GUIDELINES to the MINING ACT

Similar documents
SCHEDULE. 1 Part 10 of the Health, Safety and Reclamation Code for Mines in British Columbia is repealed and the following is substituted:

MINING AND RECLAMATION PLAN BLACK MESA AND KAYENTA MINES INDEX. Chapter Title Volume

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

The Mineral Industry Environmental Protection Regulations

Operating and Reclamation Plan

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE

RECLAMATION PLAN FOR. (name of Mine) MINING OPERATION

ARTICLE 6 EXCAVATION OF MINERAL MATERIALS

Code of Practice for Exploration Operations

Phase VII Expansion Waste Rock and Overburden Management Plan

SMARA Reclamation Standards Review

Mine Operation Plan (MOP) For New Mexico State Land Office Construction Materials Lease Lease Number: HA-

GUIDELINES FOR PREPARATION OF MINE CLOSURE PLAN

GRADING PERMIT APPLICATION

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999

Preliminary Disclosure; Application for Approval; Operating Permits, Volume 2: Licences and Approvals; and Abandonment Approval and

VIRGINIA POLLUTION ABATEMENT APPLICATION FORM D MUNICIPAL EFFLUENT AND BIOSOLIDS

CHAPTER 20.8 SURFACE MINING AND LAND RECLAMATION REGULATIONS

Northern Mine Decommissioning and Reclamation Guidelines

Draft Mine Closure Plan. 17 October 2018 Longlac & Geraldton

Planning a Complex Mine Remediation. Remediation Technologies Symposium October 14-16, 2015.

The Mineral Industry Environmental Protection Regulations, 1996

REGISTRATION PURSUANT TO. PART X of THE ENVIRONMENTAL PROTECTION ACT FOR THE NUGGET POND CROWN PILLAR. Newfoundland and Labrador

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

(18 April 2011 to date) MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 28 OF 2002

TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 652. UNDERGROUND INJECTION CONTROL

Some excerpts from the federal Surface Mining Control and Reclamation Act of 1977 (SMCRA), passed August 3, 1977

ADMINISTRATION OF AGGREGATE SOURCES INCLUDING EARTH AND ROCK BORROW SOURCES. Special Provision No. 199S38 March 2003

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

Chapter CONSTRUCTION SITE EROSION CONTROL

Rehabilitation Management

Long Term Planning for Open Pit Mines

WHAT IS THE SMALL MINE CONCEPT AND THE MAJOR ISSUES?

terms of sections 24(2), 24(5), 24D and 44, read with section 47A(1)(b) of the

CHAPTER SURFACE MINING AND RECLAMATION PLAN REGULATIONS

NICO Tailings and Mine Rock Co-disposal Facility (CDF) Design Concept

REGISTRATION DOCUMENT. Continental Stone Limited Proposed Development Belleoram Crushed Granite Rock Quarry

Environment Act Licence Loi sur I'environnement Licence

Magino Project Environmental Impact Statement. Technical Support Document Water Management Plan

Introduction- Category 9

Construction operations shall be conducted in a manner to provide DOT forces access to the Maintenance Yard on a continuous basis.

GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION

INTEGRATED MINE CLOSURE I

Chapter SURFACE MINING AND RECLAMATION

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS

Broken Hill Operations Pty Ltd Rasp Mine Preliminary Paper Zinc Lodes Project Approval Variation

CITY OF AUBURN STANDARD SPECIFICATIONS SECTION 13 EXCAVATION AND BACKFILL

Application for Gas Exploration and Production

Reclamation: Legislative / Regulatory Requirements

(B) "Facility," for the purposes of this rule, means:

Ledges East Master Owners Association. Architectural Guidelines for the Community-Wide Areas

REQUIRED INFORMATION Please check the following boxes that apply to your lot or parcel and complete the other requested information.

Introduction Category 15

AuRico Gold Provides Monthly Update on Young-Davidson Ore Processing Underway

Attachment 1 WORLD BANK ENVIRONMENT, HEALTH AND SAFETY GUIDELINES 1 MINING AND MILLING UNDERGROUND (INTERIM)

T S X : R M X N Y S E. M K T : R B Y. Rubicon Begins Stockpiling Mill Feed for Projected Production Commencing Mid-2015

Long-Hole Stope Evaluation. Operating procedures. Introduction. 1. Approach of the model. 2. Notification. 3. Worksheets

Kami Iron Ore Project Amendment to the Environmental Impact Statement APPENDICES

Box Elder County Land Use Management & Development Code Article 3: Zoning Districts

For 100 years private mining and refining

Details of the Proposed Action

INSTRUCTIONS FOR PREPARATION OF APPLICATION FORM FOR SURFACE MINING PERMIT AND/OR RECLAMATION PLAN

PERMIT AMENDMENT APPLICATION

Santoy 8 Satellite Mine at the Seabee Gold Mine. Technical Review Comments. on the. Environmental Impact Statement.

APPENDIX C MINING STUDY

APPENDIX A. This is a comprehensive map of the areas that will orient the. This map shows the cross-sectional Area A to B at which the

CARLTON COUNTY RENEWABLE ENERGY ORDINANCE #32

Revision Tailings Management Plan Minto Mine, YT

Bond Schedule for the Calculation of Bond Amounts on Noncoal Mining Operations

3D Modelling & Mine Planning Software. Comprehensive tools provide a competitive advantage from exploration to rehabilitation.

COMMON WORK RESULTS FOR EXISTING CONDITIONS SCHEDULES FOR EXISTING CONDITIONS

Permit Application: Soil Erosion and Sediment Control Program

PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES

Muskeg River Mine Dedicated Disposal Area (DDA) Plan for In-pit Cell 1

Introduction-Category 3

Implementation of this Special Provision requires a complete understanding of the following documents:

SANBORN COUNTY

Table Zone Permitted

Page 1 of 6 Permit No: MN R J. Mineral Mining and Dressing

R.H.J.North, P.Eng./P.Geo. Keystone Environmental Ltd Shellbridge Way Richmond, B.C. V6X 2W8

Environmental Impact Assessment (EIA)

PRELIMINARY DRAFT RULE LANGUAGE 8/28/2014 MNDNR SILICA SAND RECLAMATION Reclamation Plan Requirements

CONSTRUCTION AND DEMOLITION DEBRIS DISPOSAL SITE GUIDELINES

CONSTRUCTION SPECIFICATION FOR BORROW

T S X : R M X N Y S E. M K T : R B Y

Environmental Management Plan (EMP)

Self Assessment Questionnaire Inrushes and Subsidence Major Hazard Standard

Network utilities, subject to compliance with Part 6 (Infrastructure) A.3 Existing vegetation cover.

Ordinance No Lot Surface Drainage

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5B

Moving Forward, Together

IDM Mining Updates Pre-Development Engineering and Optimization at Red Mountain Gold Project

Introduction Category 1

MCDR INSPECTION REPORT S/ No. 1 Name of the Mine Navalutti Iron Ore Mine 2 Total Lease Area (Ha) with breakup of Non-forest & forest land

Harte Gold Provides Construction and Permitting Update

INFORMATION BULLETIN Bylaw No.2-Placement of Fill in the ALR

Borrow Pit and Quarry Management Procedure Environmental

REASSESSMENT OF THE FINANCIAL PROVISION FOR BLOEMHOF QUARRY, PARYS, FREE STATE PROVINCE

TECHNICAL CONTENT PROPOSED STEEP SLOPE REGULATION

Transcription:

GUIDELINES to the MINING ACT PART I Format Requirements Reports 1. All reports required to be submitted to the minister by the Mining Act or regulations shall (a) be bound in a folder; (b) be a typewritten original or a photocopy of same; (c) be on letter size paper; (d) include (i) a cover page, (ii) pages which are sequentially numbered, (iii) a summary, which includes the purpose of the report, (iv) the report body, (v) an appendix with any (A)drawings, (B) tables, (C) diamond drill hole data, (D) core logs, or (E) other information, data, or illustrations of the report required by the Mining Act and regulations. Drawings 2 (1) All engineering or geological plans, longitudinal sections or cross sections shall satisfy the requirements of the Mining Act and the regulations. (2) All drawings shall (a) be drawn to an appropriate scale;

(b) be in metric units; (c) have a title block which includes (i) the drawing title, (ii) the drawing number, (iii) the revision number if applicable, (iv) the date of the drawing, (v) the scale of the drawing, (vi) the drawing numbers for reference drawings; and (d) where appropriate have (i) an orientating grid, (ii) a north arrow, (iii) legends for symbols and/or codification used in the drawing, and (iv) a National Topographic Series map reference. Electronic format 3. (1) Where data, drawings or other information to be submitted to the minister has been collected in a digital format or transferred to a digital format, copies of the digital data shall be submitted in a format that is acceptable to the minister. (2) Electronic files shall be accompanied by a documentation file which shall include a list of all data files, their type, and their format. Part II Records Required Under Section 12 of the Mining Act Underground mines 4. Underground level plans and vertical mine sections shall show, where applicable, all (a) shafts; (b) access and haulage ramps; (c) main drifts and crosscuts; and (d) active stopes, mined out stopes, and backfilled stopes.

Open pits or quarries 5. W ith respect to an open pit or quarry, the level plans, longitudinal sections and cross sections shall show, where applicable, all (a) access and haulage ramps; (b) roadways; (c) berms, tree and vegetation screening; (d) overburden, top soil, and waste rock stockpiles; (e) the pit development plans and the ultimate pit developm ent plan based on current m ineable reserves; and (f) any other pertinent features in close proxim ity to the pit or quarry. Site boundary plan 6. A site boundary plan shall (a) show the entire area of the lease; and (b) outline all known mineral resources on the lease, projected to surface. Site plan 7. A site plan shall show in detail all areas of project activities. Surface plan 8. A surface plan shall show, where applicable, (a) all natural topographical features in the project watershed area, including (i) water bodies including lakes and streams, (ii) terrestrial features including hills, and forested areas; and (b) all man-made structures or features in the project area.

PART III Other Plans and Reports Development plan 9. (1) A development plan shall include (a) the surface plan as prescribed in section 8; (b) a geological description of the mineral resource or orebody including geological drawings that (i) show the geological sections and plans with all relevant diamond drill holes, collared from surface or from underground, and (ii) show the outline of the orebody with all relevant diamond drill holes, collared from surface or from underground; (c) a description of planned delineation and exploration drilling and other exploration work; (d) an ore reserve statement detailing the tonnages and grades by category including (i) definitions of each category, (ii) the economic cutoff grades used, (iii) the method of calculation, (iv) the plans and sections used in the calculations, and (v) the ore blocks shown on vertical longitudinal sections; (e) with respect to an underground mine, the underground mining plans as prescribed in section 4; (f) for an open pit or quarry the open-pit mining plans as prescribed in section 5; (g) the planned volume, tonnage and location of waste rock to be placed underground or to a surface area; (h) a description of the milling process that includes (i) the mill flow sheet, (ii) the mill feed rate, head grades, concentrate tonnages, metal recoveries, and tailings tonnages, (iii) a description of any arrangements for mill tailings to be reintroduced to the mine for backfill, consolidated or unconsolidated, with waste rock or without waste rock, and (iv) the milling method and expected operating life at the planned milling rate; (i) a description of concentrate handling; (j) a description of tailings disposal method and description of tailings impoundment area showing total volume available for disposal and anticipated active life of the area;

(k) a description of all operational effluent treatment methods; (l) a five year plan, showing annual production, which shall include; (i) the mine production tonnages and grades, (ii) the mill feed tonnages and grades, and (iii) the areas to be mined, and corresponding reduction in ore reserves, including plans and sections where required; (m) a listing, with costs and timing, of all major capital expenditures for the project; and (n) the planned number of employees for each department and for the total project during the operating period of the project. Operational plan 10. (1) The operational plan shall include (a) an ore reserve statement detailing the tonnages and grades by category including (i) definitions of each category, (ii) the economic cutoff grades used, and (iii) the method of calculation; (b) the planned diamond drilling for the year at the project; including exploration, delineation, in-filling, or other; (c) progressive rehabilitation work to be completed during the year with a schedule of work and cost estimates; (d) for an underground mine (i) the tonnage and grade of all ore to be mined, (ii) the tonnage of all waste to be mined, (iii) the development scheduled for the year showing metres of advance, and (iv) corresponding drawings to show the areas worked in (i), (ii) and (iii); (e) for an open pit or quarry (i) tonnage and grade of ore scheduled to be mined, (ii) the tonnage or volume of all waste rock scheduled to be mined, (iii) the tonnage or volume of overburden scheduled to be mined, and (iv) corresponding drawings to show the areas worked in (i), (ii) and (iii); (f) the tonnage and grades of ore to be milled with planned recoveries, and contained metals or metals produced; and

(g) the volume, tonnage, and location of tailings to be discharged. (2) The drilling under paragraph (1)(b) shall be shown on appropriate drawings including a description of exploration work, geochemical, geophysical, or other. (3) Progressive rehabilitation work referred to in paragraph (1)(c) shall conform in principle to the progressive rehabilitation outlined in the rehabilitation and closure plan submitted to the minister. Annual report on operations 11. (1) The operational plan shall conform with the annual report on operations of the lessee and the development plan submitted to the minister as required by the Act and regulations. (2) The annual operational report shall review all mining and milling activities at the project for the year and include (a) an ore reserve statement detailing the tonnages and grades by category including (i) definitions of each category, (ii) the economic cutoff grades used, and (iii) the method of calculation; (b) the diamond drilling completed during the year; exploration, delineation, in-filling, or other; (c) progressive rehabilitation work completed during the year with a schedule of the associated costs; (d) for an underground mine (i) the tonnage and grade of all ore mined, (ii) tonnage and grade of all waste rock mined, (iii) development for the year showing metres of advance, (iv) corresponding drawings to show the areas worked in subparagraphs (i), (ii) and (iii); (e) for an open pit or quarry (i) the tonnage and grade of ore mined during the year, (ii) the tonnage of all waste rock mined during the year, (iii) the tonnage of overburden removed during the year, (iv) corresponding drawings to show the areas worked in subparagraphs (i), (ii) and (iii); (f) the tonnage and grades of ore m illed with recoveries, and contained metals or metals produced; and (g) the volume, tonnage, and location of tailings discharged.

(3) The diamond drilling referred to in paragraph (2)(b) shall be shown on appropriate drawings and a description of exploration work, geochemical, geophysical, or other carried out during the year shall be included. (4) Progressive rehabilitation work referred to in paragraph (2)(c) com pleted shall conform in principle to the progressive rehabilitation outlined in the rehabilitation and closure plan submitted to the minister. Rehabilitation and closure plan 12.(1) A rehabilitation and closure plan shall include plans to, where appropriate, (a) rehabilitate all tailings impoundment areas; (b) rehabilitate all waste rock areas and ore stockpile areas; (c) remove from a site all surface pipelines and buried pipelines unless approval has been given by the minister for those pipelines to remain; (d) remove all power transmission lines, poles, substations, transformers, and associated electrical infrastructure unless approval has been given by the minister for that electrical infrastructure to remain; (e) remove all buildings, headframes, and other structures including their foundations unless approval has been given by the minister for those structures to remain; (f) backfill all shafts, raises, portals or stopes open to surface, and other underground openings to surface; (g) where backfilling under paragraph (f) is impractical, the openings shall be capped with reinforced concrete; (h) rehabilitate all open-pits or quarries, to the satisfaction of the minister, considering the following factors (i) the dimensions of the pit, (ii) nature of the rock, (iii) rock stability, (iv) surrounding topography, (v) surrounding land use, (vi) proximity to residential or recreational areas, (vii) the disposition of waste rock extracted from the open pit, and (viii) water elevations and ground water characteristics; (i) assess all surface and underground workings; (j) stockpile all overburden, till, and topsoil for use during progressive rehabilitation or final rehabilitation and closure,

(k) reclaim all roadways, airstrips, and other civil engineering works to the satisfaction of the minister, (l) remove all machinery, equipment, and storage tanks unless approval has been given by the minister for those items to remain, (m) rehabilitate all landfill sites and other waste management areas, and (n) complete any other work necessary for final rehabilitation and closure. (2) This assessment under paragraph (1)(i) shall determine the long-term stability of the surface and underground workings. Progressive Rehabilitation 13. (1) Progressive rehabilitation shall be laid out in a general schedule of work, with costs, for the estimated remaining life of the project. (2) Appropriate drawings shall accom pany the schedules referred to in subsection (1)where necessary. (3) Progressive rehabilitation may include, where appropriate, (a) re-vegetation of disturbed areas during project development and operations, re-vegetation of abandoned or filled mine waste areas including tailings impoundment areas; (b) removal and/or disposal of any obsolete structures and materials as per the approved final rehabilitation and closure plan; (c) backfilling of approved underground or surface excavations using mill tailings to reduce tailings impoundment areas; (d) methods to reduce or eliminate soil erosion and stabilization of the site which will facilitate re-vegetation and reclamation; and (e) placement of waste rock in the underground workings or open pits, or by covering the waste rock with till or topsoil and then re-vegetating in an acceptable manner. Small scale mines Part IV Small Scale Mines 14. (1) A mining operation shall be considered a small scale mine where that operation (a) excavates less than 20,000 cubic metres of ore, waste, and/or overburden per calendar year with a maximum amount of 100,000 cubic metres of ore, waste, and/or overburden being excavated from the original commencement of operations; or (b) disturbs less than 35,000 square metres of surface area during the life of the operation.

(2) Notwithstanding subsection (1), where a mining operation which is exempt from the Mining Act (a) excavates more than 100,000 cubic metres of ore, waste and/or overburden, or (b) disturbs more than 35,000 square metres of surface area, the operation will no longer be exempted from the Mining Act. (3) A lessee shall have three months, from the date of exceeding (a) the maximum volume excavated, or (b) the maximum area disturbed, to become in compliance with the Mining Act. (4) A project which has the potential to form acid mine water may not be exempted from the Mining Act. (5) A peat project may be exempted from the Mining Act.