Frequently Asked Questions

Similar documents
THE TECHNICAL STANDARDS AND SAFETY ACT, 2000, S.O. 2000, c. 16 ( the Act ) and

2012 Pipeline Performance and Activity Report. BC Oil and Gas Commission

OWNER USER INTEGRITY MANAGEMENT SYSTEM WRITTEN DESCRIPTION CHECKLIST AB-512(b)

(IB17-012) Province-wide Variance

Regulator s Perspective

NATIONAL ENERGY BOARD ONSHORE PIPELINE REGULATIONS

Directive 026: Setback Requirements for Oil Effluent Pipelines

QUALIFICATIONS NEEDED TO DESIGN, CONSTRUCT AND MANUFACTURE NUCLEAR SYSTEMS AND EQUIPMENT. Cosmos M. Voutsinos, P.Eng.

FLOWBACK & PRODUCTION TESTING SERVICES

Pipeline Regulatory Framework in Alberta

Integrity Management Program for

Pressure Piping Construction Requirements

Process Safety Information (PSI) Standard

Proposed Heartland Cavern Lateral Pipeline and Meter Station. Public Information Document

Pipeline Application

Information Brochure. Proposed EOR Development Project. The Company CO 2. EOR recovers as much oil as primary or secondary recovery.

GAS. Gas Distribution Systems Safety and Loss Management System Guidelines. Prepared by: Brad Wyatt, Provincial Safety Manager - Gas

NATIONAL ENERGY BOARD PIPELINE PERFORMANCE MEASURES REPORTING GUIDANCE

Enhanced Approval Process (EAP) Manual (as amended by the Disposition Management Process)

Updated December Pembina. Engin. Submitted to: Prepared by: Prepared: September Updated:

Measurement Schematics & Facility Delineation Requirements Required by September 11, 2014

Fugitive Emissions Management in Alberta Presentation to the Meeting of Canadian Flaring and Venting Regulators

Guideline for In-Service Assessment of Ammonia Refrigeration Plants

Nova Scotia What You Need to Know

SAMPLE APPROVAL ABC REGULATOR. ENVIRONMENTAL PROTECTION AND ENHANCEMENT ACT R.S.A. 2000, c.e-12, as amended. January 02, 2018.

B Contractor Licensing GUIDE FOR APPLICANTS

Mitigation of Internal Corrosion in Oil Effluent Pipeline Systems

DESIGN REGISTRATION GUIDELINES FOR NUCLEAR PRESSURE RETAINING SYSTEMS AND COMPONENTS

The Pipelines Regulations, 2000

DIRECTIVE Use of ASME Code Case 2596 in Alberta

NATIONAL ENERGY BOARD PIPELINE PERFORMANCE MEASURES 2014 DATA REPORT

The Alberta Energy Regulator (AER) has approved this directive on February 17, 2016.

Titles and Descriptions of Training Materials

Regardless of any alternative pricing provided, a quotation for the items specified herein shall be provided.

Exhibit D Measurement & Regulation Facilities Records Required for DETI Operational Responsibilities

Suspension Requirements for Wells

INTERIM DIRECTIVE ID 91-3

NOVA Chemicals Redwater Lateral Upgrade. Project Information Document and Confirmation of Non-objection

Measurement, Accounting and Reporting Plan for Thermal Heavy Oil Recovery Projects

Frequently Asked Questions

TransGas Customer Connections. Presented by: Tyler Danielson Manager, Pipeline Engineering

APPLICATION OF ASME CODE CASES 2284, 2278 & 2290 FOR USE IN THE PROVINCE OF ALBERTA

Guide for the preparation of quality programs for licensing of companies performing BPE regulated work.

Pressure Equipment Repair and Alteration Requirements

Pipeline Operational Status. API Recommended Practice 1181 First Edition

Regardless of any alternative pricing provided, a quotation for the items specified herein shall be provided.

Part 1: Life cycle governance

Mitigation of Internal Corrosion in Sour Gas Pipeline Systems

Pipeline Performance in Alberta

Quest GHG and Energy Report

ST Field Surveillance and Operations Branch Field Operations Provincial Summary 2012

LIQUEFIED NATURAL GAS FACILITY REGULATION 146/2014

CITY OF REDLANDS CUSTOMER SERVICE FIELD TECHNICIAN II, III

Ontario What You Need to Know

Shell Canada Limited. Shell s Comments for Phase 4: Oral Proceeding Related to Alberta Energy Regulator Proceeding No

Oil and Gas Contractor QA/QC Plan Sample Selected pages (not a complete plan)

Pipeline Status Document. API Document AUGUST 2017

Fuels Safety Program. Oil and Gas Pipeline Systems Code Adoption Document Amendment

COMBINED LICENCE FOR THE CONSTRUCTION OF A PETROLEUM STORAGE FACILITY AND A PETROLEUM PIPELINE

DORIN LAND AND OILFIELD MANAGEMENT INC Ave, Edmonton Alberta, Canada T6E 0C5 Telephone (780) Fax (780)

IPC ABSTRACT

Draft Directive 065 (released December 2012) Stakeholder Feedback and AER Response

Mitigation of Internal Corrosion in Carbon Steel Gas Pipeline Systems September/2018

MIGHTY THERM CP. Powerful, Efficient, Low Nox. Reliable and. Economical. Gas Fired Commercial Pool Heating Boiler. Heating Systems Company

Appendix 13 - South Pierson Unit No 3 Planned Corrosion Control Program

B Contractor License GUIDE FOR ASSESSMENT TEAMS & APPLICANTS

Supporting Guidance (WAT-SG-15)

Proposed regulation change under the Oil, Gas and Salt Resources Act

Woodenhouse Compressor Station C3 Unit Addition. Province:

Quality Control Manual Submission Information

CITY OF REEDLEY. Water Systems Specialist I. Water Systems Specialist II

MATERIAL SPECIFICATION FOR SMOOTH WALLED STEEL PIPE

Welding Performance Qualification Test Administrators GUIDE FOR APPLICANTS

PIPELINE INTEGRITY MANAGEMENT. Bob Vergette P.Eng. Lima February 28, 2008

Surface Operations Integrity Management. Bucharest March 13 th 2012

Cork Institute of Technology. Summer 2008 Process Plant Design (Time: 3 Hours)

Application Form and Guide for an EPEA Registration Code of Practice for Waterworks Systems Using High Quality Groundwater

Welding Performance Qualification Test Administrators GUIDE FOR APPLICANTS

Code of Practice for a Waterworks System Consisting Solely of a Water Distribution System

MATERIAL SPECIFICATION FOR SMOOTH WALLED STEEL PIPE

COST AND REVENUES OF DIRECT USE APPLICATIONS

MECHANICAL INTEGRITY

SECTION PIPING SPECIALS

QUALITY ASSURANCE PROTOCOL (QAP)

Integrity Management of Pipelines: Getting Product to Market Safety

Quality Control Manual Submission Information

1 The enacting clause of New Brunswick Regulation under the Boiler and Pressure Vessel Act is repealed and the following is substituted:

Guideline for Implementation Regulations of Import Boiler & Pressure Vessel Safety Licensing System

SASKATCHEWAN UPSTREAM PETROLEUM INDUSTRY ASSOCIATED GAS CONSERVATION DIRECTIVE

Figure2-DalySinclairField(01)

Audit of Weighing Services. Audit and Evaluation Services Final Report Canadian Grain Commission

NATIONAL COMPETENCY STANDARD

Gas Transmission and Distribution Piping Systems

Safe Design of Sampling Systems

Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida

Paper Number:

B. OPR, BoD, and BoD-HVAC documentation prepared by Owner and Architect contains requirements that apply to this Section.

Charter for Water Recycling & Pollution Prevention in Pulp & Paper Industries. (Specific to Ganga River Basin States)

Saskatchewan Upstream Flaring and Incineration Requirements

Transcription:

Frequently Asked Questions Pipeline Application Audit Submissions (Technical) March 2016 This document clarifies and supports the submission of audit documentation for the technical requirements of Directive 056: Energy Development Applications and Schedules (Directive 056) pipeline applications. The questions below identify areas of concern resulting from common omissions or errors within audit submissions. Clarification has been provided to reduce the number of supplemental information requests in the audit process. This document supplements the audit requirements as outlined in Directive 056, Section 6.11. Q1. Q1. Where in Directive 056 do I find a list of the documentation required for a technical pipeline audit? A1. Directive 056, section 6.11, outlines the required audit documentation to be submitted for a technical audit of a pipeline application. The table below outlines the appropriate sections in Directive 056. Schedule 3.2 Pipeline requirements Step 2: Question 1 H 2S content requirements 6.11.2.1 Step 2: Question 3 CSA Z662 6.11.2.3 Step 2: Question 4 Corrosion 6.11.2.4 Step 2: Question 5 Leak detection 6.11.2.5 Step 2: Question 6 Steam pipelines 6.11.2.6 Step 2: Question 8 Pipeline installations 6.11.2.8 Step 3: Questions 1, 2, and 3 Release volume and level designations 6.11.3.1 Step 3: Question 4 Injection 6.11.3.2 Step 4: Question 1 Substance change 6.11.4.1 Step 4: Question 1 MOP change / H 2S change 6.11.4.2 Step 4: Question 2 Liner Installation 6.11.4.3 Step 5: Questions 1a and 1b Pipeline resumption 6.11.5.1 Step 5: Question 2 Pipeline discontinuation 6.11.5.2 Step 5: Question 3 Pipeline abandonment 6.11.5.3 Step 6: Question 4 Transportation utility corridor 6.11.6.2 FAQ: Pipeline Application Audit Submissions (Technical) 1 of 8

Q2. What documentation needs to be submitted in response to a technical pipeline audit request? A2. When compiling documentation for submission in response to a technical well audit request, the AER recommends the following for the steps noted above. Schedule 3.2 Step 2: Question 1 H 2 S Content Requirement A representative gas analysis Analyses that can be linked to the application by location, and H 2S Analyses that include the sample point, well/facility, pool, source, and date of sample Step 2: Question 3 CSA Z662 A description of the methodology used to ensure CSA standards are met A list of the licensed substance and maximum operating pressure (MOP) of the pipelines into which the proposed pipeline is tied A description of pressure control and overpressure protection Mill certificates or other documentation to confirm the pipe is suitable for the product being transported Specifications for the valves, flanges, and fittings Documentation of a quality assurance program to ensure material is suitable for sour service A description or map showing valve locations and spacing Concise statements when dealing with any of the above requirements The nominal pressure class (PN class) for valves, flanges, and fittings Simple representative maps showing valve spacing, including the distance between emergency shut down Canadian Standards Association (CSA) plan documents a short statement committing to follow CSA is acceptable American Society of Mechanical Engineers (ASME) ratings for values flanges and fittings Specifications that do not relate to the 2 of 8 FAQ: Pipeline Application Audit Submissions (Technical)

devices (ESDs) Only include mill certifications specific to the application Clear description of overpressure and pressure controls that meet the requirements found in the Reference Tool for Interpreting Pipeline Pressure Control and Overpressure Protection Requirements on the AER website The depth of cover and class location for high vapour pressure (HVP) applications The tie-in licence numbers application; please highlight relevant specifications The entire mill certification. Auditors are looking for sour service certification which is normally found on the first page Any documents or specifications that do not directly relate to the application Step 2: Question 4 Corrosion If the licensee has indicated appropriate corrosion mitigation is in place, the licensee must be able to provide the evaluation performed to assess the corrosivity of the pipeline and the need for corrosion mitigation. If a corrosion mitigation plan has been deemed necessary, the licensee must provide the following: A detailed summary of the corrosion mitigation plan that outlines the scheduled actions that will be conducted A detailed summary of the monitoring plan that outlines the scheduled actions that will be conducted A description of the scheduled actions that will be conducted to review the monitoring results and assess mitigation plan performance Concise statements when dealing with any of the above requirements Statements about what if any external coating is being used Confirmation that cathodic protection will be used (if metallic pipe or risers are in use) Confirmation if coupons or other measures are being used Do Not The entire pipeline integrity management plan FAQ: Pipeline Application Audit Submissions (Technical) 3 of 8

Step 2: Question 5 Leak Detection A detailed description of the procedures for leak detection including frequency of right-of-way inspections, material balance parameters, and confirmation that employees have or will receive training. (NOTE: This documentation only applies to pipelines that fall under annex E requirements) Concise statement confirming how CSA Z662-15 clause 10.3.6 and annex E.3 and E4 and Pipeline Regulations sections 43 and 44 are being met The entire pipeline integrity manual or plans Step 2: Question 6 Steam Pipelines The licensee must submit documentation verifying that the pipeline design was registered with the Alberta Boilers Safety Association (ABSA). The ABSA registration number The entire ABSA application Step 2: Question 8 Pipeline Installations All pipeline installations A wellhead or inlet gas analysis that is representative of the inlet stream A process flow diagram that meets the requirements of Directive 056, section 6.9.26.1 A site-specific plot plan showing the placement of and distances between equipment A list of each type of meter proposed for each measurement point and their locations Compressor/pump stations Everything listed under All Pipeline Installations Manufacturer's specifications for the proposed unit that confirms emission ratings, unit size, and driver type A noise impact assessment prepared in accordance with Directive 038 A breakdown and total of all sources of NOx emissions in kg/h and CO 2 emissions in t/d 4 of 8 FAQ: Pipeline Application Audit Submissions (Technical)

Documentation to demonstrate the exhaust stack height requirements of ID 96-02 (previously IL 88-05) are met if total NOx emissions are less than 16 kilograms per hour (kg/h). Check Directive 060 for these requirements. Tank farms / oil loading and unloading terminals A list of materials that will be stored and a description of the storage methods, including details of everything listed under All Pipeline Installations, design and construction, leak detection, secondary containment, weather protection, and primary containment device and size. Line Heaters Documentation verifying the line heater is designed to Alberta Boilers Safety Codes Act (B31.3) requirements Step 3: Questions 1, 2, and 3 Release Volume and Level Designations For natural gas and oil effluent pipelines greater than 10 mol/kmol H 2 S, the licensee must submit the input parameters used to calculate the potential H 2 S release volume, representative tie-in schematics of ESD valves, and a system map showing ESD and check-valve locations. Accurate maps to determine ESD spacing for release rate calculations Calculations that used the licenced H 2S values Calculations that used the expected H 2S values Step 3: Question 4 Injection If injecting into a producing reservoir, the licensee must give an explanation as to the impact the scheme operation will have on the pipeline material and operating parameters. FAQ: Pipeline Application Audit Submissions (Technical) 5 of 8

Step 4: Question 1 Substance Change The licensee must submit documentation that confirms the pipe, valves, flanges, and fittings are suitable for the new substance; confirms that the depth of cover is sufficient (HVP pipelines only); and demonstrates the integrity and suitability of the pipeline for the proposed change and the proposed procedure for implementing the change. Concise statements when dealing with any of the above requirements Mill certifications, if required Only include mill certifications specific to the application Step 4: Question 1- MOP Change / H 2 S Change Documentation verifying that the pipe, valves, flanges, and fittings are suitable for the new MOP (MOP increase) A detailed evaluation of the integrity and suitability of the pipeline for the proposed change, and the proposed procedure for implementing the change Pressure test charts (MOP increase) Legible pressure-test charts PN ratings for the valves, flanges, and fittings A summary of the engineering assessment, or the engineering evaluation of the integrity and suitability of the pipeline Only specifications that pertain to the application Specifications for pipelines not in the application Full engineering assessments ASME ratings for the valves, flanges, and fittings Step 4: Question 2 Liner Installation Liner specifications and pressure-test charts if available Legible pressure tests Specifications for pipelines not in the application 6 of 8 FAQ: Pipeline Application Audit Submissions (Technical)

Step 5: Questions 1a and 1b Pipeline Resumption Pressure-test charts Documentation to verify depth of cover (HVP only) a record of cathodic protection (cathodic protection survey). a record of the medium left in pipelines. the pipeline external coating integrity results. Ensure sour-service requirements are met (e.g., mill certificates). Sour-service requirements on mill certificates (should be 359 11S YJ 2K coating) Submit a detailed evaluation of the integrity and suitability of the pipeline for the proposed change and the proposed procedure for implementing the change (e.g., does the engineering assessment meet current code [CSA clause 3.3] and regulation requirements?). Legible pressure-test charts Annual cathodic-protection surveys The field discontinuation report An explanation for any missing items Only include mill certifications specific to the application Pictures (if provided) must be legible A summary of the engineering assessment, or the engineering evaluation of the integrity and suitability of the pipeline The last date the line saw active flowing service and the date of field discontinuation Do Not Engineering assessments Step 5: Question 2 Pipeline Discontinuation A description of the method used to discontinue the pipelines A record of the medium left in the pipelines Documentation to confirm that cathodic protection (CP) will be maintained FAQ: Pipeline Application Audit Submissions (Technical) 7 of 8

The discontinuation report The last date the line saw active flowing service and the date of field discontinuation A statement confirming that CP will be maintained Pictures (if provided) must be legible An explanation of any missing items and a description of how the requirements are still being met Step 5: Question 3 Pipeline Abandonment A description of the method used to abandon the pipelines A record of the medium left in the pipelines Step 6: Question 4 Transportation Utility Corridor Documentation confirming the pipeline/installation has received ministerial consent from Alberta Infrastructure Consent from Alberta Infrastructure including the signed and stamped right-of-way plans 8 of 8 FAQ: Pipeline Application Audit Submissions (Technical)