program

TUV SUD BABT PRODUCTION QUALITY CERTIFICATION SCHEME

OHS Management of Contractors in Capital Works and Maintenance

Humantech Environmental Management System Manual

This is EXHIBIT A, consisting of [ ] pages, referred to in and part of the Task Order dated [ ]. Engineer's Services for Task Order

ISO /TS 29001:2010 SYSTEMKARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER

AS9100 PMA and 14 CFR 21 QUALITY HANDBOOK

Comparison ISO/TS (1999) to QS 9000, 3 rd edition (1998)

NATO REQUIREMENTS FOR DELIVERABLE QUALITY PLANS

ALBANY PORT AUTHORITY ENVIRONMENTAL MANAGEMENT SYSTEM

Table of Contents. Project Agreement Schedule 14

APPENDIX T.2 SACPCMP The South African Council for the Project and Construction Management Professions

CR-XRL-Z7-GPD-CR

Supplier Quality Requirements SQR-1.0 Rev. 3

Security Operations. BS EN ISO 9001: 2008 Issue 1.2: 21/10/2016. Quality Manual. Managing Director. Controlled / Uncontrolled when printed

IN-PILE CREEP RELAXATION AND POST-IRRADIATION THERMAL CREEP TESTING

RIS-2708-RST. Rail Industry Standard Freight Technical Committee Audit Protocol. Rail Industry Standard. Issue One: March 2015

Quality Commitment. Quality Management System Manual

Incident Response Planning & Management

APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES

21/01/2019 RIAI Advice Note - Types of Information 1

Crossrail CMS Catalogue of Documents (April 2016)

NEWCASTLE CLINICAL TRIALS UNIT STANDARD OPERATING PROCEDURES

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015

OWNER USER INTEGRITY MANAGEMENT SYSTEM WRITTEN DESCRIPTION CHECKLIST AB-512(b)

Albion Water Limited. Environmental Management System Manual

JK 1. RIBA stages JK START OF MAIN CONTRACT WORKS 1. DEFINITION 2. PURPOSE 3. PROCEDURE 3.1 PROJECT MANAGEMENT TEAM ROLE

AS9003A QUALITY MANUAL

Purchase Order Quality Clause SCC20 Revision E, Effective 1/20/2015

Space Flight Configuration Management Requirements

CDM Note 002: Principal Designer Appointment

General Accreditation Guidance. ISO/IEC 17025:2017 Gap analysis. April 2018

Title: PROCUREMENT QUALITY REQUIREMENTS CWCDS Dayton, OH

This guide is applicable to River Protection Project - Waste Treatment Plant (RPP-WTP) project suppliers and is intended for supplier use only.

ISO 14001:2015. EMS Manual.

GUIDANCE NOTE 37 MEDICAL GASES DATA INTEGRITY

IKHANA Aircraft Services, Fabrication Division PO Quality Clauses

A1 The supplier shall operate and maintain an approved Quality System that is subject to approval by Curtiss Wright Defense Solutions Dayton.

Patrick Malloy Communities Quality Assurance System

QUALITY MANUAL. Number: M-001 Revision: C Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED

Facilities Planning and Construction (FP&C)

Construction Logistics Plan Guidance

Contract Quality Requirements Manual SLM Issue 3

ISO 9001 PMA and 14 CFR 21 QUALITY POLICIES HANDBOOK

Data Transparency - Senior Staff FTE Salaries - 50, ,999 - (2015) Data as at 31 March 2015

COST VERIFICATION. Verification of Defined Cost Procedure. Document Number: CRL1-XRL-Z9-GPD-CR ( Checked by in eb *)

Percival Aviation Limited 15 Barnes Wallis Road, Segensworth, Hampshire, PO15 5TT, UK Tel: + 44 (0)

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

MSP 50 CONTROL OF CONTRACTORS

Supplier Quality Assurance Requirements

Osprey Technologies, LLC. Quality Manual ISO9001:2008 Rev -

SCHEDULE [NUMBER NAME OF WORK UNIT/WORK PACKAGE] TO THE IN-KIND CONTRIBUTION AGREEMENT SIGNED BETWEEN ESS AND PARTNER ON DATE

REQUIREMENTS FOR SAFETY RELATED SOFTWARE IN DEFENCE EQUIPMENT PART 1: REQUIREMENTS

ISO 14001: 2015 Environmental Gap Analysis

Guidance on the Application. of ISO / IEC Accreditation International Association for Certifying Bodies

D.P.E.LTD QUALITY CONTROL PROCEDURE NO 9 QUALITY CONTROL REQUIREMENTS FOR SUPPLIERS MASTER COPY

Pressure Relief Devices Requirements QMS written description verification CHECKLIST AB-524(b)

Contractor Selection & Management Guideline Rev01. Revision 00. April 2011

Signals Staff Competency Assessment

DC 102 FACTORY INSPECTION PROCEDURES AND TESTS. Requirements for Manufacturers

ISSUE CERTIFICATE OF PRACTICAL COMPLETION AND INITIATE HANDOVER TO UNIVERSITY

HIGHWAYS ENGLAND. Asset Information Group ASC PROVIDER REQUIREMENTS. March Version: 7.0 ASSET DATA MANAGEMENT MANUAL

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction

Certificate of Acceptance

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26

PENGUINS PLUS FESABILTIY

ISO9001:2008 SYSTEM KARAN ADVISER & INFORMATION CENTER QUALITY MANAGEMENT SYSTEM SYSTEM KARAN ADVISER & INFORMATION CENTER

APPENDIX C Configuration Change Management Verification and Validation Procedures

QUALITY CONTROL INSTRUCTION

CONTENTS. Quality Policy Statement. Managing Invitations to Tender. Rev 9

POLICY MANUAL FOR ISO 9001:2008. Document: PM-9001:2008 Date: April 7, Uncontrolled Copy

Developer Constructed Headworks Process. Information Guide. 1. watercorporation.com.

Transcription:

Works Information Volume 2B Part 13 Assurance, Records and Certification Part 13 Assurance, Records and Certification 13.1 Introduction The Contractor self-certifies the quality of the works. This part of the Works Information sets out the obligations of the Contractor with regards to: the provision of progressive assurance that the Contractor s design (where appropriate) and the works comply with the requirements of the contract ; the provision and maintenance of records; the requirements for the retention of records by the Contractor and the submission of records to the Project Manager ; and The certification of all parts of the works. Records means all drawings, CAD files and models, specifications, calculations, schedules, reports, consents, approvals, permits, licences, authorisations and the like that evidence the progress and compliance of the works through to the defects date. These records include documents submitted during the course of the works to verify compliance with the requirements specified elsewhere in Works Information. Records shall be sufficiently detailed to provide assurance of compliance with the Works Information and provide support to the Contractor s self certification process. All records shall be signed off by a competent person. The Contractor shall utilise the Employer s standard record templates for records where provided by the Project Manager. Completion shall not be certified by the Project Manager until all records required by the contract have been delivered to and accepted by the Project Manager. 13.2 Assurance The Contractor shall provide progressive assurance that the Contractor s design (where appropriate) and the constructed works comply with the requirements set out in the contract. The Contractor s progressive assurance will also be used by the Project Manager and Employer to demonstrate that the legal commitments and obligations placed on the contract by the Crossrail Act 2008 have been discharged. Page 13.1 of 12

Progressive assurance means that there will be continual confirmation of compliance by the generation of contemporaneous records. Within 4 weeks of the starting date, the Contractor shall develop an Assurance Plan and submit it to the Project Manager for acceptance. In the case of the first submission of the Assurance Plan the Project Manager will reply within 4 weeks of the date of submission. Any further revisions, submissions and responses shall be made within the period for reply. The Assurance Plan shall describe the means by which the Contractor will provide progressive assurance on this contract. Assurance by means of certification of compliance with the Works Information shall also be provided by the Contractor subject to the requirements specified in 13.4 below. The table attached in Appendix 13A indicates (for information only) the parts of the Works Information for which the Contractor will most likely be required to provide assurance evidence. 13.3 Deliverables and Records 13.3.1 Deliverables Within 4 weeks of the starting date, the Contractor shall produce a Contract Master Deliverables List (CMDL) relevant to the scope of work to be provided utilising the template in Appendix 13H and submit it to the Project Manager for acceptance. In the case of the first submission of the CMDL the Project Manager will reply within 4 weeks of the date of submission. Any further revisions, submissions and responses shall be made within the period for reply. The Contractor shall review and submit the CMDL periodically as agreed with the Project Manager with final acceptance of the CMDL being granted on Completion or as necessary, on or around the defects date. The Contractor shall use the Common Site Filing Structure when producing or updating the CMDL. The Contractor may, if it chooses, produce the CMDL within the EDMS using the Common Site Filing Structure instead of the template in Appendix 13H.. The CMDL shall: include a programme for the production and submission of deliverables; identify those deliverables which require approval from Others (for example RfL, TfL, NR, LUL, DLR, ORR and LFEPA) such that sufficient time is allowed to avoid approvals delaying or disrupting the works. The Contractor shall submit one copy of the deliverables to the Project Manager in electronic format compatible with the software requirements detailed in the Works Information. In addition the Contractor shall retain the hard copy of each revision of the submitted deliverable, with signed Project Manager s acceptance record until Completion of the whole of the works. Page 13.2 of 12

Where the Contractor submits deliverables or records for onward transmittal to Others one hard copy and one copy in electronic format shall be submitted in accordance with the appropriate standards identified in the Works Information. Further records may be identified as deliverables on activity specific Inspection and Test Plans. 13.3.2 Contractor Records 13.3.2.1 General Contractor records are records that the Contractor shall maintain and retain at a location to be accepted by the Project Manager. Any Contractor record/archiving procedure shall clearly indicate responsibilities for records retention and include details of the location and back up arrangements 13.3.3 Access, Submission and Retention Access to Contractor records is to be provided to the Employer, the Project Manager and Others authorised by the Project Manager who shall be allowed to copy records as necessary. Each record detailed for retention by the Contractor is to be in the form of both etched CD and hard copy with due attention being paid to Clause 4.2.4 of ISO 9001:2008 with regards to legibility, identity, retrievability and protection. Superseded documents are considered to be records. 13.3.4 Submission of Deliverable and Assurance Records The Project Manager shall provide to the Contractor the current revision of the standard forms in electronic format for the Contractor to generate certain quality records. These standard forms are compatible with EDMS but do not affect the need for the Contractor to provide information and documents specified in the contract. The Employer shall provide the Contractor access to EDMS for loading and managing documents and to record certain contract deliverables. (see 13.4 below). The Contractor shall be responsible for the management, operation, training of personnel and for all data input into the system. Records shall be collated, packaged, indexed and submitted by the Contractor in a phased manner for each element, structure, activity or section in accordance with Works Information. 13.3.5 Project Technical Request Database The Employer shall provide access for the Contractor to the Project Technical Request database, a web based software package for the purposes of managing Requests for Information, Field Change Documents and Non Conformance Reports. Page 13.3 of 12

13.3.6 Redlines, As Built and Operational Records 13.3.6.1 General The Contractor shall manage the Redline (revision X) (hereinafter described as Redline) process in accordance with the Management of Redlines Procedure (Appendix 13R Document No: CRL1-XRL-Z-GPD-CR001-50010). Further, the Contractor shall manage the As Built Drawing Process in accordance with the Management of As Builts (Appendix 13S Document No: CRL1-XRL-Z- GPD-CR001-50018). The Contractor shall keep a full set of the latest Issued for Construction (IFC) drawings, associated data and specifications on Site and available to the Project Manager and/or the Employer. The IFC drawings shall be marked up (i.e. Redlined) using red lines (for deletions), green lines (for additional), blue lines (for notes/special) and other information to accurately record all changes during construction, including any Project Manager s instructions and Requests For Information, Field Change Documents (FCD), Non-Conformance Reports (NCR) and any other relevant data. Changes from the Works Information design to red line position when identified by any of the above communications, or for any other reason, shall be fully dimensioned and clearly sketched on the drawing. Any change from the IFC drawings to the red line condition which is recorded on documents other than drawings e.g. standards, shall be referenced on theredline with a note to the associated instruction, Request For Information, Field Change Document or other relevant data. These shall reference the communications noted on the drawing. Revision clouds shall be used to aid the identification of any changes. Such drawings shall be issued at Redline and status code at S0 (Work In Progress) in the EDMS. The Contractor is required to submit the Redline to the Project Manager (as Scanned PDF or electronically DGN) by uploading each individual drawing onto the EDMS, together with the Employer s standard Register and Issue Record (RIR) on a formal transmittal to the Project Manager for review and acceptance under cover of a communication using the EDMS. All electronically re-drafted Revision C (contractual) and Status Code AB (as-built) drawings shall be in accordance with the Employer s CAD standards (Std No: CR- STD-005; Doc No: CRL1-XRL-Z-GPD-CR001-50010) & BS1192 Collaborative Production or Architectural, Engineering and Construction - Code of Practice. 13.3.6.2 Records for parts of the works where the Contractor is not responsible for design. On completion of the work, or as requested by the Project Manager, the Contractor shall create the Redline drawings, as outlined in section 13.3.6.1 and transmit to the Project Manager under cover of a formal transmittal note for electronically re-drafting at Revision C (Contractual) and status code at AB (As-Built) to reflect the as-built (operational) condition. Page 13.4 of 12

13.3.6.3 Records for parts of the works where Contractor is responsible for design. The Contractor shall submit a list of those drawings on a RIR considered necessary for operational and/or maintenance purposes to the Project Manager for acceptance. As requested by the Project Manager, the Contractor shall create the Redline drawings, as outlined in section 13.3.6.1. The Contractor shall forward theredline drawings to the Project Manager four weeks prior to Completion of the works that includes parts designed by the Contractor. When the Project Manager accepts that the Redline drawings reflect the as-built condition, by notification, the Contractor shall electronically re-draft at Revision C (Contractual) and Status Code at AB (As- Built) to reflect the As-Built (operational) condition inedms. All references on the Redline drawings to changes, such as technical queries, Requests For Information, Field Change Documents, Non-Conformance Reports, standards or other relevant data, shall be incorporated into the Revision C, Status Code AB (As-Built) such that the references are removed. 13.3.6.4 Drawings not required to be As-Built Drawings in the following categories are not required to be As-Built except where an element of permanent works is also shown on the same drawings, in which case the permanent works element only is required as an As-Built : RIBA stage E and Preliminary Design drawings to be further developed by Contractor. However, construction drawings developed from these must be As- Built. Temporary works drawings, except where the temporary works are required for interim maintenance, operational or safety purposes. Systemwide stageworks drawings leading up to the final arrangement Drawings showing temporary traffic management schemes including temporary road closures except where such drawings are required for interim maintenance, operational or safety purposes. Construction access except where such access is also permanent works access. Site clearance and demolition, except where a structure is partially demolished, or there is a requirement to inform a follow on contractor of specific risks not removed by demolition or site clearance. 13.3.6.5 Supplier Manufacturer & Standard Details Revision C drawings which are used to manufacture or fabricate an element or component off-site e.g. single component and component assembly drawings or standard detail drawings and assembly drawings stonemason drawings, etc, are not required to be As-Built, except that if a component is not fabricated in accordance with the Revision C drawing and an accepted change to the drawing has resulted in all instances of that component being revised then the drawing must be produced As-Built to indicate the change. If a component is not fabricated in accordance with the Revision C drawing but is still installed on-site then this should be recorded on the relevant assembly or GA Page 13.5 of 12

drawing showing where or how the component is located, arranged, configured and connected to other elements. This as-built drawing would also record the NCR reference accepting the non-compliant component. In this case the component drawing itself does not need revising to "As-Built" drawings. 13.3.6.6 Not Used 13.3.7 Material Proposal Schedule The Contractor shall develop a Material Proposal Schedule (MPS) for planned procurement activities for acceptance by the Project Manager. The MPS shall identify Architectural and non-architectural items Samples/mock ups required including Test Panels and Quality Benchmarking where required PTR/RFI reference numbers Material approvers(contractor/subcontractor organisation/persons including applicable BREEAM specialists) Target submission dates` 13.3.8 Materials Compliance Record (MCR) The Contractor shall utilise the template attached in Appendix 13J (MCR) for the purpose of recording material and product acceptances for the works and submit such records to the Project Manager for acceptance. Note: The MCR template is not valid for raising or approval of any change or deviation to material compliance with contract documents and specifications. The Project Manager will agree which of the Material Compliance Records are required for formal submission and acceptance including items requiring acceptance by Others. 13.4 Certification to be Provided 13.4.1 Manufacturing Certification The Contractor shall procure that subcontractors provide manufacturing and fabrication certification in accordance with the requirements of the Works Information. The Contractor submits such certification with the relevant Sub- Construction or Construction Certification Package. 13.4.2 Design Certification 13.4.2.1 General The Contractor shall establish and maintain controls over Contractor designed elements of the works which will ensure that the Contractor s design output documents are traceable to the Employer s requirements documents and that the Page 13.6 of 12

required level of technical acceptance has been obtained prior to the issue of detailed design deliverables for construction. Details of design certification are detailed under Appendix 13 B. 13.4.2.2 Design Certification Sequence Staged Design Completion Certificate (SDCC) A staged Design Compliance Certificate (SDCC) is issued by the Contractor to certify that his design is compliant with the Employer`s requirements, the project requirements, and the Conceptual Design Statement (CDS) and has been integrated within the applicable interface designers. A SDCC is issued following review and approval of the corresponding CDS and is accepted by the Project Manager. Final Design Submission (FDS) A Final Design Submission is produced by the Contractor at the end of the detailed design phase. It shall illustrate how the design has been completed in accordance with the Conceptual Design Statement and shall identify any changes. It will reference the complete set of design deliverables. Copies of all checked and approved design calculations shall be provided at the same time as the FDS for record purposes. The FDS will include a Design Completion Certificate commensurate with the full maturity of the design. 13.4.2.3 Design and Compliance Certificate (DCC) The Design Compliance Certificate is produced by the Contractor certifying that the design is in conformity with all project requirements and the accepted Conceptual Design Statement plus agreed changes. The DCC forms part of the assurance deliverables and is produced at the completion of the detailed design. 13.4.3 Construction Certification Construction and Sub-construction Certificates shall be issued by the Contractor to provide the documentary evidence required by Project Manager to demonstrate that the works have been constructed in accordance with: the contract ; the Contractor s design accepted by the Project Manager; and The Contractor shall prepare a register of proposed Sub-construction and Construction Certificates for the works for acceptance by the Project Manager. The register shall indicate the planned and actual dates at which certificate and documentary evidence are to be presented to the Project Manager for acceptance. Each Sub-construction and Construction Certificate shall include a definition of its scope and refer to any relevant Design Acceptance Certificates. The Project Manager will provide references to such Design Acceptance Certificates for design Page 13.7 of 12

by Others. Where no specific Design Acceptance Certificate relating to a part of the works exists (for example drainage, roadworks, fencing, utility diversions and other enabling works etc) then the whole contract design acceptance certificate for the contract shall be referenced. Each Sub-construction and Construction Certificate shall be supported by the associated records. Utility diversions shall have their own sub-construction certificate and shall be referenced to the whole contract design acceptance certificate for the contract. Where assets remain under the control of the Employer until transfer in its entirety to the relevant 3 rd Party or Infrastructure Manager then Works Information Part 13 shall be applied. Where the asset is to be immediately transferred upon completion to the control of a 3rd party, i.e. London Underground, Network Rail, Docklands Light Railway, National Grid Gas, etc., the requirements of the applicable 3rd party and relevant 'Parts' of the Works Information for supporting documentation shall be implemented. Refer Appendix 13 E, 13F and 13G for details. 13.5 Asset Management & Traceability The Employer will develop and manage asset information provision processes which should provide assurance that asset information is of suitable quality and to minimise the overall cost of asset information provision to both the Contractor and the Employer. These processes may be refined over the life of the contract to improve the effectiveness of asset information provision. The Contractor shall be responsible for the provision of asset labels; the Contractor shall complete and submit to the Project Manager the Asset Data Collection forms in a timely manner thus allowing the Employer to issue the required asset label information. The Employer shall operate managed processes to ensure consistent asset information is provided for each contract. In order to ensure consistent approaches to asset hierarchies and asset classification, the development and population of the asset hierarchies shall be undertaken by the Employer. Classification of assets will be based upon the Uniclass Standard and shall be undertaken by the Employer. Contractors shall be issued by the Employer with Asset Data Collection Forms relevant to their contract with the required attributes specified. Contractors shall populate the Asset Information Provision with all requested details and within the timescales specified in the information request. The Employer will provide suitable briefing and training sessions to Contractors to ensure that they are aware of their responsibilities within the overall process. An example data collection form is included in Appendix 13L. Page 13.8 of 12

All asset data shall conform to the Employer s standards as specified in the Standards Baseline and the Employer s Asset Information Management Plan CRL1-XRL-O8-XTC-CR001-00007. At an appropriate time the Contractor shall be provided with extracts of the Employer s Asset Information Management System (AIMS) database by the Project Manager containing planned assets to be constructed/ modified/ demolished/preserved/ interfaced by the Contractor as detailed in the Asset Information Management Plan CRL1-XRL-O8-XTC-CR001-00007. These extracts will contain assets adjacent to the Site which the Contractor may need to be aware of. Throughout the contract, the Contractor shall be responsible for the safe storage and management of the extracts of the Employer s Asset Information Management System (AIMS) supplied to them. They shall maintain suitable controls to prevent the loss, deletion, corruption or degradation of the Asset Register consistent with current industry good practice. The Contractor shall populate the extracts of the Employer s Asset Information Management System (AIMS) to support future operational, maintenance and asset management activities. The Asset Information Management System (AIMS) extracts shall be updated to contain the complete asset listing covering the contracted works. The Asset Information Management System (AIMS) shall enable storage and access of the following information to Employer s standards: Asset identification Asset location Asset classification to the classification standards of the relevant infrastructure manager Asset status Asset criticality Asset attributes specific to the relevant class of asset The capability to store identifiers to allow linkage to other information systems The Asset Information Management System (AIMS) extracts shall be populated by the Contractor with all specified data updates to comply with Employer requirements and shall be fully populated no later than four weeks after the relevant asset has been installed/ set to work. The Contractor shall maintain at all times traceability of all assets and line wide replaceable units, including failure during testing and commissioning and product swap-out. All assets, down to the line replaceable unit, shall have a unique identification number that is capable of being used to consistently identify the asset electronically and manually. Unique identification shall be compliant with the Employer s Asset Identification Standard (CRL1-XRL-O6-STD-CR001-00031). All assets installed or supplied by the Contractor shall have a durable label or name plate appropriate to the environment either securely fixed to the asset, or securely fixed adjacent to the asset. These labels shall be compliant with the Employer s Page 13.9 of 12

standards. These labels shall be compliant with the Employer s Asset Identification Standard (CRL1-XRL-O6-STD-CR001-00031). The Contractor shall be accountable for the management, storage and population of the Asset Register data and shall attend, and contribute to Employer data governance meetings when required. If changes are required to Employer standard reference data, then the Contractor shall notify the Project Manager. The Contractor shall ensure that all data population and updates are consistent with the Employer s quality requirements. This shall include ensuring that the accuracy, validity, precision, completeness and timeliness of asset information comply with the Employer `s standards listed as: Asset Identification Standard CRL1-XRL-O6-STD-CR001-00031 Asset Information Management Plan CRL1-XRL-O8-XTC-CR001-00007. The Contractor shall instigate suitable checks and audits of data quality to demonstrate that Employer `s standards are being complied with and shall demonstrate the effectiveness and outputs of these processes to the Project Manager, when requested. Requirements for the coding and numbering of Employer assets shall be compliant with the Employer s Asset Identification Standard (CRL1-XRL-O6-STD-CR001-00031). The Contractor shall nominate a relevant senior employee as Data Owner who shall be accountable for the management, storage and population of the Asset Register data. The Data Owner shall attend, and contribute to Employer data governance meetings when required. 13.6 Critical Readiness Review The Contractor shall undertake and be the chair of the Readiness Review for Critical Activities (Readiness Review for Critical Activities Template CRL1-XRL-Z-ZTM- CR001-50025) that are to be carried out prior to commencing new construction activities which are associated with higher than routine risks. The Contractor shall ensure that applicable representation from the Project Manager is in place and that during the meeting any output is clarified and that the review is fully endorsed by the Contractor and of those attending on behalf of the Employer. The proposed schedule of Readiness Reviews for Critical Activities shall be included in the Contractor s plans. Examples would include (but not limited to): Possessions Activities critical to the programmes of interfacing contractors Page 13.10 of 12

Start of construction by new, major sub-contractor TBM manufacturing Site logistics TBM launch TBM operational logistics TBM breakthrough Cross-passage construction SCL tunnelling SCL pre-start meeting Shaft construction Shaft sinking pre-start Monitoring Monitoring pre-start Readiness Review for Critical Activities (template: CRL1-XRL-Z-ZTM-CR001-50025) is provided for guidance and shall be made available to the Contractor during the Kick-Off Meeting along with supporting forms/templates: Permission to mobilise certificate (CRL1-XRL-Z-ZTM-CR001-50022) Permission to mobilise checklist (CRL1-XRL-Z-ZTM-CR001-50023) Site start-work checklist (CRL1-XRL-Z-ZTM-CR001-50024) Readiness Checklist for Major Excavation & SCL (CRL1-XRL-Z-ZTM-CR001-50029) Each Critical Readiness Review shall comprise of: inclusion in the Contractors P6 Programme, and reviewed in one or more planned meetings with the Project Manager well in advance of the due construction commencement date. A checklist based on the Permission to Mobilise Checklist: Readiness Review for Critical Activity completed and signed off by the Contractor at the Readiness Review Meeting(s). The checklist shall be further developed by the Contractor and may be replaced by the Contractor s preferred checklist provided that the items identified in the Readiness Review Checklist are addressed and accepted by the Project Manager. The review shall also encompass the state readiness of the required documentation, certification and open audit/surveillance items. Review meeting(s) shall be chaired by the Contractor and attended by major sub-contractors and Project Manager and their appointed representatives. Page 13.11 of 12

The completed, signed checklist shall be uploaded onto the EDMS prior to the start of the relevant construction activity. 13.7 Appendices Appendix 13A Appendix 13B Parts of the Works Information requiring Assurance Evidence Design Certificates Appendix 13 B1 Staged Design Compliance Certificate (SDCC) Appendix 13 B2 Design Compliance Certificate (DCC) Appendix 13C Appendix 13D Appendix 13E Appendix 13F Appendix 13G Appendix 13H Appendix 13J Appendix 13K Appendix 13 L Appendix 13 M Appendix 13 N Appendix 13 O Appendix 13 P Appendix 13 Q Appendix 13 R Sub-/Construction Certificate Package Listing Certificate Package Review Statement Sub-Construction Certificate Construction Certificate Whole contract Construction Certificate Contract Master Deliverables List Template Materials Compliance Record Inspection Request Form Asset Data Collection Form Readiness Review for Critical Activities Permission to Mobile Certificate Permission to Mobilise Checklist Site Start-Work Checklist Readiness Checklist for Major Excavation & SCL Appendix 13 S Management of Redlines Procedure Management of As Builts Procedure Page 13.12 of 12