Cook Inlet Gas Study Update

Similar documents
Cook Inlet Natural Gas Supply Update

Cook Inlet Natural Gas Supply Update

BlueCrest Energy Activity Update, J. Benjamin Johnson CIRCAC Board of Directors Meeting Kodiak, 9/12/2014

ASX RELEASE 20 JUNE 2013 RESERVES & RESOURCES - NORTH COOK INLET DEEP OIL RIGHTS

Commonwealth North Gas Pipeline Infrastructure. September 13, 2013

NATURAL GAS IN COOK INLET

Fairbanks to Anchorage Spur Report - Updated Analysis

For personal use only

August 22, 2014 FIRE ISLAND WIND

Alaska Oil and Gas Conservation Commission (AOGCC)

Natural Gas Issues and Emerging Trends for the Upcoming Winter and Beyond

4. RAILBELT LOAD FORECASTS

The Business of Oil & Gas in Alaska Joshua Kindred, Alaska Oil and Gas Association. November 12, 2015

Natural Gas Market Update

Natural Gas Pipeline Update

I 5 Corridor Analysis Phase 1 Report

Winter U.S. Natural Gas Production and Supply Outlook

Alaska LNG Concept Information. Alaska LNG. Overview. October

Meet Alaska Aligned Alaska = Strong Oil and Gas Industry & Stronger Alaska for another 40 Years

Mayor s Energy Task Force ENSTAR Update. October 21, 2014

Outlook for the Oil and Gas Industry

State will answer most of FERC s questions by June; last items Aug. 1

2010 Annual Winter Reliability Assessment Meeting November 4, Carlos Thillet Manager Gas Supply and Transportation PECO Energy Company

Winter U.S. Natural Gas Production and Supply Outlook

SPONSORED BY RESOURCE EXTRACTION PROJECTS 10-YEAR PROJECTION 2015 REPORT RESEARCH PARTNERS: OF 60 MINING NEWS

THE ALASKA LNG OPPORTUNITY: DEVELOPING A WORLD-CLASS LNG EXPORT PROJECT APRIL 26, 2017 LIEZA WILCOX, VICE PRESIDENT OF COMMERCIAL.

North American Midstream Infrastructure Through 2035 A Secure Energy Future. Press Briefing June 28, 2011

The Impact of Recent Hurricanes on U.S. Gas Markets for the Upcoming Winter

Short Term Energy Outlook March 2011 March 8, 2011 Release

New England Making Progress on Fuel Security? U.S. Power and Gas Weekly

Mileage-based tariff benefits Alaskans

ERCOT Changes and Challenges

Eastern Mediterranean

Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page

The Energy Consortium Recent Developments and the Outlook for Natural Gas in the Northeast. John R. Bitler October 20, 2010

The Unconventional Reservoirs Revolution and the Rebirth of the U.S. Onshore Oil & Gas Industry

MORE THAN A PIPE DREAM

Platts Natural Gas Storage Conference. January 2012

UNDERSTANDING NATURAL GAS MARKETS. Mohammad Naserifard MSc student of Oil & Gas Economics at PUT Fall 2015

Sheet No. Sheet No TARIFF ENSTARNATURAL GAS COMPANY. A Division of SEMCO ENERGY, Inc.

5.20 CUMULATIVE EFFECTS

Energy Prospectus Group

ECONOMIC PROJECTIONS FOR ALASKA AND THE SOUTHERN RAILBELT

Number Revision Number Revision Schedule or Rule Number 228 Third 228 Second Section 2403 Homer Extension Surcharge

South Australia experienced a mild summer with only a few days exceeding 40 C. A relatively short heat wave occurred in late January 2011.

Calima to benefit from ~ A$72 Billion of proposed investment in Western Canadian gas pipeline infrastructure

BC HYDRO S LONG-TERM PLAN PRESENTATION TO THE COLUMBIA BASIN REGIONAL ADVISORY COMMITTEE

International Association for Energy Economics Luncheon Presentation April 21, 2004

Analysis of Oil and Gas Production in the Arctic National Wildlife Refuge

North American Natural Gas: A Crisis Ahead Or Is Chicken Little Running Around Again?

Introduction Petroleum Exploration, Development and Production

CANBRIAM ENERGY INC. CANBRIAM ENERGY FIELD DEVELOPMENT MODELLING USE CASE: STARTED FROM EXCEL NOW WE RE HERE 24 OCTOBER 2017 HOLLIE CORBIERE

UK Oil and Gas Reserves and Resources. As at end 2016

NATIONAL ENERGY BOARD

NORTHERN CROSS YUKON LIMITED LNG Charette

Christopher Adams Oil and Gas Specialist. Upstream Development Division Tenure and Geoscience Branch June 6, 2014

A Fundamental Look At The Winter Natural Gas Market Heading Into The Back Half of Winter WHERE ARE WE?

Nenana Basin Update Oil and Gas Exploration

Shelley Wright Kendrick General Manager, Marketing & Business Development. April 13, 2012 Platt s 6 th Annual Rockies Oil & Gas Conference

IAF Advisors Energy Market Outlook Kyle Cooper, (713) , March 6, 2015

Natural Gas Outlook and Drivers

Reforming the East Coast gas market

Natural Gas/Electric Integration

Accelerated Depletion: Assessing Its Impacts on Domestic Oil and Natural Gas Prices and Production

ECONOMIC ANALYSIS. A. Introduction

The Implications of Lower Natural Gas Prices for the Electric Generation Mix in the Southeast 1

Trends, Issues and Market Changes for Crude Oil and Natural Gas

NATURAL GAS DEMAND AND SUPPLY TO THE YEAR 2000 IN THE COOK INLET BASIN OF SOUTH-CENTRAL ALASKA

Socio-Economic Impact Analysis of Alaska LNG Project

Oil & Gas Update. December 2014 Oil & Gas Update

Outlook for Natural Gas Supply and Demand for Winter

Bakken Shale: Evolution of a Giant Oil Field

Natural Gas Abundance: The Development of Shale Resource in North America

CenterPoint Energy Services. Current Market Fundamentals June 27, 2013

Understanding Potential Supply of Natural Gas in the United States (Technically Recoverable Natural Gas Resources and Proved Reserves)

ENERGY SLIDESHOW. Federal Reserve Bank of Dallas

Petroleum Resources Classification & Reserves Estimation

Joe Ewing Vice President, Investor Relations

Update on U.S. Oil and Gas Proved Reserves, Highlighting the Contribution of the Williston Basin

LNG Exports: A Brief Introduction

The Imperial Barrel Award Committee

SAMPLE. US Shale. Insight Report

Scotia Capital Tight Oil Waterflood Conference

NDPC 2018 Annual Meeting

Overview. Key Energy Issues to Economic Growth

Corporate Presentation

Alaska South Central LNG (SCLNG) Project

Weld County Oil & Gas Update October Active Wells, Drilling Permits, Production, Rig Count, Trends

The Kemper IGCC Project: Cost and Schedule Risks

Beluga to Fairbanks. Natural Gas Pipeline System

Leveraging Ahuroa and managing a fluid gas book

TABLE OF CONTENTS I. INTRODUCTION AND QUALIFICATIONS... II. NED SUPPLY PATH PROPOSAL... III. GAS PRICE FORECASTS... IV. NED SUPPLY PATH QUANTITY... V.

Outlook for Natural Gas Demand for Winter

Natural Gas Supply Issues: Gulf Coast Supply Trends and Implications for Louisiana

Analysis of California Natural Gas Market, Supply Infrastructure, Regulatory Implications, and Future Market Conditions. CIEE Subcontract No.

COPYRIGHT. Development of a Gas Condensate Reservoir. The Anschutz Ranch East Field: Case Study

The Load Forecast and Load Resource Balance do not reflect more recent information that is expected to be material.

Shale Gas - Transforming Natural Gas Flows and Opportunities. Doug Bloom President, Spectra Energy Transmission West October 18, 2011

Exploration and Appraisal Drilling Update March 2019 (ASX: OSH ADR: OISHY POMSoX: OSH)

Forward Looking Statements This presentation contains certain statements that are, or may be deemed to be, forward looking statements within the meani

Transcription:

Cook Inlet Gas Study - 2012 Update prepared for October, 2012 Peter J. Stokes, PE Petrotechnical Resources of Alaska 3601 C Street Suite 1424 Anchorage, AK 99503 (907) 272-1232 Due to the uncertainties of drilling and producing activities of operating and exploration companies and Alaska state agencies in influencing drilling activities, this study should be considered a best estimate at present with the current data available. It was prepared using generally accepted engineering predictive methods. As such, Petrotechnical Resources of Alaska can make no warranty as to the actual future performance of the Cook Inlet gas production.

Executive Summary Petrotechnical Resources of Alaska (PRA) was asked to update gas supply and demand forecasts of the March, 20 report entitled Cook Inlet Gas Study An Analysis for Meeting the Natural Gas Needs of Cook Inlet Utility Customers. The results of the 20 Study identified that Cook Inlet producers needed to drill 13.6 wells per year with an average production rate of 3.1 MMCF/D per well for an annual increased production rate of 42.2 MMCF/D to meet forecasted Cook Inlet demand. The following results (see section II, 2012 Cook Inlet Supply ) have been documented to compare the target with actual results: In 20, producers completed 5 gas wells with an average production rate of 3.7 MMCF/D for total increased production of 18.5 MMCF/D In 2011, producers completed 7 wells with an average production rate of 1.8 MMCF/D for total increased production of 12.3 MMCF/D Through June, 2012, producers completed 4 gas wells with an average production rate of 5.4 MMCF/D for total increased production of 21.5 MMCF/D Although tax incentives and an improved regulatory process appears to be working (see section IV, New Developments), new production is simply not outpacing natural field decline. In three years, Cook Inlet producers have not completed the amount of gas wells estimated in the 20 PRA report to avoid gas shortages. Based on the current 2012 supply/demand analysis, new wells will have to add ~31 MMCF/D of new production per year for 2013-2019 to avoid shortfalls prior to 2020, which suggests that Cook Inlet Producers need to increase production 2 to 3 times greater than current trends. If this new production is not added, utilities will be in short supply as early as 2014 or 2015 (see Section III, Timing of Supply Shortfall); therefore, supplemental supply/alternative resources will be required within the next two to three years. Prior PRA Findings 20-2011 In its 20 Study, PRA generally found that Cook Inlet featured declining gas reserves and decreasing production, especially when compared with the pace of development in 2007-2009. Specifically, PRA found the following: Based on the then-existing producing fields in Cook Inlet and the then-current forecasted demand, there would be a critical shortage of natural gas supply starting in 2013. If drilling activity remained at the 13.6 wells completed per year level that occurred during 2007-mid 2009, the shortage of gas would occur after 2018. To meet demand through 2020, a total of 185 wells would have to be drilled. The limited remaining development reserves in Cook Inlet and the long lead time required to bring new discoveries on-line, combined with the paucity of true gas exploration in recent years, meant that it was likely that a source of gas outside of for ENSTAR, ML&P and Chugach Electric Page i of iv

the Cook Inlet, such as LNG importation or other in-state reserves, would be required starting between 2013 and 2016. In order for Cook Inlet gas requirements to be met, either by additional development of Cook Inlet gas or gas imported as LNG or from other areas of the state, adequate gas storage would be required to meet the winter deliverability swings. PRA s November, 20 Cook Inlet Gas Drilling Update included the following findings: In the twelve months from November 2009 through October 20, drilling and permitting activity showed eight (8) net wells (ten () wells permitted and two (2) previously permitted wells cancelled). Over this twelve month period, five (5) wells were completed that averaged 3.7 per well for their first six months of production. PRA s November, 2011 Cook Inlet Gas Drilling Update included the following findings: From November 20 through October 2011, the drilling and permitting activity showed eight (8) new wells. There had been three (3) apparent exploration discoveries from November 20 through October 2011; the Kenai Loop Unit, the Shadura No. 1 and the offshore Kitchen Lights Unit. o o o Proven reserves were announced in the Kenai Loop well, the gas had been contracted, and development facilities were being constructed for gas sales in 2012. The Shadura prospect was being permitted for development but there had not been announced estimates of reserves. Additional testing was planned prior to sizing production equipment. The earliest testing and delineation would be permitted was the winter of 2012-13. There was some uncertainty around the announced Kitchen Lights discovery. It was an offshore development and would likely take several years to delineate and develop. The recently completed six (6) wells that had reported production averaged 1.65 per well for their first six months of production. PRA 2012 Update Report Findings This Cook Inlet Gas Study - 2012 Update indicates that there will be a Cook Inlet supply shortfall as early as 2014 with production from current fields only. A shortfall, where demand exceeds supply, has been consistently projected in prior studies. There were four wells completed as Cook Inlet gas wells between November 2011 and June 2012 that averaged 5.4 for their first six months of production. These new wells were included in the 2012 supply forecast. Figure 1 shows a comparison of projected demand compared to supply forecast from the wells of existing fields with no further Cook Inlet gas well development. Under this scenario, demand exceeds supply in 2014. for ENSTAR, ML&P and Chugach Electric Page ii of iv

Figure 1: 2012 Cook Inlet Supply/Demand & Shortfall from Current Cook Inlet Wells In the 20 Study, a no-development scenario supply forecast predicted a shortfall as early as 2013. Because additional wells and compression were added, the shortfall forecast with no further development is now predicted in 2014. The timing of future development is uncertain. Scenarios assuming and 20 added per year from future Cook Inlet developments were used to evaluate the sensitivity of the forecast. The sensitivity scenarios were based on results of the actual development and assumed a decline for new production of 15% per year. Table 1 shows a summary of the scenarios investigated in the 2012 Update. If there is no drilling activity to add new production in Cook Inlet, a shortfall occurs as early at 2014. Even if there is a robust level of activity that annually adds 20 of new gas to the Cook Inlet supply, a shortfall is still predicted to occur in as early as 2015. for ENSTAR, ML&P and Chugach Electric Page iii of iv

Scenario Initial Year of Shortfall Initial Year Shortfall Amount, BCF Existing Cook Inlet Fields 2014 11.4 Existing Fields + Annual Addition of Production from New Wells 2013-2019 Existing Fields + Annual Addition of 20 Production from New Wells 2013-2019 Table 1: 2012 Cook Inlet Gas Supply Scenarios 2014 5.1 2015 6.2 If there are no large discoveries made that can be brought to production within 1-2 years, it is likely the current pace of drilling activity will result in a shortfall in Cook Inlet gas supply as early as 2014 or 2015. A scenario using annual new production additions of 20 from development drilling estimates a shortfall occurring in 2015, which is in line with recent development levels and planned developments at existing and recently discovered fields. Figure 3 shows recent history and future wells estimated to meet CI gas demands through 2020. The well count assumes average well performance of 2007-2009 wells, with initial rates, and developed reserves degraded by 4.3% per year. This 2012 Update concludes: With the pace of current development, absent a major gas discovery that can be available to utilities in less than two (2) years, a shortage of Cook Inlet natural gas supply will occur by 2015. If 31 of new production is added each year from new completions 2013-2019, a shortfall will be avoided. It is estimated that 157 new gas completions are required to meet demand through 2020. The most likely sources of new production in Cook Inlet would be from existing fields such as Beluga River Unit and Trading Bay Unit or development of recent discoveries such as Kenai Loop and Shadura or possible successes at Otter, Tiger Eye or the Apache Tyonek well. Any major new gas discoveries from offshore exploration are not likely to be brought on production within 3-5 years due to permitting, planning and construction of offshore facilities and pipelines. for ENSTAR, ML&P and Chugach Electric Page iv of iv

Table of Contents Executive Summary... i Figure 1: 2012 Cook Inlet Supply/Demand & Shortfall from Current Cook Inlet Wells.. iii Table 1: 2012 Cook Inlet Gas Supply Scenarios... iv Introduction... 1 I. 2012 Cook Inlet Demand... 3 Figure 2: ed Annual Demand for Cook Inlet Gas... 3 Figure 3: Comparison of Cook Inlet Demand 20 Study v. 2012 Update... 4 II. 2012 Cook Inlet Supply... 5 Figure 4: 2012 Cook Inlet Gas 2012-2020... 6 Figure 5: Cook Inlet Production & : 20 Study v. 2012 Update... 7 Table 2: Cook Inlet Gas Completions from November 2009 through June 2012... 7 Table 3: Wells Completed December 2011 through June 2012... 7 Figure 6: Beluga River Unit Production & : 20 Study v. 2012 Update... 8 Figure 7: Ninilchik Unit Production & : 20 Study v. 2012 Update... 9 Figure 8: Trading Bay Unit Production & : 20 Study v. 2012 Update... 9 III. Timing of Supply Shortfall with Current Cook Inlet Fields... Figure 9: 2012 CI Supply/Demand and Shortfall from Current CI Wells.... IV. Potential New Developments... 11 V. Future Production Scenarios... 13 Figure : Supply/Demand & Shortfall with of New Production Added Annually....13 Figure 11: Supply/Demand & Shortfall with 20 of New Production Added Annually....14 Figure 12: 2012 Update of Wells Drilled & Wells Required...14 VI. Conclusion... 15 Table 4: 2012 Cook Inlet Gas Supply Scenarios...15 VII. Appendices... 16 Appendix A: Cook Inlet Unit Production and s...16 Appendix B-1: Beluga River Unit Well Decline Curves...22 Appendix B-2: Kenai Unit Well Decline Curves...31 Appendix B-3: Ninilchik Unit Well Decline Curves...46 Appendix B-4: North Cook Inlet Unit Well Decline Curves...55 Appendix B-5: North Fork Unit Well Decline Curves...63 Appendix B-6: Trading Bay Unit Gas Well Decline Curves...65 Appendix C: CI Gas Wells Completed in November 2009 to June 2012...77 for ENSTAR, ML&P and Chugach Electric

Introduction In March 20, PRA completed the Cook Inlet Gas Study An Analysis for Meeting the Natural Gas Needs of Cook Inlet Utility Customers that was commissioned in 2009 for ENSTAR Natural Gas Company, Chugach Electric Association and Municipal Light & Power. The March 20 report was based on AOGCC production data available for Cook Inlet wells through October 2009. The 20 Study concluded that: With existing producing fields in Cook Inlet and the current forecasted demand, there will be a critical shortage of natural gas supply starting in 2013. If drilling activity remains at the 13.6 wells completed per year level that occurred during 2007-mid 2009, the shortage of gas will occur after 2018. The most recent unit POD s showed 12 wells to be drilled in the POD period, although statements by gas producers at recent Cook Inlet's oil and gas industry forum would indicate that continuation at this level of activity is not likely. To meet demand through 2020, a total of 185 wells will be required to be drilled at an estimated total cost of $1.8 to $2.8 billion. Given the limited remaining development reserves in Cook Inlet and the long timeframe required to bring new discoveries on-line, further combined with the paucity of true gas exploration in recent years, it is likely that a source of gas outside of the Cook Inlet, such as LNG importation or other in-state reserves, will be required starting between 2013 and 2016. In order for Cook Inlet gas requirements to be met, either by additional development of Cook Inlet gas or gas imported as LNG or from other areas of the state, adequate gas storage will be required to meet the winter deliverability swings. There have been 2 reviews of gas well drilling activity in Cook Inlet that showed Cook Inlet development pace was much lower than experienced in 2007-2009. In the November, 20 Cook Inlet Gas Drilling Update, it was found that: o The twelve month drilling and permitting activity showed eight net wells (ten wells permitted and two previously permitted wells cancelled) over the twelve month period from Nov-2009 through Oct-20. o Over this twelve month period there were five wells completed that averaged 3.7 per well for their first six months of production. In November, 2011 Cook Inlet Gas Drilling Update, it was found that: o The twelve month drilling and permitting activity showed eight new wells over the twelve month period from Nov-20 through Oct-2011. o There have been 3 apparent exploration discoveries in the last year; the Kenai Loop Unit, the Shadura No. 1 and the offshore Kitchen Lights Unit. o The Kenai Loop has a certified proven reserve announced and the gas has been contracted and development facilities are being constructed for gas sales in 2012. o While the Shadura prospect is being permitted for development, there have been no announced estimates of reserves and additional testing is planned prior to sizing production equipment. The earliest testing and delineation will be permitted is the winter of 2012-13. for ENSTAR, ML&P and Chugach Electric Page 1 of 78

o There is some question about the veracity of the announced Kitchen Lights discovery and as it is an offshore development, it will likely take several years to delineate and develop. o The recently completed six wells that have reported production averaged 1.65 per well for their first six months of production. The 2012 Update of Cook Inlet Supply and Demand was undertaken as follows: I. 2012 Cook Inlet Demand II. 2012 Cook Inlet Supply III. Timing of Supply Shortfall with Current Cook Inlet Fields IV. Potential New Developments V. Future Production Scenarios VI. Conclusion Production and of Field and Well Decline Curves are presented in the Appendix. for ENSTAR, ML&P and Chugach Electric Page 2 of 78

BCF per Year I. 2012 Cook Inlet Demand The demand forecast for the Cook Inlet Basin is shown in Figure 2. It is based on input from the following Cook Inlet current and future gas users: ENSTAR Natural Gas Chugach Electric Association Municipal Light & Power Homer Electrical Association Matanuska Electrical Association Donlin Creek Mine Cook Inlet demand has changed slightly over the last few years with a reduction in utility gas demand from more efficient electric generation (7.5 BCF/year or 9.4% reduction), the addition of wind power (0.35 BCF/year or 0.4% reduction), and with a projected increase in industrial demand in 2020 (Donlin Creek Mine). The current demand forecast for the Cook Inlet Basin is shown below in Figure 2. Cook Inlet Field usage is based on the 2011 AOGCC record of fuel, flare and shrinkage for Cook Inlet fields. Tesoro fuel use is from testimony during the LNG license extension (Tesoro FERC 4/09/07). 90 80 70 60 50 40 30 20 0 Cook Inlet Natural Gas Demand PRA September 2012 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Donlin Creek 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1 1 Kenai LNG 12.4 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Field Fuel Gas.5.5.5.5.5.5.5.5.5.5 Tesoro 5.3 5.3 5.3 5.3 5.3 5.3 5.3 5.3 5.3 5.3 MEA 0.0 0.0 0.0 6.3 6.5 6.5 6.6 6.7 6.9 6.9 HEA 0.0 0.0 4.4 4.4 4.4 4.4 4.4 4.4 4.4 4.4 ML&P Native Load.6.0.0 9.8 8.4 8.4 8.5 8.5 8.6 8.6 CEA 25.0 2 16.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 ENSTAR 33.6 33.9 34.2 34.6 34.9 35.2 35.6 35.9 36.3 36.8 Figure 2: ed Annual Demand for Cook Inlet Gas for ENSTAR, ML&P and Chugach Electric Page 3 of 78

Figure 3 shows the Cook Inlet demand forecasted in the 20 Study in comparison to this 2012 Update. In general, the 2012 forecast is lower, although Donlin Creek Mine is a new addition in the 2012 Update and is projected to start up in 2020. 120 CI Gas Demand s 80 60 40 20 0 20 2012 2014 2016 2018 2020 2022 20 Study 2012 Update Figure 3: Comparison of Cook Inlet Demand 20 Study v. 2012 Update for ENSTAR, ML&P and Chugach Electric Page 4 of 78

II. 2012 Cook Inlet Supply PRA evaluated existing production declines and made a future production forecast for the major units in the Cook Inlet Basin. Larger producing units, and those that had recent development activity, were analyzed on a well-by-well basis and the unit total was the sum of the individual wells. The following units were analyzed by individual wells and those cumulative results are shown below: 2012 Predicted Average Rate, Predicted Annual Decline Remaining BCF as of 1/1/12 Beluga River Unit 87.4 18% 188.7 Kenai Unit 29.0 21% 48.5 Kenai Loop 4.3 25%.8 Ninilchik Unit 31.2 26% 43.2 North Cook Inlet Unit 36.9 17% 85.3 North Fork Unit 4.0 25% 4.6 Trading Bay Unit 57.6 23% 91.3 Units with future production are predicted on a unit total basis and results are as follows: 2012 Predicted Average Rate, Predicted Annual Decline Remaining BCF as of 1/1/12 Beaver Creek Unit 7.1 14% 18.6 Cannery Loop Unit 9.8 18% 12.9 Deep Creek Unit 6.1 % 15.8 Sterling Unit 1.3 % 3.8 Swanson River Unit 3.0 % 7.3 Other Cook Inlet Fields 13.6 12% 37.8 Cook Inlet Total 291.3 568.6 Production curves and forecasts for each of the units above are shown in Appendix A. The individual well decline curves for Beluga River, Kenai, Ninilchik, North Cook Inlet, North Fork and Trading Bay units are shown in Appendix B. For the predictions in this study, an individual well was deemed to have reached an economic limit at 250 MSCF/D. for ENSTAR, ML&P and Chugach Electric Page 5 of 78

Figure 4 shows the estimate of annual supply from the existing wells in the current units. It is an estimate of the decline curve analysis for wells completed up to June 2012. Figure 4: 2012 Cook Inlet Gas 2012-2020 Figure 5 below shows the differences in Cook Inlet production forecasts between the 20 Study and the 2012 Update for the existing Cook Inlet Fields. for ENSTAR, ML&P and Chugach Electric Page 6 of 78

BCF/Yr 250 Cook Inlet Total Production 200 150 50 0 2000 2005 20 2015 2020 2025 20 Study 2012 Update Figure 5: Cook Inlet Production & : 20 Study v. 2012 Update The increase in production in the 2012 Update is due primarily to the 11 wells completed since October, 2009 as shown in Table 2 and compression additions in Ninilchik and Beluga River Fields. Period # New Completions Production Rate Added Nov-09 to Oct- 5 18.5 Nov- to Oct-11 7 12.3 Nov-11 to Jun-12 4 21.4 Table 2: Cook Inlet Gas Completions from November 2009 through June 2012 There were four wells completed as Cook Inlet gas wells between November 2011 and June 2012 that averaged 5.4 for their first six months of production. Rates of these new wells are shown in Table 3. Well Name Producer Well Class Initial Rate, 6 Month Avg. Status MMSCF Kenai Loop 1 Buccaneer Exp - Gas 4.2 Producing TBU M-21 Hilcorp Dev - Gas.0 Producing NU S Dionne 7 Marathon Dev - Gas 0 Shut In BRU 224-23T ConocoPhillips Dev - Gas 7.2 Producing Table 3: Wells Completed December 2011 through June 2012 for ENSTAR, ML&P and Chugach Electric Page 7 of 78

BCF/Yr Material increases in the 2012 Cook Inlet Update in individual fields are as follows: Beluga River o Compression was added in the Field o 2 Re-drills were completed: BRU 212-24T and BRU 224-23T Ninilchik Unit o Compression was added at well pads o 2 New wells were drilled: Paxton #4 and S. Dionne #7 Trading Bay Unit o 4 New wells were drilled: M-, M-20, M-11 & M-21 Figures 6, 7 and 8 show the differences in forecasts from the 20 Study and the 2012 Update for Beluga River, Ninilchik and TBU Units, respectively. 70 Beluga River Unit 60 50 40 30 20 0 2000 2005 20 2015 2020 2025 20 Study 2012 Update Figure 6: Beluga River Unit Production & : 20 Study v. 2012 Update for ENSTAR, ML&P and Chugach Electric Page 8 of 78

BCF/Yr BCF/Yr 25 Ninilchik Unit 20 15 5 0 2000 2005 20 2015 2020 2025 20 Study 2012 Update Figure 7: Ninilchik Unit Production & : 20 Study v. 2012 Update TBU 70 60 50 40 30 20 0 2000 2005 20 2015 2020 2025 20 Study 2012 Update Figure 8: Trading Bay Unit Production & : 20 Study v. 2012 Update for ENSTAR, ML&P and Chugach Electric Page 9 of 78

III. Timing of Supply Shortfall with Current Cook Inlet Fields Figure 9 shows a comparison of projected demand and supply forecast from the wells in existing fields with no further development. A shortfall develops in 2014 under this scenario of no further Cook Inlet gas well development. Figure 9: 2012 CI Supply/Demand and Shortfall from Current CI Wells. In the 20 Study, a no-development scenario supply forecast predicted a shortfall as early as 2013. Due to the additional wells drilled and compression additions since then, the shortfall forecast in the 2012 Update, assuming no further development, is predicted in 2014. for ENSTAR, ML&P and Chugach Electric Page of 78

IV. Potential New Developments In 2012, exploration is occurring both onshore and offshore in Cook Inlet. Exploration programs include the Spartan 151 jack-up rig and the expected Adriatic XI jack-up rig, the Apache seismic program and onshore prospects planned by Buccaneer and Nordaq. New developments that have been identified as of this update include the development of Kenai Loop and delineation and development of Shadura. Other developments could be infield development of current Cook Inlet fields. Timing of these new developments is estimated from phone conversations, when possible, or recent filed Unit Plan of Developments. Onshore Developments Armstrong has permitted 2 gas development wells at North Fork: 23-25 and 22-35. Buccaneer is currently drilling Kenai Loop #4 as a gas well. ConocoPhillips has drilled 2 wells at Beluga River Unit, 242-04 and 244-23. They have just recently been completed. Hilcorp has permitted Happy Valley Unit B-14 as a gas well and is currently installing pipeline to Red Pad. Hilcorp has stated that they will spend $203 million in capital in 2012 to develop oil and gas. They expect to spend approximately $150 million per year over next 2 years. Nordaq indicated that they were being delayed by permits in having been required to obtain an EIS rather than an EA. The earliest Shadura #1 is estimated to complete testing and the discovery delineated will be the summer of 2013; earliest production is estimated to be Q3-Q4 2013. Marathon has said that the S. Dionne #7 was one of two potential wells planned at Ninilchik Unit in the current POD. S. Dionne #7 has been put on production, but at very low rates and it is not currently producing. In the current Beluga River POD, it is stated that drilling a well to replace 214-26 will be evaluated. ML&P expects that there could be additional wells drilled in the near future. BRU 224-23T was drilled and is currently producing 7. There are 2 additional wells that were drilled in 2012. Onshore Exploration Buccaneer plans an exploration well in the West Eagle prospect, near the North Fork Unit. Cook Inlet Energy has permitted the Otter #1 gas exploration well near Beluga River Unit. Nordaq plans an exploration well in the Tiger Eye prospect on Cook Inlet s west side, near the Trading Bay Production Facility. Nordaq has stated that they will drill by the end of 2012. Apache is acquiring extensive onshore and offshore seismic data and has announced that they will drill an onshore exploration well near Tyonek by year-end 2012. for ENSTAR, ML&P and Chugach Electric Page 11 of 78

Offshore Exploration and Developments Hilcorp had planned an additional well from the Steelhead platform in the current plan of development. Hilcorp recently acquired Chevron s Cook Inlet assets but would not comment on development plans other than the POD. The recent rig activity reported by Petroleum News showed Hilcorp working over M-16 RD, a well that showed a dramatic drop in production in the latest forecast. There are several offshore exploration wells planned by Buccaneer and Furie (operating former Escopeta prospects) with the two jack ups. Furie is currently drilling the Kitchen Lights #2 well. Buccaneer has announced that they will be drilling their Cosmopolitan prospect this winter. Apache is shooting a large 3D seismic program offshore, but the program has been delayed by permits. It is estimated that any offshore gas discoveries are likely to take at least take 3-5 years to develop after discovery due to permitting and construction timing. for ENSTAR, ML&P and Chugach Electric Page 12 of 78

V. Future Production Scenarios To understand how future development of gas wells will affect timing of potential shortfalls, sensitivities were made assuming and 20 per year being added from future Cook Inlet developments for the years 2013 through 2019. The rates assumed in these sensitivities are based on results of the actual development shown in Table 2, Cook Inlet Gas Completions from November 2009 through June 2012, in which 18.5 was added in the first year, 9.9 was added in the second year, and 21.4 was added from November 2011 through June 2012. Figures and 11 show existing production and future scenarios of of production added annually and 20 of production added annually. The decline for new production is assumed to be 15% per year. Figure : Supply/Demand & Shortfall with of New Production Added Annually. for ENSTAR, ML&P and Chugach Electric Page 13 of 78

Number of Wells Figure 11: Supply/Demand & Shortfall with 20 of New Production Added Annually. The estimated shortfall is an average of 31 each year from 2013 to 2019. Using the same approach as the 20 Study of adding wells to meet demand through 2020, an estimated 157 new gas completions would be required from 2013-2019 as shown in Figure 12. 45 40 35 30 25 2012 Update: Wells Drilled & Wells Required Wells Drilled 20-12 Wells Drilled Future Wells Needed 20 15 5 0 2001 2002 2003 2004 2005 2006 2007 2008 2009 20 2011 2012 2013 2014 2015 2016 2017 2018 2019 Year Figure 12: 2012 Update of Wells Drilled & Wells Required Previous Moving Avg Current Moving Avg Future Moving Avg Needed for ENSTAR, ML&P and Chugach Electric Page 14 of 78

VI. Conclusion Table 3 shows a summary of the scenarios investigated in the 2012 Update. If there is no drilling activity to add new production in Cook Inlet, a shortfall occurs as early at 2014. Scenario Initial Year of Shortfall Initial Year Shortfall Amount, BCF Existing Cook Inlet Fields 2014 11.4 Existing Fields + Annual Addition of Production from New Wells 2013-2019 Existing Fields + Annual Addition of 20 Production from New Wells 2013-2019 Table 4: 2012 Cook Inlet Gas Supply Scenarios 2014 5.1 2015 6.2 Even if there is a robust level of activity that annually adds 20 of new gas to the Cook Inlet supply, a shortfall is still predicted to occur in as early as 2015. If 31 of new production is added each year from new completions 2013-2019, a shortfall will be avoided. It is estimated that 157 new gas completions are required to meet demand between 2013-2020. The most likely sources of new production in Cook Inlet would be from existing fields such as Beluga River Unit and Trading Bay Unit, development of recent discoveries such as Kenai Loop and Shadura, or possible successes at Otter, Tiger Eye or the Apache Tyonek well. If there are no large discoveries made that can be brought to production within 1-2 years, it is likely the current pace of drilling activity will result in a shortfall in Cook Inlet gas supply as early as 2014 or 2015. Any major new gas discoveries from offshore exploration are not likely to be brought on production within 3-5 years due to permitting, planning and construction of offshore facilities and pipelines. for ENSTAR, ML&P and Chugach Electric Page 15 of 78

VII. Appendices Appendix A: Cook Inlet Unit Production and s BEAVER CREEK UNIT Gas Production Peak Month Production Average Annual Production Average 14% Decline Remaining Reserves, 1/1/2012 = 18.6 BCF 1 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 Beluga River Unit Total 0 Peak Month Production Average Annual Production Average 18% Decline 1 Remaining Reserves as of 1/1/12 = 188.7 BCF 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 16 of 78

CANNERY LOOP UNIT Gas Production Peak Month Production Average Annual Production Average 18% Decline Remaining Reserves, 1/1/2012 = 12.9 BCF 1 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 Deep Creek Unit Gas Production Peak Month Production Average Annual Production Average % Decline Remaining Reserves, 1/1/2012 = 15.8 BCF 1 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 17 of 78

KENAI UNIT TOTAL Peak Month Production Average Annual Production Well Declines Avg 21% Remaining Reserves as of 1/1/12 = 48.5 BCF 1 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 Ninilchik Unit Gas Production.0.0 Peak Month Production Average Annual Production Well Declines: Avg 26% Remaining Reserves as of 1/1/12 = 43.2 BCF 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 1-25 1-26 for ENSTAR, ML&P and Chugach Electric Page 18 of 78

North Cook Inlet Total.0.0.0 Peak Month Production Average Annual Production Average 16.8% Decline Remaining Reserves as of 1/1/12 = 85.3 BCF 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 NORTH FORK UNIT Gas Production.0 Peak Month Production Average Annual Production Average 25% Decline Remaining Reserves as of 1/1/2012 = 4.6 BCF 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 19 of 78

STERLING UNIT Gas Production.0 Peak Month Production Average Annual Production Average % Decline Remaining Reserves, 1/1/2012 = 3.8 BCF 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24.0 SWANSON RIVER Gas Production.0 Peak Month Production Average Annual Production Average % Decline Remaining Reserves, 1/1/2012 = 7.3 BCF 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 20 of 78

TRADING BAY UNIT Gas Production Peak Month Production Average Annual Production Well Declines Avg 23% Remaining Reserves, 1/1/2012 = 91.3 BCF 1 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 Cook Inlet Other Field Production w/o Storage Peak Month Production Average Annual Production Average 12% Decline Remaining Reserves, 1/1/2012 = 37.8 BCF 1 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 21 of 78

Appendix B-1: Beluga River Unit Well Decline Curves Beluga River Unit #211-03 1 1/1/12 Remaining Reserves to 250 mcf/d = 0 BCF Annual Decline = % 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 Beluga River Unit #211-26 1 Cum 1/1/12 to Remaining 12/31/11 = Reserves 8.9 74.08 BCF BCF to 250 mcf/d Remaining = 16.8 BCF Reserves Remaining Annual Decline to Reserves 250 = mcf/d 11.2% to = 250 16.84 mcf/d BCF= 0 BCF 0 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 22 of 78

Beluga River Unit #212-24 1 1/1/12 Remaining Reserves to 250 mcf/d = 0 BCF Annual Decline = 0% 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 Beluga River Unit #212-24T.0 1/1/12 Remaining Reserves to 250 mcf/d = 1.1 BCF Annual Decline = 36.3% 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 23 of 78

Beluga River Unit #212-25.0 1/1/12 Remaining Reserves to 250 mcf/d = 2.2 BCF Annual Decline = 14.4% 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 Beluga River Unit #212-35.0 1/1/12 Remaining Reserves to 250 mcf/d = 11.1 BCF Annual Decline = 8% 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 24 of 78

Beluga River Unit #212-35T 1 1/1/12 Remaining Reserves to 250 mcf/d = 17 BCF Annual Decline = 24% 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 Beluga River Unit #214-26 1 1/1/12 Remaining Reserves to 250 mcf/d = 41.5 BCF Annual Decline = 14.1% 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 25 of 78

Beluga River Unit #224-13.0.0 1/1/12 Remaining Reserves to 250 mcf/d = 0 BCF Annual Decline = 16.6% 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 1 Beluga River Unit #224-23 & 224-23T.0.0 1/1/12 Cum to Remaining 12/31/11 = Reserves 7.98 BCF to 250 mcf/d = 9.7 BCF Annual Remaining Decline Reserves = 25.9% to 250 mcf/d = 9.66 BCF 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 1 for ENSTAR, ML&P and Chugach Electric Page 26 of 78

Beluga River Unit #224-34 1 Cum 1/1/12 to 12/31/11 Remaining = 139.46 Reserves BCF to 250 mcf/d = 16.8 BCF Remaining Annual Reserves Decline = to 11.2% 250 mcf/d = 27.92 BCF 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 Beluga River Unit #232-04.0 1/1/12 Remaining Reserves to 250 mcf/d = 1.9 BCF Annual Decline = 19.3% 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 27 of 78

Beluga River Unit #232-23.0 Cum 1/1/12 to Remaining 12/31/11 = Reserves 2.4 BCF to 250 mcf/d Remaining = 1.3 BCF Reserves Annual Decline to 250 = mcf/d 21.5% = 1.27 BCF 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 Beluga River Unit #232-26 1 1/1/12 Remaining Reserves to 250 mcf/d = 2 BCF Annual Decline =.8% 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 28 of 78

Beluga River Unit #233-27.0 1/1/12 Remaining Reserves to 250 mcf/d = 9.7 BCF Annual Decline = 11.6% 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 Beluga River Unit #241-34 1 1/1/12 Remaining Reserves to 250 mcf/d = 14.5 BCF Annual Decline = 18.5% 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 29 of 78

Beluga River Unit #243-34.0 1/1/12 Remaining Reserves to 250 mcf/d = 13.9 BCF Annual Decline = 15% 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 Beluga River Unit #244-04.0 1/1/12 Remaining Reserves to 250 mcf/d = 0 BCF Annual Decline = 15% 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 30 of 78

Appendix B-2: Kenai Unit Well Decline Curves KENAI BELUGA UNIT 11-17X.0 0 1/1/12 Remaining Reserves to 250 mcf/d = 2 BCF Annual Decline = 17.6 % 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 KENAI BELUGA UNIT 11-7.0 0 7/1/12 Remaining Reserves to 250 mcf/d = 5 BCF Annual Decline = 18.8 % 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 31 of 78

KENAI BELUGA UNIT 11-8X.0 0 7/1/12 Remaining Reserves to 250 mcf/d = 6.17 BCF Annual Decline = 11.4 % 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 KENAI BELUGA UNIT 11-8Y.0 0 7/1/12 Remaining Reserves to 250 mcf/d = 0 BCF Annual Decline = 25.5 % 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 32 of 78

KENAI BELUGA UNIT 12-5.0 0 7/1/12 Remaining Reserves to 250 mcf/d = 2.17 BCF Annual Decline = 16.2 % 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 KENAI BELUGA UNIT 14-6Y.0 0 7/1/12 Remaining Reserves to 250 mcf/d = 1 BCF Annual Decline = 18 % 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 33 of 78

KENAI BELUGA UNIT 14-8.0 0 7/1/12 Remaining Reserves to 250 mcf/d = 3.28 BCF Annual Decline = 19.4 % 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 KENAI BELUGA UNIT 23-7.0 0 7/1/12 Remaining Reserves to 250 mcf/d = 0.48 BCF Annual Decline = 18.5 % 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 34 of 78

KENAI BELUGA UNIT 24-06RD.0 0 7/1/12 Remaining Reserves to 250 mcf/d = 0 BCF Annual Decline = 23.1 % 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 KENAI BELUGA UNIT 24-7X.0 0 7/1/12 Remaining Reserves to 250 mcf/d = 1.5 BCF Annual Decline = 23.1 % 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 35 of 78

KENAI BELUGA UNIT 31-07RD.0 0 7/1/12 Remaining Reserves to 250 mcf/d = 1.21 BCF Annual Decline = 22.2 % 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 KENAI BELUGA UNIT 33-06X.0 0 7/1/12 Remaining Reserves to 250 mcf/d = 2.71 BCF Annual Decline = 12.3 % 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 36 of 78

KENAI BELUGA UNIT 34-6.0 0 7/1/12 Remaining Reserves to 250 mcf/d = 2.09 BCF Annual Decline = 13.6 % 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 KENAI BELUGA UNIT 41-07.0 0 7/1/12 Remaining Reserves to 250 mcf/d = 0.55 BCF Annual Decline = 16.8 % 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 37 of 78

KENAI BELUGA UNIT 43-07X.0 0 7/1/12 Remaining Reserves to 250 mcf/d = 1.4 BCF Annual Decline = 25.8 % 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 KENAI BELUGA UNIT 44-06.0 0 7/1/12 Remaining Reserves to 250 mcf/d = 1.41 BCF Annual Decline = 22.9 % 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 38 of 78

KENAI DEEP UNIT 1.0 0 7/1/12 Remaining Reserves to 250 mcf/d = 2.6 BCF Annual Decline = 19.7 % 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 KENAI DEEP UNIT 2(21-8).0 0 7/1/12 Remaining Reserves to 250 mcf/d = 0.56 BCF Annual Decline = 23 % 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 39 of 78

KENAI DEEP UNIT 9.0 0.0 7/1/12 Remaining Reserves to 250 mcf/d = 0 BCF Annual Decline = 0 % 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 KENAI TYONEK UNIT 13-05.0 0 7/1/12 Remaining Reserves to 250 mcf/d = 0 BCF Annual Decline = 0 % 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 40 of 78

KENAI TYONEK UNIT 13-06.0 0 7/1/12 Remaining Reserves to 250 mcf/d = 0.42 BCF Annual Decline = 26.5 % 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 KENAI TYONEK UNIT 24-06H.0 0.0 7/1/12 Remaining Reserves to 250 mcf/d = 4.53 BCF Annual Decline =.6 % 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 41 of 78

KENAI TYONEK UNIT 32-07.0 0 7/1/12 Remaining Reserves to 250 mcf/d = 0 BCF Annual Decline = 0 % 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 KENAI TYONEK UNIT 32-07H 0 7/1/12 Remaining Reserves to 250 mcf/d = 7 BCF Annual Decline = 11.7 % 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 42 of 78

KENAI TYONEK UNIT 43-6XRD2.0 0 7/1/12 Remaining Reserves to 250 mcf/d = 2.18 BCF Annual Decline = 15.9 % 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 KENAI UNIT 14X-06.0 0.0 7/1/12 Remaining Reserves to 250 mcf/d = 1.55 BCF Annual Decline = 23.9 % 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 43 of 78

KENAI UNIT 22-6X.0 0 7/1/12 Remaining Reserves to 250 mcf/d = 0.5 BCF Annual Decline = 21.5 % 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 KENAI UNIT 31-07X.0 0.0 7/1/12 Remaining Reserves to 250 mcf/d = 0.21 BCF Annual Decline = 20.6 % 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 44 of 78

KENAI UNIT 41-18X.0 0 7/1/12 Remaining Reserves to 250 mcf/d = 1.52 BCF Annual Decline = 22.7 % 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 Other KU Wells.0.0 7/1/12 Remaining Reserves to 250 mcf/d = 2.05 BCF Annual Decline = 38 % 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 45 of 78

Appendix B-3: Ninilchik Unit Well Decline Curves NINILCHIK STATE #1.0 1/1/12 Remaining Reserves to 250 mcf/d = 1.44 BCF Annual Decline = 28.2% 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 NINILCHIK STATE #3.0 1/1/12 Remaining Reserves to 250 mcf/d = 1.29 BCF Annual Decline = 12.6% 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 46 of 78

NINILCHIK UNIT FALLS CK #1RD.0.0 1/1/12 Remaining Reserves to 250 mcf/d = 2.73 BCF Annual Decline = 24.5% 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 NINILCHIK UNIT FALLS CK #3.0,000 1/1/12 Remaining Reserves to mcf/d = 4 BCF Annual Decline = 14.9% 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 47 of 78

NINILCHIK UNIT FALLS CK #4.0 1/1/12 Remaining Reserves to 250 mcf/d = 2.62 BCF Annual Decline =.4% 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 NINILCHIK UNIT G OSKOLKOFF #1.0.0 1/1/12 Remaining Reserves to 250 mcf/d = 1.37 BCF Annual Decline = 29.5% Jan-03 Jan-04 Jan-05 Jan-06 Jan-07 Jan-08 Jan-09 Jan- Jan-11 Jan-12 Jan-13 Jan-14 Jan-15 Jan-16 Jan-17 Jan-18 Jan-19 Jan-20 Jan-21 Jan-22 Jan-23 for ENSTAR, ML&P and Chugach Electric Page 48 of 78

NINILCHIK UNIT G OSKOLKOFF #2.0,000 1/1/12 Remaining Reserves to 250 mcf/d = 0 BCF Annual Decline = 0% Jan-03 Jan-04 Jan-05 Jan-06 Jan-07 Jan-08 Jan-09 Jan- Jan-11 Jan-12 Jan-13 Jan-14 Jan-15 Jan-16 Jan-17 Jan-18 Jan-19 Jan-20 Jan-21 Jan-22 Jan-23 NINILCHIK UNIT G OSKOLKOFF #3.0,000 1/1/12 Remaining Reserves to 250 mcf/d = 0.9 BCF Annual Decline = 16.1% Jan-03 Jan-04 Jan-05 Jan-06 Jan-07 Jan-08 Jan-09 Jan- Jan-11 Jan-12 Jan-13 Jan-14 Jan-15 Jan-16 Jan-17 Jan-18 Jan-19 Jan-20 Jan-21 Jan-22 Jan-23 for ENSTAR, ML&P and Chugach Electric Page 49 of 78

NINILCHIK UNIT G OSKOLKOFF #6.0 1/1/12 Remaining Reserves to 250 mcf/d = 0.33 BCF Annual Decline = 25.6% Jan-03 Jan-04 Jan-05 Jan-06 Jan-07 Jan-08 Jan-09 Jan- Jan-11 Jan-12 Jan-13 Jan-14 Jan-15 Jan-16 Jan-17 Jan-18 Jan-19 Jan-20 Jan-21 Jan-22 Jan-23 NINILCHIK UNIT PAXTON #1.0,000 1/1/12 Remaining Reserves to 250 mcf/d = 0 BCF Annual Decline = 0% Jan-03 Jan-04 Jan-05 Jan-06 Jan-07 Jan-08 Jan-09 Jan- Jan-11 Jan-12 Jan-13 Jan-14 Jan-15 Jan-16 Jan-17 Jan-18 Jan-19 Jan-20 Jan-21 Jan-22 Jan-23 for ENSTAR, ML&P and Chugach Electric Page 50 of 78

NINILCHIK UNIT PAXTON #2.0,000 1/1/12 Remaining Reserves to 250 mcf/d = 2.67 BCF Annual Decline = 23.9% Jan-03 Jan-04 Jan-05 Jan-06 Jan-07 Jan-08 Jan-09 Jan- Jan-11 Jan-12 Jan-13 Jan-14 Jan-15 Jan-16 Jan-17 Jan-18 Jan-19 Jan-20 Jan-21 Jan-22 Jan-23 NINILCHIK UNIT PAXTON #3.0 1/1/12 Remaining Reserves to 250 mcf/d = 4.71 BCF Annual Decline = 20% Jan-03 Jan-04 Jan-05 Jan-06 Jan-07 Jan-08 Jan-09 Jan- Jan-11 Jan-12 Jan-13 Jan-14 Jan-15 Jan-16 Jan-17 Jan-18 Jan-19 Jan-20 Jan-21 Jan-22 Jan-23 for ENSTAR, ML&P and Chugach Electric Page 51 of 78

NINILCHIK UNIT PAXTON #4.0 1/1/12 Remaining Reserves to 250 mcf/d = 4.31 BCF Annual Decline = 30% Jan-03 Jan-04 Jan-05 Jan-06 Jan-07 Jan-08 Jan-09 Jan- Jan-11 Jan-12 Jan-13 Jan-14 Jan-15 Jan-16 Jan-17 Jan-18 Jan-19 Jan-20 Jan-21 Jan-22 Jan-23 NINILCHIK UNIT S DIONNE #3.0,000.0 1/1/12 Remaining Reserves to 250 mcf/d = 2.57 BCF Annual Decline = 19.3% Jan-03 Jan-04 Jan-05 Jan-06 Jan-07 Jan-08 Jan-09 Jan- Jan-11 Jan-12 Jan-13 Jan-14 Jan-15 Jan-16 Jan-17 Jan-18 Jan-19 Jan-20 Jan-21 Jan-22 Jan-23 for ENSTAR, ML&P and Chugach Electric Page 52 of 78

NINILCHIK UNIT S DIONNE #4.0,000.0 1/1/12 Remaining Reserves to 250 mcf/d = 5.61 BCF Annual Decline = 17.9% Jan-03 Jan-04 Jan-05 Jan-06 Jan-07 Jan-08 Jan-09 Jan- Jan-11 Jan-12 Jan-13 Jan-14 Jan-15 Jan-16 Jan-17 Jan-18 Jan-19 Jan-20 Jan-21 Jan-22 Jan-23 NINILCHIK UNIT S DIONNE #5.0.0 1/1/12 Remaining Reserves to 250 mcf/d = 6.03 BCF Annual Decline = 30.9% Jan-03 Jan-04 Jan-05 Jan-06 Jan-07 Jan-08 Jan-09 Jan- Jan-11 Jan-12 Jan-13 Jan-14 Jan-15 Jan-16 Jan-17 Jan-18 Jan-19 Jan-20 Jan-21 Jan-22 Jan-23 for ENSTAR, ML&P and Chugach Electric Page 53 of 78

NINILCHIK UNIT S DIONNE #6.0,000.0 1/1/12 Cum to Remaining 12/31/11 = Reserves 9.11 BCF to 250 mcf/d = 6.45 BCF Annual Remaining Decline Reserves = 33.2% to 250 mcf/d = 6.45 Jan-03 Jan-04 Jan-05 Jan-06 Jan-07 Jan-08 Jan-09 Jan- Jan-11 Jan-12 Jan-13 Jan-14 Jan-15 Jan-16 Jan-17 Jan-18 Jan-19 Jan-20 Jan-21 Jan-22 Jan-23 NINILCHIK UNIT S DIONNE #7 1/1/12 Remaining Reserves to 250 mcf/d = 0 BCF Annual Decline = 0% 0.0 Jan-03 Jan-04 Jan-05 Jan-06 Jan-07 Jan-08 Jan-09 Jan- Jan-11 Jan-12 Jan-13 Jan-14 Jan-15 Jan-16 Jan-17 Jan-18 Jan-19 Jan-20 Jan-21 Jan-22 Jan-23 for ENSTAR, ML&P and Chugach Electric Page 54 of 78

Appendix B-4: North Cook Inlet Unit Well Decline Curves North Cook Inlet #A-01.0 0.0 1/1/12 Remaining Reserves to 250 mcf/d = 0 BCF Annual Decline = 0% 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 North Cook Inlet #A-02.0 0.0 1/1/12 Remaining Reserves to 250 mcf/d = 23.63 BCF Annual Decline = 9.7% 1 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 55 of 78

North Cook Inlet #A-03.0 0.0 1/1/12 Remaining Reserves to 250 mcf/d = 0 BCF Annual Decline = 12.8% 1 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 North Cook Inlet #A-04.0 0.0 1/1/12 Remaining Reserves to 250 mcf/d = 2.41 BCF Annual Decline = 21.8% 1 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 for ENSTAR, ML&P and Chugach Electric Page 56 of 78