TRANS-SIBERIAN GOLD PLC

Similar documents
TRANS-SIBERIAN GOLD PLC

2016 Mineral Resource Tritton Tenement Package

QUARTERLY PRODUCTION REPORT: KANMANTOO PRODUCTION AHEAD OF YTD GUIDANCE

QUARTERLY REPORT for the period ending 30 September 2017

Dittmer G r old P roject

A Deeper Look 04/ / 187. Lonmin Plc Annual Report and Accounts 2016

2018 Resources and Reserves

Vast Resources plc / Ticker: VAST / Index: AIM / Sector: Mining. Quarterly Production Summary & Operations Update

Q Preliminary Production Results, 2018 Production Guidance and Mineral Reserve and Resource Update

ASX Release ASX Code: YTC

Kumtor Gold Company 2018

Confidence in Carrapateena project grows

For personal use only

Malachite Resources AGM. November For personal use only. Malachite Resources Limited

Olympias: Highlights Q Phase 1 Retreatment. Acquired from European Goldfields in February. EIA approved. Phase 1 Retreatment began

For personal use only

DALGARANGA GOLD PROJECT OPERATIONAL UPDATE: MILL PERFORMANCE TEST COMPLETED AS RAMP UP CONTINUES

Garden Well Gold Deposit. Reserve Increases to 1.66 Million Ounces

Maiden Ore Reserve for Camel Creek JV

ASX ANNOUNCEMENT 26 February 2013 ASX Code: BDR. MAIDEN DUCKHEAD HANGINGWALL LODE RESOURCE 584, g/t for 71,000 oz gold

JORC RESOURCE FOR OLD KONONGO TAILINGS DAM

ASX ANNOUNCEMENT. MacPhersons Nimbus Silver Target up to 6 Million Ounces. Highlights. ASX Code: MRP. Contact Details

UPDATE TO BROKEN HILL MINERAL RESOURCES AND ORE RESERVES

Transitioning from Explorer to Miner

Underground Ore Reserve growth at Prominent Hill extends mine life to 2030

Krasny project JORC resources update: oz of gold at 1,200 USD/oz gold price

Kingsgate 2012 Mineral Resources & Ore Reserves

TEMBANG PRE-FEASIBILITY STUDY DELIVERS POSITIVE OUTCOME

IDM Mining Updates Pre-Development Engineering and Optimization at Red Mountain Gold Project

For personal use only

TEMBANG PROJECT OPTIMISATION

NEWS RELEASE GREAT PANTHER SILVER ACHIEVES SEVERAL PRODUCTION RECORDS IN THIRD QUARTER 2013

Morrison Copper/Gold/Moly (Silver) Project

For personal use only

For personal use only

SECOND QUARTER REPORT 15 JULY 2014

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 30 SEPTEMBER 2018

QUARTERLY ACTIVITIES REPORT

FIRST MAJESTIC SILVER CORP.

For personal use only

For personal use only REGIS RESOURCES LTD JUNE 2016 QUARTERLY REPORT & EXPLORATION UPDATE

For personal use only

Update on Hammer Mill 3 Commissioning

MINING COMMENCES AT KONONGO GOLD PROJECT

QUARTERLY ACTIVITIES REPORT

FOR THE THREE MONTHS ENDING 30 JUNE 2009

Saracen Mineral Holdings Limited ACN

Non-IFRS performance measure. Refer to the Non-IFRS Performance Measures contained in the Q Management s Discussion and Analysis.

Financial results for the 6 months to 30 June 2008

DALGARANGA GOLD PROJECT CONSTRUCTION UPDATE LESS THAN 5 MONTHS TO FIRST GOLD

Trading Symbol: TSX: SVM February 8, 2011 NYSE: SVM

AGA. Australia ANGLOGOLD ASHANTI AUSTRALIA. Fraser Clark Manager: Geology

ASX and Media Release: 20 September 2016 ASX Code: WRM Initial mining review demonstrates potential upside at Mt Carrington

30 January 2012 AIM: AR. Archipelago Resources plc ( Archipelago or the Company ) Updated resource and reserve estimates for Archipelago

For personal use only

For personal use only

FIRST GOLD FROM DALGARANGA GOLD PROJECT: AHEAD OF SCHEDULE AND UNDER BUDGET

Accelerated Exploration

AGM - Lorena Gold Project

For personal use only

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 31 MARCH 2018

Koka Project Stands to be a Highly Profitable Gold Mine: Scoping Study

Zimplats Holdings Limited Mines Limited

HORSESHOE LIGHTS PROJECT ASX/MEDIA ANNOUNCEMENT

Santacruz Silver Reports First Quarter 2017 Production and Financial Results

T S X : R M X N Y S E. M K T : R B Y

N E W S R E L E A S E

Hidden Valley PNG s Newest Mine Briefing for Analysts

930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel:

Thalanga Operations Ore Reserve and Mineral Resource Statement

For personal use only

N E W S R E L E A S E

For personal use only

AVINO SILVER & GOLD MINES LTD.

N E W S R E L E A S E

DALGARANGA GOLD PROJECT - CONSTRUCTION UPDATE 8 MONTHS TO FIRST GOLD

Thalanga Project Ore Reserve and Mineral Resource Statement (as at 1 December 2017)

SILVERCORP REPORTS Q2 FISCAL 2017 RESULTS: NET INCOME UP 454%, CASH FLOWS FROM OPERATIONS OF $27.0 MILLION ON RECORD SILVER PRODUCTION

TWANGIZA OPERATIONAL HIGHLIGHTS

Haoma Mining NL. Dear Sir, ACTIVITIES REPORT FOR THE QUARTER ENDED MARCH 31, 2011 HIGHLIGHTS

2014 MINERAL RESOURCES AND ORE RESERVES

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 30 JUNE 2016

ACTIVITIES REPORT FOR THE QUARTER ENDED 31 DECEMBER 2018

OPERATIONAL UPDATE AND 2019 PRODUCTION GUIDANCE

For personal use only

Sierra Metals Updates Mineral Resource and Reserve Estimate for Bolivar Mine, Mexico

For personal use only

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 30 JUNE 2018

Harte Gold Provides Construction and Permitting Update

Strong open pit drilling results boost plan to grow Paulsens' production to 100,000ozpa

BROKEN HILL MINERAL RESOURCES AND ORE RESERVES UPDATE

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 31 MARCH 2016

For personal use only

VALUE THROUGH GOLD BRUCEJACK PROJECT PREMIER S NATURAL RESOURCE CONFERENCE

For personal use only

Niblack Project Poised For Development

Zimplats Holdings Limited Mines Limited REPORT FOR THE QUARTER ENDED 31 MARCH 2018

2013 Ore Reserve estimates Increased Ore Reserves at Ban Houayxai

Forward Looking Statement

For personal use only

Transcription:

TRANS-SIBERIAN GOLD PLC 29 June 2017 Annual General Meeting TRANS-SIBERIAN GOLD

TSG Company history Established in 2000 Listed on LSE (AIM) in November 2003 UFG acquired 25% in 2006, now 79.69% Veduga and Bogunay sold for $40 million in 2007 Asacha in production since September 2011 Asacha licence extended in 2013 to 1 September 2018, application for further extension in preparation

ASACHA Underground Mine 2013 2014 2015 2016 Q1 2017 Mine developmen t (metres) 2,672 3,576 3,937 4,926 1,263 Ore extracted (tonnes) 185,573 198,38 7 177,555 179,258 46,155 TRANS-SIBERIAN GOLD

ASACHA Processing plant 2013 2014 2015 2016 Q1 2017 Ore processed (tonnes) Gold grade (g/t) Silver grade (g/t) Gold recovery (%) Silver recovery (%) Gold in dore (oz) Silver in dore (oz) 155,215 156,561 161,242 162,892 44,320 6.29 7.68 7.65 7.23 5.35 10.45 13.46 12.28 12.71 8.99 94.43 95.06 95.40 95.18 94.24 75.44 67.17 76.94 81.69 76.69 29,666 36,513 37,798 36,225 7,246 39,136 45,086 49,232 54,595 10,148

ASACHA Refining and sales Gold refined (oz) Silver refined (oz) Gold sales $mill Silver sales $mill 2013 2014 2015 2016 Q1 2017 29,670 36,089 37,984 35,366 7,644 39,026 44,610 49,398 51,428 12,356 43.3 45.4 43.3 44.4 9.4 0.9 0.8 0.7 0.8 0.2 TRANS-SIBERIAN GOLD

JORC Resource Estimate Resource estimate updated in 2017 by ARANZ Geo Expert Services/QG Australia Pty Ltd (QG) shows the Asacha property contains 693,000 oz. of gold and 1.76 million oz. of silver. The estimate incorporates new data from mining development, 2016 exploration programme and accounts for mining depletion during 2016. TRANS-SIBERIAN GOLD

JORC Resource as at 31 December 2016 ASACHA PROPERTY MEASURED + INDICATED INFERRED MEASURED, INDICATED & INFERRED CUT-OFF g/t Tonnes (000) 681 370 1,051 Gold Oz (000) 424 269 693 4.0 GRADE g/t 19 23 Silver Oz (000) 1,200 560 1,760 4.0 GRADE g/t 55 47

Russian State Geological Commission for Reserves (GKZ) Resource Estimate In February 2017 a special meeting of GKZ reapproved the Asacha resources. The reapproval is required also for prolongation of the license. The figures (next slide) exclude ore mined up to 31 December 2016, and include the results of exploration 2012.

Mineral Resources - Russian State Commission for Reserves (GKZ) as at 31 December 2016 Mineral Resources - Russian State Commission for Reserves (GKZ) as at 31 December 2016 Au Ag C1 & C2 oz Grade g/t C1 & C2 oz Grade g/t Cut-off g/t Asacha 623,943 19.8 1,476,612 46.8 2

Asacha mine Average monthly output of about 15,000 tonnes of ore in 2016 ensures continuous operation of the plant Processing plant throughput averaged more than 13,500 tonnes per month in 2016 Dilution, which reduces the grade of ore delivered to the plant (excluding rockfalls) reduced in 2016 to 34% (40.4% in 2015 and 56.8% in 2014)

Asacha mine in operation

Main activities at underground mine In 2014 mine development started below 200 metre level In 2015 mining activities started below 200 metre level In 2017 mining activities started below 150 metre level Stoping methods chosen thoroughly for areas of fractured rock Gold grades for Q1 2017-5.35 g/t (Q1 2016-7.38 g/t )

Decrease of gold grades in ore The main reason for the decrease is the delay in mine development which has led to a shortage of rich stoping ore delivered to the plant (in 1Q 2017 40.8% of total ore; in 2016-41.2%; in 2015 54.5%). The shortage has been compensated by the use of lower grade ore cut earlier and the poor ore from stockpiles). It occurred because of: lack of mobile underground equipment in operation; extreme water inflow at low levels accompanied by seasonal floods.

Low grade ore - Solutions Purchase of equipment In 2017 four new underground trucks arrived at the site in April and two LHDs are expected in September Control of dilution Stability in dilution which is normal for the mining systems applied (in 2016-34%, in January-May 2017-36.0% ) Control of water inflows Additional pumps purchased and interim pump station designed and constructed Hydro-geologic studies conducted Continuous monitoring of water underground Underground exploration drilling In 2016-2017 about 3,500 metres were drilled, providing more details on ore bodies configuration and grades. We expect a continuous increase in the proportion of rich ore delivered to the plant starting in the second half of 2017. Annual gold production is expected up to 36,000 oz.

Geologic exploration in 2016 Advanced exploration mining (underground drilling) - 37 holes, about 3,400 metres - Surface exploration drilling totalled 18 holes and about 5,500 metres. Following the results of the drilling geologic exploration comprehensive programme for 2017 has been worked out

Construction activities Mine development in order to reach 100 metre level Additional pumping station at 150 metre level Second compartment of the tailings storage facility Solid wastes landfill

New loan facilities with VTB Bank $15 million and $5 million debt facilities 5-year and 3-year terms respectively 6.2% interest rate Reduces cost of debt and maintains flexibility for growth and development

Special Dividend Paid On 23 December 2016 a special dividend was paid, 5 US cents (3.97 pence) per ordinary share Special dividend in total US$ 5.5 million