PROPOSED NEW REGULATION:- ENVIRONMENTAL QUALITY (POLLUTION OF THE SOIL) REGULATIONS 201X

Similar documents
Regulations and Good Practices. Convention

SUBSIDIARY LEGISLATION BOREHOLE DRILLING AND EXCAVATION WORKS WITHIN THE SATURATED ZONE REGULATIONS

EnviroLeg cc NATIONAL WATER Reg p 1

A bylaw to establish a cross connection control program and process for the District of Squamish.

The Corporation Of The City of Grand Forks BYLAW NO. 1817

Overview of Scheduled Waste Management in Malaysia & the Way Forward

CORPORATION OF THE CITY OF NEW WESTMINSTER BYLAW NO. 7660, A bylaw for the management of waste and recyclable materials from demolition work

PENGURUSAN SISA TERJADUAL

The Waste Regulations, Legal Notice No.31 of 2000

[Rev. 2012] CAP. 324 Plant Protection

GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT MUNICIPAL SOLID WASTE AND RECYCLABLE MATERIAL REGULATORY BYLAW NO. 181, 1996

("Commissioners Court") has the authority to act to protect the Health, Safety, and Welfare

Ministry of Environment & Forests NOTIFICATION. New Delhi, the 6 th January, 2000.

CHAPTER 18 PLUMBING CODE

CITY OF SURREY. Surrey Waterworks Cross Connection Control By-law, 2013, No

Contaminated Land Update

This Bill would repeal and replace the Holidays with Pay Act, Cap. 348 in order to (a)

This Bill would repeal and replace the Holidays with Pay Act, Cap. 348 in order to (a)

*T?,,ttffiHfirt, BARINGO COUNTY GAZETTE SUPPLEMENT. Act ACTS, NAIROBI, 22nd. September, SPECIAL ISSUE REPUBLIC OF KENYA

Central NSW Regional Contaminated Land Policy Template

5 Contaminated Sites

THE WATER POLLUTION CONTROL REGULATIONS, 1999

Goewermentskennisgewings

ENVIRONMENT AND DEVELOPMENT PLANNING ACT (CAP. 504) The Waste Regulations, 2011 ARRANGEMENT OF REGULATIONS PART II GENERAL REQUIREMENTS 8 11

Septic Waste Hauler Guidelines

NIUE LAWS LEGISLATION AS AT DECEMBER 2006 ENVIRONMENT BIOSAFETY (GENETICALLY MODIFIED ORGANISMS) REGULATIONS /4 4 July 2006

AGRICULTURE (FARM FORESTRY) RULES, 2009

EAST AFRICAN COMMUNITY CUSTOMS MANAGEMENT (DUTY REMISSION) REGULATIONS, 2008 ARRANGEMENT OF REGULATIONS

No. R June 2014 NATIONAL ENVIRONMENTAL MANAGEMENT: INTEGRATED COASTAL MANAGEMENT ACT, 2008 (ACT NO. 24 OF 2008)

No. R June 2014 NATIONAL ENVIRONMENTAL MANAGEMENT: INTEGRATED COASTAL MANAGEMENT ACT, 2008 (ACT NO. 24 OF 2008)

POLLUTION CONTROL LAW:

DEPARTMENT OF ENVIRONMENTAL AFFAIRS. No. R August 2013 NATIONAL ENVIRONMENTAL MANAGEMENT: WASTE ACT, 2008 (ACT NO.

South Australian Public Health (Wastewater) Regulations 2013

THE FOOD, DRUGS AND CHEMICAL SUBSTANCES (FOOD HYGIENE) REGULATIONS

GMP Cosmetic in Malaysia: The Past & Present

1.13 WATER SERVICES BY-LAWS

ENVIRONMENTAL QUALITY ACT 1974 (ACT 127): ENFORCEMENT AND WATER POLLUTION PREVENTION IN MALAYSIA

NATIONAL AGENCY FOR FOOD AND DRUG ADMINSTRATION AND CONTROL (NAFDAC)

OSH LEGISLATION LAW AND REGULATION TO CONSTRUCTION SAFETY LAW AND REGULATION TO CONSTRUCTION SAFETY 20/2/2013

GOVERNMENT GAZETTE REPUBLIC OF NAMIBIA

THE UNITED REPUBLIC OF TANZANIA

ENVIRONMENTAL DEFENDER S OFFICE (ACT)

Perchlorate BMP Regulations R TITLE 22 EMERGENCY REGULATIONS Perchlorate Best Management Practices DEPARTMENT REFERENCE NUMBER: R

2003 No. 319 WATER AND SEWERAGE. The Control of Pollution (Silage, Slurry and Agricultural Fuel Oil) Regulations (Northern Ireland) 2003

THE ADDITIONAL REMUNERATION (2014) ACT 2013

CHAPTER Committee Substitute for House Bill No. 335

2001 No (W.323) WATER, ENGLAND AND WALES. The Water Supply (Water Quality) Regulations 2001

STAATSKOERANT, 13 FEBRUARIE 2009 No GOVERNMEI\IT NOTICE DEPARTMENT OF ENVIRONMENTAL AFFAIRS AND TOURISM

BILL (No. XXI of 2017) Explanatory Memorandum. The object of this Bill is to provide for the payment of

(1 February to date) ENVIRONMENT CONSERVATION ACT 73 OF (Gazette No , Notice No Commencement date: 9 June 1989)

Duty to Notify: How soon is as soon as reasonably practicable? ACLCA 4 August 2010 Andrew Pruszinski Principal Adviser Site Contamination

THE NATIONAL EMPLOYMENT BILL (No. XII of 2017) Explanatory Memorandum

Siti Zaleha Binti Ibrahim Director Department of Environment, Selangor

BYLAW NUMBER 13M2004

CHBDC:Part 6:2008 CENTRAL HAWKE'S BAY DISTRICT COUNCIL BYLAWS. Part 6 Solid Waste

The Mineral Industry Environmental Protection Regulations

2 No GOVERNMENT GAZETTE, 13 FEBRUARY 2009 No. CONTENTS INHOUD Page No. Gazette No. GOVERNMENT NOTICE Environmental Affairs and Tourism, Departm

THE ADDITIONAL REMUNERATION AND OTHER ALLOWANCES (2019) BILL (No. XXVI of 2018) Explanatory Memorandum

TOWNSHIP OF FRANKLIN YORK COUNTY, PENNSYLVANIA ORDINANCE NO

Environmental Health Legislation, Law 12 of 1995

KNOX COUNTY HEALTH ORDINANCE ARTICLE IV ONSITE WASTEWATER DISPOSAL

Government Notices Goewermentskennisgewings

PRACTICAL CONSEQUENCES OF THE MINE HEALTH AND SAFETY AMENDMENT ACT 2008 (ACT NO. 74 OF 2008) THE IMPACT ON SOUTH AFRICA S MINING INDUSTRY

LA WS OF TRINIDAD AND TOBAGO SAWMILLS ACT CHAPTER 66:02

MADE UNDER PART 1 PRELIMINARY

CITY OF EDMONTON BYLAW SURFACE DRAINAGE BYLAW (CONSOLIDATED ON DECEMBER 10, 2008))

Demolition Waste and Recyclable Materials Bylaw, 2017, No

Government Gazette Staatskoerant

The internalisation and application of the content Why and How should be read in tandem with the line of sight outlined by the Intended Outcome.

Chapter 20. Solid Waste

WASTEWATER DRAINAGE BYLAW

City of Sydney Contaminated Land Development Control Plan 2004

5 th Asean Chief Justices Roundtable on Environment STATUTORY PENALTIES FOR ENVIRONMENTAL VIOLATIONS

GUYANA TERMINATION OF EMPLOYMENT AND SEVERANCE PAY ACT ACT No. 19 of 1997 ARRANGEMENTS OF SECTIONS PART II CONTINUITY OF EMPLOYMENT

CONSOLIDATION OF EMERGENCY MEASURES ACT S.Nu. 2007,c.10 In force November 8, 2007, except s.5-9 s.5-9 NIF. (Current to: August 24, 2010)

Managing Land Contamination Planning Guidelines SEPP 55 Remediation of Land

FEDERATION OF MALAYSIA FREIGHT FORWARDERS GENERAL STANDARD TRADING CONDITIONS

NOTICE 850 OF 2013 DEPARTMENT OF ENVIRONMENTAL AFFAIRS NATIONAL ENVIRONMENTAL MANAGEMENT: AIR QUALITY ACT, 2004 (ACT NO.

TRADE WASTE BYLAW 2014

CARLOW COUNTY COUNCIL GUIDANCE NOTE FOR APPLICANT AIR LICENCE

[Rev. 2012] CAP. 336 Dairy Industry

Staying Alive CIBSE. Legionella Risk Management Are you aware of your duty of care?

MOTOR CARRIER ACT REGULATIONS

EMERGENCY MEASURES ACT

WEIGHTS AND MEASURES (PRE-PACKAGED PRODUCT) REGULATION 2014

Application Pack 5. How to apply for a Connection to a Public Sewer/Lateral Drain

CHAPTER 8 of ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT HOME FIRST SCHEDULE ARRANGEMENT OF REGULATIONS PART I - PRELIMINARY

AUDIT ACT 1957 (Act 62) First enacted 1957 (Ordinance No. 60 of 1957) Revised 1972 (Act 62 w.e.f. 1 March 1972) ARRANGEMENT OF SECTIONS 1.

Waste Water Incidents

WARREN COUNTY, IOWA CHAPTER 31 CHAPTER 31 ON-SITE WASTEWATER TREATMENT AND DISPOSAL SYSTEMS

KENYA GAZETTE SUPPLEMENT

DEPARTMENT OF TRANSPORT

DEPARTMENT OF TRANSPORT SCHEDULE

BEFORE THE BOARD OF COUNTY COMMISSIONERS MARTIN COUNTY, FLORIDA ORDINANCE NO.

SIXTH NORTHERN MARIANAS COMMONWEALTH LEGISLATURE S.B. NO S.D.1, H.D.2 SECOND REGULAR SESSION, 1988

Western Australia. Western Australia CHAPTER Objects of the WA Act. 5.2 Employers duties under the Act and Regulations

TRANSMISSION COMPLIANCE MONITORING FRAMEWORK FOR THE SOUTH AFRICAN ELECTRICITY INDUSTRY

Sulcor Pollution Incident Response Management Plan (PIRMP)

KENYA GAZETTE SUPPLEMENT

Chapter 60 BUILDING CONSTRUCTION AND FIRE PREVENTION ADMINISTRATION

Transcription:

PROPOSED NEW REGULATION:- ENVIRONMENTAL QUALITY (POLLUTION OF THE SOIL) REGULATIONS 201X PERATURAN-PERATURAN KUALITI ALAM SEKELILING (PENCEMARAN TANAHTANIH) 201X

INTRODUCTION Malaysia has not inherited such a frightening legacy of contaminated land as in other developed countries. Many sites such as motor workshops, petrol stations, fuel depots, railway yards, landfills, industrial sites and ex-mining land can be potential contaminated sites. Little work carried out in identifying contaminated sites. Land contamination normally goes unnoticed. Severe land contamination will have significant impacts on human health and the environment Significant liability issues associated with land contamination unlike wastewater discharge or air emission, land contamination stays long after chemicals releases. There is no regulation on CLM developed in Malaysia.

SOIL POLLUTION CONTROL BY EQA, 1974 Section 24 of the Environmental Quality Act 1974 states that; (1) No person shall, unless licensed, pollute or cause or permit to be polluted any soil or surface of any land in contravention of the acceptable conditions specified under section 21. (2) Not withstanding the generality of subsection (1), a person shall be deemed to pollute any soil or surface of any land if (a) he places in or on any soil or in any place where it may gain access to any soil any matter whether liquid, solid, or gaseous; or (b) he establishes on any land a refuse dump, garbage pit, soil and rock disposal site, sludge deposit site, waste injection well or otherwise used land for the disposal of or a repository for solid or liquid wastes so as to be obnoxious or offensive to human beings or interfere with underground water or detrimental to any beneficial use of the soil or the surface of the land. 3

PENALTY EQA, 1974 Section 24 Compounding of offence shall not exceed RM 2,000 Any person who contravenes this section shall be guilty of an offence and shall be liable to a fine not exceeding one hundred thousand ringgit or to imprisonment for a period of not exceeding five years or both and to a further fine not exceeding one thousand ringgit a day for every day that is continued after a notice by the Director General to cease the act specified therein has been served 4

REFERENCES TO SIMILAR REGULATIONS IN OTHER COUNTRIES The regulation and framework was formulated by referring to countries that used risk-based approach in their regulation; Australia New Zealand United States United Kingdom Netherlands Taiwan - Risk-Based Concentrations (RBC) Other ASEAN countries Jepun - Thailand & Singapore OHT 5

GUIDELINES Contaminated Land Management and Control Guidelines No. 1: Malaysian Recommended Site Screening Levels for Contaminated Land; Contaminated Land Management and Control Guidelines No. 2: Assessing and Reporting Contaminated Sites; dan Contaminated Land Management and Control Guidelines No. 3: Remediation of Contaminated Sites. OHT 6

REGULATIONS PART 1 PRELIMINARY Regulation 1. Citation and commencement Regulation 2. Interpretation PART 2 - ADMINISTRATION Regulation 3. Application PART 3 - PREVENTION ON POLLUTION OF THE SOIL Regulation 4. Prohibition of Pollution of the Soil Regulation 5. Liabilities of Polluter PART 4 - REQUIREMENTS FOR CONTROL ON POLLUTION OF THE SOIL Regulation 6. Responsibility to Notify Pollution of the Soil Regulation 7. Responsibility to Perform Initial and Detailed Assessments Regulation 8. Responsibility to Perform Risk Assessment 7

REGULATIONS (continue) Regulation 9. Responsibility to Provide Information to the Department of Environment Regulation 10. Responsibility to Remediate Pollution of the Soil Regulation 11. Remediation Action Plan Regulation 12. Management of Contaminated Soil and Abstracted Contaminated Groundwater Regulation 13. Registered Consultant PART 5 GENERAL PROVISIONS Regulation 14. Compounding of offences Regulation 15. General Penalty 8

PART 1 PRELIMINARY Regulation 1 - Citation and commencement 1. These regulations may be cited as the Environmental Quality (Pollution of the Soil) Regulations 201X. Regulation 2 - Interpretation There are 16 interpretations, among others; pollution of the soil means a site at which substances occur at concentrations above natural background level occurring metal or substance concentrations and pose or are likely to pose an immediate or long term hazard to human health or the environment or exceed concentration specified in the Site Screening Levels. 9

PART 2 ADMINISTRATION Regulation 3 - Application 3. These Regulations shall apply to any land which:- (a) currently being used or was previously used, to perform polluting activities with the potential to cause soil and groundwater contamination; or (b) involves with the change of land used from polluting activities to non polluting activities or from non polluting activities to polluting activities. 10

PART 3 PREVENTION OF POLLUTION OF THE SOIL Regulation 4 - Prohibition of Pollution of the Soil 4. No person shall cause or pollute any soil or surface of any land in contravention of the concentration specified in accordance to Site Screening Levels. Note: Person refer to:- Land owner; or Land occupier; or Any polluter or potential polluter whom the Director General has reason to believe that the subject land has potential air, soil, surface water and groundwater impact 11

PART 3 PREVENTION OF POLLUTION OF THE SOIL Regulation 5 - Liabilities of Polluter 5. A Polluter shall be liable for: (a) all expenses incurred to investigate and perform remediation of pollution of the soil to achieve a remedial standard acceptable to the Director General as approved in the remediation action plan; and (b) any other direct expenses or loss incurred by affected human receptors or neighbouring land owners as a result of loss of income, temporary or permanent loss of access to their properties or destruction or alterations to their properties. Note: Polluter Pay Principle 12

PART 4 REQUIREMENTS FOR CONTROL ON POLLUTION OF THE SOIL Regulation 6 - Responsibility to Notify Pollution of the Soil 6. (1) Any land owner or land occupier who has a potential of contaminating soil and groundwater as listed in the First Schedule shall notify the Director General of the existence, or likely existence, of the contaminated soil. The notification shall be made within two years after the commencement of these regulations. (2) The notification given under subregulation (1) shall include the information provided in the Second Schedule. NOTE: Notification are as in Appendix B - Contaminated Land Management and Control Guidelines No. 1: Malaysian Recommended Site Screening Levels for Contaminated Land and notify through on line system. 13

PART 4 REQUIREMENTS FOR CONTROL ON POLLUTION OF THE SOIL Regulation 7 - Responsibility to Perform Initial and Detailed Assessment 7. (1) Where the Director General or any officer duly authorized has reason to believe that any soil may be polluted, he may direct in writing the polluter responsible for the contamination to perform an initial assessment on the identified site. (2) In the case where the initial assessment report under subregulation (1) shows that potential contamination may be present on the identified site, the polluter must perform a detailed assessment. The detailed assessment shall be performed within a period of 60 days from the date of the initial assessment report submitted to the Director General. (3) The initial assessment and detailed assessment shall be performed in accordance with the Contaminated Land Management and Control Guidelines No. 2: Assessing and Reporting Contaminated Sites 14

PART 4 REQUIREMENTS FOR CONTROL ON POLLUTION OF THE SOIL Regulation 8 - Responsibility to Perform Risk Assessment 8. (1) If a detailed assessment report of a site shows that contamination are detected at concentrations higher than the Site Screening Levels, the polluter shall perform a risk assessment in accordance with the Contaminated Land Management and Control Guidelines No. 2: Assessing and Reporting Contaminated Sites. (2) The Director General or any authorised officer is authorised to impose restriction on the use of a contaminated site as well as its surroundings, in the event that a risk assessment of the site shows that such site use restriction is required to reduce the risk of exposure to human health and environment. 15

PART 4 REQUIREMENTS FOR CONTROL ON POLLUTION OF THE SOIL Regulation 9 - Responsibility to Provide Information to the Department of Environment 9. (1) The polluter, after having performed an initial assessment, detailed assessment or risk assessment, are required to furnish the Director General on report within 30 days upon receipt of the assessment report from the registered consultant. (2) The Director General or authorised officer has the authority to request for any information deemed relevant to obtain a better understanding of the soil and groundwater condition of a site from any person as specified above. Note: The initial assessment / detailed assessment / risk assessment shall be submitted to DG within 30 days after completion of the report prepared by registered consultants. 16

PART 4 REQUIREMENTS FOR CONTROL ON POLLUTION OF THE SOIL Regulation 10 - Responsibility to Remediate Pollution of the Soil 10. The polluter shall carry out remediation on any of the following land: (a) Site which the detailed assessment report shows that the soil and groundwater concentrations are detected above the Site Screening Levels; or (b) Site that is concluded to pose unacceptable risk to human health and the environment based on the findings of risk assessment performed in accordance with the Contaminated Land Management and Control Guidelines No. 2: Assessing and Reporting of Contaminated Sites. 17

PART 4 REQUIREMENTS FOR CONTROL ON POLLUTION OF THE SOIL Regulation 11 - Remediation Action Plan 11. (1) The Remediation Action Plan shall be prepared in accordance with the Contaminated Land Management and Control Guidelines No. 3: Remediation of Contaminated Sites and submit to the Director General for approval before any remediation action is carried out. (2) The polluter who is performing the site remediation shall submit in writing to the Director General a periodic update on progress of the remediation actions in accordance with the Contaminated Land Management and Control Guidelines No. 3: Remediation of Contaminated Sites. (3) Closure report shall be prepared in accordance with the Contaminated Land Management and Control Guidelines No. 3: Remediation of Contaminated Sites and shall submit to the Director General for approval. 18

PART 4 REQUIREMENTS FOR CONTROL ON POLLUTION OF THE SOIL Regulation 12 - Management of Contaminated Soil and Abstracted Contaminated Groundwater 12. A person must not use or dispose contaminated soil or contaminated water from a contaminated site without prior approval of the Director General. Note: Disposal of contaminated soil and contaminated water off site from the premises need to follow the procedure of Environmental Quality (Scheduled Wastes) Regulations 2005. 19

PART 4 REQUIREMENTS FOR CONTROL ON POLLUTION OF THE SOIL Regulation 13 - Registered Consultant 13. (1)For the purpose of carrying out an initial assessment or detailed assessments or risk assessment shall be performed by a registered consultant. (2) Notwithstanding subregulation (1), the registered consultant shall be registered in accordance with the Contaminated Land Management and Control Guidelines No. 1: Malaysian Recommended Site Screening Levels for Contaminated Land. 20

PART 5 GENERAL PROVISIONS Regulation 14 - Compounding of Offences 14. (1)Every offence which consists of any omission or neglect to comply with, or any act done or attempted to be done contrary to these Regulations may be compounded under Section 45 of the Act. (2) The compounding of offences referred to in subregulation (1) shall be in accordance with the procedure prescribed in the Environmental Quality (Compounding of Offences) Rules 1978 1. 21

PART 5 GENERAL PROVISIONS Regulation 15 - General Penalty 15. Any person who contravenes regulations 6, 7, 8, 9, 10, 11, 12, 13, and 14, shall be guilty of an offence and shall be liable to a fine not exceeding one hundred thousand ringgit or to imprisonment for a period of not exceeding five years or both and to a further fine not exceeding one thousand ringgit a day for every day that the offence is continued after a notice by the Director General requiring him to cease the act specified therein has been served upon him. 22

IMPACT / STAKEHOLDERS RESPONSIBILITY Determine if there is any presence of subsurface contamination in their land. Determine if there is any unacceptable human health and ecological risk Propose a remediation action plan (RAP), implement, construct, operate and maintain appropriate remediation actions in order to address the risk arises from the presence of the identified subsurface contamination In the event if the current land owner(s) confirmed through properly conducted environmental site assessment, that the subsurface contamination is not caused by its current or historical onsite operation, it is the responsibility of the land owner(s) to identify the polluter(s) who will be directly responsible for the subsequent remediation actions to be implemented at the subject land property OHT 23

IMPACT / STAKEHOLDERS RESPONSIBILITY (CONTINUE) For land properties which are not identified with any potential subsurface contamination during the initial assessment, it is recommended to conduct minimum baseline environmental site assessment to establish the background level of subsurface soil and groundwater quality for future reference, this is especially applicable for land properties that will be used for activities of polluting industries. Land Transaction - It is the duty of the seller or owner of a land property to disclose all soil and groundwater information related to the subject land / It is the responsibility of the buyer of a land property to perform soil and groundwater assessment as part of the due diligence process prior to the transaction. OHT 24

SEKIAN, TERIMA KASIH WORKSHOP ON CONTAMINATED LAND MANAGEMENT IN MALAYSIA Tarikh: 07 December 2015 (Monday) Tempat: Auditorium EiMAS Ijan Khushaida Binti Mohd Jan e-mail: ijan@doe.gov.my Tel: 03-8871 2137