FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

Similar documents
FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY 2019 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

NJTPA Transportation Improvement Program Fiscal Years

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MARCH 1, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MAY 24, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION JUNE 5, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Highway Construction Program

University Region FY 2023 Final Scoping Package

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS

IMPROVING I 81 IN MARYLAND

MEMORANDUM: INITIAL CONCEPTS SUMMARY

STRUCTURE AND BRIDGE DIVISION

Lehigh Valley Transportation Study

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016

Tier 1 Recommendations October 30, 2017

5/11/2016 SR 15 SECTION 088 CSVT SOUTHERN SECTION SR 15 SECTION 088 CSVT SOUTHERN SECTION AGENDA

New Jersey Department of Transportation. Local Freight Impact Fund Handbook. Procedures and Criteria for Local Freight Impact Fund Grant Program

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.

Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida

Overview of Maintenance and Construction Programs. Mike Holder, PE, Chief Engineer Jennifer Brandenburg, PE, State Asset Management Engineer

Berkshire Region TIP Project Data Form

GREENE COUNTY - SR 221(J10) # PROPOSAL:$11.76 PLANS:$ X18:$ X36:$47.10

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JULY 12, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Year Pre Total County Debt (Bonds & BANS) Mitigation Fees

PCL Definitions for the Local Program J01 3R Policy J04 3P Policy J06 Local Bridges and Township Bridge Program Bridge Work Activities

Going Forward The Plan to Maintain & Improve Mobility Frequently Asked Questions (FAQs)

Conceptual Design Report

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JULY 26, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

3.6 Construction Methods

CLA /10.54, PID Project Description:

Oklahoma Department of Transportation Environmental Programs Division Office Fax

Information for File # RJH

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION

Any municipality meeting the following basic requirements may apply:

11, 2019 MONTOUR COUNTY SR 2006(026) # PROPOSAL:$16.56 PLANS:$ X18:$ X36:$19.50

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four

The North Jersey Transportation Planning Authority. FY 2014 Study and Development Program

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

CHAPTER 3 SCOPE SUMMARY

Administrative Modification 22 FY FY 2021 Transportation Improvement Program October 25, Page 1

Highway Construction Program

Minnesota Statewide Freight Bottlenecks

Review of Plans and Specs from a Constructability Perspective

Fall 2018 Engineer Trainee Recruitment Preference Sheet

S.R. 0070, Section T20. Engineering District ASHE National Project of the Year Award

APPENDIX B. Excerpts from the October 2002 Conceptual Alternatives Report

Maine Turnpike Authority FINAL 4-year Capital Investment Plan ( )

Fuller /Fuller Heights Road Improvements

Joint Legislative Transportation Oversight Committee January 6, 2016 Maintenance Operations Performance Analysis Report (MOPAR) Kristin Barnes

I-64 Capacity Improvements Segment I Financial Plan Annual Update

Engineering & Capital Improvements. Shore Acres Civic Association August 21 st, 2017

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION

State of New Jersey NEW JERSEY DEPARTMENT OF TRANSPORTATION 1035 PARKWAY AVENUE P.O. Box 600 TRENTON, NEW JERSEY

NJTPA Region. Bergen Essex Hudson Hunterdon Jersey City Middlesex Monmouth Morris. Newark Ocean Passaic Somerset Sussex Union Warren

Ohio Contractor Association Annual Work Forecast Program. John Picuri, District 4 Deputy Director Myron Pakush, District 12 Deputy Director

Project Prioritization for Urban and Rural Projects TEAM CONFERENCE March 7, 2018

SUPPLEMENTAL ECMS ADVANCED INFORMATION AUGUST 10, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

CENTRE COUNTY SR 26(ST1) # PROPOSAL:$21.00 PLANS:$ X18:$ X36:$70.20

WELCOME. Public Meeting for I-35 / I-44 Interchange. October 6, 2015

Capital District Transportation Committee November 6, Unit Costs for Non-State Highway Reconstructions with Federal Funds

BEAVER COUNTY SR 68(B38) # PROPOSAL:$26.64 PLANS:$ X18:$ X36:$222.30

PAVEMENT DESIGN MEMORANDUM

Final Recommendations Identification of Improvements, Strategies, and Solutions

Constructability Guidelines

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0

ADDENDUM 1: PERFORMANCE MEASURES

Surface Transportation Block Grant Program

STIP Project Description Guidance Revised December 14, 2015

I-64 Capacity Improvements Segment II Financial Plan Annual Update October 30, 2017

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT OCTOBER 29, Resurfacing of Aldrich Road West Contract # 11-06

Going/Greeley Interchange Enhancements for Truck Operations

MEMORANDUM. Attachments:

Future Programmatic Date 09/04/2018 Sorted By District (Subject to Departmental Changes) Run Date 6/22/2018

Overall project. The $288 million Phase 2 DesignBuild project starts construction. this spring, with completion by December 31, 2016

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

TRANSFORM66: OUTSIDE THE BELTWAY

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work

Town of Whitchurch-Stouffville Bethesda Side Road Reconstruction

Diverging Diamond Interchanges in Michigan

FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT

South Dakota Department of Transportation. Interchange Modification Justification Report. Interstate 90 Exit 44 (Bethlehem Road - Piedmont)

SCHUYLKILL COUNTY SR 125(JFR) # PROPOSAL:$20.76 PLANS 8.5X11:$1.20

IH 30/IH 35E Reconstruction Project Pegasus Final Technical Memorandum - Evaluation of Conceptual Alternatives Task 7.5

DESIGN PUBLIC HEARING APRIL 3, 2017 THE LEE MEMORIAL (TOWN) HALL LEE, MASSACHUSETTS :00 PM FOR THE PROPOSED

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 22, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Transcription:

FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM ADA Central, Contract 3 DBNUM: 15419 / UPC: 154190 This contract will bring projects into compliance with current ADA design requirements that could not be completed within original design or construction time frame. COUNTY: Somerset, Middlesex, Hunterdon, Warren MUNICIPALITY: Various MILEPOST(S): N/A AIR QUALITY CODE (NON-EXEMPT/EXEMPT): AQ2 (Exempt) LEGISLATIVE DISTRICT: Various STRUCTURE NO.: N/A ASSET MANAGEMENT CATEGORY: Infrastructure Preservation (Multimodal Programs: Bicycle/Pedestrian) $10.475 $10.475

FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM ADA North, Contract 1 DBNUM: 15411 / UPC: 154110 This contract will bring projects into compliance with current ADA design requirements that could not be completed within original design or construction time frame., Morris MUNICIPALITY: Knowlton Twp, Mt Olive Twp, Netcong Boro MILEPOST(S): N/A AIR QUALITY CODE (NON-EXEMPT/EXEMPT): AQ2 (Exempt) LEGISLATIVE DISTRICT: 24, 25 STRUCTURE NO.: N/A ASSET MANAGEMENT CATEGORY: Infrastructure Preservation (Multimodal Programs: Bicycle/Pedestrian) STBGP $6.000 $6.000

FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM Route 22, Bates Avenue to Route 57 DBNUM: 11369 / UPC: 113690 Initiated from the Drainage Management System, this project provides for a drainage alternatives study. In 2012 Drainage Management System, this location was ranked 46/232 for flooding and 100/131 for Icing incidents. MUNICIPALITY: Phillipsburg Town, Lopatcong Twp MILEPOST(S): 1.1-2.1 AIR QUALITY CODE (NON-EXEMPT/EXEMPT): S4 (Exempt) ASSET MANAGEMENT CATEGORY: Infrastructure Preservation (Road Assets: Drainage) LEGISLATIVE DISTRICT: 23 STRUCTURE NO.: N/A PE $0.300 $0.300 $0.750 $0.750 $4.750 $4.750

FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM Route 22, Rockfall Mitigation, Phillipsburg DBNUM: 15442 / UPC: 154420 This section consists of 2 main cut slopes, one of which is located adjacent to the DRJTBC Easton-Philipsburg toll bridge; there are many large blocks and limited sight distance along the EB curve from the bridge. The other rock cut slope is located along the nearby Rt. 22 WB exit ramp, directly adjacent to a pedestrian sidewalk that is a travel way for students of Phillipsburg High School. There have been several recent reports of Rockfall along this cut and interim action has been recommended. A permanent improvement is required. MUNICIPALITY: Phillipsburg Town MILEPOST(S): 0.2-0.6 AIR QUALITY CODE (NON-EXEMPT/EXEMPT): S2, S5 (Exempt) ASSET MANAGEMENT CATEGORY: Safety (Safety Management: Rockfall Mitigation) LEGISLATIVE DISTRICT: 23 STRUCTURE NO.: N/A $2.250 $2.250

FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM Route 31, Bridge over Furnace Brook DBNUM: 09325 / UPC: 093250 This project will replace the structurally deficient bridge, built in 1920. Pedestrian facilities on the bridge, and at the adjacent Route 31/Wall Street intersection, will be upgraded to meet current standards and ADA compliance. In addition, improvements to the traffic signal, the substandard Southbound shoulder, and guidrail will be provided. MUNICIPALITY: Oxford Twp MILEPOST(S): 46.83 STRUCTURE NO.: 2111154 AIR QUALITY CODE (NON-EXEMPT/EXEMPT): S19 (Exempt) LEGISLATIVE DISTRICT: 24 ASSET MANAGEMENT CATEGORY: Infrastructure Preservation (Bridge Assets: Bridge Rehab and Replacement) $1.300 $1.300 ROW $0.500 $0.500 $3.750 $3.750

FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM Route 46, Bridge over Paulins Kill DBNUM: 16347 / UPC: 163470 Problem Statement submitted by BMS for Tier 1 Screening. It is recommended for replacement. MUNICIPALITY: Knowlton Twp MILEPOST(S): 0.74 STRUCTURE NO.: 2107156 AIR QUALITY CODE (NON-EXEMPT/EXEMPT): LEGISLATIVE DISTRICT: 24 ASSET MANAGEMENT CATEGORY: Infrastructure Preservation (Bridge Assets: Bridge Rehab and Replacement) PE $0.875 $0.875 $0.800 $0.800 $10.500 $10.500

FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM Route 46, Route 80 to Walnut Road DBNUM: 11340A / UPC: 148100 Initiated from the Pavement Management System, this project will reconstruct pavement within the project limits. MUNICIPALITY: Knowlton Twp LEGISLATIVE DISTRICT: 24 MILEPOST(S): 0-1.4 STRUCTURE NO.: N/A AIR QUALITY CODE (NON-EXEMPT/EXEMPT): S10 (Exempt) ASSET MANAGEMENT CATEGORY: Infrastructure Preservation (Road Assets: Highway Rehab and Recon) PE $0.600 $0.600 $1.100 $1.100 ROW $0.500 $0.500 $7.700 $7.700

FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM Route 46, Stiger St to Sand Shore Rd/Naughright Road DBNUM: 15387 / UPC: 153870 Initiated from the Pavement Management System, this project will include; resurfacing, ADA compliance, and signal upgrades within the project limits. COUNTY: Morris, Warren MUNICIPALITY: Hackettstown Town, Mount Olive Twp, Washington Twp MILEPOST(S): 21.0-24.6 AIR QUALITY CODE (NON-EXEMPT/EXEMPT): S19 (Exempt) LEGISLATIVE DISTRICT: 23, 24 STRUCTURE NO.: N/A ASSET MANAGEMENT CATEGORY: Infrastructure Preservation (Road Assets: Highway Resurfacing) $4.600 $4.600

FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM Route 57, Bridge over Branch Lopatcong Creek DBNUM: 16345 / UPC: 163450 Problem Statement submitted by BMS for Tier 1 Screening. It is recommended for replacement. MUNICIPALITY: Lopatcong Twp MILEPOST(S): 1.91 STRUCTURE NO.: 2105153 AIR QUALITY CODE (NON-EXEMPT/EXEMPT): LEGISLATIVE DISTRICT: 23 ASSET MANAGEMENT CATEGORY: Infrastructure Preservation (Bridge Assets: Bridge Rehab and Replacement) PE $0.100 $0.100 $0.200 $0.200 $0.945 $0.945

FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM Route 57, Bridge over Shabbacong Creek DBNUM: 15447 / UPC: 154470 This study will examine replacing or rehabilitating the structurally deficient and functionally obsolete bridge, built in 1907. MUNICIPALITY: Washington Boro MILEPOST(S): 11.120 STRUCTURE NO.: 2106151 AIR QUALITY CODE (NON-EXEMPT/EXEMPT): O10A (Exempt) LEGISLATIVE DISTRICT: 23 ASSET MANAGEMENT CATEGORY: Infrastructure Preservation (Bridge Assets: Bridge Rehab and Replacement) PE $0.600 $0.600 $1.000 $1.000 ROW $0.050 $0.050 $2.800 $2.800

FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM Route 57, CR 519 Intersection Improvement DBNUM: 97062B / UPC: 028091 The project will provide operational and safety improvements at the Rt. 57 and CR 519 intersection. The intersection approaches will be widened to provide turning lanes and shoulders. The project includes replacement of two structures over the Lopatcong Creek; the existing bridges, on Rt. 57, immediately to the east of the intersection and on Rt. 519, immediately to the north of the intersection will be demolished and reconstructed further away from the immediate vicinity of the intersection. In order to accomplish this, the Lopatcong Creek will also be relocated. MUNICIPALITY: Lopatcong Twp MILEPOST(S): 1.40-1.60 STRUCTURE NO.: 2101031, 2105152 AIR QUALITY CODE (NON-EXEMPT/EXEMPT): NR3 (Exempt) LEGISLATIVE DISTRICT: 23 ASSET MANAGEMENT CATEGORY: Mobility and Congestion Relief (Congestion Relief: Highway Operational Improvements) DEMO $0.600 $0.600 $0.900 $0.900 ROW $0.900 $0.900 $10.800 $10.800

FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM Route 57, Lopatcong Creek, Culvert Replacement DBNUM: 11351 / UPC: 113510 The existing culvert (structure number 2105-151) (on a tributary to Lopatcong Creek), is a four-sided, reinforced concrete culvert, which was constructed in 1921. The culvert is in need of repair or replacement given its poor structural condition. Given the poor condition of the culvert's roof slab, the culvert has low load ratings. The culvert also has inadequate deck geometry and substandard guide rail end terminals. Through the Concept Development phase, the Department is identifying and evaluating options, such as culvert replacement (e.g., three-sided versus four-sided culverts) and repair options, to address those identified deficiencies. MUNICIPALITY: Lopatcong Twp MILEPOST(S): 0.2-0.3 STRUCTURE NO.: 2105151 AIR QUALITY CODE (NON-EXEMPT/EXEMPT): S4 (Exempt) ASSET MANAGEMENT CATEGORY: Infrastructure Preservation (Bridge Assets: Culverts) LEGISLATIVE DISTRICT: 23 PE $0.400 $0.400 $0.550 $0.550 ROW $0.200 $0.200 $2.120 $2.120

FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM Route 57/182/46, Hackettstown Mobility Improvements DBNUM: 9237 / UPC: 950409 Initiated from the Congestion Management System, this project will help relieve congestion at four intersections located on a congested commuter corridor in Warren County. Substandard ADA features at each intersection will also be upgraded. US 46 and East Ave. Curb radius will be widened on the Southeast quadrant of the intersection. Revised signal phasing will provide a right turn overlap phase for the Northbound East Ave. approach right turn movement onto US 46. US 46 and NJ 182 (Mountain Ave.)/Willow Grove St./Warren St. Traffic signals will be retimed. US 46 and High Street/Grand Ave. Realign the High St. Southbound approach to improve traffic flow. NJ 57 and NJ 182 Will be reconfigured to allow a left turn lane and a shared left/through/right turn lane on the Eastbound NJ 57 approach to the intersection., Morris MUNICIPALITY: Hackettstown Town, Washington Twp MILEPOST(S): 0-0.96 AIR QUALITY CODE (NON-EXEMPT/EXEMPT): AQ2, NR1, NR2 (Exempt) LEGISLATIVE DISTRICT: 23, 25 STRUCTURE NO.: N/A ASSET MANAGEMENT CATEGORY: Mobility and Congestion Relief (Congestion Relief: Highway Operational Improvements) $0.600 $0.600 ROW $0.450 $0.450 CMAQ $2.053 $2.053

FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM Route 80, WB Rockfall Mitigation, Hardwick Township DBNUM: 09545 / UPC: 095450 Initiated from the Rockfall Hazzard Management System, this project will stabilize the existing rock outcrop area adjacent to I-80 Westbound at four locations within the project limits. MUNICIPALITY: Hardwick Twp MILEPOST(S): 1.04-1.35 AIR QUALITY CODE (NON-EXEMPT/EXEMPT): S4 (Exempt) ASSET MANAGEMENT CATEGORY: Safety (Safety Management: Rockfall Mitigation) LEGISLATIVE DISTRICT: 24 STRUCTURE NO.: N/A $20.000 $20.000 $19.150 $59.150

FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM Route 94, Bridge over Jacksonburg Creek DBNUM: 11322 / UPC: 113220 Initiated by the Bridge Management System, this project will replace the structurally deficient and functionally obsolete bridge, built in 1872. Incidental roadway approach work, including milling & paving and the replacement of the guiderail in order to upgrade to current standards as required, will also be included in the project. MUNICIPALITY: Blairstown Twp MILEPOST(S): 7.946-7.954 STRUCTURE NO.: 2117157 AIR QUALITY CODE (NON-EXEMPT/EXEMPT): S19 (Exempt) LEGISLATIVE DISTRICT: 24 ASSET MANAGEMENT CATEGORY: Infrastructure Preservation (Bridge Assets: Bridge Rehab and Replacement) $0.900 $0.900 ROW $0.300 $0.300 $3.700 $3.700

FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM Route 173, Bridge over Pohatcong Creek DBNUM: 09320 / UPC: 093200 Initiated by the Bridge Management System, this project will replace the bridge and provide scour countermeasures to address this scour critical structure. MUNICIPALITY: Greenwich Twp MILEPOST(S): 1.40-1.60 STRUCTURE NO.: 2103152 AIR QUALITY CODE (NON-EXEMPT/EXEMPT): S19 (Exempt) LEGISLATIVE DISTRICT: 23 ASSET MANAGEMENT CATEGORY: Infrastructure Preservation (Bridge Assets: Bridge Rehab and Replacement) $3.700 $3.700