Re: PW Appendix 3 - Part 8

Similar documents
Gardiner East EA & Integrated Urban Design Study

Re: EX8.12 F.G. Gardiner Expressway Strategic Rehabilitation Plan Procurement Strategy

PUBLIC INFORMATION MEETING June 24, 2015

Highway 417 Bridge Replacement

2016 STRUCTURE INSPECTION APPRAISAL REPORT. Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN

Appendix M. Criteria, Measures and Indicators for Effects Assessment

SPRINGBROOK 2017 Offsite Levies

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction

B510-5 REMOVAL-PAVEMENT WORK OPSS 510. CDED B Removal CDED B Reclaim Asphalt Pavement

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

B510-5 REMOVAL-PAVEMENT WORK OPSS 510. CDED B Removal CDED B Reclaim Asphalt Pavement

Curtis Bouteillier, Proform Management Inc. Wayne Gustafson, The City of Red Deer

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ICM Project. Externally Initiated Plant Relocations and Expansions. Waterfront Toronto. Toronto Hydro Electric System Limited (THESL)

Appendix C - Highway 400 Widening and Interchange Evaluation Summary Tables

Preliminary Engineering Report. For the. Foxglove Trail. Prepared for: The City of Moore. Prepared By:

Engineering & Construction Services Division Standard Drawings for Road Works. T No. Revision T No. Revision Remarks All T- drawings

Pattullo Bridge Replacement Project. Cost Report

WELCOME. QEW Credit River Bridge Detail Design Assignment from Mississauga Road to Hurontario Street. Public Information Centre Round #1 October 2017

313-1 HOT MIX ASPHALT - OPSS.PROV 313

STATE UNIVERSITY CONSTRUCTION FUND

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project.

Cleveland Opportunity Corridor Project Section 3. Subcontractor Informational Meeting August 12, 2016

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work

Pinellas County Capital Improvement Program, FY FY2016 Project Summary Report

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING FEBRUARY

ASSET MAINTENANCE, RENEWAL AND CAPITAL EXPENDITURE POLICY

313-1 HOT MIX ASPHALT - OPSS.PROV 313

3.6 Construction Methods

Life Cycle Cost Analysis Pavement Options May 2002 Materials Division / Virginia Transportation Research Council TABLE OF CONTENTS

Construction Specification for General Excavation

Town of South Bruce Peninsula Bridge and Culvert Inspections OSIM Inspection Report

Highway Construction Program

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E

Construction Related User Delay Costs The Case of the Crowchild Trail Bridge Rehabilitation in Calgary

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MARCH 1, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

FLOODPLAIN MANAGEMENT STRATEGY FEASIBILITY PLAN. EB3679 February 2011

THE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION

Constructability Guidelines

Table of Contents. List of Tables. 11. Advantages and Disadvantages

Review of Plans and Specs from a Constructability Perspective

DESIGN OF ROAD OVERBRIDGES

EXECUTIVE SUMMARY. Figure 1 - Rail Deck Park Study Area. Executive Summary Rail Deck Park Engineering & Costing Study Report Page 1 of 10

Traffic Technical Memorandum: Hickman Road over Tuolumne River Bridge Replacement Project, Stanislaus County (BRLO-5938(199))

BA Blacktop Ltd. An ISO 9001:2008 registered

VT 14 East Montpelier Bridge Project Informational Meeting. February 22, 2017

Eastern Region, Ministry of Transportation, Ontario. Island Park Drive Rapid Bridge Replacement

IDAS form 6 Building or operational work assessable against a planning scheme

SECTION MAINTENANCE OF EXISTING CONDITIONS

Bridge Preventative Maintenance.Act now before this happens to you! Keith Cooper, P.E. Local Bridge Program Manager

9 Conclusion. 9.1 Introduction

APPENDIX G WHITTIER BRIDGE TYPE STUDY EVALUATION OF BRIDGE ALTERNATIVES

EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL NOTES

1. Introduction. 1.1 Project Background. E n v i r o n m e n t a l A s s e s s m e n t chapter 1. introduction

TH 25 Bituminous Mill, Full Depth Reclamation and Overlay SP &

5.0 PRELIMINARY ENVIRONMENTAL REVIEW

How to Review SI&A Data

Community Improvement Districts CIDs. CID concepts

City of St. Catharines Standard Drawings SEPTEMBER Revised September 6, 2018 TES-ENG (SH)

City of St. Catharines Standard Drawings JULY Revised July 21, 2017 TES-ENG (SH)

Information for File # MVP MHK

CITY CLERK. Consolidated Clause in Works Committee Report 2, which was considered by City Council on April 25, 26 and 27, 2006.

Project Overview. Wilson Boulevard over Route 50 Bridge Rehabilitation. Get Involved. Public Information Meeting. Contact Information

Torbram Road Improvements From Queen Street East to Bovaird Drive

Conceptual Design Report

QEW Garden City Skyway Niagara Street to Glendale Avenue Risk and Value Engineering Support Major Infrastructure Decisions

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA

BRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report

Select Subgrade Material, Compacted

B HOT MIX ASPHALT - OPSS.PROV 313

Maine Turnpike Authority

Canadian Consulting Engineering Awards 2016 CANADIAN NIAGARA POWER FOREBAY BRIDGE RECONSTRUCTION

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016

MINISTRY OF TRANSPORTATION ONTARIO MANAGING OUR ASSETS

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

IDAS form 6 Building or operational work assessable against a planning scheme

Bay of Quinte Skyway (Site No ) VE Study CSVA Conference Tammy Dow, HDR Corporation Stuart Sokoloff, CTS Group

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way

I. STREET CONSTRUCTION AND RECONSTRUCTION

Steeles Avenue Widening (Tapscott Road to Ninth Line) Principles of a Cost-Sharing and Implementation Agreement

Johnson Street Bridge Project Technical Evaluation of Replacement and Rehabilitation Alternatives. June Prepared by:

Niagara Region Transportation Master Plan Road Network Strategy Technical Paper

KALIA-FORT DERUSSY WASTEWATER SYSTEM IMPROVEMENTS FINAL ENVIRONMENTAL ASSESSMENT EXECUTIVE SUMMARY

The Regional Municipality of Peel Basis of Payment

PUBLIC NOTICE. From: Corporate Services Date: March 26, 2012 Re: Federal Gas Tax Reporting

Branch Transportation Operations

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MAY 24, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

study for 2018 include:

Plessis Road Twinning and Grade Separation at CN Redditt Subdivision: Design Challenges and Innovative Solutions

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four

APPENDIX D STRUCTURAL REPORT

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

CITY OF SAFETY HARBOR ENGINEERING

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017

Zoo Interchange Reconstruction

TRANSPORTATION. Governmental Projects

Transcription:

Demolish S/W DVP ramp, FGE WBL (including Logan Ramp), Don River bridge WB, and existing LSB WBL Construct new S/W DVP ramp, FGE WBL ramp, Don River bridge WB, and remaining portion of LSB WB roadwork. LEGEND Demolition Construction (at grade) Construction (elevated) In Service (at grade) In Service (elevated) 2 3 No. Lanes (at grade) 2 No. Lanes (elevated) 1 No. Lanes (bi-directional) Re: PW11.1 - Appendix 3 - Part 8

Demolish E/N DVP ramp, FGE EBL (including Logan Ramp), Don River bridge EB, and existing LSB EBL Construct new E/N DVP ramp, FGE EBL ramp, Don River bridge EB, and remaining portion of LSB EB roadwork. Gardiner EB traffic diverted to use Queens Quay by-pass (from Jarvis Ramp) LEGEND Demolition Construction (at grade) Construction (elevated) In Service (at grade) In Service (elevated) 2 3 No. Lanes (at grade) 2 No. Lanes (elevated) 1 No. Lanes (bi-directional)

Remove temporary crossing at Keating Channel Open all structures and roadways LEGEND Demolition Construction (at grade) Construction (elevated) In Service (at grade) In Service (elevated) 2 3 No. Lanes (at grade) 2 No. Lanes (elevated) 1 No. Lanes (bi-directional)

APPENDIX D INFRASTRUCTURE COSTING ASSUMPTIONS

Gardiner Expressway and Lake Shore Boulevard East Reconfiguration Environmental Assessment and Urban Design Study CAPITAL COST AND NPV ESTIMATE APPRAOCH REVISED FEBRUARY 2016 Capital Cost and NPV Estimate Approach The estimate of probable costs that was completed for the evaluation of alternative solutions involved the determination of comparative capital, operations and maintenance costs of each of the three Hybrid Alternatives (Options 1, 2A and 3) over a 100-year period starting in 2013. This approach adopted conventional Life Cycle Cost Analysis methodology but used a more lengthy evaluation period of 100 years to allow the exercise to be performed and presented in line with the City s original method of evaluation of its Maintain Scheme of re-decking the F.G. Gardiner Elevated Expressway from Yonge Street to Cherry Street. This method of evaluating the costs and life cycle costs of alternatives for the Gardiner Reconfiguration is kept consistent throughout the entire Environmental Assessment work. Capital Cost Estimate Capital costs in the estimates were defined as the major capital expenditures necessary for either new bridge or road construction or for bridge deck replacement. These included cost determination for the following Major Costs Items: 1. Roadworks Lakeshore Boulevard On-grade portion of the Gardiner Other Roadworks, Signals and Intersections 2. Structures Bridge and Ramp Demolition Bridge Deck Replacement of the Gardiner Other Bridges (e.g. Don River Crossings, Transition between existing and new bridges) New Ramp Bridges Overpass Bridge (e.g. Metrolinx Bridge) 3. Utility Relocations 4. Traffic Maintenance During Construction Major Detours, Temporary Roadworks and Outside corridor works 5. Landscaping and Urban Design Type 1: Hardscape w/ Planting Area (Urban, street trees in paving, structural soil) Type 2: Hardscape w/ Planting Areas & Special Amenities (skate park, court sports, 1/3 planting) Type 3: Hardscape w/ Planting Areas (Paving, Gardens, Street trees, 1/3 Planting) Type 4: Softscape (Primarily groundcover Planting, trees, Paths, 2/3 planting) Vegetative green screening of railway retaining wall (non-structural) 6. Contaminated Material Disposal Contaminated soil disposal for trench excavation along new Lake Shore for sewer works and new footing construction. Dillon Consulting Limited, Morrison Hershfield 1

Gardiner Expressway and Lake Shore Boulevard East Reconfiguration Environmental Assessment and Urban Design Study CAPITAL COST AND NPV ESTIMATE APPRAOCH REVISED FEBRUARY 2016 For utility costs, an inventory of the buried utilities under the existing Gardiner Expressway was developed and costed for complete removal and relocation. 15% of this cost was assigned to each of the three Hybrid Alternatives. A detailed inventory of the existing utilities in the Lake Shore Boulevard corridor was prepared from available Digital Map Owners Group (DMOG) composite underground utility maps mapping. This inventory was provided to the affected utility companies for the costing exercise. Of note is that the majority of the lands through which the Hybrid options are located are outside of the Gardiner/Lake Shore Boulevard corridor and has minimal underground utilities Any costs associated with relocating existing utilities from the old Lake Shore Boulevard corridor to the new one through the Keating Precinct area were not included in establishing utility costs for the Hybrid Alternatives. Municipal servicing and utility work requirements and issues in this area were assessed as part of the Keating Channel Precinct Plan (May 2010) that concluded the following relative to municipal servicing infrastructure: The current potable water infrastructure in the Keating Channel Precinct is very limited and over 80 years old, nearing the end of its lifespan. It needs to be replaced to adequately prepare for new development in this Precinct and the rest of the Lower Don Lands The sewers in this area were part of the East Harbour Development, and were constructed and installed in the late 1920 s and early 1930 s. Like the water infrastructure, the wastewater infrastructure is nearing the end of its lifespan. In addition to the age of the infrastructure, the configuration of the existing system is not conducive to supporting the proposed development The majority of storm outlets are found along the Keating Channel. They serve the study area north of the Keating Channel. Most of the active storm system was constructed in the late 1920s and 1930s as a part of the Eastern Harbour Development, with the most recent storm sewers constructed in the late 1940s. Much of the servicing infrastructure is old and needs replacing and is not functioning in a manner that is considered sustainable Utility/servicing, relocation and de-commissioning issues and costs associated with existing utilities in the bypassed portion of Lake Shore Boulevard were considered to be part of the cost of development of the Keating Precinct lands and as a separate initiative to this EA. For traffic maintenance during construction costs, these were determined as a percentage allowance of 5 % of the total Major Cost Items 1, 2, and 3 as mentioned above. Contaminated material disposal costs were established by estimating the volume of contaminated soil that may be encountered with disposal to an appropriate MOE licensed site using unit rates from recent project experience. The estimation of the required volume of contaminated soil removal and disposal along the project limits was based on a 4 m wide excavation into native soils along the new Lake Shore Boulevard footprint between Cherry Street and Don Roadway to a depth of 2 m and an additional allowance for the construction of new footings for the new bridge and ramp structures. Of note is that the future grade of Lake Shore Boulevard in this area will be entirely in fill. Similar to the issue utility Dillon Consulting Limited, Morrison Hershfield 2

Gardiner Expressway and Lake Shore Boulevard East Reconfiguration Environmental Assessment and Urban Design Study CAPITAL COST AND NPV ESTIMATE APPRAOCH REVISED FEBRUARY 2016 relocation associated with the bypassed Lake Shore Boulevard corridor, any de-commissioning costs related to the disposal of contaminated materials in the old road corridor were considered to be part of the development of the Keating Precinct lands and were not part of this EA. Totals for the Major Cost Items outlined above were developed and, in addition to the above-mentioned allowances already made, the following percentages were added to determine the total capital costs for each Hybrid alternative: Engineering and design costs 10% for the new works east of Cherry Street added under the Hybrid Concepts. Contingencies 15% for the new work east of Cherry Street added under the Hybrid Concepts. An additional 20% cost allowance was applied for the total capital, operations and maintenance costs Quantities for costing (e.g. deck areas, LSB lanes) were taken from concept plans for each of the alternatives. Unit costs were applied to these quantities to determine the capital cost. The unit costs were estimated based on the following principles: The major reference for prices was the Ontario Ministry of Transportation (MTO) s Parametric Estimating Guide (PEG), 2011. For items not directly related to the MTO PEG (e.g. bridge demolition, and bent relocation) the work was quantified and priced according to MTO s Highway Costing (HiCo) 2013 data base with adjustment based on similar and local project experience. Other items that were not covered or not directly related to PEG or HiCo were estimated based on recent, similar project experience. These include the following: o Demolition; o Intersection costs (drainage, curb, pavement marking etc.); and o Landscaping and urban design Although the majority of unit prices were based on the MTO PEG, price adjustments were made. Prices from recent City of Toronto projects (e.g. bridge removal, and deck replacement) were reviewed and some of the unit prices were adjusted to account for complexity of the Gardiner project, the increased durability required to provide for the extended service life of 100 years, use of advanced construction materials and the work in downtown core. Unit prices used in the analysis were corrected to 2013 year values. Additional adjustments were made as follows; Available MTO PEG 2011 prices were updated with inflation rate of 5% per year for two years in order to represent 2013 prices. In agreement with Delcan s 2014 peer review report, a complexity factor of 2.6 was applied for the new bridge construction item New Bridge Gardiner and Ramp. This was to account for the difficult urban city construction environment for bridge work. This factor was not considered applicable to demolition, road, signal, and other structural items. Dillon Consulting Limited, Morrison Hershfield 3

Gardiner Expressway and Lake Shore Boulevard East Reconfiguration Environmental Assessment and Urban Design Study CAPITAL COST AND NPV ESTIMATE APPRAOCH REVISED FEBRUARY 2016 All deck replacement unit costs were adjusted to be consistent with the City s original Gardiner Rehabilitation Life Cycle Analysis. Life Cycle Costs and Operations and Maintenance Considerations A life cycle cost analysis was conducted for the alternatives for a 100-year cycle starting in 2013. The City previously conducted a Life Cycle Cost Analysis (LCCA) for maintaining the entire elevated section of the Gardiner. The same approach was adopted here for the Hybrid Alternatives. The capital costs and costs associated with projected remedial treatment occurrences were assigned throughout the 100 year time line using year 2013 construction unit rates without adjustment for inflation. The maintenance methodology followed the City of Toronto s model proposed for Major and Minor Arterial Roads. A 4% discount rate was applied to convert all costs to 2013 present value and summed together to arrive at the total LCCA cost for each individual alternative. The following are some key comments and assumptions related to this analysis: All capital cost work items carried forward from the original Maintain (west of Cherry Street) were be used in accordance with the original Maintain Alternative time line. The majority of the capital costs for new bridge works (demolition of Logan Ramp and construction of new ramp structures in the vicinity of Cherry Street) would start in 2020 and be carried out over a period of 4 years, followed by designated and specific life-cycle repairs required over the 100 years period of evaluation. The new structures supporting the new ramps and new road works would follow a similar model once their remaining life-spans expired. All new bridges would be designed for 75 years life according the CHBDC except otherwise noted. Operations and maintenance (O&M) costs include allowances for the following: o Structural work Superstructure Repairs - overlay, waterproof and pave (OWP); Superstructure Repairs - patch, waterproof and pave (PWP); Bent Repairs; and Steel Painting. o Road work Road Resurfacing; Road Reconstruction; and Intersection Signal Replacement. O&M unit costs were based on ongoing and recent City costs for these types of remediation works. It was assumed that the new decks will have a life span of 100 years, having been replaced with reinforcing materials inert to chlorides such as Stainless Steel and/or Glass Fibre Reinforced Polymer (GFRP) in conjunction with high performance concrete, waterproofing membrane and asphalt protection layer. Dillon Consulting Limited, Morrison Hershfield 4

Gardiner Expressway and Lake Shore Boulevard East Reconfiguration Environmental Assessment and Urban Design Study CAPITAL COST AND NPV ESTIMATE APPRAOCH REVISED FEBRUARY 2016 To systemically evaluate the costs, the section of the Gardiner Expressway east of Yonge Street was divided into twelve (12) zones based on similar condition, and approximate dates of construction or rehabilitation for the existing deck. The capital and O&M costs for these zones were developed for each of the alternatives: o Zone 1: Jarvis Street to Small Street o Zone 2: Small Street to Cherry Street o Zone 3: Cherry Street to Don River (Existing structures to be maintained) o Zone 3a: Cherry Street to Don River (New Structures under Hybrid Scheme) o Zone 4: Gardiner to LSB Ramps at east o Zone 5: Jarvis on-ramp o Zone 6: Sherbourne off-ramp o Zone 7: Gardiner off ramp to DVP o Zone 8: DVP on-ramp to Gardiner o Zone 9: Yonge Street to west of Jarvis Street o Zone 10: West of Jarvis Street to Jarvis Street o Zone 0: LSB Bridge over the Don River Life cycle costs have been summarized in two ways: All 2013 capital and maintenance costs were assigned over the 2013 2113 timeline at the appropriate years and discounted to a 2013 net present worth. The initial construction capital costs (essentially in the period of 2020 to 2028) were classified as 2013 capital costs and the remaining costs in the 100 year period were discounted to 2013 and added to the 2013 capital costs. The above costing methodology was peer reviewed by an independent consultant and has been adjusted based on comments and suggestions that were received. Property costs are not included in the capital cost estimates. Dillon Consulting Limited, Morrison Hershfield 5