TS 805 POLES TTS CONSTRUCTION SPECIFICATION FOR POLE INSTALLATION TTS MATERIAL SPECIFICATION FOR STEEL POLES BASE MOUNTED

Similar documents
CONSTRUCTION SPECIFICATION FOR POLE ERECTION

CONSTRUCTION SPECIFICATION FOR POLE ERECTION

CONSTRUCTION SPECIFICATION FOR ERECTION OF POLES

CONSTRUCTION SPECIFICATION FOR ERECTION OF POLES

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POLES

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

TS 804 CABLES TABLE OF CONTENTS TRAFFIC SIGNAL EQUIPMENT POLE WIRING DIAGRAM LOCATIONS WITH CENTRE MEDIANS

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER

TS 803 DUCTS DUCT INSTALLATION, PROTECTION AND MARKING WITHIN A TRENCH OPEN TRENCH DUCT INSTALLATION PROFILE

CONSTRUCTION SPECIFICATION FOR GROUNDING

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ROADWAY LUMINAIRES

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ROADWAY LUMINAIRES

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES

CONSTRUCTION SPECIFICATION FOR CONCRETE FOOTINGS AND MAINTENANCE PLATFORMS FOR HIGH MAST LIGHTING POLES

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF DUCTS

CONSTRUCTION SPECIFICATION FOR TRAFFIC ACTUATION EQUIPMENT

CONSTRUCTION SPECIFICATION FOR STEEL BEAM GUIDE RAIL AND CABLE GUIDE RAIL

General Symbols, Ducts and Cables

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF DUCTS

CONSTRUCTION SPECIFICATION FOR GUIDE RAIL END TREATMENT - ECCENTRIC LOADER TERMINAL SYSTEM

CONSTRUCTION SPECIFICATION FOR CABLE INSTALLATION

General Symbols, Ducts and Cables

CONSTRUCTION SPECIFICATION FOR STEEL BEAM GUIDE RAIL AND CABLE GUIDE RAIL

General Symbols, Ducts and Cables

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF DUCTS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF DUCTS

CONSTRUCTION SPECIFICATION FOR EMBEDDED WORK IN STRUCTURES FOR ELECTRICAL SYSTEMS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE

CONSTRUCTION SPECIFICATION FOR CHAIN LINK FENCE

Special Provision No. 541S01 October OPSS 541, Construction Specifications for Chain Link Fence, is deleted and replaced with the following:

MATERIAL SPECIFICATION FOR STEEL POLES, BASE MOUNTED

AMENDMENTS TO OPSS 408 (OCT 89) CONSTRUCTION SPECIFICATION FOR ADJUSTING OR REBUILDING MANHOLES, CATCH BASINS, DITCH INLETS AND VALVE CHAMBERS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF SECTIONAL STEEL HIGH MAST LIGHTING POLES

Special Provision No. 599F01 May 2004 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF SECTIONAL STEEL HIGH MAST LIGHTING POLES

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES

CONSTRUCTION SPECIFICATION FOR PERMANENT SMALL SIGNS AND SUPPORT SYSTEMS

CONSTRUCTION SPECIFICATION FOR GUIDE RAIL ENERGY ABSORBING TERMINALS

Special Provision No. 799F01 March 2012 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE

Section 820. TRAFFIC SIGNALS

SPECIAL SPECIFICATION 1924 Neighborhood Friendly High Mast Illumination System

CONSTRUCTION SPECIFICATION FOR GUIDE RAIL END TREATMENT - STEEL BEAM ENERGY ATTENUATING TERMINAL SYSTEMS

B STEEL BEAM GUIDE RAIL - OPSS.PROV 721

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE

All RED text must be removed from the special provisions prior to the special provisions being submitted for project letting.

SCHEDULE G REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE INSTALLATION OF STREET LIGHTING

CONSTRUCTION SPECIFICATION FOR GUIDE RAIL END TREATMENT - EXTRUDER TERMINAL SYSTEM

ITEM 686 TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)

B STEEL BEAM GUIDE RAIL - OPSS 721

CONSTRUCTION SPECIFICATION FOR NOISE BARRIER SYSTEMS

Special Provision No. 799S15 December 2016

Grant PUD. Joint Use Standards. For Pole Attachments including: Cable Television Fiber Optics Telecommunications

SECTION 410 FENCES All materials shall be new and without flaws or defects of any type GENERAL

SWER OVERHEAD CONDUCTOR DISTRIBUTION SYSTEM AFTER GAZETTING (WORKING DOCUMENT FOR A 3 YEAR PERIOD) DATE PAGE PARAGRAPH DESCRIPTION ORIGINATOR APPROVED

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION

CONSTRUCTION SPECIFICATION FOR STRUCTURAL WOOD SYSTEMS

TABLE OF CONTENTS. Appendices are not a mandatory part of this specification unless invoked by the Owner.

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER. OPR:CT 1 of 5 APPR:JAR:DBP: FHWA:APPR:

Curved W-beam rails shall be formed to the radius specified in accordance with drawing TEB 3.54.

TS 801 ELECTRICAL WORK - GENERAL TABLE OF CONTENTS

Special Provision No. 540S01 March OPSS 540, Construction Specification for Highway Fence, is deleted and replaced with the following:

CONSTRUCTION SPECIFICATION FOR STANDARD HIGHWAY FENCE

CONSTRUCTION SPECIFICATION FOR SIGN SUPPORT STRUCTURES

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2015 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

ROAD CLOSURE GATE PLAN ESTIMATED QUANTITIES CONCRETE FOOTINGS FOR S. D. DEPT. OF TRANSPORTATION DECEMBER 1996 ELEVATION CABLE TIE DOWN FOOTING

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF SIGN LUMINAIRES

Special Provision No. 915S03 December References, Materials, Construction, and Quality Assurance for Sign Support Structures

CONSTRUCTION SPECIFICATION FOR ENERGY ATTENUATORS

Special Provision No. 421S01 November 2006

CONSTRUCTION SPECIFICATION FOR STANDARD HIGHWAY FENCE

STRUCTURAL STEEL FRAMING

Special Provision No. 421F01 April 2006

OVERHEAD SERVICES - SECONDARY

STANDARD TECHNIQUE : OH4L/1

CONSTRUCTION SPECIFICATION FOR SIGN SUPPORT STRUCTURES

Ontario Ministry of Transportation. Designated Sources of Material (DSM) Index

CONSTRUCTION SPECIFICATION FOR SIGN SUPPORT STRUCTURES

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3

CONSTRUCTION SPECIFICATION FOR STRUCTURAL WOOD SYSTEMS

B STEEL BEAM GUIDE RAIL - OPSS 721

CONSTRUCTION SPECIFICATION FOR STANDARD HIGHWAY FENCE

DIVISION 4.3 CITY OF SARNIA CONCRETE SIDEWALKS, CURBS AND DRIVEWAYS STANDARDS 2018

Requirements for Measuring and Pricing of Traffic Signs and Road Markings

STANDARDIZED STRUCTURES

The Regional Municipality of Peel Basis of Payment

CONSTRUCTION SPECIFICATION FOR INERTIAL BARRIER MODULES

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE

CHAPTER 13 GROUNDING AND BONDING

ITEM 555 CHAIN LINK FENCING

CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3

Transcription:

TORONTO TRANSPORTATION January 2012 TS 805 POLES TABLE OF CONTENTS 1. DRAWINGS TTD 805.001 POLE HANDHOLE ORIENTATION DETAILS TTD 805.005 WOOD POLE IN EARTH TTD 805.010 BACK GUY MOUNTING DETAILS TTD 805.015 TEMPORARY TRAFFIC SIGNAL STAND TTD 805.050 OCTAGONAL STEEL POLE BASE MOUNTING TTD 805.051 ELLIPTICAL GALVANIZED POLE BASE MOUNTING 2. CONSTRUCTION SPECIFICATION TTS 805.100 CONSTRUCTION SPECIFICATION FOR POLE INSTALLATION 3. MATERIAL SPECIFICATIONS TTS 805.200 MATERIAL SPECIFICATION FOR STEEL POLES BASE MOUNTED 4. RECOMMENDATIONS TTR 805.300 MAINTENANCE OF TRAFFIC POLES

TABLE OF CONTENTS 1.0 Scope 2.0 References 3.0 Construction 3.1 General 3.1.1 Pole Orientation 3.1.2 Pole Handling 3.1.3 Removals and Restoration Work 3.2 Direct Buried Poles 3.2.1 Installation in Earth 3.2.2. Pole Alignment 3.3 Base Mounted Poles 3.3.1 Preparation 3.3.2 Pole Erection 3.4 Apertures 3.5 Guy Anchors 3.6 Guy Spans 4.0 Measurement of Payment 4.1 Individual Item Method 4.1.1 Actual Measurement 4.1.2. Plan Quantity Measurement 5.0 Basis of Payment 5.1 All Inclusive Price Method 5.1.1 Poles - Item 5.2 Individual Item Method 5.2.1 Wood Poles, Direct Buried in Earth - Item 5.2.2 Steel Poles, Base Mounted - Item 5.2.3 Guy Anchors - Item 5.2.4 Guy Spans - Item

1.0 Scope This specification covers the requirements for the installation of all poles used for the mounting of sign, traffic signal and control equipment, low voltage aerial cables and extra low voltage aerial cables. 2.0 References This specification refers to the following standards, specifications or publications: Toronto Transportation: TS 1.00 TS 13.10 TS 801 TS 803 TS 807 TS 813 TS 815 Maintenance of Traffic Unshrinkable Fill Electrical Work Ducts Footings and Bays Grounding Removals Ontario Provincial Standards TS 1010 Aggregates - Granular A,B,M CSA Standards CSA C83-96 (R2000) - Communication and Power Line Hardware. CAN/CSA G12-92 (R2003) - Zinc Coated Steel Wire Strand. 3.0 Construction 3.1 General 3.1.1 Pole Orientation Steel poles shall be installed with the handhole parallel to or perpendicular to the centreline of the roadway as specified and such that the mast arm bracket wiring aperture is at right angles to the centreline of the road being served. 3.1.2 Pole Handling Poles shall be handled using suitable nonabrasive slings at the pole pick up points specified by the pole manufacturer. 3.1.3 Removals and Restoration Work Removals and restoration work required shall conform to TS 815.

3.2 Direct Buried Poles 3.2.1 Installation in Earth Wood poles shall conform to TTD 805.005. Pole line hardware shall conform to CSA C83-96 (R2000). Excavation shall be done by vacuum excavation, augering or other suitable means to obtain a hole large enough to accommodate wood pole and backfill. Backfill shall be native material placed and compacted in conformance to TS 1010. 3.2.2. Pole Alignment Direct buried poles shall be held in plumb alignment by use of a suitable temporary support assembly during backfill operations. 3.3 Base Mounted Poles 3.3.1 Preparation Steel poles for base mounting shall conform to TTS 805.200. Anchor templates shall be removed prior to installation of poles. All bolts and nuts shall be cleaned and coated with white lithium based grease. Anchorage nuts shall be cleaned and coated with white lithium based grease. 3.3.2 Pole Erection Poles shall be secured to the anchor assembly by setting all nuts to an initial torque of 75Nm. Poles shall then be set in plumb alignment by adjustments of combinations of pole shims and holding nuts. Final tightening of nuts shall be one-half turn past the initial setting or to a minimum torque of 150Nm. 3.4 Apertures Drilled apertures shall be accurately aligned to suit pole attachments or equipment. Apertures in metal poles shall be deburred. Apertures in galvanized steel poles shall be coated with grey zinc rich paint and allowed to dry. Wiring apertures in metal poles shall be provided with rubber grommets. Unused pole apertures shall be plugged with rubber neoprene or plastic plugs.

3.5 Guy Anchors Steel guy cable shall conform to CAN/CSA G12-92 (R2003). Guy anchors shall be of the helical power driven or direct buried expansible types with a minimum diameter of 250mm and a minimum anchor rod ultimate strength of 50kN and a length of 1800mm. Guy anchors shall be an anchorage plate, galvanized steel rod, cable thimble, guy cables, preformed guy grips, strain relief insulators, three bolt clamps, guy guards, sidewalk strut, pole attachment hardware and fittings, and shall be installed to the full depth specified. Anchorage plates shall be installed at the specified guy lead distance, adjusted to remain clear of any existing guy anchors or by 600mm minimum distance. Native backfill shall be placed and compacted in conformance to TS 1010. Guy anchors shall be installed with single or double guy cable sets as specified. All guy cables shall be installed to a snug condition prior to aerial cable stringing and shall be readjusted upon completion to maintain pole in a plumb position. Guy cables shall be tightened to maintain pole alignment and aerial cable clearances. 3.6 Guy Spans Guy spans consisting of guy cables, preformed guy grips, strain relief insulators, three bolt clamps and pole attachment hardware and fittings shall be installed at the clearance height specified in the contract. One end of the guy span shall be connected with a three bolt clamp to allow for future cable tightening. Guy spans shall be tightened to maintain pole alignment and aerial cable clearances. 4.0 Measurement of Payment 4.1 Individual Item Method 4.1.1 Actual Measurement Where the contract includes tender items, measurement will be made of each pole, guy anchor and guy span. 5.0 Basis of Payment 5.1 All Inclusive Price Method 5.1.1 Poles - Item Payment at the contract price for the above tender item shall be full compensation for all labour, equipment and materials required for the installation of all types and sizes of poles including all assembly, preparation, earth excavation, back-filling and compaction, concrete work and the installation of all frangible bases, sealant, guy anchors, guy spans, rock anchors, rock mounts, steel dowel bars and pole modification

work. Such payment shall include compensation for the removal of pavement, sidewalk and curb and gutter and restoration work where such work is not included in other tender items. 5.2 Individual Item Method 5.2.1 Wood Poles, Direct Buried in Earth - Item Payment at the contract price for the above tender item(s) shall be full compensation for all labour, equipment and materials required for the installation of each type of pole specified including assembly, all earth excavation, back-filling and compaction, concrete work and pole modification work. Such payment shall include compensation for the removal of pavement, sidewalk and curb and gutter and restoration work where such work is not included in other tender items. 5.2.2 Steel Poles, Base Mounted - Item Payment at the contract price for the above tender item(s) shall be full compensation for all labour equipment and materials required for the installation of each type of pole specified including assembly, sealant and pole modification work. 5.2.3 Guy Anchors - Item Payment at the contract price for the above tender item shall be full compensation for all labour, equipment and materials required to install all types and sizes of guy anchors including single or double guy cable sets, sidewalk struts, pole attachment hardware and fittings, earth excavation, backfill and compaction and tightening of guy cables as necessary. 5.2.4 Guy Spans - Item Payment at the contract price for the above tender item shall be full compensation for all labour, equipment and materials required to install all types and sizes of guy spans, regardless of length, and including all pole attachment hardware and fittings and tightening of guy cables as necessary.