FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

Similar documents
FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

NJTPA Transportation Improvement Program Fiscal Years

FY 2019 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Highway Construction Program

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MARCH 1, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

APPENDIX B. Excerpts from the October 2002 Conceptual Alternatives Report

SUPPLEMENTAL ECMS ADVANCED INFORMATION JUNE 5, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MAY 24, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

REHABILITATION PACKAGE 4-a

5/11/2016 SR 15 SECTION 088 CSVT SOUTHERN SECTION SR 15 SECTION 088 CSVT SOUTHERN SECTION AGENDA

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JULY 12, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

PCL Definitions for the Local Program J01 3R Policy J04 3P Policy J06 Local Bridges and Township Bridge Program Bridge Work Activities

Tier 1 Recommendations October 30, 2017

University Region FY 2023 Final Scoping Package

Highway Construction Program

GREENE COUNTY - SR 221(J10) # PROPOSAL:$11.76 PLANS:$ X18:$ X36:$47.10

House Select Committee on Strategic Transportation Planning and Long Term Funding Solutions. March 28, 2016

Minnesota Statewide Freight Bottlenecks

Historic Bridge Adoption Information Packet

Ohio Contractor Association Annual Work Forecast Program. John Picuri, District 4 Deputy Director Myron Pakush, District 12 Deputy Director

South Boston. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

New Jersey Department of Transportation. Local Freight Impact Fund Handbook. Procedures and Criteria for Local Freight Impact Fund Grant Program

EIGHT PLANNING FACTORS

PLAN 2040 Regional Transportation Plan Update. Final Recommendations. Transportation and Air Quality Committee March 13, 2014

Transportation Connectivity, Accessibility and Economic Opportunity Study

Clear Creek Road (PM 1.82 & 0.25) Bridge Replacement Projects. Public Meeting, Wednesday, November 20, 2013 Pleasant Valley Middle School

ODOT Bridge and Pavement Funding Allocation Business Process. Bruce Johnson 11 th IBSMC, Mesa Arizona 4/24/17

Evaluation of Bridge Functional Obsolescence Using Congestion Performance Measures Determined from Anonymous Probe Vehicle Data

Joint Legislative Transportation Oversight Committee January 6, 2016 Maintenance Operations Performance Analysis Report (MOPAR) Kristin Barnes

CLA /10.54, PID Project Description:

Going Forward The Plan to Maintain & Improve Mobility Frequently Asked Questions (FAQs)

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017

Oklahoma Department of Transportation Environmental Programs Division Office Fax

Feasibility Assessment Study

Corridor Study and Feasibility Analysis

Joint House and Senate Transportation Committee Update to the Ten Year Plan

MEMORANDUM: INITIAL CONCEPTS SUMMARY

TABLE OF CONTENTS. Section Section 2 Alternative A...7 Section 2 Alternative B...7

Fuller /Fuller Heights Road Improvements

TRIP s Top 40 Transportation Projects to Support Economic Growth and Quality of Life in Maryland

Conceptual Design Report

Lehigh Valley Transportation Study

3.6 Construction Methods

VDOT s Strategic Approach to Bridge Management and Maintenance

FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT

Informational Brochure. Proposed Interchange. Interstate Route 295 (I-295) AT Greenville Avenue (State Route 5) Town of Johnston, Rhode Island

Bow Concord I-93 Improvements City of Concord Transportation Policy Advisory Committee

SR 432 RAIL REALIGNMENT AND HIGHWAY IMPROVEMENTS PROJECT ELECTED AND AGENCY OFFICIALS PROJECT BRIEFING May 14, 2014

IMPROVING I 81 IN MARYLAND

S.R. 0070, Section T20. Engineering District ASHE National Project of the Year Award

Maine Turnpike Authority FINAL 4-year Capital Investment Plan ( )

Final Recommendations Identification of Improvements, Strategies, and Solutions

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

3.2 Description of the Alternatives Evaluated in this DSEIS

Berkshire Region TIP Project Data Form

Recommendations. Bismarck-Mandan MPO Regional Freight Study

Engineering & Capital Improvements. Shore Acres Civic Association August 21 st, 2017

Highway and Freight Current Investment Direction and Plan. TAB September 20, 2017

There are two (2) amendments for which staff is requesting recommendation to the Transportation Policy Council this month:

Highway Construction Program

Year Pre Total County Debt (Bonds & BANS) Mitigation Fees

LANDSIDE FACILITIES AIRLINE TERMINAL FACILITIES INVENTORY 5.0 INTRODUCTION C H A P T E R 1 CHAPTER 5

NJTPA 2014 Local Concept Development Study Hudson & Essex Counties Clay Street Bridge over the Passaic River. Public Information Center

Overview of Maintenance and Construction Programs. Mike Holder, PE, Chief Engineer Jennifer Brandenburg, PE, State Asset Management Engineer

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JULY 26, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Transit Project Descriptions ($ millions)

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016

Location Drainage Study

State of New Jersey NEW JERSEY DEPARTMENT OF TRANSPORTATION 1035 PARKWAY AVENUE P.O. Box 600 TRENTON, NEW JERSEY

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement

IOWA TRANSPORTATION BY THE NUMBERS:

ATP-6 STIP APPLICATION FORM FOR FISCAL YEAR 2017 Page AGENCY (Requestor or Agency who'll open bids): Contact: Phone:

Appendix F: Noise Report

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION

WOO-SR Feasibility Study (PID 90541) Feasibility Study Report April 22, 2011

Peninsula Widening. Project Description. Overview of Project Status. Estimated Total Project Cost $4.7 - $7.3 Billion

Interchange Workshop Report (August 2004)

NJTPA Region. Bergen Essex Hudson Hunterdon Jersey City Middlesex Monmouth Morris. Newark Ocean Passaic Somerset Sussex Union Warren

Alder Drive / Blair Road Bridge Replacement Projects

DDI s Can Move More Than Cars. Alex Ariniello. Presentation for the ITE Western District Annual Meeting. July, 2016 in Albuquerque, New Mexico

Pinellas County Capital Improvement Program, FY FY2016 Project Summary Report

I-64 Capacity Improvements Segment I Financial Plan Annual Update

Asset Management: Federal Perspective on Bridge Maintenance and Preservation

ITEM 8 Action May 17, 2017

CHAPTER 5 PARALLEL PARKWAY CORRIDOR IMPROVEMENTS

Bowen Road and Queen Elizabeth Way Interchange

ADDENDUM 1: PERFORMANCE MEASURES

Transcription:

FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM Route 57, Bridge over Branch Lopatcong Creek DBNUM: 16345 / UPC: 163450 Problem Statement submitted by BMS for Tier 1 Screening. It is recommended for replacement. MILEPOST(S): 1.91 STRUCTURE NO.: 2105153 AIR QUALITY CODE (NON-EXEMPT/EXEMPT): ASSET MANAGEMENT CATEGORY: Infrastructure Preservation (Bridge Assets: Bridge Rehab and Replacement) $0.100 $0.100 $0.945 $0.945

FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM Route 57, Bridge over Shabbacong Creek DBNUM: 15447 / UPC: 154470 This study will examine replacing or rehabilitating the structurally deficient and functionally obsolete bridge, built in 1907. MUNICIPALITY: Washington Boro MILEPOST(S): 11.120 STRUCTURE NO.: 2106151 AIR QUALITY CODE (NON-EXEMPT/EXEMPT): O10A (Exempt) ASSET MANAGEMENT CATEGORY: Infrastructure Preservation (Bridge Assets: Bridge Rehab and Replacement) $1.000 $1.000 $0.050 $0.050 $2.800 $2.800

FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM Route 57, CR 519 Intersection Improvement DBNUM: 97062B / UPC: 028091 The project will provide operational and safety improvements at the Rt. 57 and CR 519 intersection. The intersection approaches will be widened to provide turning lanes and shoulders. The project includes replacement of two structures over the Lopatcong Creek; the existing bridges, on Rt. 57, immediately to the east of the intersection and on Rt. 519, immediately to the north of the intersection will be demolished and reconstructed further away from the immediate vicinity of the intersection. In order to accomplish this, the Lopatcong Creek will also be relocated. MILEPOST(S): 1.40-1.60 STRUCTURE NO.: 2101031, 2105152 AIR QUALITY CODE (NON-EXEMPT/EXEMPT): NR3 (Exempt) ASSET MANAGEMENT CATEGORY: Mobility and Congestion Relief (Congestion Relief: Highway Operational Improvements) DEMO $10.800 $10.800

FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM Route 57, Lopatcong Creek, Culvert Replacement DBNUM: 11351 / UPC: 113510 The existing culvert (structure number 2105-151) (on a tributary to Lopatcong Creek), is a four-sided, reinforced concrete culvert, which was constructed in 1921. The culvert is in need of repair or replacement given its poor structural condition. Given the poor condition of the culvert's roof slab, the culvert has low load ratings. The culvert also has inadequate deck geometry and substandard guide rail end terminals. Through the Concept Development phase, the Department is identifying and evaluating options, such as culvert replacement (e.g., three-sided versus four-sided culverts) and repair options, to address those identified deficiencies. MILEPOST(S): 0.2-0.3 STRUCTURE NO.: 2105151 AIR QUALITY CODE (NON-EXEMPT/EXEMPT): S4 (Exempt) ASSET MANAGEMENT CATEGORY: Infrastructure Preservation (Bridge Assets: Culverts) $0.400 $0.400 $0.550 $0.550 $2.120 $2.120

FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM Route 57/182/46, Hackettstown Mobility Improvements DBNUM: 9237 / UPC: 950409 Initiated from the Congestion Management System, this project will help relieve congestion at four intersections located on a congested commuter corridor in Warren County. Substandard ADA features at each intersection will also be upgraded. US 46 and East Ave. Curb radius will be widened on the Southeast quadrant of the intersection. Revised signal phasing will provide a right turn overlap phase for the Northbound East Ave. approach right turn movement onto US 46. US 46 and NJ 182 (Mountain Ave.)/Willow Grove St./Warren St. Traffic signals will be retimed. US 46 and High Street/Grand Ave. Realign the High St. Southbound approach to improve traffic flow. NJ 57 and NJ 182 Will be reconfigured to allow a left turn lane and a shared left/through/right turn lane on the Eastbound NJ 57 approach to the intersection., Morris MUNICIPALITY: Hackettstown Town, Washington Twp MILEPOST(S): 0-0.96 AIR QUALITY CODE (NON-EXEMPT/EXEMPT): AQ2, NR1, NR2 (Exempt), 25 STRUCTURE NO.: N/A ASSET MANAGEMENT CATEGORY: Mobility and Congestion Relief (Congestion Relief: Highway Operational Improvements) $0.450 $0.450 CMAQ $2.053 $2.053